Ft Eisenhower MCA 1 Floor Plan-SAM.pdf
PDF 2 MB Posted
- Solicitation number
- W912DY26QA187
About this file
These are interior design furniture plan drawings for the SCI Training, Research & Network Center at Fort Gordon, Georgia, prepared by the US Army Corps of Engineers. The document set consists of four floor plan sheets (Levels 1-4) showing furniture and equipment layouts at a scale of 1/16" = 1'-0" for the overall facility. The plans are dated October 2020 and are identified as conformed documents submission under Contract No. W912HN-20-C-3006 with category code 171-36-03.
The furniture plans depict comprehensive layouts across multiple levels including classrooms, laboratories, conference rooms, offices, break areas, storage spaces, mechanical and electrical rooms, restrooms, elevators, and stairs. Equipment shown includes copiers, kiosks, workstations, and various furnishings. General notes on all sheets specify that furniture and equipment are shown for planning purposes and will be provided and installed by the government (GFGI) as Government-Furnished Government-Installed items. The general contractor is required to coordinate with the government furniture contractor to schedule installation of furniture and power/data connections prior to construction completion. Critical dimensions must be field-verified by the furniture dealer prior to installation, and floor box locations are to be coordinated with electrical/data plans and final furniture layout. The drawings reference electrical and data plans for detailed floor box positioning and coordination requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT7 W912DY26QA187 Ft Gordon-MCA1.docx | DOCX document | |
| RFQ W912DY26QA187 Ft Gordon-MCA1 Industrial Storage.pdf | ||
| ATT1 Ft Gordon MCA1 Industrial Storage SAMgov.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
CLASSROOM
CLASSROOM
CLASSROOM
ELEC TEL
INSTRUCTORCONF
5-7 P
CAVE
CLASSROOM
LAB
LAB
CLASSROOM
ELEC
FIRE
PUMP
AUDITORIUM
#1
AUDITORIUM
#2
PRINT/COPY
STAFF
BREAK
STAIR #4
STUDENT
BREAK
LOADING
G6
SPPN
STUDENT
RECORDS
TEL
COMP
MAINT
STAIR #5
CORRIDOR
MALE
TLT
STAIR #2
STAIR #3
SECURE
LOBBY
CORRIDOR
CORRIDOR CORRIDOR
NON-SECURE
LOBBY
G2
SECURITY
MECH
BEF
CORRIDORCORRIDOR
CORRIDOR
FEMALE
TLT
ELEV #1
JC
CLASSROOM
ELEV #2
CORRIDOR
V E
N D
IN
G
A R
E A
BATTERY
INVERTER
M
AT
C H
LI
N
E
- S
EE
:IF
1A
M
AT
C H
LI
N
E
- S
EE
:IF
1B
M
AT
C H
LI
N
E
- S
EE
:IF
1B
M
AT
C H
LI
N
E
- S
EE
:D
N P-
IF
-1
C
V E
N D
IN
G
A R
E A
IF401
D8
IF401
D6
IF401
F6
GENERAL FURNITURE NOTES
1. FURNITURE & EQUIPMENT ARE SHOWN ON PLANS FOR
PLANNING PURPOSES. FURNITURE & EQUIPMENT IS TO BE
PROVIDED & INSTALLED BY GOVERNMENT (GFGI) U.N.O.
2. GENERAL CONTRACTOR WILL WORK WITH THE
GOVERNMENT FURNITURE CONTRACTOR TO SCHEDULE
THE INSTALLATION OF FURNITURE AND POWER/DATA HOOK
UP PRIOR TO CONSTRUCTION COMPLETION.
3. REFER TO ELECTRICAL/DATA PLANS FOR FLOOR BOX
LOCATIONS. TO BE COORDINATED WITH FINAL FURNITURE
LAYOUT.
4. FURNITURE DEALER TO FIELD VERIFY ALL CRITICAL
DIMENSIONS PRIOR TO FURNITURE BEING INSTALLED.
IF401
D4
TOILET
G2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
C:\rvt\2020\10053876-A-MCA1-Central_RCRUZ.rvt
9/30/2020 10:12:47 AM
IF101
MCA1
IN
T
E R
IO
R
D E
S
IG
N
F U
R N
IT
U
R E
P L
A N
L
E V
E L
O V
E R
A L
L
F O
R T
G O
R D
O N
, G E
O R
G
IA
W
E S
T O
G L
E T
H O
R P
E A
V E
N U
E S
A V
A N
N A
H D
IS
T
R
IC
T S
A V
A N
N A
H , G
A
H D
R A
R L
IN
G
T O
N
V
IR
G
IN
IA
E . C
O O
P E
R
C
N O
R T
H C
U T
T
D
H O
F M
A N
N
H
E Z
Z E
D D
IN
E
O C
T O
B E
R
-- W
H N
-2
-C -3
-3
-0
C
A T
E G
O R
Y C
O D
E
CONFORMED DOCUMENTS SUBMISSION
S C
I T R
A
IN
IN
G
, R E
S E
A R
C H
N
E T
W O
R K
C E
N T
E R
F Y
P
N
B C
KEY PLAN
A
1/16" = 1'-0"A1 FURNITURE PLAN - LEVEL 1, OVERALL
0 8' 16' 32'
SCALE: 1/16" = 1'-0"
UP DN
UPDN
UP DN
UP DN
ELEC
STORAGE
TEL
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
INSTRUCTOR
ELEC TEL
CAVE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
STUDENT
RECORDS
CLASSROOM
KIOSK
AREA
STAIR #4
ELEV #2
PRINT/COPY
STAFF
BREAKSTUDENT
BREAK
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
CORRIDOR
ELEV #1
FEMALE
TLT
STAIR #3
CORRIDOR
CORRIDOR
STAIR #2
STAIR #5
MALE
TLT
MECH
SHAFT
CONF
5-7 P
CONF
4-6 P
JC
LAB
INSTRUCTOR
CAVE
PRINT/COPY
MECH
SHAFT
CORRIDORCORRIDOR
CORRIDOR
M
AT
C H
LI
N
E
- S
EE
:IF
2A
M
AT
C H
LI
N
E
- S
EE
:IF
2B
M
AT
C H
LI
N
E
- S
EE
:IF
2B
M
AT
C H
LI
N
E
- S
EE
:IF
2C
C O
P
IE
R -N
IC
GENERAL FURNITURE NOTES
1. FURNITURE & EQUIPMENT ARE SHOWN ON PLANS FOR
PLANNING PURPOSES. FURNITURE & EQUIPMENT IS TO BE
PROVIDED & INSTALLED BY GOVERNMENT (GFGI) U.N.O.
2. GENERAL CONTRACTOR WILL WORK WITH THE
GOVERNMENT FURNITURE CONTRACTOR TO SCHEDULE
THE INSTALLATION OF FURNITURE AND POWER/DATA HOOK
UP PRIOR TO CONSTRUCTION COMPLETION.
3. REFER TO ELECTRICAL/DATA PLANS FOR FLOOR BOX
LOCATIONS. TO BE COORDINATED WITH FINAL FURNITURE
LAYOUT.
4. FURNITURE DEALER TO FIELD VERIFY ALL CRITICAL
DIMENSIONS PRIOR TO FURNITURE BEING INSTALLED.
C O
P
IE
R -N
IC
65431 8 10 11 13 14 16157
E
C
F
B
92 12
D
A
F-06
SC-1 SC-1 SC-1
SC-1 SC-1 SC-1 SC-1
F-06
F-06
F-06F-06
F-06
F-06
F-06
F-06F-06
F-06
F-06
F-06
F-06
F-06
F-06
F-06
SN02
SN02
SN02
SN02
SN02
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
C:\rvt\2020\10053876-A-MCA1-Central_RCRUZ.rvt
9/30/2020 10:13:20 AM
IF102
MCA1
IN
T
E R
IO
R
D E
S
IG
N
F U
R N
IT
U
R E
P
LA
N
L E
V E
L 2, O V
E R
A
LL
F O
R T
G O
R D
O N
G
E O
R G
IA
W E
S T
O G
L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
D
IS
T R
IC
T
S A
V A
N N
A H
G
A
H D
R A
R
LI
N G
T O
N
V
IR
G
IN
IA
E
C O
O P
E R
C . N
O R
T H
C U
T T
D . H
O F
M A
N N
H
E Z
Z E
