FS_1&2_Boiler_Replacement_Plans.pdf
PDF 3 MB Posted
- Attached to
- Fire Stations 1 & 2 Boiler Replacement State and local contract opportunity
- Solicitation number
- 2025-05
- Issued by
- Mclean County, Illinois
About this file
These are detailed mechanical and electrical engineering design plans for the City of Bloomington's Fire Stations 1 and 2 Boiler Replacement project. The documents include comprehensive technical drawings for mechanical equipment room plans, demolition plans, boiler heating water diagrams, gas and flue diagrams, and electrical system modifications for both fire stations located at 310 N Lee Street and 1911 Hamilton Road. The project involves replacing existing boilers with new Lochinvar PowerFin and CopperFin atmospheric boilers, including associated piping, circulation pumps, gas connections, and electrical systems. Specific requirements include installing new boiler circulation pumps, connecting to existing building automation systems, providing drain lines, and integrating temperature controls.
The technical specifications detail precise mechanical and electrical requirements, including boiler specifications with specific heat input, output, and efficiency ratings. The boilers for Fire Station 1 are two Lochinvar PowerFin PBN752 models with 750 MBH input and 638 MBH output at 85% efficiency, while Fire Station 2 will receive one Lochinvar CopperFin CHN0502 with 500 MBH input and 425 MBH output. The plans also specify safety features like heat detectors, emergency boiler shutdown switches, and carbon monoxide detectors. Electrical work includes connecting to existing power systems, routing new circuits, and ensuring compatibility with current infrastructure. The project documents indicate careful consideration of existing mechanical room limitations and the need for precise equipment integration.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Fire_Stations_1_&_2_Boiler_Replacement_(Addendum_#1_Revision).pdf | ||
| FS_1&2_Boiler_Replacement_Technical_Specs.pdf | ||
| FS_1&2_Boiler_Replacement_General_Project_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'' HWS
2'' HWR
3'' NG
M-101
M-101
(E) AHU
B
B
3'' NG
BOILER CIRC. PUMP
9'' DIA.
9'' DIA.
(E) AHU
BOILER CIRC. PUMP
2 1/2" HWR
2 1/2" HWR
2 1/2" HWS
2" NG
3" NG
5ø
5ø
(E) 3'' NG (E) 18'' FLUE STACK
(E) ISOLATION
VALVE TO
REMAIN
B-2 B-1
2'' NG
PROVIDE VENT
INCREASER (TYP)
9''
PROVIDE TRANSITION
AS REQUIRED
MZ-1
HEATING COIL
AIR SEPARATOR
HWR
HWS
2''
P-2
P-1
1 1/2''
EXP. TANK 1''
2''
2''
1 1/2''
CHEMICAL POT
FEEDER
2 1/2''
(E) HOUSEKEEPING PAD
ISOLATION VALVES TO
REMAIN (TYP).
2 1/2''
B-2 B-1
2 1/2'' HWS
STRAINER
BOILER CIRC. PUMP
2 1/2'' HWR
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
/3
/2
:3
:4
A M
PARTIAL FLOOR
PLAN - NEW WORK
EPO
TMV
JMF
05/29/24
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
N
L E
E S
T
M-101 Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM PLAN - NEW WORK
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM SECTION - NEW WORK
NEW WORK NOTES: #
Scale: N.T.S.
BOILER GAS AND FLUE DIAGRAM SECTION - NEW WORK
Scale: N.T.S.
BOILER HEATING WATER DIAGRAM - NEW WORK
MECH - BOILER SCHEDULE
MARK TAG MANUFACTURER MODEL TYPE
HEATING REQUIREMENT
EWT LWT
ELECTRICAL DATA
NOTES
HEAT INPUT
(MBH)
HEAT
OUTPUT
(MBH)
EFFICIENCY
(%) VOLTAGE PHASE
B 1 LOCHINVAR POWERFIN PBN752 ATMOSPHERIC 750 638 85 160 190 120 1 1-5
B 2 LOCHINVAR POWERFIN PBN752 ATMOSPHERIC 750 638 85 160 190 120 1 1-5
GENERAL NOTES:
NOTES:
1. FLOW THROUGH THE BOILER SHALL NOT EXCEED THE MANUFACTURER'S MAXIMUM RECOMMENDED FLOW RATE.
2. PROVIDE BOILER CIRCULATION PUMP AND PUMP CONTROLS PER MANUFACTURER'S REQUIREMENTS. 43.5 GPM, 2.1 FEET HEAD, 30 F TEMPERATURE RISE, 1/2 HP.
3. CONNECT BOILER CONTROLS TO EXISTING BAS.
4. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF NEW BOILERS ARE COMPATIBLE WITH ACCESSIBILITY LIMITATIONS TO BOILER ROOM.
5. INTERLOCK EXISTING COMBUSTION AIR DAMPER ACTUATORS TO BOILER CONTROL PANEL.
1. INSTALL NATURAL GAS PIPING TO BOILER PER MANUFACTURER'S REQUIREMENTS. PROVIDE AND INSTALL UNION AND DRIP LEG. 1. PROVIDE AND INSTALL DRAIN LINE FROM RELIEF VALVE TO FLOOR DRAIN.
2. PROVIDE AND INSTALL DRAIN LINES FROM BOILER DRAIN PORTS TO FLOOR DRAIN.
3. PROVIDE AND INSTALL DRAIN LINE FROM BOILER FLUE TO FLOOR DRAIN.
4. NEW EQUIPMENT AND DEVICES SHOWN IN THICK, SOLID LINE TYPE.
5. EXISTING EQUIPMENT AND DEVICES SHOWN IN THIN, SOLID LINE TYPE.
6. NOT ALL EXISTING EQUIPMENT TO REMAIN IS SHOWN.
7. DRAIN AND PROVIDE NEW CHEMICAL TREATMENT AS REQUIRED FOR NEW WORK.
COORDINATE WITH OWNER.
8. TEMPERATURE CONTROL INTEGRATION WORK CAN BE PERFORMED BY ANY
VENDOR THAT MEETS THE CONTRACT REQUIREMENTS AND SPECIFICATIONS.
CONTROL SYSTEM MAINTENANCE AT BOTH STATIONS IS CURRENTLY PROVIDED
BY XCELL MECHANICAL SERVICES. CONTACT CRAIG BROWN, 30068 IL RTE 9,
MACKINAW, IL 61755, OFFICE: (309) 359-3084
NO. DESCRIPTION DATE
2'' NG
2'' HWR
1-1/4'' NG DOWN
AIR SEPARATOR
B
16ø
BOILER
CIRC. PUMP
M-102
(E) 10'' FLUE
STACK
(E) 20X8 COMBUSTION
AIR DUCT
BYPASS
(E) 2'' NG
(E) 10'' FLUE STACK
1-1/4'' NG
6'' FLUE
B-1
AIR SEPARATOR
CHEMICAL TREATMENT
POT FEEDER
FLOW METER
SIDESTREAM FILTER
WALL MOUNTED
STRAINER
1''
FLOOR DRAIN
P1
P2
HWS
2'' HWR
2'' HWR
2'' HWS
2'' HWS
STRAINER
BOILER. CIRC PUMP
2'' HWR
B-1
INSTALL BYPASS PER MANUFACTURER'S
REQUIREMENTS.
