FtBragg_SATOC_SPECS_RTA.pdf
PDF 2 MB Posted
- Attached to
- Single Award Task Order Contract (SATOC) for Construction at Fort Bragg, NC Federal contract opportunity
- Solicitation number
- W912PM20R0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PM20R0029-0001 FB SATOC.pdf | ||
| W912PM20R0029_SATOC for Construction_AMENDMENT0001_Conformed_SPECS.pdf | ||
| Attachment 3 Cover Sheet to W912PM20R0029.pdf | ||
| Attachment 1 to W912PM20R0029 - Experience Information Form.docx | DOCX document | |
| SF330-16f.pdf | ||
| Attachment 2 to W912PM20R0029.docx | DOCX document | |
| W912PM20R0029 FB SATOC RTA.pdf | ||
| Attachment 5 TO W912PM20R0029.docx | DOCX document | |
| Attachment 6 to W912PM20R0029.docx | DOCX document | |
| Attachment 4 to W912PM20R0029.pdf | ||
| Attachment 3 to W912PM20R0029_NAVFAC-USACE PPQ (fillable).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATOC f or Const r uct i on at For t Br agg, NC W912PM20R0029
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 73 00 SUPPLEMENTARY CONDI TI ONS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 02 STATEMENT OF WORK/ DESCRI PTI ON/ SPECI FI CATI ONS
01 00 04 DELI VERY ORDER PROCEDURES
01 00 60. 20 SOTF SECURI TY PROCEDURES GUI DE
01 00 60. 30 JSOC SECURI TY PROCEDURES GUI DE
01 00 60. 40 USASOC SECURI TY PROCEDURES GUI DE
01 14 00. 20 WORK RESTRI CTI ONS - FORT BRAGG SOF
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
SECTI ON TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
DOCUMENT 00 73 00
SUPPLEMENTARY CONDI TI ONS
01/13
PART 1 GENERAL
1. 1 ( S- 102) CONTRACTOR SUPPLY and USE OF ELECTRONI C SOFTWARE FOR PROCESSI NG DAVI S- BACON ACT CERTI FI ED LABOR PAYROLLS ( Apr i l 2011)
1. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( MAR 1995)
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
DOCUMENT 00 73 00 Page 1
DOCUMENT 00 73 00
SUPPLEMENTARY CONDI TI ONS
01/13
PART 1 GENERAL
1. 1 ( S- 102) CONTRACTOR SUPPLY and USE OF ELECTRONI C SOFTWARE FOR PROCESSI NG DAVI S- BACON ACT CERTI FI ED LABOR PAYROLLS ( Apr i l 2011)
The cont r act or i s encour aged t o use a commer ci al l y- avai l abl e el ect r oni c syst em t o pr ocess and submi t cer t i f i ed payr ol l s el ect r oni cal l y t o t he Gover nment . The r equi r ement s f or pr epar i ng, pr ocessi ng and pr ovi di ng cer t i f i ed l abor payr ol l s ar e est abl i shed by t he Davi s- Bacon Act as st at ed i n FAR 52. 222- 8, PAYROLLS AND BASI C RECORDS and FAR 52. 222- 13, COMPLI ANCE
WI TH DAVI S- BACON AND RELATED ACT REGULATI ONS.
I f t he cont r act or el ect s t o use an el ect r oni c Davi s- Bacon payr ol l pr ocessi ng syst em, t hen t he cont r act or shal l be r esponsi bl e f or obt ai ni ng and pr ovi di ng f or al l access, l i censes, and ot her ser vi ces r equi r ed t o pr ovi de f or r ecei pt , pr ocessi ng, cer t i f y i ng, el ect r oni cal l y t r ansmi t t i ng t o t he Gover nment , and st or i ng weekl y payr ol l s and ot her dat a r equi r ed f or t he cont r act or t o compl y wi t h Davi s- Bacon and r el at ed Act r egul at i ons.
When t he cont r act or uses an el ect r oni c Davi s- Bacon payr ol l syst em, t he el ect r oni c payr ol l ser vi ce shal l be used by t he cont r act or t o pr epar e, pr ocess, and mai nt ai n t he r el evant payr ol l s and basi c r ecor ds dur i ng al l wor k under t hi s const r uct i on cont r act and t he el ect r oni c payr ol l ser vi ce shal l be capabl e of pr eser vi ng t hese payr ol l s and r el at ed basi c r ecor ds f or t he r equi r ed 3 year s af t er cont r act compl et i on. I f t he cont r act or chooses t o use an el ect r oni c Davi s- Bacon payr ol l syst em, t hen t he cont r act or shal l obt ai n and pr ovi de el ect r oni c syst em access t o t he Gover nment , as r equi r ed t o compl y wi t h t he Davi s- Bacon and r el at ed Act r egul at i ons over t he dur at i on of t hi s const r uct i on cont r act . The access shal l i ncl ude el ect r oni c r evi ew access by t he Gover nment cont r act admi ni st r at i on of f i ce t o t he el ect r oni c payr ol l pr ocessi ng syst em used by t he cont r act or .
The cont r act or ' s pr ovi s i on and use of an el ect r oni c payr ol l pr ocessi ng syst em shal l meet t he f ol l owi ng basi c f unct i onal cr i t er i a: commer ci al l y avai l abl e; compl i ant wi t h appr opr i at e Davi s Bacon Act payr ol l pr ovi s i ons i n t he FAR; abl e t o accommodat e t he r equi r ed number s of empl oyees and subcont r act or s pl anned t o be empl oyed under t he cont r act ; capabl e of pr oduci ng an Excel spr eadsheet - compat i bl e el ect r oni c out put of weekl y payr ol l r ecor ds ( f or mat at ht t p: / / www. r mssuppor t . com/ gui des. aspx) f or expor t i n an Excel spr eadsheet t o be i mpor t ed i nt o t he cont r act or ' s Qual i t y Cont r ol Syst em ( QCS) ver si on of Resi dent Management Syst em ( RMS) , t hat i n t ur n shal l expor t payr ol l dat a t o t he Gover nment ' s Resi dent Management Syst em ( RMS) ; demonst r at ed secur i t y of dat a and dat a ent r y r i ght s; abi l i t y t o pr oduce cont r act or - cer t i f i ed el ect r oni c ver si ons of weekl y payr ol l dat a; abi l i t y t o i dent i f y er r oneous ent r i es and t r ack t he dat a/ t i me of al l ver si ons of t he cer t i f i ed Davi s Bacon payr ol l s submi t t ed t o t he gover nment over t he l i f e of t he cont r act ; capabl e of gener at i ng a dur abl e r ecor d copy, t hat i s , a CD or DVD and PDF f i l e r ecor d of dat a f r om t he syst em dat abase at end of t he cont r act c l oseout . Thi s dur abl e r ecor d copy of dat a f r om t he el ect r oni c Davi s- Bacon payr ol l pr ocessi ng syst em shal l be pr ovi ded t o t he Gover nment dur i ng cont r act c l oseout .
DOCUMENT 00 73 00 Page 2
Al l cont r act or - i ncur r ed cost s r el at ed t o t he cont r act or ' s pr ovi s i on and use of an el ect r oni c payr ol l pr ocessi ng ser vi ce shal l be i ncl uded i n t he cont r act or ' s pr i ce f or t he over al l wor k under t he cont r act . The cost s f or Davi s- Bacon Act compl i ance usi ng el ect r oni c payr ol l pr ocessi ng ser vi ces shal l not be a separ at el y bi d/ pr oposed or r ei mbur sed i t em under t hi s contract.
( End of speci al cont r act r equi r ement )
1. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( MAR 1995)
a) Thi s speci al cont r act r equi r ement does not appl y t o t er mi nat i ons. See
52. 249- 5000, Basi s f or Set t l ement of Pr oposal s, and FAR Par t 49.
b) Al l owabl e cost f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of EP 1110- 1- 8, Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e, Regi on I I I . Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.
c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR 31. 105( d) ( i i ) and FAR 31. 205- 36, Rent al Cost s. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.
d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he SAT, t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e. The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .
( End of speci al cont r act r equi r ement )
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Document - -
DOCUMENT 00 73 00 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 00 02
STATEMENT OF WORK/ DESCRI PTI ON/ SPECI FI CATI ONS
12/14
PART 1 GENERAL
1. 1 REFERENCES
1. 2 DESCRI PTI ON
1. 2. 1 Del i ver y Or der s
1. 2. 2 Pr i ces
1. 2. 3 Gener al and Speci al Pr ovi s i ons
1. 2. 4 Types of Const r uct i on
1. 3 SCOPE OF WORK
1. 3. 1 Commencement of Wor k
1. 3. 2 Per f or mance of Wor k by Cont r act or
1. 4 TECHNI CAL SPECI FI CATI ONS
1. 5 REGULATI ONS
1. 6 MATERI ALS FOR DESI GN
1. 6. 1 Dr awi ngs
1. 6. 1. 1 As- Bui l t Dr awi ngs
1. 6. 1. 2 Locat i ons
1. 7 STANDARD PRODUCTS
1. 8 EQUI PMENT/ SUPPLI ES
1. 8. 1 El ect r oni c For mat
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 LOCATI ON OF STAFF
3. 1. 1 For t Br agg
3. 2 QUALI TY CONTROL
3. 3 ENVI RONMENTAL PROTECTI ON
3. 4 SI TE SECURI TY
3. 5 PUBLI C AFFAI RS
3. 6 SAFETY
3. 6. 1 Compl i ance
3. 6. 2 Per sonal Saf et y
3. 6. 3 Speci al Saf et y Requi r ement s
3. 7 PRESERVI NG HI STORI CAL AND ARCHAEOLOGI CAL FI NDS
3. 8 APPLI CATI ON OF WAGE RATES AND FRI NGE BENEFI TS
3. 9 PARTNERI NG
3. 10 CONTRACTOR MANPOWER REPORT ( CMR)
SECTI ON 01 00 02 Page 1
SECTI ON 01 00 02
STATEMENT OF WORK/ DESCRI PTI ON/ SPECI FI CATI ONS
12/14
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 241 ( 2019) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Operations
1. 2 DESCRIPTION
Al l wor k shal l be i n conf or mance wi t h t he r equi r ement s of t he cont r act i ncl udi ng, but not l i mi t ed t o, f ur ni shi ng al l mat er i al s, l abor , pl ant , t ool s, equi pment , t r anspor t at i on, super vi s i on, management , and ot her ser vi ces ( i ncl udi ng engi neer i ng/ t echni cal desi gn suppor t ) , i t ems, and i nci dent al s necessar y f or t he successf ul compl et i on of each i ssued del i ver y or der . The cont r act i s a f i r m f i xed pr i ce, I ndef i ni t e Del i ver y, I ndef i ni t e Quant i t y ( I DI Q) f or Si ngl e Awar d Task Or der Cont r act ( SATOC) .
The cont r act consi st s of f our maj or el ement s as f ol l ows:
1. 2. 1 Del i ver y Or der s
Det ai l ed del i ver y or der s speci f i cat i ons encompassi ng most aspect s of Publ i c Wor ks r esponsi bi l i t i es
1. 2. 2 Prices
Uni t s of measur e and cor r espondi ng pr i ces f or each of t he speci f i cat i ons and del i ver y or der .
1. 2. 3 Gener al and Speci al Pr ovi s i ons
No monet ar y amount shal l be obl i gat ed by t he awar d of t he cont r act .
Monet ar y amount s ar e obl i gat ed by t he i ssuance of del i ver y or der s onl y.
1. 2. 4 Types of Const r uct i on
Thi s cont r act i s f or Gener al Const r uct i on and Desi gn/ Bui l d Const r uct i on for Sust ai nment , Rest or at i on, and Moder ni zat i on ( SRM) pr oj ect s on For t Br agg. The t ype of const r uct i on may consi st of but not be l i mi t ed t o:
SECTI ON 01 00 02 Page 2
New const r uct i on, r ehabi l i t at i on, r enovat i on and r epai r of bui l di ngs, bui l di ng addi t i ons, pr e- engi neer ed bui l di ngs and ot her st r uct ur es ( e. g. open bay pr e- engi neer ed, st or age f aci l i t i es, t r ai ni ng r anges, et c. ) . Bui l di ng r enovat i ons t o i ncl ude: f l oor s, cei l i ngs, wal l s, wi ndows, door s, pai nt i ng, el ect r i cal & mechani cal upgr ades, et c. , f ur ni t ur e i nci dent al t o const r uct i on ( e. g. wor kst at i ons) , l ead, asbest os and mol d r emedi at i on, i nt er i or and/ or ext er i or pai nt i ng of new and exi st i ng f aci l i t i es, and wor k i nci dent al t o sur f ace det er i or at i on ( e. g. pat chi ng dr ywal l , r epl aci ng si di ng, t r i m wor k, et c) . Desi gn and const r uct i on of t he f ol l owi ng t ypes of f aci l i t i es or t hei r equi val ent or s i mi l ar commer ci al or i nst i t ut i onal t ypes may i ncl ude but not be l i mi t ed t o: Admi ni st r at i ve & Of f i ce Bui l di ngs, Recr eat i onal & St or age Faci l i t i es, Vehi c l e Mai nt enance Faci l i t i es, and Warehouses.
Rehabi l i t at i on, mai nt enance or r epai r of el ect r i cal syst ems ( condui t , wi r e, br eaker s, panel s, t r ansf or mer s, emer gency gener at or s, i nt er i or / ext er i or hi gh and l ow vol t age el ect r i cal power l i nes, i nt er i or / ext er i or l i ght s, emer gency shut of f s, l i ght i ng pr ot ect i on, etc.).
Rehabi l i t at i on, mai nt enance or r epai r of mechani cal syst ems ( HVAC i nst r ument at i on & cont r ol s, HVAC cont r ol syst ems, commi ssi oni ng, decommi ssi oni ng, r et r o- commi ssi oni ng, t ot al bui l di ng commi ssi oni ng, gas l i nes, var i abl e f r equency cont r ol s on HVAC syst ems, et c. ) .
Rehabi l i t at i on, mai nt enance or r epai r of pl umbi ng syst ems ( sani t ar y sewer , domest i c wat er l i nes, backf l ow pr event er s, pumps, wat er cool er s, et c. ) , f i r e suppr essi on syst ems ( f i r e al ar m syst ems, spr i nkl er syst em, et c. ) .