D D
IN
E
O C
T O
B E
R
-- W
2H N
-2
-C -3
-3 6-
C
A T
E G
O R
Y C
O D
E
CONFORMED DOCUMENTS SUBMISSION
S C
I T
R A
IN
IN
G
R E
S E
A R
C H
N
E T
W O
R K
C E
N T
E R
F Y
P
N
B C
KEY PLAN
A
1/16" = 1'-0"A1 FURNITURE PLAN - LEVEL 2, OVERALL
DN
UPDN
UP DN
UP DN
INSTRUCTOR
MECH
SHAFT
ELEC TEL
CAVE
STAIR #2
TEL
STORAGE
CLASSROOM
ELEC
LAB
CLASSROOM
CLASSROOM
CLASSROOM
STUDENT
RECORDS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
STAIR #4
STAIR #3
STAIR #5
PRINT/COPY
CLASSROOM
CLASSROOM
FEMALE
TLT
CORRIDOR
CORRIDOR
MALE
TLT
CORRIDOR
ELEV #2
CLASSROOM
KIOSK
AREA
STAFF
BREAK
CONF
4-6 P
STUDENT
BREAK
CONF
5-7 P
JC
INSTRUCTOR
CAVE
PRINT/COPY
MECH
SHAFT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ELEV #1
M
AT
C H
LI
N
E
- S
EE
:IF
3A
M
AT
C H
LI
N
E
- S
EE
:IF
3B
M
AT
C H
LI
N
E
- S
EE
:IF
3B
M
AT
C H
LI
N
E
- S
EE
:IF
3C
C O
P
IE
R -N
IC
IF401
F4
GENERAL FURNITURE NOTES
1. FURNITURE & EQUIPMENT ARE SHOWN ON PLANS FOR
PLANNING PURPOSES. FURNITURE & EQUIPMENT IS TO BE
PROVIDED & INSTALLED BY GOVERNMENT (GFGI) U.N.O.
2. GENERAL CONTRACTOR WILL WORK WITH THE
GOVERNMENT FURNITURE CONTRACTOR TO SCHEDULE
THE INSTALLATION OF FURNITURE AND POWER/DATA HOOK
UP PRIOR TO CONSTRUCTION COMPLETION.
3. REFER TO ELECTRICAL/DATA PLANS FOR FLOOR BOX
LOCATIONS. TO BE COORDINATED WITH FINAL FURNITURE
LAYOUT.
4. FURNITURE DEALER TO FIELD VERIFY ALL CRITICAL
DIMENSIONS PRIOR TO FURNITURE BEING INSTALLED.
C O
P
IE
R -N
IC
F-06
F-06
F-06
F-06
F-06
F-06 F-06
F-06
F-06
F-06
F-06
F-06
F-06
F-06
F-06
F-06 F-06
SC-1 SC-1 SC-1
SC-1 SC-1 SC-1 SC-1
SN02
SN02
SN02
SN02
SN02
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
C:\rvt\2020\10053876-A-MCA1-Central_RCRUZ.rvt
9/30/2020 10:14:06 AM
IF103
MCA1
IN
T
E R
IO
R
D E
S
IG
N
F U
R N
IT
U
R E
P
LA
N
L E
V E
L 3, O V
E R
A
LL
F O
R T
G O
R D
O N
G
E O
R G
IA
W E
S T
O G
L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
D
IS
T R
IC
T
S A
V A
N N
A H
G
A
H D
R A
R
LI
N G
T O
N
V
IR
G
IN
IA
E
C O
O P
E R
C . N
O R
T H
C U
T T
D . H
O F
M A
N N
H
E Z
Z E
D D
IN
E
O C
T O
B E
R
-- W
2H N
-2
-C -3
-3 6-
C
A T
E G
O R
Y C
O D
E
CONFORMED DOCUMENTS SUBMISSION
S C
I T
R A
IN
IN
G
R E
S E
A R
C H
N
E T
W O
R K
C E
N T
E R
F Y
P
N
B C
KEY PLAN
A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
C:\rvt\2020\10053876-A-MCA1-Central_RCRUZ.rvt
9/30/2020 10:14:06 AM
IF103
MCA1
IN
T
E R
IO
R
D E
S
IG
N
F U
R N
IT
U
R E
P
LA
N
L E
V E
L 3, O V
E R
A
LL
F O
R T
G O
R D
O N
G
E O
R G
IA
W E
S T
O G
L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
D
IS
T R
IC
T
S A
V A
N N
A H
G
A
H D
R A
R
LI
N G
T O
N
V
IR
G
IN
IA
E
C O
O P
E R
C . N
O R
T H
C U
T T
D . H
O F
M A
N N
H
E Z
Z E
D D
IN
E
O C
T O
B E
R
-- W
2H N
-2
-C -3
-3 6-
C
A T
E G
O R
Y C
O D
E
CONFORMED DOCUMENTS SUBMISSION
S C
I T
R A
IN
IN
G
R E
S E
A R
C H
N
E T
W O
R K
C E
N T
E R
F Y
P
N
B C
KEY PLAN
A
1/16" = 1'-0"A1 FURNITURE PLAN - LEVEL 3, OVERALL
DN
ELEC
MECH
SHAFT
ELEC TEL
PRIVATE
OFFICE
STAIR #4
STAIR #2
TEL
LAB LAB
LABLAB
OPEN
OFFICE
RESOURCE
CENTER
CORRIDOR
MALE
TLT
FEMALE
TLT
ELEV #1
CORRIDOR
PRIVATE
OFFICE
BREAK
PRIVATE
OFFICE
PRIVATE
OFFICE
TOILET
EXECUTIVE
CONFERENCE
ROOM (35 PN)
CAVE
PRINT/COPY
CONF
8-10 P
CORRIDOR
OPEN
OFFICE
PRINT/COPY
CA2
CONF CONF
OFFICE
OFFICE
OFFICE
CAVE
CAVE
JC
INSTRUCTOR
PRINT/COPY
PRIVATE
OFFICE
ELEV #2
MECH
SHAFT
COLLABORATION
COLLABORATION
STORAGE
BREAK
PRINT/COPY
STAIR #5
COMMANDANT
OPEN OFFICE
SUPPLY
STORAGE
86'-10 1/2"
60'-0"
60'-0"
M
AT
C H
LI
N
E
- S
EE
:IF
4A
M
AT
C H
LI
N
E
- S
EE
:IF
4A
M
AT
C H
LI
N
E
- S
EE
:IF
4B
M
AT
C H
LI
N
E
- S
EE
:IF
4C
LACTATION
COPIER-NIC
IF401
A1
IF401
A5
IF401
D1
C O
P
IE
R -N
IC
C O
P
IE
R -N
IC
GENERAL FURNITURE NOTES
1. FURNITURE & EQUIPMENT ARE SHOWN ON PLANS FOR
PLANNING PURPOSES. FURNITURE & EQUIPMENT IS TO BE
PROVIDED & INSTALLED BY GOVERNMENT (GFGI) U.N.O.
2. GENERAL CONTRACTOR WILL WORK WITH THE
GOVERNMENT FURNITURE CONTRACTOR TO SCHEDULE
THE INSTALLATION OF FURNITURE AND POWER/DATA HOOK
UP PRIOR TO CONSTRUCTION COMPLETION.
3. REFER TO ELECTRICAL/DATA PLANS FOR FLOOR BOX
LOCATIONS. TO BE COORDINATED WITH FINAL FURNITURE
LAYOUT.
4. FURNITURE DEALER TO FIELD VERIFY ALL CRITICAL
DIMENSIONS PRIOR TO FURNITURE BEING INSTALLED.
C O
P
IE
R -N
IC
AI542
D8
F-08
F-06
SC-1 SC-1 SC-1
SC-1 SC-1 SC-1 SC-1
F-06 F-06
F-06
SC-1
SC-1
SC-1
SN02
SN02
SN02
SN02
SN02
SN02
SN02SN02
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
C:\rvt\2020\10053876-A-MCA1-Central_RCRUZ.rvt
9/30/2020 10:14:54 AM
IF104
MCA1
IN
T
E R
IO
R
D E
S
IG
N
F U
R N
IT
U
R E
P
LA
N
L E
V E
L 4, O V
E R
A
LL
F O
R T
G O
R D
O N
G
E O
R G
IA
W E
S T
O G
L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
D
IS
T R
IC
T
S A
V A
N N
A H
G
A
H D
R A
R
LI
N G
T O
N
V
IR
G
IN
IA
E
C O
O P
E R
C . N
O R
T H
C U
T T
D . H
O F
M A
N N
H
E Z
Z E
D D
IN
E
O C
T O
B E
R
-- W
2H N
-2
-C -3
-3 6-
C
A T
E G
O R
Y C
O D
E
CONFORMED DOCUMENTS SUBMISSION
S C
I T
R A
IN
IN
G
R E
S E
A R
C H
N
E T
W O
R K
C E
N T
E R
F Y
P
N
B C
KEY PLAN
A
1/16" = 1'-0"A1 FURNITURE PLAN - LEVEL 4, OVERALL
| 1st fl.pdf |
| 2nd fl.pdf |
| 3rd fl.pdf |
| 4th fl.pdf |
File details come from the government source that posted it. Updated .