BOILER CIRC.
PUMP
2'' HWR
2'' HWS
1-1/4'' NG
(E) 10'' FLUE (E) 12X20 CA DUCT
6ø
1-1/4'' NG
2'' HWR
2'' HWS
CA MOTORIZED
DAMPER
(E) 8X20 CA
DUCT
2'' NG
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
PARTIAL FLOOR
PLAN - NEW WORK
EPO
TMV
JMF
05/29/2024
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
H
A M
IL
T
O N
R D
M-102
B L O
O M
IN
G
T O
N
IL
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM - NEW WORK
Scale: N.T.S.
BOILER GAS AND FLUE DIAGRAM - NEW WORK
Scale: N.T.S.
BOILER HEATING WATER DIAGRAM - NEW WORK
NEW WORK NOTES:
MECH - BOILER SCHEDULE
MARK TAG MANUFACTURER MODEL TYPE
HEATING REQUIREMENT
EWT LWT
ELECTRICAL DATA
NOTES
HEAT
INPUT
(MBH)
HEAT
OUTPUT
(MBH)
EFFICIENCY
(%) VOLTAGE PHASE
B 1 LOCHINVAR COPPERFIN CHN0502 ATMOSPHERIC 500 425 85 160 190 120 1 1-5
NOTES:
1. FLOW THROUGH THE BOILER SHALL NOT EXCEED THE MANUFACTURER'S MAXIMUM RECOMMENDED FLOW RATE.
2. PROVIDE BOILER CIRCULATION PUMP AND PUMP CONTROLS PER MANUFACTURER'S REQUIREMENTS. 28 GPM, 1.6 FEET HEAD, 30 F TEMPERATURE RISE, 1/4 HP.
3. CONNECT BOILER CONTROLS TO EXISTING BAS.
4. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF NEW BOILER ARE COMPATIBLE WITH ACCESSIBILITY LIMITATIONS TO BOILER ROOM.
5. INTERLOCK EXISTING COMBUSTION AIR DAMPER ACTUATOR TO BOILER CONTROL PANEL.
1. INSTALL NATURAL GAS PIPING TO BOILER PER MANUFACTURER'S REQUIREMENTS. PROVIDE AND INSTALL UNION AND DRIP LEG.
# GENERAL NOTES:
1. PROVIDE AND INSTALL DRAIN LINES FROM RELIEF VALVE TO FLOOR DRAIN.
2. PROVIDE AND INSTALL DRAIN LINES FROM BOILER DRAIN PORTS TO FLOOR DRAIN.
3. PROVIDE AND INSTALL DRAIN LINE FROM BOILER FLUE TO FLOOR DRAIN.
4. NEW EQUIPMENT AND DEVICES SHOWN IN THICK, SOLID LINE TYPE.
5. EXISTING EQUIPMENT AND DEVICES SHOWN IN THIN, SOLID LINE TYPE.
6. NOT ALL EXISTING EQUIPMENT TO REMAIN IS SHOWN.
7. DRAIN AND PROVIDE NEW CHEMICAL TREATMENT AS REQUIRED FOR NEW WORK.
COORDINATE WITH OWNER.
6. TEMPERATURE CONTROL INTEGRATION WORK CAN BE PERFOMED BY ANY VENDOR
THAT MEETS THE CONTRACT REQUIREMENTS AND SPECIFICATIONS. CONTROL
SYSTEM MAINTENANCE AT BOTH STATIONS IS CURRENTLY PROVIDED BY XCELL
MECHANICAL SERVICES. CONTACT CRAIG BROWN, 30068 IL RTE 9, MACKINAW, IL
61755, OFFICE: (309) 359-3084
Scale: 1/4" = 1'-0"
MECHANICAL ROOM SECTION - NEW WORK
1-1/4'' NG DOWN
MD-101
MD-101
6ø
6ø
2'' HWR
3'' NG
(E) AHU
(E) 14x10 SA DUCT
B-1
MZ-1
HEATING COIL
AIR SEPARATOR
HWR
HWS
2''
P-2
P-1
1 1/2''
EXP. TANK 1''
2''
2''
1 1/2''
CHEMICAL POT
FEEDER
B-2
CIRC PUMP (TYP)
2''
2 1/2''
(E) HOUSEKEEPING PAD
ISOLATION VALVES TO
REMAIN (TYP).
2 1/2''
(E) AHU
2'' HWR
2'' HWS
3'' NG
(E) FLUE STACK
B-1B-2
1 1/4'' NG (TYP)(E) 3'' NG
6'' FLUE (TYP)
(E) 18'' FLUE STACK
(E) ISOLATION
VALVE TO
REMAIN
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
/3
/2
:3
:2
A M
PARTIAL FLOOR
PLAN -
DEMOLITION
EPO
TMV
JMF
05/29/24
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
N
L E
E S
T
MD-101
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM PLAN - DEMOLITION
Scale: N.T.S.
BOILER HEATING WATER DIAGRAM - DEMOLITION
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM SECTION - DEMOLITION
DEMOLITION NOTES: #
1. REMOVE BOILER, ASSOCIATED HEATING WATER CIRCULATION PUMP AND PIPING UP TO ISOLATION VALVES.
2. REMOVE NATURAL GAS PIPING SERVING BOILERS DOWNSTREAM OF SHUTOFF VALVE.
3. REMOVE FLUE DUCT FROM BOILER TO MAIN STACK.
GENERAL NOTES:
Scale: N.T.S.
BOILER GAS AND FLUE DIAGRAM - DEMOLITION
1. EQUIPMENT AND DEVICES SHOWN IN THICK, DASHED LINE
TYPE ARE TO BE REMOVED.
2. EQUIPMENT AND DEVICES SHOWN IN THIN, SOLID LINE TYPE
ARE EXISTING TO REMAIN.
3. NOT ALL EXISTING EQUIPMENT TO REMAIN IS SHOWN.
AIR SEPARATOR
FLOW METER
SIDESTREAM FILTER
WALL MOUNTED
STRAINER
1''
FLOOR DRAIN
P1
P2
HWS
2'' HWR
2'' HWR
2'' HWS
CIRC. PUMP
CHEMICAL TREATMENT
POT FEEDER
2'' NG
2'' HWR
2'' NG DOWN
MD-102
AIR SEPARATOR
10'' DIA.
2'' HWS
1'' NG
(E) 20X12 COMBUSTION AIR
DUCT UP IN CHASE
(E) 20X8 COMBUSTION
AIR DUCT
(E) 10'' FLUE
7'' FLUE
2'' NG
1'' NG
2'' HWR
2'' HWS
(E) 2'' NG
7'' FLUE
10'' FLUE
1'' NG
(E) 10'' FLUE STACK
B-1
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
PARTIAL FLOOR
PLAN-DEMOLITION
EPO
TMV
JMF
05/29/2024
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
H
A M
IL
T
O N
R D
MD-102
B L O
O M
IN
G
T O
N
IL
Scale: N.T.S.
BOILER HEATING WATER DIAGRAM - DEMOLITION
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM SECTION - DEMOLITION
Scale: N.T.S.
BOILER GAS AND FLUE DIAGRAM - DEMOLITION
DEMOLITION NOTES: #
1. REMOVE BOILER, ASSOCIATED HEATING WATER CIRCULATION PUMP AND PIPING UP TO ISOLATION VALVES.
2. REMOVE NATURAL GAS PIPING SERVING BOILERS DOWNSTREAM OF SHUTOFF VALVE.
3. REMOVE FLUE DUCT FROM BOILER TO MAIN STACK.
STRAINER
GENERAL NOTES:
1. EQUIPMENT AND DEVICES SHOWN IN THICK, DASHED LINE
TYPE ARE TO BE REMOVED.
2. EQUIPMENT AND DEVICES SHOWN IN THIN, SOLID LINE TYPE
ARE EXISTING TO REMAIN.
3. NOT ALL EXISTING EQUIPMENT TO REMAIN IS SHOWN.
BRANCH CIRCUIT WIRE SIZE SCHEDULE (GENERAL)
PROVIDE CONDUCTORS FOR 120 & 277 VOLT, 1-PHASE CIRCUITS IN ACCORD WITH THIS
SCHEDULE TO COMPENSATE FOR VOLTAGE DROP. SEE DWGS FOR SPECIFIC REQS.
DISTANCE FOR 120 VOLT CIRCUITS
1' TO 100' 101' TO 160' 161' TO 200' 261' TO 410'
120 VOLT
WIRE SIZE
#12 (AWG) #10 (AWG) #8 (AWG) #6 (AWG)
DISTANCE FOR 277 VOLT CIRCUITS
1' TO 140' 141' TO 225' 226' TO 360' 361' TO 570'
277 VOLT
WIRE SIZE #12 (AWG) #10 (AWG) #8 (AWG) #6 (AWG)
CIRCUIT DISTANCES ARE ONE-WAY TO THE LAST DEVICE OR FIXTURE.
TAPS WITH #12 FOR CONNECTION TO THE LAST DEVICE SHALL NOT EXCEED 15'.
WIRE SIZES FOR 208 VOLT AND 480 VOLT SINGLE PHASE AND THREE PHASE CIRCUITS
ARE NOTED ON THE DRAWINGS.
TYPE: NAME
VOLT-PHASE:
FED FROM:
PER EQUIP.
SOURCE
INSTALLED: YEAR
2-1/2"
LENGTH AS REQUIRED
REFER TO SPECIFICATION SECTION 260000 FOR
EQUIPMENT TYPES REQUIRING LABELS AND
ADDITIONAL REQUIREMENTS
PUSH BUTTON/EPO SWITCH
ELECTRICAL SYMBOLS - POWER
SYMBOL DESCRIPTION
DUPLEX RECEPTACLE
"S" = SECURITY, "C" = SWITCH CONTROLLED
"GF" = GROUND FAULT, "U" = USB PORT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX, "AC" = ABOVE COUNTER
SPECIAL PURPOSE RECEPTACLE
"WP" = WEATHERPROOF BOX
QUADRUPLEX RECEPTACLE
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
SIMPLEX RECEPTACLE
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
DUPLEX RECEPTACLE - FLOOR MOUNTED
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
DUPLEX RECEPTACLE - CEILING MOUNTED
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
COMBINATION STARTER & DISCONNECT SWITCH
JUNCTION BOXJ
MOTOR
DISCONNECT SWITCH - FUSIBLE
DISCONNECT SWITCH - NON-FUSIBLE
ELECTRICAL SYMBOLS - SPECIAL SYSTEMS
SYMBOL DESCRIPTION
HEAT DETECTOR, "FT" = FIXED TEMPERATURE
COMBINATION SMOKE/CARBON MONOXIDE DETECTOR
EQUIPMENT - SIZE & TYPE AS SHOWN
VARIABLE SPEED DRIVEVFD
FRACTIONAL MOTOR STARTERF
MANUAL MOTOR STARTERM
SURGE PROTECTIVE DEVICE
208V PANELBOARD - NORMAL BRANCH
APPROVED BY
CHECKED BY
A
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SEAL
REVISIONS
23456
B
C
D
E
F Dewberry Engineers, Inc.
401 SW Water Street Suite 701 Peoria IL 61602
309.282.8000 Phone
309.282.8001 Fax
IL DESIGN FIRM REG.
#184005007-0006
E-001
ELECTRICAL
SYMBOLS,
ABBREVIATIONS,
& NOTES
RLB
MJM
MJM
05/29/24
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
B L O
O M
IN
G
T O
N I
L
N
L E
E S
T
BLOOMINGTON IL, 61701 Fax
IS
S
U E
D F
O R
B
ID
GENERAL NOTES - DEMOLITION
1. DISCONNECT AND REMOVE ALL DEVICES SHOWN OR INDICATED
ALONG WITH ALL ASSOCIATED CONDUIT, WIRE, SUPPORTS, AND
OTHER HARDWARE.
2. ALL EQUIPMENT SHALL REMAIN IN PLACE AND OPERATIONAL
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT, CONDUIT,
AND CIRCUITS PRIOR TO REMOVAL OF ANY EQUIPMENT.
4. ALL EXISTING RACEWAY AND WIRING THAT ARE TO REMAIN IN THE
AREA OF WORK SHALL BE RELOCATED AS REQUIRED TO
ACCOMMODATE THE PROPOSED CONSTRUCTION. CONTRACTOR
SHALL FIELD VERIFY ALL RACEWAY AND WIRING TO REMAIN PRIOR
TO START OF WORK. ALL RELOCATION SHALL BE COORDINATED
WITH THE ARCHITECT AND OWNER. PROVIDE TEMPORARY
CONNECTIONS TO EQUIPMENT AND DEVICES TO MAINTAIN
EQUIPMENT AND SYSTEMS IN SERVICE. ALL DOWNTIME
REQUIRED FOR INSTALLATION OF TEMPORARY CONNECTIONS
SHALL BE COORDINATED WITH THE OWNER.
5. EXCEPT WHERE OTHERWISE NOTED, ALL REMOVED ELECTRICAL
EQUIPMENT, DEVICES, CONDUIT, CONDUCTORS, BOXES,
FIXTURES, AND ASSOCIATED ITEMS SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN
ACCORDANCE WITH ALL CODES AND REGULATIONS.
6. STORE ANY DEVICES TO BE REUSED AND REINSTALL WHERE
SHOWN ON DRAWINGS.
7. DISCONNECT AND REMOVE ALL ELECTRICAL CONNECTIONS TO
ALL MECHANICAL UNITS BEING REMOVED IN AREA OF WORK.
COORDINATE WITH MECHANICAL.
8. REMOVE ALL EXISTING UNUSED ELECTRICAL DEVICES, CONDUIT,
AND WIRING BACK TO NEAREST ACTIVE JUNCTION BOX OUTSIDE
AREA OF WORK. FURNISH AND INSTALL INSULATED WIRING
CONNECTORS ON CONDUCTORS AND INSTALL PLUGS IN ALL
UNUSED KNOCKOUTS ON BOXES.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUITY OF ALL
EXISTING CIRCUITS AND SYSTEMS TO REMAINING DEVICES AND
SYSTEMS WHICH MAY BE AFFECTED BY AREA OF WORK.
10. DEMOLITION AND REMOVAL OF EXISTING EQUIPMENT SHALL BE
PHASED IN ACCORDANCE WITH CONTRACT DOCUMENTS AND
OWNERS REQUIREMENTS. PROVIDE TEMPORARY CONNECTIONS
TO EXISTING EQUIPMENT AND DEVICES TO MAINTAIN OPERATION
DURING EACH PHASE OF CONSTRUCTION.
Scale: N.T.S.
ELECTRICAL EQUIPMENT LABELING
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY NOT
APPLY TO THIS PROJECT.
ABBREVIATIONS - ELECTRICAL
IMC INTERMEDIATE METALLIC CONDUIT
JB JUNCTION BOX
K KELVIN
KCMIL THOUSAND CIRCULAR MILLS
KVA KILOVOLT-AMPERES
KW KILOWATT
LED LIGHT EMITTING DIODE
LFMC LIQUID TIGHT FLEXIBLE METALLIC CONDUIT
LP LIGHTING PANEL
LSIG LONG, SHORT, INSTANTANEOUS & GROUND
LTG LIGHTING
LV LOW VOLTAGE
LVRC LOW VOLTAGE RELAY CABINET
MATL MATERIAL
MC METAL CLAD CABLE
MCA MAXIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MTR MOTOR
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NECA NATIONAL ELECTRICAL CONTRACTORS
ASSOCIATION
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHTING
NO NUMBER
NTS NOT TO SCALE
OCC OCCUPANCY (SENSOR)
P POLE
PB PULL BOX
PH, Ø PHASE
PNL PANEL
POE POWER OVER ETHERNET
PP POWER PANEL
PVC POLYVINYL CHLORIDE
PWR POWER
QTY, QUAN QUANTITY
R REMOVE
RAF RETURN AIR FAN
RCP REFLECTED CEILING PLAN
REC, RECP RECEPTACLE
REQ, REQ'D REQUIRED
RHC REHEAT COIL
RMC RIGID METALLIC CONDUIT
RNC RIGID NON-METALLIC CONDUIT
RP RECEPTACLE PANEL
RR REMOVE AND RELOCATE
RTU ROOF TOP UNIT
SBD, SWBD SWITCHBOARD
SGR, SWGR SWITCHGEAR
SMK SMOKE
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SSU SWITCH & FUSE UNIT (BUSS)
STD STANDARD
TEMP TEMPORARY
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTABLE POWER SUPPLY
V VOLTS
VA VOLT AMPERES
VFD VARIABLE FREQUENCY DRIVE
W WATT
WG WIRE GUARD
XFMR TRANSFORMER
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY NOT
APPLY TO THIS PROJECT.
ABBREVIATIONS - ELECTRICAL
A, AMP AMPERE
AC ABOVE CEILING
ADA AMERICANS WITH DISABILITIES ACT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AL, ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BRKR, BKR BREAKER
BTU BRITISH THERMAL UNIT
C CONDUIT
C/B, CB CIRCUIT BREAKER
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CL CENTERLINE
CLG CEILING
CNT CONTACTS
CP CIRCULATING PUMP
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
CUH CABINET UNIT HEATER
CWP COLD WATER PUMP
DD DUCT DETECTOR
DET DETECTOR
DIA DIAMETER
DN DOWN
DP DISTRIBUTION PANEL
DTEN DETENTION
DWG DRAWING
E EXISTING
EA EACH
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMT ELECTRICAL METALLIC TUBING
EOL END OF LINE RESISTOR
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRICAL WATER HEATER
EXH EXHAUST
FA FIRE ALARM
FC FOOTCANDLE
FCU FAN COIL UNIT
FFB FROM FLOOR BELOW
FLA FULL LOAD AMPS
FLEX FLEXIBLE CONDUIT CONNECTION
FLR FLOOR
FTU FAN TERMINAL UNIT
G GROUND
GALV GALVANIZED
GEN GENERATOR
GFCI, GF GROUND FAULT CIRCUIT INTERRUPTER
GRC, GRMC GALVANIZED RIGID METALLIC CONDUIT
GUH GAS UNIT HEATER
GWAF GAS WARM AIR FURNACE
GWH GAS WATER HEATER
HP HORSE POWER
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
HWP HOT WATER PUMP
Hz HERTZ, FREQUENCY
IC INSULATED CAN
ELECTRICAL GENERAL NOTES
1. REFER TO SHEET E-001 (THIS SHEET) ELECTRICAL SYMBOLS,
ABBREVIATIONS FOR DESCRIPTIONS OF ALL GRAPHIC SYMBOLS USED ON
THESE DRAWINGS.
2. ALL EQUIPMENT, DEVICES, AND FIXTURES DEPICTED IN THESE DRAWINGS
ARE BASIS OF DESIGN ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING THE EXACT INSTALLATION REQUIREMENTS OF ACTUAL
EQUIPMENT PROVIDED WITH ALL OTHER TRADES.
3. ALL WIRING SHALL BE IN CONDUIT, UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL CALCULATE FOR AND INCREASE WIRE SIZE TO
COMPENSATE FOR VOLTAGE DROP.
5. FURNISH, INSTALL, AND ROUTE ALL CONDUIT AND WIRING REQUIRED FOR A
COMPLETE, OPERATING ELECTRICAL SYSTEM FOR ALL EQUIPMENT USING
THE PANELBOARD AND CIRCUIT NUMBERS SHOWN ON THE PLANS. ALL
WIRING SHALL BE #12 AWG (MINIMUM) INSTALLED IN 3/4 INCH DIAMETER
CONDUIT (MINIMUM).
6. ALL CONDUITS SHALL BE INSTALLED CONCEALED FROM VIEW ABOVE
CEILINGS AND IN WALLS OR FLOORS EXCEPT IN MECHANICAL ROOMS AND
ON CEILINGS OF AREAS WITH EXPOSED STRUCTURE. EXPOSED CONDUIT
AND BOXES SHALL BE PAINTED TO MATCH ADJACENT EXISTING STRUCTURE.
7. WIRE SIZES SHALL REMAIN CONSISTENT THROUGHOUT THE ENTIRE CIRCUIT.
8. PROVIDE A DEDICATED GROUNDING CONDUCTOR FOR EACH A-B-C PHASE
GROUPING FOR ALL 20 AMP CIRCUITS. FOR ANY CIRCUIT GREATER THAN 20
AMPS AND FOR ANY MULTI-PHASE DEVICE OR PIECE OF EQUIPMENT,
PROVIDE A DEDICATED GROUNDING CONDUCTOR OF THE SIZE REQUIRED
UNLESS OTHERWISE NOTED.
9. PROVIDE STEEL SLEEVES IN ALL FIRE WALLS, SMOKE WALLS, OR
COMBINATION SMOKE/FIRE WALLS FOR CONDUIT/WIRING PENETRATIONS.
PROVIDE FIRE SEALANT FOR ALL PARTITION TYPES OF EQUIVALENT RATING
AFTER ALL WIRING IS INSTALLED. REFER TO CODE PLAN.
10. UNLESS OTHERWISE NOTED, ALL CIRCUITS SHALL ORIGINATE FROM THE
PANELBOARD AREA SHOWN.
11. ALL CIRCUITS SHALL CONTAIN DEDICATED NEUTRAL CONDUCTORS, UNLESS
SHOWN OTHERWISE.
12. REFER TO MECHANICAL DRAWINGS FOR ALL EQUIPMENT INFORMATION.
COORDINATE ALL REQUIREMENTS WITH OTHER TRADES.
13. FINAL CONNECTIONS TO ALL MOTORS, VIBRATING EQUIPMENT, AND OTHER
EQUIPMENT REQUIRING FLEXIBLE CONNECTIONS SHALL BE WITH LIQUID
TIGHT CONDUIT.
14. ALL EMPTY CONDUITS SHALL HAVE PULL STRINGS INSTALLED PER
SPECIFICATIONS.
15. EXPOSED CONDUIT ENDS SHALL BE FITTED WITH PLASTIC BUSHINGS.
16. PROVIDE ALL WIRING AND CONNECTIONS SHOWN ON DRAWINGS, LISTED IN
SPECIFICATIONS, AND AS REQUIRED FOR FULLY OPERABLE COMMUNICATION
SYSTEMS.
17. FURNISH AND INSTALL A COMPLETE RACEWAY SYSTEM (3/4 INCH CONDUIT
(MINIMUM) WITH PULL AND OUTLET BOXES) FOR THE FIRE ALARM SYSTEM
18. ALL FIRE ALARM STROBE UNITS AND OTHER WALL MOUNTED VISUAL DEVICES
SHALL BE MOUNTED AT 80" A.F.F.
19. PROVIDE ALL RACEWAY, CABLE, CONNECTIONS, AND PROGRAMMING.
PROVIDE ALL FIRE ALARM INTERFACE FOR ALL FIRE PROTECTION,
ARCHITECTURAL, AND MECHANICAL EQUIPMENT AS REQUIRED.
20. ALL WORK SHALL BE PHASED IN ACCORDANCE WITH CONTRACT DRAWINGS
AND OWNERS REQUIREMENTS.
No. Description Date
I LL I NO I S
062-061703
LICENSED
PROFESSIONAL
ENGINEER
OF
J.
M
LEAH
CI S
McTAV
I H
EXP: 11-30-2025
DATE: 05-28-2024
PUSH BUTTON/EPO SWITCH
ELECTRICAL SYMBOLS - POWER
SYMBOL DESCRIPTION
DUPLEX RECEPTACLE
"S" = SECURITY, "C" = SWITCH CONTROLLED
"GF" = GROUND FAULT, "U" = USB PORT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX, "AC" = ABOVE COUNTER
SPECIAL PURPOSE RECEPTACLE
"WP" = WEATHERPROOF BOX
QUADRUPLEX RECEPTACLE
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
SIMPLEX RECEPTACLE
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
DUPLEX RECEPTACLE - FLOOR MOUNTED
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
DUPLEX RECEPTACLE - CEILING MOUNTED
"GF" = GROUND FAULT
"IG" = ISOLATED GROUND
"WP" = WEATHERPROOF BOX
COMBINATION STARTER & DISCONNECT SWITCH
JUNCTION BOXJ
MOTOR
DISCONNECT SWITCH - FUSIBLE
DISCONNECT SWITCH - NON-FUSIBLE
ELECTRICAL SYMBOLS - SPECIAL SYSTEMS
SYMBOL DESCRIPTION
HEAT DETECTOR, "FT" = FIXED TEMPERATURE
COMBINATION SMOKE/CARBON MONOXIDE DETECTOR
EQUIPMENT - SIZE & TYPE AS SHOWN
VARIABLE SPEED DRIVEVFD
FRACTIONAL MOTOR STARTERF
MANUAL MOTOR STARTERM
SURGE PROTECTIVE DEVICE
208V PANELBOARD - NORMAL BRANCH
TYPE: NAME
VOLT-PHASE:
FED FROM:
PER EQUIP.
SOURCE
INSTALLED: YEAR
2-1/2"
LENGTH AS REQUIRED
REFER TO SPECIFICATION SECTION 260000 FOR
EQUIPMENT TYPES REQUIRING LABELS AND
ADDITIONAL REQUIREMENTS
BRANCH CIRCUIT WIRE SIZE SCHEDULE (GENERAL)
PROVIDE CONDUCTORS FOR 120 & 277 VOLT, 1-PHASE CIRCUITS IN ACCORD WITH THIS
SCHEDULE TO COMPENSATE FOR VOLTAGE DROP. SEE DWGS FOR SPECIFIC REQS.
DISTANCE FOR 120 VOLT CIRCUITS
1' TO 100' 101' TO 160' 161' TO 200' 261' TO 410'
120 VOLT
WIRE SIZE
#12 (AWG) #10 (AWG) #8 (AWG) #6 (AWG)
DISTANCE FOR 277 VOLT CIRCUITS
1' TO 140' 141' TO 225' 226' TO 360' 361' TO 570'
277 VOLT
WIRE SIZE #12 (AWG) #10 (AWG) #8 (AWG) #6 (AWG)
CIRCUIT DISTANCES ARE ONE-WAY TO THE LAST DEVICE OR FIXTURE.
TAPS WITH #12 FOR CONNECTION TO THE LAST DEVICE SHALL NOT EXCEED 15'.
WIRE SIZES FOR 208 VOLT AND 480 VOLT SINGLE PHASE AND THREE PHASE CIRCUITS
ARE NOTED ON THE DRAWINGS.
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
/3
/2
:4
:4
A M
ELECTRICAL
SYMBOLS,
ABBREVIATIONS &
NOTES
RLB
MJM
MJM
05/29/2024
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
H
A M
IL
T
O N
R D
E-002
B L O
O M
IN
G
T O
N
IL
Scale: N.T.S.
ELECTRICAL EQUIPMENT LABELING
GENERAL NOTES - DEMOLITION
1. DISCONNECT AND REMOVE ALL DEVICES SHOWN OR INDICATED
ALONG WITH ALL ASSOCIATED CONDUIT, WIRE, SUPPORTS, AND
OTHER HARDWARE.
2. ALL EQUIPMENT SHALL REMAIN IN PLACE AND OPERATIONAL
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT, CONDUIT,
AND CIRCUITS PRIOR TO REMOVAL OF ANY EQUIPMENT.
4. ALL EXISTING RACEWAY AND WIRING THAT ARE TO REMAIN IN THE
AREA OF WORK SHALL BE RELOCATED AS REQUIRED TO
ACCOMMODATE THE PROPOSED CONSTRUCTION. CONTRACTOR
SHALL FIELD VERIFY ALL RACEWAY AND WIRING TO REMAIN PRIOR
TO START OF WORK. ALL RELOCATION SHALL BE COORDINATED
WITH THE ARCHITECT AND OWNER. PROVIDE TEMPORARY
CONNECTIONS TO EQUIPMENT AND DEVICES TO MAINTAIN
EQUIPMENT AND SYSTEMS IN SERVICE. ALL DOWNTIME
REQUIRED FOR INSTALLATION OF TEMPORARY CONNECTIONS
SHALL BE COORDINATED WITH THE OWNER.
5. STORE ANY DEVICES TO BE REUSED AND REINSTALL WHERE
SHOWN ON DRAWINGS.
6. FURNISH AND INSTALL BLANK PLATES FOR ALL DEVICES BEING
REMOVED FROM OUTLET BOXES ON WALLS OR
CEILINGS-TO-REMAIN, WHICH ARE NOT BEING USED FOR NEW
DEVICES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUITY OF ALL
EXISTING CIRCUITS AND SYSTEMS TO REMAINING DEVICES AND
SYSTEMS WHICH MAY BE AFFECTED BY AREA OF WORK.
8. DEMOLITION AND REMOVAL OF EXISTING EQUIPMENT SHALL BE
PHASED IN ACCORDANCE WITH CONTRACT DOCUMENTS AND
OWNERS REQUIREMENTS. PROVIDE TEMPORARY CONNECTIONS
TO EXISTING EQUIPMENT AND DEVICES TO MAINTAIN OPERATION
DURING EACH PHASE OF CONSTRUCTION.
ELECTRICAL GENERAL NOTESELECTRICAL GENERAL NOTESELECTRICAL GENERAL NOTES
10. UNLESS OTHERWISE NOTED, ALL CIRCUITS SHALL ORIGINATE FROM THE
PANELBOARD AREA SHOWN.
11. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR ALL EQUIPMENT
INFORMATION. COORDINATE ALL REQUIREMENTS WITH OTHER TRADES.
12.
FINAL CONNECTIONS TO ALL MOTORS, VIBRATING EQUIPMENT, AND OTHER
EQUIPMENT REQUIRING FLEXIBLE CONNECTIONS SHALL BE WITH LIQUID
TIGHT CONDUIT.
13. ALL EMPTY CONDUITS SHALL HAVE PULL STRINGS INSTALLED PER
SPECIFICATIONS.
14. FURNISH AND INSTALL A COMPLETE RACEWAY SYSTEM (1/2) INCH CONDUIT
(MINIMUM) WITH PULL AND OUTLET BOXES) FOR THE FIRE ALARM & CO
DETECTION SYSTEMS.
15. ALL WORK SHALL BE PHASED IN ACCORDANCE WITH CONTRACT DRAWINGS
AND OWNERS REQUIREMENTS.
16. ALL CIRCUITS SHALL CONTAIN DEDICATED NEUTRAL CONDUCTORS, UNLESS
SHOWN OTHERWISE.
ELECTRICAL GENERAL NOTES
1. REFER TO SHEET E-001 (THIS SHEET) ELECTRICAL SYMBOLS,
ABBREVIATIONS FOR DESCRIPTIONS OF ALL GRAPHIC SYMBOLS USED ON
THESE DRAWINGS.
2. ALL EQUIPMENT, DEVICES, AND FIXTURES DEPICTED IN THESE DRAWINGS
ARE BASIS OF DESIGN ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING THE EXACT INSTALLATION REQUIREMENTS OF ACTUAL
EQUIPMENT PROVIDED WITH ALL OTHER TRADES.
3. ALL WIRING SHALL BE IN CONDUIT, UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL CALCULATE FOR AND INCREASE WIRE SIZE TO
COMPENSATE FOR VOLTAGE DROP.
5. FURNISH, INSTALL, AND ROUTE ALL CONDUIT AND WIRING REQUIRED FOR A
COMPLETE, OPERATING ELECTRICAL SYSTEM FOR ALL EQUIPMENT USING
THE PANELBOARD AND CIRCUIT NUMBERS SHOWN ON THE PLANS. ALL
WIRING SHALL BE #12 AWG (MINIMUM) INSTALLED IN 3/4 INCH DIAMETER
CONDUIT (MINIMUM).
6. ALL CONDUITS SHALL BE INSTALLED CONCEALED FROM VIEW ABOVE
CEILINGS AND IN WALLS OR FLOORS EXCEPT IN MECHANICAL ROOMS AND
ON CEILINGS OF AREAS WITH EXPOSED STRUCTURE. EXPOSED CONDUIT
AND BOXES SHALL BE PAINTED TO MATCH ADJACENT EXISTING
STRUCTURE.
7. WIRE SIZES SHALL REMAIN CONSISTENT THROUGHOUT THE ENTIRE
CIRCUIT.
8. PROVIDE A DEDICATED GROUNDING CONDUCTOR FOR EACH A-B-C PHASE
GROUPING FOR ALL 20 AMP CIRCUITS. FOR ANY CIRCUIT GREATER THAN 20
AMPS AND FOR ANY MULTI-PHASE DEVICE OR PIECE OF EQUIPMENT,
PROVIDE A DEDICATED GROUNDING CONDUCTOR OF THE SIZE REQUIRED
UNLESS OTHERWISE NOTED.
9. PROVIDE STEEL SLEEVES IN ALL FIRE WALLS, SMOKE WALLS, OR
COMBINATION SMOKE/FIRE WALLS FOR CONDUIT/WIRING PENETRATIONS.
PROVIDE FIRE SEALANT FOR ALL PARTITION TYPES OF EQUIVALENT RATING
AFTER ALL WIRING IS INSTALLED. REFER TO CODE PLAN.
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY NOT
APPLY TO THIS PROJECT.
ABBREVIATIONS - ELECTRICAL
MW MEGAWATT
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NF NOT FUSED / NON-FUSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NFSS NON-FUSED SAFETY SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHTING
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O.L. OVERLOAD
OCPD OVERCURRENT PROTECTIVE DEVICE
P POLE
PB PULL BOX
PH, Ø PHASE
PLC PROGRAMMABLE LOGIC CONTROLLER
PNL PANEL
POE POWER OVER ETHERNET
PP POWER PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
PWR POWER
QTY QUANTITY
R REMOVE
RCP REFLECTED CEILING PLAN
REC, RECP RECEPTACLE
REQ, REQ'D REQUIRED
RMC RIGID METALLIC CONDUIT
RNC RIGID NON-METALLIC CONDUIT
RP RECEPTACLE PANEL
RTS REMOTE TEST SWITCH
SBD, SWBD SWITCHBOARD
SDP SECONDARY DISTRIBUTION PANEL
SGR, SWGR SWITCHGEAR
SP SINGLE POLE
SPD SURGE PROTECTIVE DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPST SINGLE POLE SINGLE THROW
SS SAFETY SWITCH
ST SHUNT TRIP
STD STANDARD
STR MOTOR STARTER
SW SWITCH
SYM SYMMETRICAL
TEL, TELE TELEPHONE
TEMP TEMPORARY
TGB TELECOMMUNICATIONS GROUND BAR
TTB TELEPHONE TERMINAL BOARD
TYP TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTABLE POWER SUPPLY
USB UNIVERSAL SERIAL BUS
V VOLTS
VA VOLT AMPERES
VAR VOLT AMPERES REACTIVE
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOIP VOICE OVER INTERNET PROTOCOL
W WIRE
W WATT
WG WIRE GUARD
XFR, XFMR TRANSFORMER
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY NOT
APPLY TO THIS PROJECT.
ABBREVIATIONS - ELECTRICAL
FO FIBER OPTIC
FSS FUSED SAFETY SWITCH
FTL FEED-THRU LUGS
FU FUSE
FURN FURNITURE
FVNR FULL VOLTAGE NON-REVERSING
G, GND GROUND
GALV GALVANIZED
GEN GENERATOR
GFCI, GF GROUND FAULT CIRCUIT INTERRUPTER
GFEP GROUND FAULT EQUIPMENT PROTECTION
GFP GROUND FAULT PROTECTION
GRC, GRMC GALVANIZED RIGID METALLIC CONDUIT
HCF MC HEALTHCARE FACILITY METAL-CLAD
HID HIGH INTENSITY DISCHARGE
HL HORN LIGHT
HOA HAND OFF AUTO
HORIZ HORIZONTAL
HP HORSE POWER
HT HEIGHT
HV HIGH VOLTAGE
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
HWP HOT WATER PUMP
Hz HERTZ, FREQUENCY
IDF NTERMEDIARY DISTRIBUTION FRAME
IG ISOLATED GROUND
IMC INTERMEDIATE METALLIC CONDUIT
INCAN INCANDESCENT
INT INTERLOCK
IPC INTEGRATED POWER CENTER
IS INTRINSICALLY SAFE
ISO ISOLATED
JB, JBOX JUNCTION BOX
K KELVIN
KCMIL THOUSAND CIRCULAR MILLS
KV KILOVOLT
KVA KILOVOLT-AMPERES
KVAR KILOVOLT-AMPERES REACTIVE
KW KILOWATT
KWH KILOWATT-HOUR
LCP LIGHTING CONTROL PANEL
LED LIGHT EMITTING DIODE
LFMC LIQUID TIGHT FLEXIBLE METALLIC CONDUIT
LP LIGHTING PANEL
LRA LOCKED ROTOR AMPS
LS LIFE SAFETY
LS LIMIT SWITCH
LSIG LONG, SHORT, INSTANTANEOUS & GROUND
LTG LIGHTING
LTS LIGHTS
LV LOW VOLTAGE
MC METAL CLAD CABLE
MCA MAXIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCCB MOLDED CASE CIRCUIT BREAKER
MCP MOTOR CIRCUIT PROTECTOR
MDF MAIN DISTRIBUTION FRAME
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MI MINERAL INSULATED
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MTG MOUNTING
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
THIS IS A MASTER ABBREVIATIONS LIST. SOME ABBREVIATIONS MAY NOT
APPLY TO THIS PROJECT.
ABBREVIATIONS - ELECTRICAL
A, AMP AMPERE
AC ALTERNATING CURRENT
AC ABOVE CEILING
AC ARMORED CABLE
ADA AMERICANS WITH DISABILITIES ACT
AF AMPERE FRAME
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERES INTERRUPTING CAPACITY
AL, ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
AWS ABOVE WORK SURFACE
BAS BUILDING AUTOMATION SYSTEM
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BRKR, BKR BREAKER
C CONDUIT
C/B, CB CIRCUIT BREAKER
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CKT CIRCUIT
CL CENTERLINE
CLF CURRENT LIMITING FUSE
CLG CEILING
COL COLUMN
COMM COMMUNICATION
CONV CONVENIENCE
CP CONTROL PANEL
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DUCTBANK
dB DECIBEL
DC DIRECT CURRENT
DIA DIAMETER
DN DOWN
DP DISTRIBUTION PANEL
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DWG DRAWING
E, EX EXISTING
EA EACH
EC ELECTRICAL CONTRACTOR
EC EMPTY CONDUIT
ECB ENCLOSED CIRCUIT BREAKER
EGB EARTH, ELECTRICAL OR EQUIPMENT
GROUND BAR
EGC EQUIPMENT GROUNDING CONDUCTOR
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM, EMERG EMERGENCY
EMT ELECTRICAL METALLIC TUBING
EOL END OF LINE RESISTOR
EPO EMERGENCY POWER OFF
EQ, EQP EQUIPMENT
ERMS ENERGY REDUCTION MAINTENANCE SWITCH
FA FIRE ALARM
FC FOOT-CANDLE
FLA FULL LOAD AMPS
FLEX FLEXIBLE CONDUIT CONNECTION
FLR FLOOR
NO. DESCRIPTION DATE
I LL I NO I S
062-061703
LICENSED
PROFESSIONAL
ENGINEER
OF
J.
M
LEAH
CI S
McTAV
I H
ATS ATS
(E) AHU
BP-1(R)
BP-2(R)
BOILER #B-1
BOILER #B-2
BOILER(E)
EM1(E)'A'(E) 'MDP'(E) 400A MAIN FUSED
DISCONNECT SWITCH(E)
UTILITY COMPANY
CT/METER(E)TEMPERATURE
CONTROL
PANEL(E)
CONTACTOR
PANEL(E)
TIME
SWITCH(E)
GENSET BATTERY
CHARGER(E)
(E)
(E) AHU
B
B
BOILER(E)5
400A MAIN FUSED
DISCONNECT SWITCH(E)
UTILITY COMPANY
CT/METER(E)TEMPERATURE
CONTROL
PANEL(E)
CONTACTOR
PANEL(E)
TIME
SWITCH(E)
GENSET BATTERY
CHARGER(E)
'MDP'(E)EM1(E)'A'(E)
F
6 6
(E)
(E)
BP-1(R)
BP-2(R)
(E)
120VOLT, 1-PHASE
POWER CIRCUIT
N
BOILER 'B-1'
KIDDE #SM120X RELAY/POWER
SUPPLY MODULE. ROUTE
BOILER POWER CIRCUIT VIA
N.C. CONTACTS
F
STI-USA #SS2231ZA-EM
PUSHBUTTON; YELLOW COVER, PUSH
TO INITIATE, TURN TO RESET, CLEAR
LIFT COVER, READING
"EMERGENCY BOILER SHUTDOWN"
KIDDE #HD135F HEAT
DETECTOR ABOVE
BOILER.
