Ft Drum Railhead Loading Facility - D-B RFP.pdf
PDF 7 MB Posted
- Attached to
- New Railhead Loading Facility, Fort Drum, NY Federal contract opportunity
- Solicitation number
- W912DS20R0018
About this file
This is a request for proposal from the U.S. Army Corps of Engineers Engineering District New York to design and construct a new Railhead Loading Facility at Fort Drum, New York. The scope of work includes constructing a new railhead loading area with ramps and a side loading container area, rail operations storage building, alert holding area, and supporting facilities. The contract will be a firm fixed-price design-build award with a period of performance of 730 calendar days from notice to proceed. The estimated value is between $15-35 million. Offerors must be registered in SAM.gov and proposals will be evaluated based on recent relative experience, past performance, team qualifications, technical approach, and phasing/scheduling. The contracting office is located in New York City and the point of contact is the named contract specialist and contracting officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DS20R0018 Amend 0001.pdf | ||
| Ft Drum Railhead Loading Facility - Design Analysis.pdf | ||
| Ft Drum Railhead Loading Facility - D-B RFP - Appendices.pdf | ||
| W912DS20R0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Army
New York District
Corps of Engineers
26 Federal Plaza, RM 16-300
New York, NY 10278-0090
Railhead Loading Facility
Fort Drum
Ft Drum, New York
U.S. Army Engineering Corps of Engineers, New York District
Contract No.: W912DS19D0012
Order No.: W912DS20F0006
Design-Build RFP Package
Volume 1
July 2020
Railhead Loading Facility Design-Build RFP
Ft Drum, NY
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 COVER SHEET
00 00 02 CHECK LIST FOR BIDDERS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFEROR
00 22 10 TECHNICAL PROPOSAL DESIGN -BID-BUILD SELECTION PROCEDURES
00 22 20 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 24 00 EVALUATION FACTORS FOR AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 90 00 WAGE RATES
DIVISION 01 - GENERAL REQUIREMENTS
STATEMENT OF WORK
SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 00 00 01
COVER SHEET
01/18
PART 1 GENERAL
NEW YORK DI STRI CT
CORPS OF ENGI NEERS
NEW YORK, NEW YORK 10278- 0090
I NVI TATI ON FOR BI DS
FOR
Rai l head Loadi ng Faci l i t y
Ft Dr um, New Yor k
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-[___]
2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 21 16 of this IFB).
5. REPRESENTATIONS AND CERTIFICATIONS - SECTION 00 45 00 Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
Within Section 00 45 00, note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause
(1984 APR).
6. THIS PROJECT IS A MILTARY PROGRAM PROCUREMENT AND IS FUNDED BY THE
DEPARTMENT OF DEFENSE. BUY AMERICAN ACT - CONSTRUCTION MATERIALS (MAY
1993) IN ACCORDANCE WITH FAR 52.225-5 DOES NOT APPLIES.
7. Please review all bonds and accompanying documents required to be submitted. Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be
DOCUMENT 00 00 01 Page 1 accepted. Submission of such documents may render the bid or offer non-responsive and ineligible for award.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
DOCUMENT 00 00 01 Page 2
SECTION 00 00 02
CHECK LIST FOR BIDDERS
01/18
PART 1 GENERAL
ATTACHED IS IFB NO. W912DS-[___]
Rai l head Loadi ng Faci l i t y
Ft Dr um, New Yor k
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE
FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR OFFER INELIGIBLE FOR
AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED
TO THOSE LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU
IN SUBMITTING A PROPER BID
____HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
____HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION
00 45 00) PORTION OF THE SOLICITATION?
____IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
____IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY
AND ARE ALL SEALS AFFIXED?
____DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR SIGNATURES AND SEALS
AFFIXED AFTER THE DOCUMENT WAS GENERATED, AS OPPOSED TO COMPUTER
PRINTER-GENERATED SIGNATURES AND/OR SEALS?
____HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER BY ALTERING
THE PROVISIONS OF THE SOLICITATION?
____WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE ITEM?
(THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)
____ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES
LEGIBLE?
____IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY
INITIALED BY THE PERSON SIGNING THE BID?
____DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT ISA
SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID
OPENING TIME?
____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE
SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF
THE SOLICITATION.)
____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE
SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF
THE SOLICITATION.)
DOCUMENT 00 00 02 Page 1
NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS
FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT TAKES
TO ENTER THE BUILDING. BIDDERS IS RESPONSIBLE TO ENSURE THAT ITS BID
IS SUBMITTED TIMELY.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 00 02 Page 2
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
03/18
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
To be provided by Contracting Division.
1.2 BID SCHEDULE
ITEM
NO.
SUPPLIES/SERVICES EST.
QTY.
UNIT UNIT PRICE AMOUNT
BASE BID:
0001 Design and Construction of Railhead Loading Facility
1 JOB
OPTIONS:
0002 Add Concrete Paved Areas to Site ILO No Pavement
1 JOB
0003 Add Concrete Paved Areas to Site ILO No Pavement
1 JOB
0004 Add Concrete Paved Areas to Site ILO No Pavement
1 JOB
0005 POV Parking Modifications - Railhead Operations Building Parking Area Asphalt ILO Gravel, Building #6001 Parking Area Gravel ILO Existing, AHA Scale House Parking Area Gravel ILO Existing
1 JOB
0006 Replace Existing Site Lighting Fixtures and Poles on South of Site
1 JOB
0007 Overhead Canopy at Railhead 1 JOB
0008 Guard House Structure ILO No Guard House
1 JOB
TOTALS:
TOTAL BASE NO OPTIONS (ITEM 0001)
TOTAL OPTIONS (ITEMS 0002 thru 0008)
TOTAL BASE PLUS OPTIONS (ITEMS 0001 thru 0008)
NOTES:
1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.
DOCUMENT 00 10 00 Page 1
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.
3. The Basis of Evaluation will be the lowest responsive, responsible bid based on the Total Amount for the Base Bid Items plus the Optional Bid Items (Line Items 0001 thru 0008).
4. The Bid Acceptance Period is as stated on Standard Form 1442.
5. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
6. Pricing for Option Items must be valid for 450 calendar days.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 10 00 Page 2
LEFT BLANK INTENTIONALLY
DOCUMENT 00 10 00 Page 3
SECTION 00 21 16
INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFEROR
09/16
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 21 16 Page 1
DOCUMENT 00 21 16 Page 2
SECTION 00 22 10
TECHNICAL PROPOSAL DESIGN -BID-BUILD SELECTION PROCEDURES
09/17
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 22 10 Page 1
DOCUMENT 00 22 10 Page 2
SECTION 00 22 20
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
09/17
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 22 20 Page 1
DOCUMENT 00 22 20 Page 2
SECTION 00 24 00
EVALUATION FACTORS FOR AWARD
06/17
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 24 00 Page 1
DOCUMENT 00 24 00 Page 2
SECTION 00 45 00
REPRESENTATIONS AND CERTIFICATIONS
09/16
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 45 00 Page 1
DOCUMENT 00 45 00 Page 2
SECTION 00 72 00
CONTRACT CLAUSES
09/16
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 72 00 Page 1
DOCUMENT 00 72 00 Page 2
SECTION 00 90 00
WAGE RATES
06/17
PART 1 GENERAL
1.1 NOTE:
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 90 00 Page 1
DOCUMENT 00 90 00 Page 2
Colby Company Engineering
TABLE OF CONTENTS - Page 1 Railhead Loading Facility Fort Drum, NY
SECTION 01 10 00
MAY 2020
STATEMENT OF WORK
1.0 PROJECT DESCRIPTION
1.1. OBJECTIVES
1.2. SECTION ORGANIZATION
2.0 SCOPE
2.1. RAILHEAD LOADING AREA
2.2. RAILHEAD TRACK
2.3. ALERT HOLDING AREA (AHA) / SCALE HOUSE BUILDING
2.4. RAILHEAD OPERATIONS BUILDING
2.5. GUARD SHACK
2.6. PROJECT DESIGN
2.7. AMERICANS WITH DISABILITIES ACT (ADA) / ARCHITECTURAL BARRIERS ACT (ABA)
2.8. ANTITERRORISM AND FORCE PROTECTION REQUIREMENTS (AT/FP)
2.9. INSTALLATION DESIGN GUIDE/INSTALLATION PLANNING STANDARD
2.10. SUSTAINABLE DESIGN AND CONSTRUCTION
2.11. CYBERSECURITY
2.12. SECURED AREAS
2.13. WORKFLOW PROCESS
2.14. SPECIAL DESIGN CHALLENGES
2.15. GOVERNMENT-FURNISHED GOVERNMENT INSTALLED EQUIPMENT (GFGI)
2.16. BUILDING COMMISSIONING
2.17. BIRD INTRUSION PREVENTION
2.18. RADON
3.0 SITE ANALYSIS
TABLE OF CONTENTS - Page 2 Railhead Loading Facility
3.1. EXISTING SITE DESCRIPTION
3.2. CONSTRUCTION PHASING, STAGING, AND CONTRACTOR ACCESS
3.3. DEMOLITION
3.4. NEW CONSTRUCTION SITE LAYOUT GUIDELINES
3.5. LANDSCAPING
4.0 APPLICABLE CRITERIA
4.1. INDUSTRY CRITERIA
4.2. MILITARY CRITERIA
5.0 FUNCTIONAL AND AREA REQUIREMENTS
5.1. PROJECT & DESIGN REQUIREMENTS
5.2. REQUIRED ASSEMBLIES
5.3. PROJECT DESIGN
5.4. RAILHEAD OPERATIONS BUILDING
5.5. ALERT HOLDING AREA (AHA) / SCALE HOUSE BUILDING
5.6. GUARD SHACK
6.0 PROJECT SPECIFIC REQUIREMENTS
A10 FOUNDATIONS
B10 SUPERSTRUCTURE
B20 EXTERIOR ENCLOSURE
B30 ROOFING
C10 INTERIOR CONSTRUCTION
C20 STAIRS
C30 INTERIOR FINISHES
D20 PLUMBING
D30 HVAC
D40 FIRE PROTECTION
TABLE OF CONTENTS - Page 3 Railhead Loading Facility
D50 ELECTRICAL
E10 EQUIPMENT
E20 FURNISHINGS
G10 SITE PREPARATIONS
G20 SITE IMPROVEMENTS
G30 SITE CIVIL/MECHANICAL UTILITIES
G40 SITE ELECTRICAL UTILITIES
APPENDICES (VOLUME 2)
Appendix A - Geotechnical Information
Appendix B – Building Program and Room Data Sheets
Appendix C - Fire Protection Calculations
Appendix D - Existing Facility Photos
Appendix E – Sustainability Checklist
Appendix F – RFP Drawings
Appendix G – Installation Design Guidance
SECTION 01 10 00 - CHAPTER 1 Page 1 Railhead Loading Facility
1.0 PROJECT DESCRIPTION
1.1. OBJECTIVES
The project objective is to design and construct facilities for the military that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to the military projects.
For example, a Company Operations Facility has the similar function as an office/warehouse in the civilian sector; therefore the design and construction practices for a company operations facility should be consistent with the design and construction of an office/warehouse building.
MILITARY FACILITY CIVILIAN FACILITY
Alert Holding Area (AHA) / Scale House Building Office/Vehicle Maintenance Garage
Railhead Operations Building Office/Warehouse
Supporting Facilities Supporting Facilities
Army's objective is that these buildings will have a 25-year useful design life before a possible reuse/re-purpose or renovation requirement, to include normal sustainment, restoration, modernization activities and a 50-year building replacement life. Therefore, design and construction should provide an appropriate level of quality to ensure continued use of the facility over that time-period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project
OWNER.
Site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles.
Develop project site for efficiency and to convey a sense of unity or connectivity with the adjacent buildings and with the Installation as a whole.
Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the OFFEROR is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule.
The Government’s intent is to emphasize the placement of funds into functional/operational requirements.
Materials and methods should reflect this by choosing the most economical Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes and systems selected.
1.2. SECTION ORGANIZATION
This Section is organized under six major chapters.
Chapter 1 - Defines project objectives and provides a comparison between military facilities and comparable “civilian” type buildings.
Chapter 2 - Describes the scope of the project.
Chapter 3 – Describes the site analysis.
Chapter 4 - Lists applicable industry and government design criteria, generally applicable to all facility types, unless otherwise indicated in the Section and is not an all-inclusive list. Other industry and government
SECTION 01 10 00 - CHAPTER 1 Page 2 Railhead Loading Facility standards may also be used, where necessary to produce professional designs, unless they conflict with those listed.
Chapter 5 - Provides general room requirements
Chapter 6 - Contains Army Standard Design Criteria, generally applicable to all facility types, installation and project specific criteria unless otherwise indicated in Section. Criteria in Chapter 6 follows industry standard ASTM Uniformat II.
SECTION 01 10 00 - CHAPTER 2 Page 1 Railhead Loading Facility
2.0 SCOPE
Design and construct new Railhead Loading Facility consisting of a railhead loading area, railroad track, paved areas for storage and vehicle access, Alert Holding Area/Scale House Building, Railhead Operations Building, and a Guard Shack. Project site is located at the existing railhead facility site in the Building 6000 area at Ft Drum, NY. In addition to the major site features and buildings, the new Railhead Loading Facility will include supporting facilities consisting of concrete paved areas for loading and storage, parking areas (paved and gravel lots), site lighting, fencing and gates, stormwater improvements, and utility modifications.
Project includes fire protection and fire alarms, Intrusion Detection System installation (IDS), Energy Monitoring and Control Systems (EMCS), with building information systems. Heating and cooling will be self-contained systems. Additional support facilities include electrical service, security lighting, fire protection, communications, water, sewer with a lift-station, update/extension of force main, storm drainage, apron, signage, landscaping, organizational parking, parking, air conditioning, and other site improvements.
Provide compliance with Department of Defense (DOD) Minimum Antiterrorism for Building standards.
Comprehensive building and furnishings related interior design services are required. Provide Access for individuals with disabilities (ABA). Incorporate Cyber Security Measures. Design and achieve Sustainability/Energy measures. Provide facilities for a minimum life of 50 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems. All structures will comply with the UFCs, Federal, State, installation and local standards.
Where conflict exists between the standards, the most stringent requirements will govern. The project will require permitting with the New York State DEC for stormwater treatment, and associated permitting requirements. Local permitting will also be required.
2.1. RAILHEAD LOADING AREA
Construct a total of five (5) new ramps at the railhead loading area along with a concrete paved area adjacent to the rail track to allow for side loading containers. Four ramps will be constructed to align with the new rail tracks and one ramp will be constructed to align with an existing storage track to be repurposed for the railhead loading operations. Additionally, four new truck ramps (two high and two low) are to be constructed with direct access/adjacency to the railhead operations area. A canopy is to be constructed over the railhead loading area ramps at the railtracks for weather protection. Construct a lighting support structure every 100’ along the length of the track to provide operational lighting.
2.2. RAILHEAD TRACK
Construct new rail track and switches for connection to the existing track in use. A total of four rail tracks and four switches are to be constructed which will align with the ramps at the railhead loading area. The capacity of the tracks for the railhead operations will meet the minimum storage requirement of 179 railcars. Replace a section of rail with rotted ties with new ties and ballast. Ballast removed as part of the project may be disposed on site at a designated area.
2.3. ALERT HOLDING AREA (AHA) / SCALE HOUSE BUILDING
Construct a new Alert Holding Area (AHA) / Scale House Building providing two drive through vehicle bays with weigh in scales and Fixed DACMS/Profiling System. The office/administration/support function of the building includes a TCAIMS/WIMS Inspection area with up to 10 workstations, a men’s and women’s restroom, janitor closet, storage, mechanical, electrical, and telecommunications support spaces. Maximum gross area is 10,900 square feet. Contractor will provide and install Fixed DACMS/Profiling System and maintain required lane widths per the system requirements. Refer to the Building Program and Room Data Sheets in Appendix B for additional information.
SECTION 01 10 00 - CHAPTER 2 Page 2 Railhead Loading Facility
2.4. RAILHEAD OPERATIONS BUILDING
Construct a new Railhead Operations Building consisting of a common area for troops, tool storage area with overhead door, vehicle storage of three bays in width, men’s and women’s restrooms, supporting office spaces, and supporting mechanical, electrical, and telecommunications rooms. The office spaces consist of three total offices with a shared pantry area. The common area is sized to serve up to 100 troops at a time.
The maximum gross area is 11,900 square feet. Contractor will provide and install wall mounted hooks and stainless-steel shelves in common area. Refer to the Building Program and Room Data Sheets in Appendix B for additional information.
A bid option for the Railhead Operations Building includes removal of one of the vehicle storage bays for a total of two bays.
2.5. GUARD SHACK
Construct a prefabricated building with maximum gross area of 60 square feet. Building will be conditioned (heated and cooled) space with windows on all four sides of the building.
2.6. BID OPTIONS
The project involves several bid options that may be executed. The bid options are summarized below and are depicted on drawing GA-101.
OBI #1: Add Concrete Paved Areas to Site in lieu of No Pavement
• The bid option includes adding concrete paved areas for military vehicles in the marshalling area of the site.
OBI #2: Add Concrete Paved Areas to Site in lieu of No Pavement
• The bid option includes adding concrete paved areas for military vehicles in the marshalling area of the site.
OBI #3: Add Concrete Paved Areas to Site in lieu of No Pavement
• The bid option includes adding concrete paved areas for military vehicles in the marshalling area of the site.
OBI #4: Parking Area Modifications
• The bid option includes additional area for the Railhead Operations Building Parking including asphalt, the addition of gravel to the Building #6001 parking area, and the addition of gravel to the AHA Scale House parking area.
OBI #5: Replace Existing Site Lighting
• The bid option includes the replacement of site lighting fixtures on the south side of the site.
OBI #6: Overhead Canopy at Railhead
• The bid option includes the addition of an overhead canopy of the railhead loading ramp area.
OBI #7: Guard House
SECTION 01 10 00 - CHAPTER 2 Page 3 Railhead Loading Facility
• The bid option includes the design and construction of the prefabricated building and all associated infrastructure to the Guard House.
2.7. PROJECT DESIGN
Provide overall project design per Section 01 33 16.00 10, Design Data (Design After Award). The Designer of Record (DOR) is responsible for continuing the development of the schematic design documents located in Appendix G RFP Drawings based on the criteria in the DBRFP. CAD drawings will be provided to the Contractor at project award which can be used at the Contractor’s risk.
2.7.1. Site Design
Project site is located within the existing Railhead Loading Facility in the Building 6000/6001 area at Ft Drum.
Project design and construction will consider proximity to active roadways and the buildings in the vicinity of the project will maintain operations throughout the construction duration.
2.7.2. Building Designs
Contractor and Designer of Record will be responsible and provide oversight, inspection and overall project coordination throughout. Design and construction approvals are required through review, comment, resolution, and concurrence by the Government. Design and construct all structures to comply with UFC 3- 301-01 “Structural Engineering” and other criteria listed in Chapter 4.
Design Submittals will be in accordance with Design Submittal Procedures in the Specifications, and other sections of this RFP. Delegated designs and proprietary materials specified in design documents will comply with DOD regulations.
2.7.3. Technical and Design Requirements for Rooms, Product, Materials, and Finishes.
For technical and design requirements of rooms, product, materials, and finishes refer to Chapter 6. For room finishes refer to Room Data Sheets, Appendix B.
2.7.4. Interior Design
Excellence in design is a primary objective for maximizing efficiency toward fulfilling the mission objective.
Reaching this goal requires a commitment for a level of quality that includes a coordinated relationship of interior design with building design, as well as details of design that affect efficient use of facilities. Quality interior design is value added to a project as it vitally improves facility operating efficiency, attractiveness, livability, functionality, life-cycle economics, and productivity. Toward that end, the project will require a Comprehensive Interior Design (CID) demonstrating coordination of Structural Interior Design (SID) with Furniture, Fixtures & Equipment (FF&E). Interior Design includes ergonomic value, a manageable inventory of parts, and sustainable attributes are important aspects to consider.
2.7.4.1. Structural Interior Design (SID)
Structural Interior Design (SID) includes building-related finishes, colors, & materials that are physically part of the building itself, such as walls, ceilings, floor finishes, and coverings, window treatments (blinds, shades), signage, and built-in casework.
2.7.4.2. Comprehensive Interior Design (CID)
Comprehensive Interior Design is required for spatial layout of Furniture, Fixtures & Equipment (FF&E) throughout and coordination of overall color scheme of building finishes through as development for Structural Interior Design (SID). Assure coordination of color, patterns, & finishes throughout between SID & FF&E.