Rehabi l i t at i on, mai nt enance or r epai r of i nt er i or and ext er i or ut i l i t y syst ems and l i nes. Wor k may i ncl ude but not be l i mi t ed t o t he f ol l owi ng: New const r uct i on, r ehabi l i t at i on or r epai r ser vi ces i ncl udi ng el ect r i cal wor k. I nt er i or and ext er i or hi gh and l ow vol t age el ect r i cal l i nes, communi cat i on l i nes, ( t el ephone & dat a l i nes) , communi cat i on syst ems, secur i t y & secur i t y camer a syst ems and cabl i ng. Nat ur al gas, wat er , st or m sewer , sani t ar y sewer and pr opane gas l i nes. Desi gn, i nst al l at i on, and t est i ng of new and exi st i ng emer gency gener at or syst ems, aut omat i c t r ansf er swi t ches, and emer gency power connect i ons i nt o exi st i ng el ect r i cal syst ems.
Rehabi l i t at i on, mai nt enance or r epai r of r oof and r oof i ng syst ems.
Wor k wi l l i ncl ude gut t er s, downspout s, f l ashi ng, f asci a and sof f i t s.
I nci dent al damage ( e. g. cei l i ng r epl acement , pai nt i ng and car pet c l eani ng) as a r esul t of r oof l eaks.
Renovat i on, r epai r s and/ or upgr ades of st r eet s, concr et e apr ons & pads, s i dewal ks, decor at i ve paver s, l andscapi ng & i r r i gat i ons syst ems, seedi ng/ soddi ng, par ki ng l ot s, t r af f i c l i nes/ mar ki ngs/ si gns.
Wor k can al so i ncl ude t he f ol l owi ng, but not be l i mi t ed t o: s i t e pr epar at i on, ear t hwor k, gr adi ng, excavat i on & f i l l i ng, c l ear i ng & gr ubbi ng, sur veyi ng, st or m wat er management , st or m dr ai nage syst ems and er osi on cont r ol .
The Cont r act or shal l be r esponsi bl e f or obt ai ni ng per mi t s r equi r ed f or wor k under each t ask or der as r equi r ed i n Sect i on 01 57 19 TEMPORARY
SECTI ON 01 00 02 Page 3
ENVI RONMENTAL CONTROLS, par agr aph ENVI RONMENTAL PERMI TS AND
COMMITMENTS.
Wor k i nci dent al t o t he t asks per f or med i n any of t he above par agr aphs shal l be i ncl uded, but i s not l i mi t ed t o demol i t i on, car pent r y, l i ght i ng, and si mi l ar mi nor el ect r i cal wor k t hat may be r equi r ed t o pr ovi de a compl et e, saf e and usabl e f aci l i t y dur i ng and af t er t he cour se of r oof i ng, mechani cal , pl umbi ng or pai nt i ng ser vi ces.
a. Damage such as cei l i ng r epl acement , pai nt i ng and car pet c l eani ng as a r esul t of r oof l eaks.
b. Lead, asbest os and mol d r emedi at i on wor k i nci dent al t o r enovat i on work.
c. Sur f ace det er i or at i on i nci dent al t o i nt er i or / ext er i or r epai r s such as pat chi ng dr ywal l , r epl aci ng si di ng, t r i m wor k, et c.
d. Rel ocat i ng f ur ni t ur e, wor kst at i ons, et c. i nci dent al t o const r uct i on.
e. Test i ng, r epor t s and sur veys associ at ed wi t h r enovat i on, r epai r s and/ or upgr ades and addi t i ons t o bui l di ngs ( i ncl udi ng l ead and asbest os) , st r uct ur es, and r oads.
1. 3 SCOPE OF WORK
1. 3. 1 Commencement of Wor k
Wi t hi n t hi r t y ( 30) cal endar days af t er cont r act awar d, t he Cont r act or shal l be f ul l y oper at i onal and capabl e of r espondi ng t o r equi r ement s f or pr oposal s. Wi t hi n t hi r t y ( 30) cal endar days af t er cont r act awar d, t he Cont r act or shal l be capabl e of per f or mi ng wor k on del i ver y or der s.
Cont r act or shal l schedul e al l wor k t o i ncl ude subcont r act wor k i n a manner t hat mi ni mi zes downt i me at each pr oj ect s i t e. At no t i me shal l a const r uct i on pr oj ect be abandoned unl ess appr oved by t he Cont r act i ng Of f i cer or hi s/ her aut hor i zed r epr esent at i ve.
Wi t hi n one ( 1) cal endar day af t er commencement of wor k under t hi s cont r act , t he Cont r act or shal l pr ovi de at t he j ob s i t e a weat her pr oof , gl ass- cover ed bul l et i n boar d f or di spl ayi ng t he Fai r Empl oyment post er , wage r at es, post er s and saf et y bul l et i ns as not ed i n Sect i on 01 35 26, par agr aph DI SPLAY OF SAFETY I NFORMATI ON. The bul l et i n boar d shal l be l ocat ed i n a conspi cuous pl ace, easi l y accessi bl e t o al l empl oyees, and l egi bl e copi es of t he af or ement i oned dat a shal l be di spl ayed unt i l wor k under t he cont r act i s compl et e. No di r ect payment wi l l be made f or t he bul l et i n boar d.
1. 3. 2 Per f or mance of Wor k by Cont r act or
The Cont r act or shal l mai nt ai n an or gani zat i onal char t showi ng t he t ot al or gani zat i on, onsi t e st af f , and engi neer i ng suppor t t eam. The onsi t e st af f shal l i ncl ude a s i t e super i nt endent and t he qual i t y cont r ol / s i t e saf et y heal t h of f i cer . A f i nal or gani zat i onal char t shal l be pr ovi ded t o t he Gover nment at t he st ar t of t he cont r act , or af t er per sonnel changes.
The or gani zat i on char t shal l pr ovi de c l ear , l ogi cal l i nes of aut hor i t y f r om Pr ogr am Manager t o subcont r act i ng management , demonst r at i ng t echni cal suf f i c i ency, i ncl udi ng si t e super i nt endent s and
SECTI ON 01 00 02 Page 4 qual i t y cont r ol .
The Cont r act or shal l pr ovi de a posi t i on descr i pt i on of t he onsi t e st af f .
Thi s shal l i ncl ude a br i ef j ob descr i pt i on, qual i f i cat i ons, r esponsi bi l i t i es and deci s i on maki ng aut hor i t y of each member .
The Cont r act or shal l pr ovi de an onsi t e super i nt endent and CQCSM. The super i nt endent and CQCSM must pr ovi de on- si t e deci s i on maki ng aut hor i t y.
1. 4 TECHNI CAL SPECI FI CATI ONS
The SATOC Techni cal Speci f i cat i ons shal l be t he Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) . The Techni cal Speci f i cat i ons ar e t o be done i n SpecsI nt act f or mat . The Desi gner of Recor d ( DOR) shal l i ncl ude as a mi ni mum Di vi s i on 01 Gener al Requi r ement s speci f i cat i on sect i ons l i s t ed bel ow. UFGS Gui de Speci f i cat i ons wi l l be edi t ed as appl i cabl e by t he Desi gner of Recor d dur i ng desi gn as r equi r ed t o conf or m t o t he pr oj ect , i nst al l at i on r equi r ement s and Del i ver y Or der .
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 60. 20 SOTF SECURI TY PROCEDURES GUI DE
01 00 60. 30 JSOC SECURI TY PROCEDURES GUI DE
01 00 60. 40 USASOC SECURI TY PROCEDURES GUI DE
01 14 00. 20 WORK RESTRI CTI ONS - FORT BRAGG SOF
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 33 16. 00 10 DESI GN DATA ( DESI GN AFTER AWARD)
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
1. 5 REGULATIONS
The Cont r act or shal l compl y wi t h al l appl i cabl e Feder al , St at e, l ocal and Ar my r egul at i ons, i ncl udi ng suppl ement s per t ai ni ng t o saf et y, t r af f i c cont r ol , and f i r e pr event i on.
The wor k under t he del i ver y or der s shal l be desi gned i n accor dance wi t h t he desi gn and const r uct i on st andar ds cont ai ned i n Nat i onal Fi r e Pr ot ect i on Code, Nat i onal El ect r i cal Code, Nat i onal Pl umbi ng Code, Ar chi t ect ur al Bar r i er s Act , Uni f i ed Faci l i t i es Cr i t er i a ( UFC) ; and ot her appl i cabl e Depar t ment of Def ense ( DOD) and Ar my r egul at i ons, f eder al r egul at i ons, St at e of Nor t h Car ol i na r egul at i ons, manual s, engi neer i ng t echni cal l et t er s, ener gy conser vat i on cr i t er i a, Fort Br agg speci f i c pol i c i es, and t he EM 385- 1- 1 USACE Saf et y Manual ( l at est ver si on) .
The Gover nment wi l l not f ur ni sh t he Cont r act or r ef er ence mat er i al s, codes, r egul at i ons, or gui de speci f i cat i ons. These may be acqui r ed f r om t he Gover nment Pr i nt i ng Of f i ce or f r om ot her f eder al agenci es.
The l at est edi t i on of t he f ol l owi ng Bui l di ng Codes shal l be used and mai nt ai ned f or al l const r uct i on under t hi s cont r act .
SECTI ON 01 00 02 Page 5
Uni f or m Bui l di ng Code Uni f or m Mechani cal Code Uni f or m Pl umbi ng Code Nat i onal El ect r i cal Code Li f e Suppor t Code - 101 Nat i onal Fi r e Code Nat i onal El ect r i cal Saf et y Code
The Cont r act or shal l have a copy of each of t hese document s avai l abl e f or use dur i ng t he t er m of t hi s cont r act .
I f t her e i s a conf l i c t bet ween t hese codes, r egul at i ons, and speci f i cat i ons, t he most st r i ngent r equi r ement s shal l appl y at al l t i mes.
Al l desi gns per f or med under t hi s cont r act shal l consi der empl oyi ng gr een pr i nci pl es est abl i shed by t he Gr een Bui l di ng Cer t i f i cat e I nst i t ut e.
Addi t i onal l y, t he cont r act or shal l mai nt ai n accr edi t at i on Leader shi p i n Ener gy and Envi r onment al Desi gn ( LEED) t hr oughout t he dur at i on of t hi s cont r act .
1. 6 MATERI ALS FOR DESI GN
1. 6. 1 Drawings
The Gover nment wi l l f ur ni sh copi es of avai l abl e as- bui l t dr awi ngs whi ch ar e per t i nent t o t he f aci l i t y / ar ea i nvol ved i n t he St at ement of Wor k t o t he Cont r act i ng Of f i cer or hi s/ her aut hor i zed r epr esent at i ve who, i n t ur n wi l l pr ovi de t hem t o t he Cont r act or .
1. 6. 1. 1 As- Bui l t Dr awi ngs
The Gover nment does not guar ant ee t he accur acy or adequacy of t he avai l abl e as- bui l t dr awi ngs. The Cont r act or shal l ver i f y, by f i el d i nvest i gat i on, al l condi t i ons and i nf or mat i on r el evant t o t he pr oj ect , i ncl udi ng di mensi ons, pr i or t o t he i ssuance of each del i ver y or der . Thi s conf i r mat i on of accur acy shal l enhance t he qual i t y of t he del i ver y or der ' s desi gn. The Cont r act or shal l advi se t he Cont r act i ng Of f i cer , or hi s/ her aut hor i zed r epr esent at i ve, i n wr i t i ng of any di scr epanci es pr i or t o submi t t i ng t he pr oposal . Fai l ur e t o ver i f y t he di mensi ons and l ocat i ons shal l be at t he Cont r act or ' s r i sk and shal l not r el i eve t he Cont r act or f r om accompl i shi ng t he wor k r equi r ed by t he cont r act at t he pr i ce awar ded by t he Gover nment .
1. 6. 1. 2 Locations
Wher e exact l ocat i ons ar e not gi ven i n t he St at ement of Wor k f or t he posi t i oni ng of equi pment , devi ces, and wor k, t hey shal l be posi t i oned t o per mi t easy access f or mai nt enance and f or r emoval and r epl acement of component par t s. The Cont r act or i s r esponsi bl e f or t he coor di nat i on and pr oper r el at i on of t he wor k wi t h t he exi st i ng sur r oundi ngs.
1. 7 STANDARD PRODUCTS
Mat er i al s and equi pment shal l be st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of such pr oduct s, whi ch ar e of a s i mi l ar mat er i al , desi gn, and wor kmanshi p. The st andar d pr oduct s shal l have been i n sat i sf act or y commer ci al and/ or i ndust r i al use f or t wo ( 2) year s pr i or t o use. The 2- year use shal l i ncl ude appl i cat i ons of
SECTI ON 01 00 02 Page 6 equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze.
The 2- year s of use must be sat i sf act or i l y compl et ed by a pr oduct whi ch has been sol d or i s of f er ed f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es. Pr oduct s havi ng l ess t han a 2- year f i el d ser vi ce r ecor d wi l l be accept abl e, i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on, f or not l ess t han 6, 000 hour s excl usi ve of t he manuf act ur er ' s f act or y or l abor at or y t est s, can be shown. The Cont r act or shal l not pur chase " c l ose- out " pr oduct s t hat ar e bei ng di scont i nued by t he manuf act ur er .
1. 8 EQUIPMENT/SUPPLIES
The Cont r act or awar ded t hi s cont r act shal l be r equi r ed t o pr ovi de t o t he Gover nment and t o mai nt ai n t he f ol l owi ng equi pment and pr ogr ams at t he Cont r act or ' s expense:
1. 8. 1 El ect r oni c For mat
Al l el ect r oni c cor r espondence of i nf or mat i on out si de of e- mai l shal l be done i n Mi cr osof t Of f i ce Wor d, or Mi cr osof t Excel , or Adobe.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
3. 1 LOCATI ON OF STAFF
3. 1. 1 Fort Br agg
See Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS f or of f i ce space r equi r ement s.
3. 2 QUALI TY CONTROL
See Sect i ons 01 45 00. 00 10 QUALI TY CONTROL and 01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) , whi ch pr ovi de speci f i c r equi r ement s f or qual i t y cont r ol .
3. 3 ENVI RONMENTAL PROTECTI ON
The Cont r act or shal l per f or m al l wor k i n such a manner as t o mi ni mi ze t he pol l ut i on of ai r , wat er , or l and and t o cont r ol noi se and dust wi t hi n r easonabl e l i mi t s and i n accor dance wi t h al l appl i cabl e U. S. and l ocal Gover nment envi r onment al l aws, r egul at i ons and pr ogr ams of i nst al l at i ons t hat r el at e t o t he per f or mance of t hi s cont r act or i ndi v i dual Task Or der s.
Wher e t her e i s conf l i c t bet ween U. S. and l ocal l aw, t he r equi r ement s mor e pr ot ect i ve of t he envi r onment wi l l be used. I n no case wi l l t he r equi r ement be l ess st r i ngent t han t hose r equi r ed by U. S. l aw and regulation.
3. 4 SI TE SECURI TY
The Cont r act or shal l pr ovi de si t e secur i t y ( f enci ng, l i ght i ng, or guar d ser vi ce) as r equi r ed by each Task Or der . However , at a mi ni mum, t he Cont r act or shal l mai nt ai n t he s i t e and al l ot her Cont r act or cont r ol l ed
SECTI ON 01 00 02 Page 7 ar eas i n such manner as t o mi ni mi ze t he r i sk of t hef t , vandal i sm, i nj ur y, or acci dent . The Cont r act or shal l compl y wi t h s i t e secur i t y r egul at i ons.
3. 5 PUBLI C AFFAI RS
The Cont r act or shal l not publ i c l y di scl ose any dat a gener at ed or r evi ewed under t hi s cont r act . The Cont r act or shal l r ef er al l r equest s f or i nf or mat i on concer ni ng si t e condi t i ons t o t he Cont r act i ng Of f i cer , or hi s/ her desi gnat ed r epr esent at i ve f or comment .
3. 6 SAFETY
3. 6. 1 Compliance
Compl i ance wi t h t he cur r ent U. S. Ar my Cor ps of Engi neer s " Saf et y and Heal t h Requi r ement s Manual " , ( EM 385- 1- 1) ; Occupat i onal Saf et y and Heal t h Act ( OSHA) st andar ds, and cur r ent Fort Br agg saf et y r egul at i ons i s mandat or y. The pr i me Cont r act or shal l be hel d r esponsi bl e t o i nsur e t hat hi s/ her wor kf or ce and any subcont r act or or suppl i er wor kf or ce compl y wi t h t he above saf et y r equi r ement s.
3. 6. 2 Per sonal Saf et y
Adequat e pr ot ect i on of al l per sons ( r egar dl ess of who t hey ar e empl oyed wi t h) shal l be pr ovi ded at al l t i mes. Wor k shal l pr oceed i n a manner t o pr event hazar d.
3. 6. 3 Speci al Saf et y Requi r ement s
The Cont r act or shal l compl y wi t h Ar my and l ocal f i r e r egul at i ons and NFPA 241 " ( 2019) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons. " Fi r e ext i ngui sher s r at ed and appr oved by t he Nat i onal Fi r e Pr ot ect i on Associ at i on, of suf f i c i ent s i ze, t ype, and quant i t y t o cope wi t h al l known hazar ds, shal l be pr ovi ded by t he Cont r act or at t he const r uct i on s i t e dur i ng t he execut i on of t hi s cont r act ;
t he ext i ngui sher s shal l be r emoved upon accept ance of t he pr oj ect .
3. 7 PRESERVI NG HI STORI CAL AND ARCHAEOLOGI CAL FI NDS
Al l i t ems havi ng any appar ent hi st or i cal or ar chaeol ogi cal i nt er est s whi ch ar e di scover ed i n t he cour se of any const r uct i on act i v i t i es shal l be car ef ul l y pr eser ved. The Cont r act or shal l l eave t he ar chaeol ogi cal f i nd undi st ur bed and shal l i mmedi at el y r epor t t he f i nd t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve so t hat t he pr oper aut hor i t i es may be not i f i ed. Ref er t o Sect i on 01 57 20. 00 10 ENVI RONMENTAL PROTECTI ON f or addi t i onal det ai l s.
3. 8 APPLI CATI ON OF WAGE RATES AND FRI NGE BENEFI TS
For t he appl i cat i on of t he wage r at es and f r i nge benef i t s cont ai ned i n t he Deci s i on of t he Secr et ar y of Labor ; at t ached t o and a par t of t hi s cont r act , al l wor k shal l be consi der ed Heavy and Hi ghway Const r uct i on, Bui l di ng Const r uct i on, or Resi dent i al and t he speci f i c wage det er mi nat i on wi l l be i dent i f i ed on each i ndi v i dual del i ver y or der .
3. 9 PARTNERING
The Gover nment i nt ends t o encour age t he f or mat i on of a cohesi ve
SECTI ON 01 00 02 Page 8 par t ner shi p wi t h t he Cont r act or . Thi s par t ner shi p wi l l be st r uct ur ed t o dr aw on t he st r engt hs of each or gani zat i on t o i dent i f y and achi eve r eci pr ocal goal s. The obj ect i ve i s ef f ect i ve cont r act per f or mance i n achi evi ng compl et i on wi t hi n budget , on schedul e and i n accor dance wi t h pl ans and speci f i cat i ons. Thi s par t ner shi p bet ween t he Cont r act or and t he Gover nment wi l l be vol unt ar y and i t s i mpl ement at i on wi l l not be par t of t he cont r act r equi r ement s nor wi l l i t r esul t i n a change t o cont r act pr i ce or t er ms.
3. 10 CONTRACTOR MANPOWER REPORT ( CMR)
The Of f i ce of t he Assi st ant Secr et ar y of t he Ar my ( Manpower & Reser ve Af f ai r s) oper at es and mai nt ai ns a secur e Ar my dat a col l ect i on s i t e wher e t he cont r act or wi l l r epor t ALL cont r act or manpower ( i ncl udi ng subcont r act or manpower ) r equi r ed f or per f or mance of t hi s cont r act . The cont r act or i s r equi r ed t o compl et el y f i l l i n al l t he i nf or mat i on i n t he f or mat usi ng t he f ol l owi ng web addr ess: ht t ps: / / www.ecmra.army.mil
The r equi r ed i nf or mat i on i ncl udes:
( 1) Cont r act i ng Of f i ce, Cont r act i ng Of f i cer , Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve;
( 2) Cont r act number , i ncl udi ng t ask and del i ver y or der number ;
( 3) Begi nni ng and endi ng dat es cover ed by r epor t i ng per i od;
( 4) Cont r act or name, addr ess, phone number , e- mai l addr ess, i dent i t y of cont r act or empl oyee ent er i ng dat a;
( 5) Est i mat ed di r ect l abor hour s ( i ncl udi ng sub- cont r act or ) ;
( 6) Est i mat ed di r ect l abor dol l ar s pai d t hi s r epor t i ng per i od ( i ncl udi ng sub- cont r act or ) ;
( 7) Tot al payment s ( i ncl udi ng subcont r act or ) ;
( 8) Pr edomi nant Feder al Ser vi ce Code ( FSC) r ef l ect i ng ser vi ces pr ovi ded by cont r act or ( and separ at e pr edomi nant FSC f or each sub- cont r act or i f di f f er ent ) ;
( 9) Or gani zat i onal t i t l e associ at ed wi t h t he Uni t I dent i f i cat i on Code ( UI C) f or t he Ar my Requi r i ng Act i v i t y ( t he Ar my Requi r i ng Act i v i t y i s r esponsi bl e f or pr ovi di ng t he cont r act or wi t h i t s UI C f or t he pur poses of r epor t i ng t hi s i nf or mat i on) ;
( 10) Locat i ons wher e cont r act or and sub- cont r act or s per f or m t he wor k ( speci f i ed by z i p code i n t he Uni t ed St at es and near est Ci t y, Count r y, when i n an over seas l ocat i on, usi ng st andar di zed nomencl at ur e pr ovi ded on websi t e) ;
( 11) Pr esence of depl oyment or cont i ngency cont r act l anguage, and, ( 12) Number of cont r act or and sub- cont r act or empl oyees depl oyed i n t heat er t hi s r epor t i ng per i od ( by count r y) .
As par t of i t s submi ssi on, t he cont r act or wi l l al so pr ovi de t he est i mat ed t ot al cost ( i f any) i ncur r ed t o compl y wi t h t hi s r epor t i ng r equi r ement .
Repor t i ng per i od wi l l be t he per i od of per f or mance not t o exceed 12 mont hs
SECTI ON 01 00 02 Page 9 endi ng Sept ember 30 of each gover nment f i scal year and must be r epor t ed by 31 Oct ober of each cal endar year .
The Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) or Techni cal Repr esent at i ve ( COTR) cr eat es t he cont r act r ecor d and t he cont r act or compl et es i t .
Cont r act or s may use a di r ect XML dat a t r ansf er t o t he dat abase ser ver or f i l l i n t he f i el ds on t he websi t e. The XML di r ect t r ansf er i s a f or mat f or t r ansf er r i ng f i l es f r om a cont r act or ' s syst ems t o t he secur e web si t e wi t hout t he need f or separ at e dat a ent r i es f or each r equi r ed dat a el ement at t he web si t e. The speci f i c f or mat s f or t he XML di r ect t r ansf er may be downl oaded f r om t he web si t e. I f you need assi st ance or have quest i ons about CMR, pl ease cont act t he CMR Hel pdesk by phone at 703- 377- 6199 or E- mai l cont r act or manpower @hqda. ar my. mi l .
*Note:
For i n- t heat er cont r act s, r equi r i ng act i v i t i es have t he opt i on of r equi r i ng mor e f r equent r epor t i ng. I nf or mat i on f r om t he secur e web si t e i s consi der ed t o be pr opr i et ar y i n nat ur e when t he cont r act number and cont r act or i dent i t y ar e associ at ed wi t h t he di r ect l abor hour s and di r ect l abor dol l ar s. At no t i me wi l l any dat a be r el eased t o t he publ i c wi t h t he cont r act or name and cont r act number associ at ed wi t h t he dat a. For i nt er nal Ar my anal ysi s, t he r epor t s and quer i es f r om t he dat abase shal l not cont ai n pr opr i et ar y dat a.
- - End of Sect i on - -
SECTI ON 01 00 02 Page 10
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 00 04
DELI VERY ORDER PROCEDURES
12/14
PART 1 GENERAL
1. 1 CONTRACT ADMI NI STRATI ON
1. 1. 1 Cor r espondence I dent i f i cat i on
1. 1. 2 Del i ver y Or der Li mi t at i ons
1. 1. 3 Adj ust ment s To Basi c Pr i ces
PART 2 PRODUCTS
2. 1 ORDERI NG PROCEDURES
2. 1. 1 Not i f i cat i on of Cont r act or
2. 1. 2 Desi gn- Bui l d Del i ver y Or de
2. 1. 3 Bui l d Onl y Del i ver y Or der
2. 2 CONTRACTOR' s RESPONSE
2. 2. 1 Si t e Vi s i t s
2. 2. 2 Ver bal Cont act
2. 3 DELI VERY ORDER DURATI ON
2. 4 CONTRACTOR' s PROPOSAL
2. 4. 1 Ser vi ces t o be Fur ni shed
2. 4. 2 Coef f i c i ent Fact or s
2. 4. 2. 1 Coef f i c i ent Base Pr i c i ng
2. 4. 2. 1. 1 Consul t ant s
2. 4. 2. 1. 2 Non- Cont r act or Gener at ed Hazar dous Mat er i al s or Wast e
2. 4. 2. 1. 3 Sur veys and Soi l I nvest i gat i ons
2. 4. 2. 1. 4 Abat ement , Decont ami nat i on, Encapsul at i on, or Removal
2. 4. 2. 1. 5 Rubbi sh Removal
2. 4. 2. 1. 6 Non- Pr e- Pr i ced Li ne I t ems
2. 4. 2. 1. 7 Pr e- Pr i ced Li ne I t ems
2. 4. 2. 1. 8 Ai r Suppor t ed St r uct ur es
2. 4. 2. 1. 9 Desi gn or Const r uct i on Wor k I t ems
2. 4. 2. 1. 10 Wast e
2. 4. 2. 1. 11 Tempor ar y Scaf f ol di ng and Pl at f or ms ( 015423) and
Tempor ar y Bar r i cades ( 015623)
2. 4. 2. 1. 12 Nor t h Car ol i na Sal es Tax ( 012163)
2. 4. 2. 1. 13 Secur i t y Fact or s
2. 4. 2. 2 Desi gn and Consul t i ng Ser vi ces
2. 4. 2. 3 St af f i ng f or Fi el d Of f i ce
2. 4. 2. 4 Ar chi t ect ur al Engi neer Pr i ce Schedul e ( AEPS)
2. 4. 2. 5 Fi el d Of f i ce St af f i ng Pr i ce Schedul e ( FOSPS)
2. 4. 3 Compl i ance
2. 4. 4 Tr avel and Per Di em
2. 4. 5 LEED Requi r ement s
PART 3 EXECUTI ON
3. 1 DELI VERY ORDER PRI CI NG
SECTI ON 01 00 04 Page 1
3. 1. 1 DELI VERY ORDER PRI CI NG FOR COST WORKS
3. 1. 2 Del i ver y Or der Pr i c i ng f or MCACES ( MI I )
3. 2 PRI CI NG METHODS
3. 2. 1 RS Means Pr i c i ng For Cost Wor ks
3. 2. 1. 1 Al t er nat e Pr i ce Met hod ( Pr e- Pr i ced)
3. 2. 1. 2 Appr oxi mat e Pr i ce Met hod ( Pr e- Pr i ced)
3. 2. 1. 3 Edi t ed Pr i ce Met hod ( Pr e- Pr i ced)
3. 2. 1. 4 Non Pr e- Pr i ced Met hod
3. 2. 1. 5 Ar chi t ect Engi neer Pr i ce Schedul e ( AEPS)
3. 2. 1. 6 Fi el d Of f i ce St af f i ng Pr i ce Schedul e ( FOSPS)
3. 2. 2 RS Means Pr i c i ng For MCACES ( MI I )
3. 3 SATOC DELI VERY ORDER PROPOSAL PREPARATI ON
3. 3. 1 Del i ver y Or der s
3. 3. 2 The Desi gn- Bi d- Bui l d Coef f i c i ent s
3. 3. 3 The Desi gn- Bui l d Coef f i c i ent s
3. 4 DESI GN- BI D- BUI LD DELI VERY ORDERS
3. 4. 1 Fi r m Fi xed Pr i ce Pr oposal
3. 5 DESI GN- BUI LD DELI VERY ORDERS
3. 5. 1 Fi r m Fi xed Pr i ce Pr oposal
3. 5. 2 Desi gn Del i ver abl es
3. 6 COST SECTI ON OF PROPOSAL
3. 7 PREPARATI ON OF PROGRESS SCHEDULES AND REPORTS
3. 8 MEETI NGS AND CONFERENCES
3. 8. 1 CSI Di scussi on Meet i ng
3. 8. 2 Pr e- Const r uct i on Conf er ence
3. 8. 3 Coor di nat i on Meet i ng
3. 8. 4 Wor k Schedul i ng Meet i ng
3. 8. 4. 1 Weekl y
3. 9 SAFETY ASSURANCE
3. 9. 1 Saf et y Meet i ng
3. 9. 2 Requi r ement f or Saf et y Coor di nat i on
3. 10 APPROVED EQUAL
3. 11 RECORD DRAWI NGS
3. 12 DI FFERENCES I N DRAWI NGS
3. 13 ACCEPTANCE
3. 13. 1 Appr oval of Each Del i ver y Or der
3. 13. 2 Modi f i cat i on and/ or Suspensi on of Wor k
3. 13. 3 Pr e- Fi nal I nspect i on
3. 13. 4 Not i ce of Compl et i on of Del i ver y Or der
3. 13. 5 Fi nal I nspect i on
3. 14 CLOSEOUT OF DELI VERY ORDER
3. 14. 1 Cl oseout s
3. 14. 2 Cl oseout Mat er i al s
3. 14. 2. 1 O&M Manual s
3. 14. 2. 2 Tr ai ni ng Requi r ement s
3. 14. 2. 3 Spar e Par t s Requi r ed
3. 14. 2. 4 Sal vaged Mat er i al
3. 14. 3 Gover nment - Fur ni shed Equi pment
3. 14. 4 Ut i l i t i es Pr ovi ded or Rel ocat ed by Ot her s
3. 14. 5 Tr ansf er and Accept ance of Mi l i t ar y Real Pr oper t y ( DD For m
1354)
3. 14. 6 Fi nal As- Bui l t Submi t t al s
3. 14. 7 War r ant i es
3. 15 CONTRACTOR- FURNI SHED EQUI PMENT DATA
3. 15. 1 Equi pment Li st
3. 15. 2 Guar ant ees
SECTI ON 01 00 04 Page 2
SATOC for Construction at Fort Bragg, NC W912PM20R0029
SECTION 01 00 04
DELIVERY ORDER PROCEDURES
12/14
PART 1 GENERAL
1.1 CONTRACT ADMINISTRATION
Administration of the delivery orders under this contract will be performed by the US Army Corps of Engineers, Wilmington District contracting office. No changes, deviations, or waivers shall be effective without a modification of the contract or delivery orders executed by the Contracting Officer or his/her authorized representative authorizing such changes, deviations, or waivers.
1.1.1 Correspondence Identification
All correspondence and data submitted by the Contractor under this contract shall reference the Project Number, Delivery Order Number and Project Name.
1.1.2 Delivery Order Limitations
Delivery orders may be subject to statutory cost limitation.
1.1.3 Adjustments To Basic Prices
The Contracting Officer will include the current Davis-Bacon wage determination with each delivery order request, and the Contractor will be required to pay a minimum of those rates. The Contractor is responsible for using the most current version of the Davis Bacon Wages for the appropriate area. When using Cost Works, the Fort Bragg pricing shall be based on the 283 zip code prefix. . The pricing database shall be updated quarterly, and line item costs will be based on those updates.
The Contractor shall bear the cost of Means Pricing Guide Software updates using the latest version of Cost Works and MCACES (MII).
PART 2 PRODUCTS
2.1 ORDERING PROCEDURES
2.1.1 Notification of Contractor
As the need exists for performance under the terms of this contract, the Contracting Officer, or his/her authorized representative, will notify the Contractor of a new requirement. The Contractor shall receive a Statement of Work (SOW) with general requirements, which the Contractor will be able to utilize to lay out the work using the SATOC Technical Specifications.
The SOW may also include preliminary sketches or advance concept drawings, depending on the complexity of the particular project. The SOW and preliminary sketches are only conceptual documents and do not become part of the delivery order or contract. Once the Contractor's drawings are approved by the Government and the negotiation process is complete, the Contractor shall provide a revised SOW to be approved by the Government.
When approved, the revised SOW becomes attachment one to the delivery order. The revised and approved construction drawings become attachment
SECTION 01 00 04 Page 3 two.
2. 1. 2 Desi gn- Bui l d Del i ver y Or der
Desi gn- Bui l d Del i ver y Or der al l ows t he Gover nment t o i ssue a Del i ver y Or der f or al l wor k i nci dent al t o devel opi ng a pr oposal t o i ncl ude desi gn and del i ver y or der pr oposal , negot i at i ng and const r uct i ng a del i ver y or der . The i nt ent i s t o obt ai n a desi gn and/ or exact pr i ce f or del i ver y or der s and const r uct t he del i ver y or der s wher e t he r equi r ement s have not been f ul l y def i ned.
2. 1. 3 Bui l d Onl y Del i ver y Or der
Bui l d Del i ver y Or der al l ows t he Gover nment t o i ssue a Del i ver y Or der f or al l wor k i nci dent al t o const r uct i ng a del i ver y or der t hat was desi gned and negot i at ed under a Desi gn Onl y Del i ver y Or der .
2. 2 CONTRACTOR' s RESPONSE
Upon r ecei pt of t he SOW, t he Cont r act or shal l r espond t o t he needs of t he Gover nment as speci f i ed i n t he SOW and Request f or Pr oposal ( RFP) .
2. 2. 1 Si t e Vi s i t s
A r easonabl e number of i nvest i gat i ve v i s i t s t o a pr oposed wor k s i t e shal l be compl et ed i n t he company of t he Cont r act i ng Of f i cer or hi s/ her aut hor i zed r epr esent at i ve, Publ i c Wor ks r epr esent at i ve and ot her Gover nment per sonnel as necessar y. The pur pose of t he v i s i t i s f or t he Cont r act or t o gat her enough i nf or mat i on t o pr epar e t he dr awi ngs/ sket ches, pr oj ect est i mat e and r evi sed SOW.
2. 2. 2 Ver bal Cont act
Est abl i shi ng ver bal cont act wi t h t he Cont r act i ng Of f i cer or hi s/ her aut hor i zed r epr esent at i ve t o f ur t her def i ne t he scope of t he r equi r ement i f necessar y.
2. 3 DELI VERY ORDER DURATI ON
The Gover nment wi l l est abl i sh t he Del i ver y Or der dur at i on f or each Del i ver y Or der .
2. 4 CONTRACTOR' s PROPOSAL
Upon est abl i shi ng t he scope of t he i ndi v i dual r equi r ement , t he Cont r act or shal l t hen pr epar e hi s/ her pr oposal f or accompl i shment of t he t ask.
2. 4. 1 Ser vi ces t o be Fur ni shed
The cont r act or shal l pr ovi de al l management , super vi s i on, l abor , mat er i al s, t ool s and equi pment necessar y f or t he per f or mance of al l wor k i n r el at i on t o t hi s cont r act i n di r ect suppor t of Ft . Br agg and Wi l mi ngt on Di st r i ct , U. S. Ar my Cor ps of Engi neer s, i n accor dance wi t h t he Scope of Wor k, and as r equi r ed. The ser vi ces t o be pr ovi ded shal l be pr i ced i n accor dance wi t h t he most r ecent RS Means Cost Dat a publ i cat i ons ut i l i z i ng Cost Wor ks or MCACES ( MI I ) , and t he coef f i c i ent pr i c i ng f act or s as i ndi cat ed i n t hi s sect i on and as ot her wi se r equi r ed. I ndi v i dual Del i ver y Or der s wi l l i dent i f y ei t her Cost Wor ks or MCACES i s t o be used f or submi t t al s
SECTI ON 01 00 04 Page 4
2. 4. 2 Coef f i c i ent Fact or s
Any Di vi s i on 1 l i ne i t ems t hat r ef er ence l i ne i t ems i n ot her RS Means Di vi s i ons ( 2 - 44) shal l not be consi der ed Di vi s i on 1 cost s and shal l not be i ncl uded i n t he coef f i c i ent s.
2. 4. 2. 1 Coef f i c i ent Base Pr i c i ng
The pur pose of coef f i c i ent based pr i c i ng i s t o per mi t t he Gover nment and t he cont r act or t o qui ckl y ar r i ve at a f ai r and r easonabl e f i r m f i xed pr i ce f or t he r equi r ement s t hat f al l under t hi s cont r act . Al l RS Means Di vi s i on 1 l i ne i t ems NOT speci f i cal l y excl uded f r om t he coef f i c i ent s shal l be i ncl uded i n t he coef f i c i ent s. Ther e wi l l not be a separ at e annual escal at ed coef f i c i ent r at e. The coef f i c i ent and hour l y r at es negot i at ed at t he t i me of cont r act awar d wi l l be used t hr oughout t he l i f e of t he cont r act . The coef f i c i ent s shal l i ncl ude al l cost s l i s t ed i n RS Means Di vi s i on 1 wi t h t he f ol l owi ng except i ons:
2. 4. 2. 1. 1 Consultants
Food Ser vi ce and Ki t chen Consul t ant s, Educat i onal Faci l i t y Consul t ant s, and El evat or and Conveyi ng Syst ems Consul t ant s ser vi ces, as r ef er enced i n Di v i s i on 1, ar e not cont ai ned wi t hi n t he coef f i c i ent and wi l l be t r eat ed as non- pr e- pr i ced l i ne i t ems on a per del i ver y or der basi s.
2. 4. 2. 1. 2 Non- Cont r act or Gener at ed Hazar dous Mat er i al s or Wast e
Non- Cont r act or Gener at ed Hazar dous Mat er i al s or Wast e ( i ncl udi ng asbest os, l ead pai nt and mol d) ar e not cont ai ned wi t hi n t he coef f i c i ent and wi l l be t r eat ed as non- pr e- pr i ced l i ne i t ems on a per del i ver y or der basi s.
2. 4. 2. 1. 3 Sur veys and Soi l I nvest i gat i ons
Sur veys and Soi l I nvest i gat i ons wi l l be t r eat ed as pr e- pr i ced l i ne i t ems on a per del i ver y or der basi s and shal l not be i ncl uded i n coef f i c i ent s and shal l be i ncl uded as Di v i s i on 2 pr e- pr i ced l i ne i t ems.
2. 4. 2. 1. 4 Abat ement , Decont ami nat i on, Encapsul at i on, or Removal
Abat ement , Decont ami nat i on, Encapsul at i on, or Removal ar e pr e- pr i ced l i ne i t ems cont ai ned i n Di v i s i on 2 of RS Means.
2. 4. 2. 1. 5 Rubbi sh Removal
Rubbi sh Removal as def i ned i n RS Means Di vi s i on 1, Sect i on 01 74, l i ne i t em 01 74. 13. 20. 0200 i s not i ncl uded i n t he coef f i c i ent and shal l be i ncl uded as Di v i s i on 2 pr e- pr i ced l i ne i t ems.
2. 4. 2. 1. 6 Non- Pr e- Pr i ced Li ne I t ems
Any desi gn on Shi pyar ds, Wat er ways, Mar i ne Const r uct i on, Fl oat i ng const r uct i on, Rai l way const r uct i on, Secur i t y Vehi c l e bar r i er s, Tr af f i c s i gnal syst ems, Vehi c l e gui de r ai l s, Fi xed vehi c l e del i neat or s, and Rai l Tr ack const r uct i on l i ne i t ems, as def i ned by Di v i s i on 34 ( onl y) - Tr anspor t at i on - of RS Means and Di vi s i on 35 ( onl y) - Wat er way and Mar i ne of RS Means, i s excl uded f r om t he coef f i c i ent s and wi l l be t r eat ed as non- pr e- pr i ced l i ne i t ems f or sur veys, pl ans, and desi gn del i ver abl es under desi gn bui l d del i ver y or der s.
SECTI ON 01 00 04 Page 5
2. 4. 2. 1. 7 Pr e- Pr i ced Li ne I t ems
Al l Model s, Phot ogr aphi c Document at i on ( i f al l owed by s i t e Secur i t y Of f i cer s) , Render i ngs, and Tempor ar y Secur i t y l i ne i t ems as def i ned by Di v i s i on 1 sect i on 11 31. 50 ( Model s) , 11 31. 75 ( Render i ngs) , 32 33. 50 ( Phot ogr aphs) , and 56 32. 50 ( Wat chmen) of RS Means shal l be excl uded f r om t he coef f i c i ent s and shal l be pr i ced as pr e- pr i ced l i ne i t ems on a per del i ver y or der basi s.
2. 4. 2. 1. 8 Ai r Suppor t ed St r uct ur es
Del et i on of Di v i s i on 1 l i ne i t em 01 52 13 20. 5000, Ai r Suppor t ed st r uct ur es. Ai r Suppor t ed st r uct ur es shal l not be used f or Of f i ce or St or age space as def i ned i n Di v i s i on 1 and ar e not i ncl uded i n any coefficients.
2. 4. 2. 1. 9 Desi gn or Const r uct i on Wor k I t ems
Any desi gn or const r uct i on wor k i t ems under Di v i s i on 01, sect i on 91 13. 50, Commi ssi oni ng ( onl y) , of RS Means, i s excl uded f r om bot h t he desi gn- bi d- bui l d and t he desi gn- bui l d coef f i c i ent s and wi l l be t r eat ed as non- pr e- pr i ced l i ne i t ems on a per del i ver y or der basi s.
2. 4. 2. 1. 10 Waste
Wast e of excess mat er i al quant i t i es i s i nci dent al cost s, whi ch ar e i ncl uded wi t hi n t he cont r act - pr i c i ng f act or . Quant i t i es used on i ndi v i dual del i ver y or der pr oposal s shal l be t aken f r om f i el d measur ement s or desi gn pl ans, as appr opr i at e, wi t hout al l owance f or wast e unl ess RS Means aut hor i…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .