03b. Basis of Estimate REPAIR NOSE DOCK 7.pdf

PDF 156 KB Posted

Attached to
Repair Nose Dock 7 B1232
Solicitation number
FTQW062467
Issued by

About this file

This is a 100% Design Basis of Estimate template for an Air Force construction project. The document is a blank form issued by AFCEC/COSC (Air Force Civil Engineer Center/Center of Standardization and Control) Version 2.0, dated 21 March 2025, designed to capture comprehensive cost estimation data for military construction projects at the programming phase.

The project under estimate is "Repair Nose Dock 7/" at Eielson Air Force Base, Alaska, with project number FTQW062467, planned for fiscal year 2027. The estimate is classified as a Class 1 Estimate at the Programming level. The form is structured to document project summary information including construction duration, milestones, temporary space requirements, facility specifications, and design standards compliance. Section 3 requires key assumptions documentation covering cost effects, schedule requirements, exclusions, exceptions, demolition scope, special systems, government-furnished equipment, and extraordinary items. Section 4 addresses estimation methodology and cost data sources, including area cost factors, various markup calculations (productivity, overtime, job office overhead, home office overhead, subcontractor overhead, and profit), bonding, risk factors, owner's contingency, escalation justification, and contracting method. The document currently contains only field headers and labels with no populated cost data or project-specific details filled in.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTQWXXXXXX, PROJECT TITLE 100% CWE

03/02/25 Page 1 of 3

OPR: AFCEC/COSC Ver 2.0 21 March 2025

100% DESIGN BASIS OF ESTIMATE

1. GENERAL

Project Title: Repair Nose Dock 7/

Project Number (ABCD NN-NNNN): FTQW FTQW062467

Project Location (Installation/State or Country): Eielson AFB, AK

Project Program Year (FY): FY27

Name/rank/role of persons in team writing the estimate:

Organization of person(s) writing the estimate:

Date of estimate (MMM-YY):

2. PROJECT SUMMARY

Time & Duration of Construction: Project Midpoint, Key Milestones:

Estimated Construction Start Date (MMM-YY):

Estimated Number of Months of Construction (MM):

Estimated Midpoint of Construction (MMM-YY):

Temporary or Swing Space Required – Gross Square Feet (GSF)/Gross Square Meters (GSM):

Not identified as needed.

Purpose & Class of Estimate/Level of Design planning (Planning, Programming, Pre-Award):

Class 1 Estimate/Programming

Scope:

Facility/building type/uses:

Category Codes:

Floor area – GSM/GSF (Horizontal facilities M/FT):

Height – Number of stories, M/FT:

Facility/Building Systems:

AT/FP considerations and elements:

1628743947A Highlight

03/02/25 Page 2 of 3

OPR: AFCEC/COSC Ver 2.0 21 March 2025

Cybersecurity:

Environmental mitigation & permits:

Extraordinary elements:

Deviations from AF standard design and/or Unified Facility Criteria corporate standards (list, narrative):

3. KEY ASSUMPTIONS

Effect on costs (summary):

Unusual schedule requirements:

Exclusions (identify what is not in the project but needed for complete work):

Exceptions (e.g., elements or features different from policy):

Demolition required:

Facility special systems, elements or items included/excluded:

Government-furnished, Contractor-installed equipment; Government-furnished, Government-installed equipment:

Extraordinary items:

4. DESCRIPTION OF ESTIMATE

Methods Used & Limitations Sources of Cost Data Used:

Area Cost Factor(s):

Productivity Markup:

Labor Premium Time (Overtime) Markup:

Prime Job Office Overhead (JOOH) Markup:

Prime Home Office Overhead (HOOH) Markup:

Sub JOOH Markup:

Profit:

03/02/25 Page 3 of 3

OPR: AFCEC/COSC Ver 2.0 21 March 2025

Bond:

Risk Factor:

Owner’s Contingency:

Changes/Markups to Default Data and Justifications:

Duration and Escalation (Justification):

Contracting Method: