Fire Station 14 Workforce Privacy Project Rebid Pre-Proposal Meeting Summary
This document is a REBID Pre-Proposal Meeting presentation for the City of Long Beach regarding the Fire Station 14 Workforce Privacy Project (3005010091, R-7215 & B-4808). The project consists of interior improvements to meet required gender accommodations and accessibility requirements at 5200 E Eliot Street, Long Beach, California 90803. Work includes renovation of the second floor office, gym, sleeping areas, and restrooms into an office, laundry room, private sleeping rooms, and private restrooms; reconfiguration of the first floor Captain's Dormitory and restroom into two dormitory rooms with accessible restrooms; refurbishment and redecoration of restrooms with new plumbing fixtures, flooring, and finishes; upgrades to plumbing, HVAC, and electrical systems; and site improvements including roof replacement, new windows, smoke alarm and fire station alerting systems, parking revisions, and sidewalk/hardscape improvements. The Engineer's Estimate is $3,000,000. The mandatory pre-bid conference was held on May 3, 2023 at 9:00 AM, with an optional pre-bid job-site walk at 1:00 PM the same day. Request for Information submissions were due May 19, 2023, and bids were due electronically through Long Beach Buys on June 2, 2023 at 3:00 PM. Council award was anticipated for July 2023. The project duration is 365 calendar days inclusive of all submittals, material procurement, and work execution.
Bidders must hold a California Class A or B General Contractor license and submit bids electronically through Long Beach Buys with 10% bid security. Contractor minimum qualifications require completion of at least three projects of similar scope within the last three calendar years, with at least two projects valued at $3,000,000 or more. A 10% self-performance requirement applies to the work. The project is subject to prevailing wage requirements under California Department of Industrial Relations wage rates 2023-1, with Certified Payroll Records submitted weekly via LCPtracker and eCPR to DIR. A Project Labor Agreement applies with a 40% local hire goal for specified zip codes and a 10% Transitional Worker goal including veterans and individuals with employment barriers. The Long Beach Small Business Enterprise Program requires a combined 5.93% goal utilizing at least two of three certified business types: Small Business Enterprise, Very Small Business/Microbusiness, or Local Small Business Enterprise. Bidders must meet this goal either through an LBSBE Commitment Plan or demonstrate Good Faith Efforts. Upon award, contractors must use apprentices dispatched through official apprenticeship programs within craft ratio requirements and hire a Jobs Coordinator for targeted hiring outreach. A Labor Compliance Consultant will be assigned upon award to monitor compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REBID Pre-proposal Meeting
May 3, 2023
FIRE STATION 14 WORKFORCE PRIVACY PROJECT
3005010091 (R-7215 & B-4808)
Agenda
• Introductions
• Project Requirements
• Prevailing Wage
• LBSBE Program
• Labor Compliance
• Project Labor Agreement
• Project Overview & Scope of Work
• Bid Requirements
• Bid Schedule
• Pre-Bid Sign-In
**Please remember to use the mute button whether joining via a computer or phone to avoid disruption during the meeting.
Introductions
Name & CompanyRole
Michelle Harati (Harati Solutions)
E-mail: michelle.Harati@haratisolutions.com
Project Manager / Construction
Manager
Mary McGrath (Mary McGrath Architects)Designer
Troy Degener (Group Delta)Inspector
James Vazquez (City of Long Beach)
Marisa Olmos (City of Long Beach)
Larry Ginid (Padilla & Associates)
Jared Pappas (Padilla & Associates)
Labor Compliance Administrator
Eric Galeana (Pacific Gateway)Project Labor Agreement
Administrator
• Projects can only be awarded to a contractor registered with the California Department of Industrial Relations. Primes can only list subs that are registered with DIR on their bids.
• Wage Rates applicable to this project: 2023-1
• CPRs shall be kept weekly and submitted via LCPtracker. They shall also be submitted to DIR via eCPR
• This project will require that upon award all contractors notify apprenticeship programs of project award and request dispatch of apprentices (DAS 140/142 forms). Apprentices must be utilized within ratio requirements of each craft and must be registered in an official apprenticeship program.
• Prime is responsible for subcontractor compliance to applicable laws
• A Labor Compliance Consultant will be assigned upon award to monitor contractor compliance and provide assistance as required
Prevailing Wage Requirements
• This means 5.93% of your base bid must go to a combination of LBSBE businesses
• “Combined” means you MUST utilize at least 2 of the following LBSBE certified business types to be considered responsive to goal attainment:
• SBE – Small Business Enterprise
• VSBE – Very Small Business or Microbusiness
• LSBE – local business based within the City of Long Beach
• Contractors MUST be certified as a Long Beach Small Business Enterprise (LBSBE) to count towards goal attainment (*a valid, unexpired Long Beach Buys or PlanetBids LBSBE certification will be accepted until PlanetBids has phased out)
Long Beach Small Business Enterprise Program (LBSBE)
A Long Beach Small Business Enterprise Program (LBSBE) combined goal of 5.93% has been assigned to this bid.
• If your base bid is $3,800,000
• 5.93% of $3.8m is $225,340
• If I am a NON LBSBE Prime, I would need to subcontract to LBSBEs for a minimum of $225,340 to meet the goal. I must use at least 2 of the following LBSBE certified business types on my commitment form (SBE-2 form) to attain this:
• SBE (with LBSBE certification)
• VSBE (with LBSBE certification)
• LSBE (with LBSBE certification)
• If I am a performing LBSBE certified Prime (SBE status), I would only need to further subcontract out to either an LBSBE certified VSBE or LBSBE certified LSBE business in an amount that will make our combined cost meet or exceed the goal
• If I am a performing LBSBE that is also a VSBE or LSBE, as long as I perform at least $225,340 of the work, I do not need to sub out further
• If I cannot find enough subs to meet the combined goal amount, I must demonstrate Good Faith Efforts
Combined Goal Responsiveness Example
• Based on the scope of work for this bid, we anticipate the following associated NAICS codes for subcontracting opportunities:
• Search databases for businesses with these codes
Long Beach Small Business Enterprise Program (LBSBE)
• Long Beach Buys : https://longbeachbuys.buyspeed.com
• Planet Bids: https://pbsystem.planetbids.com/portal/15810/portal-home
• Port of Long Beach PlanetBids: https://pbsystem.planetbids.com/portal/19236/portal-home
• California Unified Certification Program Database: https://californiaucp.dbesystem.com/
• CALTRANS DBE Business Search: https://ucp.dot.ca.gov/licenseForm.htm
* If they don’t have a Long Beach Small Business Enterprise Certification, ask them to register on Long Beach Buys and submit the certification request*
Some Database Sources
• Long Beach Buys : https://longbeachbuys.buyspeed.com
• Meet the goal via the LBSBE Commitment Plan (SBE-2/Attachment B)
OR
• Show Good Faith Efforts (Attachment C plus supporting documentation)
How to Show Responsiveness
LBSBE COMMITMENT PLAN (SBE-2/Attachment B)
LBSBE Commitment Form (SBE-2 Form) Section 1
LBSBE Commitment Form (SBE-2 Form) Section 2
We verify:
- Business DIR
Registration
- LBSBE Status
- SBE/VSBE/LSBE status
- Calculations
This LBSBE form would be responsive for a 5.93% goal
If all the information is deemed verified.
If a vendor is listed with an
Expired LBSBE certification, they will not count.
EXPIRED CERT
If a vendor is listed as a status they do not have, it will not count
Exceeds VSBE threshold
Goal Not met. The verified amount is $120,000 and
3.16%. No business combination
ALWAYS VERIFY THE INFO
ON YOUR SBE-2 FORM!!!!
If you do not demonstrate goal achievement, you will need to submit Good Faith
Efforts.
Complete the last questions according to how you populated the top of Section 2. Then fill in your contact information and sign.
GOOD FAITH EFFORTS
• Attend pre-bid/pre-proposal meeting (attach copy of sign-in)
• Subdivide the work
• Advertise* (submit copy of advertisement)
• Use Public Databases (PlanetBids, PlanetBids, Chambers of Commerce, etc)
• Directly solicit small businesses* (provide copy of email, log)
Must demonstrate 7 of 10 if fail to provide a commitment plan demonstrating goal achievement
LBSBE Good Faith Efforts
• Provide additional info to interested small businesses
• Conduct follow-up (email, log)
• Offer assistance (bonding, insurance, equipment, etc)
• Negotiate (provide evidence)
• Document bid and negotiation results Detailed descriptions can be found in the LBSBE Program
Instructions
* Must occur within 14 days of bid closing or time specified by City SBE staff
LBSBE Good Faith Efforts
ALL ATTACHMENTS CAN BE FOUND IN THE LBSBE PROGRAM
PARTICIPATION INSTRUCTIONS INCLUDED IN THE BID
• Attachment A
• LBSBE Program Acknowledgement - Required for ALL bid/proposal submissions
• Attachment B
• LBSBE Program Commitment Plan (SBE-2 Form) – Required for ALL bid/proposal submissions
• Attachment C
• Good Faith Effort/Statement of GFE Compliance – Required only if you have not demonstrated goal attainment on Attachment B.
• Supporting documentation
LBSBE Required Documents
PLEASE NOTE THE LBSBE PROGRAM BID DOCUMENTS AND REQUIREMENTS HAVE CHANGED WITH THE
IMPLEMENTATION OF LONG BEACH BUYS
• Upon award, Prime must utilize subs annotated on commitment form unless receive written approval to substitute (in accordance with all applicable laws)
• Contractor shall submit monthly utilization reports to the assigned labor compliance consultant in order to track goal attainment
• Failure to adhere to commitment plan can result in up to 10% withhold
LBSBE Monitoring
• Refer to the LBSBE Participation Program Instructions included in the bid
• It is easier to meet the goal than to go through GFE
• If you have a sub you want to work with, ensure they submit an LBSBE certification request over Long Beach Buys
• Use databases to search for SBE/VSBE/LSBEs. You can find some examples in the Program Instructions (starting on page 5, under “use public databases”)
• Ensure you are filling out your Commitment Plan (SBE-2) accurately
TIPS
• Projects can only be awarded to a contractor registered with the California
Department of Industrial Relations
• Wage Rates applicable to this project: 2023-1
• CPRs shall be kept weekly and submitted via LCPtracker. They shall also be submitted to DIR via eCPR
• Total contract value over $30,000 will require that upon award all contractors utilize
DAS 140 form to notify apprenticeship programs of project award and DAS 142 form request dispatch of apprentices (72 hours in advance or need). Apprentices must be utilized within ratio requirements of each craft and must registered in an official apprenticeship program
• Prime is responsible for subcontractor compliance to applicable laws
• A Labor Compliance Consultant will be assigned upon award to monitor contractor compliance and provide assistance as required
Prevailing Wage Requirements
UNION AND NON-UNION CONTRACTORS:
Both Union and Non-Union Contractors are equally eligible to bid and win the award of contracts subject to the City’s PLA. Non-Union
Contractor Core workforce may still be used on a 1:1 ratio per craft. 1st worker from Core, 2nd from Union, 3rd from Core, 4th From Union, and so on up to 10 employees. Employee #11 and on must be dispatched from the Union Halls.
PLA FORMS:
Upon contract award, you and your subs will be required to complete and submit forms prior, during, and post construction throughout the duration of the project. Further details, will be discussed at the project’s pre-con meeting.
PLA HIRING PROVISIONS:
-The Local Hire Goal established for this project is 40% of the total hours worked within the zip codes specified within the Attached PLA.
-The Transitional Worker goal for this project is 10%. This category includes individuals with barriers to employment and veterans.
JOBS COORDINATOR:
The City will require the prime contractor to hire a "Jobs Coordinator" who shall provide additional outreach efforts in connecting Long Beach residents with job opportunities. The term Jobs Coordinator means an independent third-party individual, entity or employee with whom the prime contractor enters into a contract or employs to facilitate implementation of the targeted hiring requirements of the PLA. The Jobs
Coordinator must be able to demonstrate or document to the City the requisite qualifications and/or experience to fulfill the duties and responsibilities as outlined in the PLA provisions.
PRE-JOB CONFERENCES:
Each Primary Contractor which is awarded a Construction Contract by the City for Project work shall conduct a Pre-Job Conference with the appropriate affected Union prior to commencing work, which additionally requires that you notify the Trades Council through the assistance of the PLA Administrator.
Project Labor Agreement
Project Overview and Scope of Work
Engineer’s Estimate: $3M
DESCRIPTION OF WORK: The Work consists of interior improvements to meet required gender accommodations and accessibility improvements. Scope includes the renovation of existing second floor office, gym (add/alt), sleeping areas, restrooms into an office, laundry room, private sleeping rooms, and private restrooms. Reconfigure the first floor
Captain’s Dormitory and restroom into two (2) dormitory rooms and accessible restrooms.
Refurbish and redecorate existing and new restrooms with new plumbing fixtures, flooring, wall and ceiling finishes. Plumbing, HVAC and electrical systems will be upgraded, refurbished or added to as appropriate. Additional building improvements include a new roof, new windows/infill existing windows, new smoke alarm system, Fire Station alerting system, telephone, cable TV, and communications systems. Site improvements include revisions to existing parking, sidewalk/hardscape, entry door hardware, improvements to the storm drain lines and systems, and accessibility signage. Bids are required for the entire Work indicated on the Drawings and Specifications.
Project Site
Location:
5200 E Eliot St
Long Beach, CA 90803
Project Duration: 365 Calendar
Days (inclusive of all submittals, material procurement, and execution of the Work)
*NOTE ADJACENT COLORADO
LAGOON OPEN CHANNEL PHASE 2A
PROJECT FOR COORDINATION
Bid Requirements – Contract Documents
• Required License
Class A or B – General Contractor
• Submission of Bids
Electronic Submittal through Long Beach Buy ONLY
Note: Give yourself enough time for bid submittal as the system will close at the bid time.
• Bid Opening, Location, Day, Time
Electronic through Long Beach Buy, June 2, 2023, 3:00pm
• Bid Security
10% (see Division A, Bid Security, Page A-2)
• Self-Performance – 10% - Division H
• Contractor Minimum Qualifications – Division C
Must have completed at least three (3) projects of similar scope within the last three (3) calendar years
At least two (2) of the referenced projects must have had a hard cost value of at least $3M each
Bid Schedule
• Bid Advertisement Date:
April 20, 2023
• Mandatory Pre-Bid Conference:
May 3, 2023 9:00am
• Optional Pre-Bid Job-Site Walk:
May 3, 2023 1pm
• Request for Information (RFI) due (14 calendar days prior to Bid Opening)
May 19, 2023
• Bid Due Date & Bid Opening electronically through Long Beach Buy:
June 2, 2023 3:00pm
• Council Award (Approximate):
July 2023
Pre-Bid Sign-In
IMPORTANT: The contractor attending today’s pre-bid meeting is responsible for registering that they attended by sending an e-mail to Michelle Harati, Project Manager at michelle.Harati@haratisolutions.com by Wednesday, 5/3/23 before 5:00pm (Pacific Time).
Corrected from this morning’s presentation
Include in the e-mail:
• Contractor (Company), Address, City, State, Zip Code and Phone Number
• Company Representative who attended the WebEx pre-bid meeting
• Indicate whether Prime or Subcontractor
Failure to send the pre-bid sign-in e-mail will result in your bid being rejected as the pre-bid conference is mandatory. See Notice Inviting Bids – Division A.
For any questions or request for information (RFI), please send to michelle.harati@haratisolutions.com
Note: The City will not respond to a RFI or questions after the deadline period.