SECTION 01 10 00 - CHAPTER 2 Page 4 Railhead Loading Facility
2.7.4.3. Furniture, Fixtures & Equipment (FF&E):
Furniture, Fixtures and Equipment (FF&E) is defined as all movable / relocatable property and equipment within a building, room, or space. Designer of Record will develop room designs with FF&E layouts, demonstrating that design integrates physical sizes of FF&E and achieves necessary clearances, access, operability, and coordination with building systems. Development of FF&E includes layout, selection of finishes and colors to be coordinated with SID selections, and creation of specification, and procurement documentation required to procure and install FF&E under separate contract.
Procurement and installation of FF&E is NOT included in this contract. With separate funding, the Government will procure, and installed FF&E under a separate contract. Contractor will accommodate that effort with allowance for entry of FF&E vendor/installer onto this project site at appropriate time to permit completion of installation for a complete and usable facility coinciding with Beneficial Occupancy Date (BOD).
The furniture vendor/installer contract will include all electrical pre-wiring and whips for final connection to the building electrical systems however, the Contractor will make final connections to building systems under this contract. Furthermore, the General Contractor will provide all Information/Technology (IT) wiring (i.e. LAN, phone, etc.) up to and including faceplates. The Contractor shall perform connections for all freestanding systems furniture, desktops, and equipment as applicable, with services to install cable and face plates in coordination with FF&E vendor/installer to accomplish installation at the appropriate time, along with final IT connections to building systems under this contract.
The Government reserves the right to change method of procurement and installation of FF&E to be Contractor Furnished/Contractor Installed (CF/CI). CF/CI furniture will require competitive open market procurement by the Contractor using the Furniture, Fixtures, and Equipment (FF&E) package developed.
Preliminary FF&E information, including dimensions and sizes, are provided on Room Data Sheets, refer to Appendix B. Scheduled items of FF&E is not considered an all-inclusive list.
2.8. AMERICANS WITH DISABILITIES ACT (ADA) / ARCHITECTURAL BARRIERS ACT (ABA)
Project designs will achieve full compliance with Architectural Barriers Act (ABA) as required by federal law.
Architectural Barriers Act (ABA) contains scoping and technical requirements for accessibility to sites, facilities, buildings, and elements by individuals with disabilities. Apply requirements during design for new construction, additions, alterations, and lease of sites, facilities, buildings, and elements to the extent required by regulations issued by Federal agencies under the Architectural Barriers Act (ABA).
2.9. ANTITERRORISM AND FORCE PROTECTION REQUIREMENTS (AT/FP)
The project will meet the minimum requirements of UFC 4-010-01, latest version (December 2018). No specific design basis threat has been identified for the project. The project will comply with all 21 Standards contained in the UFC. Exterior site features such as dumpsters and mechanical features will be sited in accordance with unobstructed space requirements and other security measures will also be considered for the design such as protective bollards, etc.
2.10. INSTALLATION DESIGN GUIDE / INSTALLATION PLANNING STANDARD
Built environments develop a sense of community, which affect overall safety, visual appeal, sense of place, and provides visual orientation across the installation. Fort Drum, Installation Planning Standard (IPS) provides guidance for features of Site Planning, Building Standards, Circulation (pedestrian, vehicles, & trails), Signage, Road Networks, Building Material & Colors, Utilities, and Landscaping. Project design will comply with the Fort Drum, Installation Planning Standard (IPS). Fort Drum, IPS identifies project location within the South Post District, for building type use being, Industrial & Maintenance.
2.11. SUSTAINABLE DESIGN AND CONSTRUCTION
SECTION 01 10 00 - CHAPTER 2 Page 5 Railhead Loading Facility
Design and construct project to comply with sustainability requirements identified in Part 2 Section 01 33
29.05 20, Sustainability Reporting for Design-Build. Additional specific sustainability requirements are found in RFP Chapter 6 sections.
Design and construct project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
2.12. CYBERSECURITY
Design, acquire and execute all control systems (including systems separate from management utility monitoring and control system) in accordance with UFC 4-010-06 Cybersecurity of Facility-Related Control Systems and as required by individual Facilities Engineering Command (FEC) or Installation implementation policy. Design the project using UFGS 25 05 11 Cybersecurity of Facility-Related Control Systems. The Cybersecurity levels (C-I-A) identified in the UFC are Low-Low-Low for this project.
Incorporate cybersecurity requirements into project facility control systems identified in:
D30, HVAC
D40, FIRE PROTECTION
D50, ELECTRICAL
2.13. WORKFLOW PROCESS
2.13.1. Operation
The existing railhead facility will not be in operation during the execution of the project including the rails and loading ramps, however, the existing Buildings 6000 and 6001 will remain in operation and access will be maintained to the building for personnel including parking areas and walkways.
The new project will be designed for operating on a 24-hour a day schedule, using two-twelve-hour shifts per day, with a typical schedule of seven days per-week, during the railhead operations which varies. The anticipated operational usage of the facility is for up to six weeks per year at full capacity.
2.13.2. Staffing/Occupancy
The number of occupants specified in the RFP are identified for programming purposes. The DoR must confirm the occupancy used to design building features, such as structural, egress, and plumbing fixtures as required in applicable building or life safety codes.
2.14. SPECIAL DESIGN CHALLENGES
The Contractor shall understand that operational performance of the existing Buildings must remain uninterrupted throughout project duration.
2.15. GOVERNMENT-FURNISHED GOVERNMENT INSTALLED EQUIPMENT (GFGI)
Contractor shall coordinate with Contracting Officer for requirements of GFGI items scheduled, and provide design and deliver suitable structural support, brackets for projectors/VCRs/TVs, with all utility connections and space with required clearances for all GFGI items. Fire extinguishers, fire extinguisher brackets, and cabinets are Contractor furnished and installed CF/CI. All Computers and related hardware, copiers, faxes, printers, video projectors, VCRs and TVs are GFGI. For scheduled GFGI items, refer to Room Data Sheets.
2.16. BUILDING COMMISSIONING
SECTION 01 10 00 - CHAPTER 2 Page 6 Railhead Loading Facility
Provide commissioning to meet requirements identified in Section 01 91 00.15 Total Building Commissioning, and UFC 1-200-02 High Performance and Sustainable Building Requirements.
2.17. BIRD INTRUSION PREVENTION
Provide and coordinate accepted intrusion prevention measures with the environmental office for the host facility. Design intrusion prevention systems to not restrict access to building systems. Design all access required as removable panels that can be removed and replaced with the normal means of access and tools used by maintenance personnel.
2.18. RADON
Radon levels for the area are under 4/pCi/L according to the Environmental Protection Agency’s (EPA’s) Map of Radon Zones (by state). An under-slab depressurization system is not required.
CHAPTER 3 – SITE ANALYSIS- Page 1 Railhead Loading Facility
3.0 SITE ANALYSIS
Site work consists of site planning and design of all new site features buildings, roads, parking, railroad yards , walkways, fencing, demolition, earthwork / grading, storm drainage, utilities, signage, landscaping, compliance with stormwater management, erosion and sediment control, and obtaining necessary permits.
The project will also entail the expansion of railroad loading and storage yards. Currently, Fort Drum has the ability to load 122 railcars between the project site and the rail loading facility adjacent to the co-generation plant. The proposed project will construct 5 new railhead loading ramps and construct 5 new rail loading yards and re-purpose the existing main line rail at the project site to accommodate the simultaneous loading of 179 railcars.
3.1. EXISTING SITE DESCRIPTION
The project site is located within the Fort Drum Army Installation north of Lewis Avenue and south of Guard Lane. The site is accessed by multiple driveways off from Guard Lane and a single gravel road off from Lewis Avenue. The site is approximately 60 acres and is comprised of container storage areas, driveways, gravel storage areas, Building 6000 and Building 6001, concrete ramp for unloading trucks, a single concrete ramp used to load rail cars, storage and loading railroad tracks.
With the exception of the access road and parking, the site lies within a secure fenced area adjacent to the existing railroad storage yard. The site consists of sandy soils that are conducive to on site infiltration for stormwater management. The terrain is fairly flat, grades within the railhead area do not exceed 1.5%.
The existing site has all utilities necessary to serve the new facility, except a sanitary sewer force main to serve the Railhead Operations Building. An existing 10” dia. water main is located in Guard Lane. An 8” dia. water main runs southerly between Building 6000 and Building 6001 and terminates approximately 500 feet south of Building 6000. There are (3) fire hydrants located along this main. Sanitary sewer is collected from building 6000 and 6001 into a pump station located northwesterly of Building 6000.
Wastewater is pumped across Guard Lane to another Pump Station where wastewater is pumped northerly along Guard Lane. Existing overhead electrical service runs into the site and terminates at pole located west of Building 6000. Additionally, overhead electric runs along the north side of Lewis Avenue, though there are no current services that feed the railhead facility. A 2” dia. natural gas line runs along Guard Lane and provides services to Building 6000 and Building 6001. There are four catch basins that collect stormwater in a small area to the south of Building 6001, stormwater is directed to an existing open detention pond located to the west of Building 6000. The pond discharges into a swale south of Guard Lane where it appears to be collected into the drainage system that serves Guard Lane.
The existing site was once the location for the disposal of munitions and military vehicles. Previous projects revealed a constant discovery of buried military munition boxes. The POC (Range Control) has stringent notification and handling protocols that must be followed. Refer to specification 01 35 26 for additional requirements.
3.2. CONSTRUCTION PHASING, STAGING, AND CONTRACTOR ACCESS
The existing Railhead Facility adjacent to Building 6001 and surrounding site including storage areas, parking, and railroad storage and loading areas will not be operational during construction. The contractor will consider any phasing aspects in the new design in order to maintain all on-going operations of the existing rail storage yard and buildings 6000, 6001 and 6004 to the maximum extent
CHAPTER 3 – SITE ANALYSIS- Page 2 Railhead Loading Facility practicable, including but not limited to pavement construction, utilities, fencing, earth moving, railroad track and other equipment operations.
The Contractor staging and trailer areas will be contained within the project limits and will minimize the impact to the existing buildings and existing railhead operations to the maximum extent practicable. Areas to be utilized will be included in design documents and approved by the Government. Security of the site is the contractor’s responsibility and fencing (permanent and/or temporary) will be installed at the Contractors discretion within the project limits or portions thereof. Any areas disturbed by the Contractor’s staging areas not part of the new development will be stabilized against erosion and restored with top soil and seeded per landscape paragraphs herein and in accordance with New York State Department of Environmental Conservation (NYSDEC) requirements. Any pavement areas damaged during construction will be repaired at the Contractor's expense to the satisfaction of the Contracting Officer. Staging of equipment, soil stockpile, and other material will not be placed within 5 feet from any existing tree drip line.
Contractor access shall be coordinated with and approved by the Contracting Officer and all Contractor and Sub-Contractor related vehicles must strictly adhere to the approved construction access route.
3.3. DEMOLITION
The Contractor will be responsible to prepare the site for construction of new site features with proper grading and drainage. Some minor demolition will be required for this project. Some sections of railroad track requires removal, other sections of track need to be renovated. Approximately 10% of ties and all ballast needs to be replaced on the existing main line and storage track identified on the drawings. Sections of concrete apron adjacent to Building 6000 will be removed. Existing light fixtures and poles and existing fencing will be removed. Remove existing concrete truck loading ramp.
Existing gravel storage areas and areas around the proposed three buildings will be regraded to ensure stormwater will drain positively away from the buildings and towards proposed stormwater infiltration basins. A small amount of trees will need to be cleared to allow for underground electric and gas service to connect to the Railhead Operations Building from Lewis Avenue.
All existing utilities to remain on the site will be protected during the demolition and construction process. Any damage will be immediately repaired to the satisfaction of the Contracting Officer in accordance with the utility owner’s requirements at the Contractor’s expense. Utility lines not in use or abandoned as the result of construction will be completely removed to the project limits or capped at the main distribution. See the electrical and mechanical portion of the RFP for their respective demolition requirements. All utility demolition will be in compliance with the Fort Drum Utility Standards, which can be found in Appendix G. A detailed demolition plan will be developed and submitted per Section 01 33 16.
All materials will be disposed within the limits of Fort Drum. Disposal will be in accordance with the federal, state, and local regulations. The Contractor will notify the Contracting Officer if any material to be disposed of is found to contain hazardous, toxic, biological, or radiological substances. Rubbish and debris will be removed from Government property promptly to avoid accumulation at the project site.
3.4. NEW CONSTRUCTION SITE LAYOUT GUIDELINES
The finished project will consist of the Contractor designed optimum layout of all required features, including buildings, driveways, storage areas, railroad tracks, parking areas, utilities, stormwater management features and fencing. The site design will provide for vehicle access around each facility.
Sidewalks and clear areas around each facility will meet Government emergency requirements.
Additional items of consideration in siting the project features will include force protection, aesthetics, CHAPTER 3 – SITE ANALYSIS- Page 3 Railhead Loading Facility optimum drainage, earthwork (cuts and fills), fire protection, environmental/sustainability concerns, safety, and convenience for vehicles and pedestrians. Buildings are required to be handicapped accessible.
Conceptual site drawings were developed by the Government in conjunction with the expanded Railhead Facility, facility users, and Center of Standardization, and are provided as bridging documents in Appendix G. These drawings are provided for information reference only, and will be modified as required during design development to incorporate the requirements included in this RFP.
3.4.1. Siting of Facilities
The AHA Scale House will be located in a north-south alignment perpendicular with Guard Lane and far enough west to avoid any grading conflicts with the pond and far enough east to ensure at least 20 feet of separation from the existing fence line to ensure security.
The Railhead Operations Building will be located to provide walking access to the railhead ramp area and ensure that security fencing is tied into the building. A function of the building is to allow parking for personally owned vehicles and to allow for personnel to be cleared through the building to access the secure portions of the railhead facility. The building will house management and administrative personnel during rail car loading operations.
The Guard House is located at the northeastern portion of the site just to the east of Building 6001. The Guard House will be located just inside the northern edge of the fence. The Guard House will be placed adjacent to the proposed pavement and south of an access gate to inspect and regulate trucks leaving the site.
A new concrete 4-bay truck ramp (2 high ramps and 2 low ramps) will be constructed in the commercial truck yard, approximately 475 feet south of Building 6001. It is the intent to locate the ramps such that WB-67 design trucks can enter between Building 6000 and 6001 turn 180 degrees and back into the ramps. Equipment will be off-loaded and moved to the equipment staging area.
A total of 4 new railroad loading tracks will be constructed and 2 storage tracks reconstructed to accommodate the new loading ramps. Five new loading ramps will be constructed to facilitate the anticipated loading requirements of the railcars. All work will be in conformance with UFC 4-860-01FA Railroad Design and Rehabilitation.
3.4.2. Antiterrorism and Force Protection
The project will be sited to comply with UFC 4-010-01, December 2018 version, which requires a 20’ unobstructed space around the security fence. The unobstructed space requirements will be met through restriction of vegetation and other potential explosive concealment opportunities around the facility; dumpsters will be placed outside of the unobstructed space. The site will be secured with FE-7 chain link security fencing and access gates as shown on the site drawings.
3.4.3. Grading
All grading will be in conformance with applicable standards included in section 6. The concept site grading plan drawings are presented as bridging documents presenting one potential solution, but will be modified as required during design development to provide optimum drainage and balance of earthwork.
The finished floor for the AHA Scale House must be set to allow for truck traffic to enter and exit the two overhead doors located on the northerly and southerly building facades. In addition, an at-grade by
CHAPTER 3 – SITE ANALYSIS- Page 4 Railhead Loading Facility pass lane is located between the AHA Scale House and perimeter security fence. Grades are intended to slope away from the AHA Scale House at a minimum of 1 % in all directions.
The finished floor for the Rail Operations Center must be set so that the grades around the building allow for access to the garage bays through the overhead doors. Grades will uniformly slope away from the building at a minimum of 1% in all directions.
The finished floor for the Guard Shack must be set a minimum of 6” above the existing grade. The paved exit driveway runs adjacent to the Guard Shack as is necessary by its function. Grades will slope away from the Guard Shack at a minimum of 1% in every direction.
3.4.4. Utilities
Utilities will be designed in accordance with the standards and requirements included in chapter 6 and Fort Drum Utility Design Guide. Utilities shown on conceptual utility plan drawings present one potential solution, but will be modified as required during design development. Storm Drainage System, Water Distribution and Service, Sanitary Sewer Service, Gas Service, Telecommunications, and Electric utilities are described below.
Storm Drainage System
The use of storm drain structures should be minimized through the practice of open conveyances (swales and ditches) and overland sheet flows into the stormwater ponds, which will in turn rely largely on infiltration. Each pond requires two methods of pre-treatment before being allowed to infiltrate into the ground. As shown, on the Grading and Drainage Plan, a treatment swale will flow into a sediment basin before spilling into the infiltration basin. The conceptual design limits the use of storm drain structures and pipe. Storm drain structures and pipes will be used as necessary to collect roof drain leaders, specifically from the Rail Operations Building and AHA Scale Building, and as outfalls from ponds if necessary. Storm drain and drainage features shown on plans are conceptual and have not been sized through required design processes. However, the infiltration ponds have been sized to ensure that their size relative to other site improvements would allow for the site layout as required by Fort Drum.
Water Distribution and Service
A new HDPE waterline (constructed in accordance with Fort Drum Utility Standards in Appendix G) will be looped around the site and connect to the existing 10” dia. waterline located in Guard Lane. Fittings will be supplied along the waterline to accommodate the new building fire protection and domestic services including the appropriate valves. The looped main will supply both domestic and fire flows to the proposed structures as well as the (12) new fire hydrants as required by the UFC. The water system is owned and operated by Fort Drum Department of Public Works, and all design requirements will be in accordance with Fort Drum Utility Standards (Appendix G) and chapter 6 requirements. The water system design will be submitted to Army Corps of Engineers for review. The ACOE will coordinate all necessary permits with Public Works prior to construction.
Sanitary Sewer Service
The existing sanitary lift station serving Building 6000 and 6001 will be utilized to accommodate the new wastewater flows from the AHA Scale House. The Guard Shack is not equipped with a bathroom or drain, so sewer service is not required. Sanitary service to the existing buildings will remain operational during construction, either through the existing lift station or other methods designed by the Contractor and approved by the Government. Any temporary shutdowns will occur during non-working hours with prior written approval from the Government
CHAPTER 3 – SITE ANALYSIS- Page 5 Railhead Loading Facility
Wastewater flows from the Rail Operations building will need to be pumped via a force main to a sanitary sewer manhole located east of the rail yard near Building T-45. It will be necessary to directionally bore the forcemain under the existing rail road track just to the east of the Railhead Operations Parking Area. Sanitary components shown on the conceptual utility plans represent one potential solution, but all final system components will be sized and fully designed by the contractor.
The sanitary system is owned and operated by Ft Drum Department of Public Works, and all design requirements will be in accordance with Ft Drum Utility Standards (Appendix G) and chapter 6 requirements.
Gas Service
The project site is serviced by natural gas mains located in Guard Lane and Lewis Avenue. The Railhead Operations Building will be serviced from the main located in Lewis Avenue. The AHA Scale House will be serviced from the main located in Guard Lane. Regulators will be located on the outside of the buildings.
Telecommunications
The Railhead Operations Building, AHA Scale House and Guard Shack will all be connected to the Fort Drum telecommunications network via fiberoptic cable. The 48 strand fiberoptic and 200 pair copper cable will originate from Building 128 and be pulled approximately 20 feet through an existing pathway to TM 2-1. At TM 2-1 the 48 strand fiberoptic and 200 pair copper cable will be spliced in the existing fiberoptic and copper cable. The existing fiberoptic and copper cable runs between TM 2-1 and TM 2-3- 5B. Splice new 48 strand fiberoptic and copper cable at TM 2-3-5B and pull new cables to new manhole to replace handhole TM 2-3-6B. A new 6-way duct bank will be constructed parallel to Guard Lane westward to a new manhole at TM 2-3-7B. A new 2-way duct will leave TM 2-3-7B to service the AHA Scale House. A new 4-way duct will leave the TM 2-3-6B and connect to a new manhole located between Building 6000 and 6001. A 2-way duct will leave the manhole to service the Guard Shack and a separate 2-way duct will leave the manhole and service the Railhead Operations Building.
Electric
The three new proposed buildings; AHA Scale House, Railhead Operations Building and Guard Shack will all be served by underground electric services.