H
INTERCONNECT
FIRE ALARM
WIRING
120VOLT, 1-PHASE
POWER CIRCUIT
N
KIDDE #HD135F HEAT
DETECTOR ABOVE
BOILER.
H
INTERCONNECT
FIRE ALARM
WIRING
KIDDE #HD135F HEAT
DETECTOR IN 1ST
FLOOR DORMITORY.
APPROVED BY
CHECKED BY
A
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SEAL
REVISIONS
23456
B
C
D
E
F Dewberry Engineers, Inc.
401 SW Water Street Suite 701 Peoria IL 61602
309.282.8000 Phone
309.282.8001 Fax
IL DESIGN FIRM REG.
#184005007-0006
E-101
FLOOR PLANS -
ELECTRICAL
RLB
MJM
MJM
05/29/24
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
B L O
O M
IN
G
T O
N I
L
N
L E
E S
T
BLOOMINGTON IL, 61701 Fax
IS
S
U E
D F
O R
B
ID
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM PLAN - ELECTRICAL
DEMOLITION
PLAN NOTES - DEMOLITION:
1 DISCONNECT POWER TO EXISTING BOILER. LEAVE CIRCUITRY
IN PLACE FOR RECONNECTION TO NEW BOILER.
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM PLAN - NEW WORK
ELECTRICAL
GENERAL NOTES - NEW WORK ELECTRICAL:
PLAN NOTES - NEW WORK ELECTRICAL:
1 CONNECT EXISTING POWER TO NEW BOILER, & BOILER CIRC PUMP.
INSTALL NEW STANDALONE HEAT DETECTOR. CONNECT TO 'EMERGENCY BOILER SHUTDOWN'
CIRCUIT AS PER DETAIL '3' ON THIS SHEET. PROVIDE POWER FROM LOCAL PANELBOARD 'BOILER'(E).
INSTALL NEW STANDALONE CARBON DIOXIDE DETECTOR. CONNECT TAS PER DETAIL '4' ON THIS SHEET.
PROVIDE EMERGENCY BOILER SHUTDOWN SWITCH. SEE DETAIL '3' ON THIS SHEET.
ROUTE ALL NEW POWER CIRCUITS TO EXISTING PANELBOARD. CONNECT TO SPARE CIRCUIT BREAKERS.
PROVIDE FIRE ALARM RELAY MODULE FOR 'BOILER SHUTDOWN CIRCUIT' AS PER DETAIL '3' ON THIS SHEET.
Scale: N.T.S.
BOILER SHUTDOWN - WIRING DIAGRAM
Scale: N.T.S.
CO DETECTOR - WIRING DIAGRAM
No. Description Date
1. PROVIDE CO DETECTOR IN ADJACENT HALLWAY TO BUNK ROOMS. FIELD VERIFY FOR EXACT LOCATION AND DISTANCE
FOR INTERCONNECT WIRING.
I LL I NO I S
062-061703
LICENSED
PROFESSIONAL
ENGINEER
OF
J.
M
LEAH
CI S
McTAV
I H
'B'(E)
1 BOILER
BOILER PUMPS(E)
BOILER PUMP
STARTERS(E)
AIR SEPARATOR(E)
'B'(E)
BOILER PUMPS(E)
BOILER PUMP
STARTERS(E)
2 6
BOILER
CIRC PUMP
B
10 10
F
120VOLT, 1-PHASE
POWER CIRCUIT
N
BOILER 'B-1'
KIDDE #SM120X RELAY/POWER
SUPPLY MODULE. ROUTE
BOILER POWER CIRCUIT VIA
N.C. CONTACTS
F
STI-USA #SS2231ZA-EM
PUSHBUTTON; YELLOW COVER, PUSH
TO INITIATE, TURN TO RESET, CLEAR
LIFT COVER, READING
"EMERGENCY BOILER SHUTDOWN"
KIDDE #HD135F HEAT
DETECTOR ABOVE
BOILER.
H
INCONNECT
FIRE ALARM
WIRING
120VOLT, 1-PHASE
POWER CIRCUIT
N
KIDDE #HD135F HEAT
DETECTOR ABOVE
BOILER.
H
INTERCONNECT
FIRE ALARM
WIRING
KIDDE #HD135F HEAT
DETECTOR IN 1ST
FLOOR DORMITORY.
Dewberry Engineers Inc.
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
/3
/2
:4
:4
A M
FLOOR PLANS -
ELECTRICAL
RLB
MJM
MJM
05/29/2024
50166763
F
IR
E S
T A
T
IO
N
B
O
IL
E R
R E
P L A
C E
M E
N T
C
IT
Y O
F B
L O
O M
IN
G
T O
N
IS
S
U E
D F
O R
B
ID
H
A M
IL
T
O N
R D
E-102
B L O
O M
IN
G
T O
N
IL
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM - ELECTRICAL DEMOLITION
Scale: 1/4" = 1'-0"
MECHANICAL EQUIPMENT ROOM - NEW WORK ELECTRICAL
Scale: N.T.S.
BOILER SHUTDOWN - WIRING DIAGRAM
PLAN NOTES - DEMOLITION:
1 DISCONNECT POWER TO EXISTING BOILER & RELATED CIRCULATING
PUMP. LEAVE CIRCUITRY IN PLACE FOR RECONNECTION TO NEW BOILER AND PUMP.
PLAN NOTES - NEW WORK ELECTRICAL :
1 CONNECT EXISTING POWER TO NEW BOILER, & BOILER CIRC PUMP.
INSTALL NEW STANDALONE HEAT DETECTOR. CONNECT TO 'EMERGENCY BOILER SHUTDOWN'
CIRCUIT AS PER DETAIL '3' ON THIS SHEET.
INSTALL NEW STANDALONE CARBON DIOXIDE DETECTOR. CONNECT AS PER DETAIL '4' ON THIS SHEET.
PROVIDE EMERGENCY BOILER SHUTDOWN SWITCH. SEE DETAIL '3' ON THIS SHEET.
ROUTE ALL NEW POWER CIRCUITS TO EXISTING PANELBOARD 'B'(E). CONNECT TO SPARE CIRCUIT BREAKERS.
PROVIDE FIRE ALARM RELAY MODULE FOR 'BOILER SHUTDOWN CIRCUIT' AS PER DETAIL '3' ON THIS SHEET.
Scale: N.T.S.
CO DETECTOR - WIRING DIAGRAM
1. PROVIDE CO DETECTOR IN ADJACENT HALLWAY TO BUNK ROOMS. FIELD VERIFY FOR EXACT LOCATION AND DISTANCE
FOR INTERCONNECT WIRING.
GENERAL NOTES - NEW WORK ELECTRICAL :
NO. DESCRIPTION DATE
I LL I NO I S
062-061703
LICENSED
PROFESSIONAL
ENGINEER
OF
J.
M
LEAH
CI S
McTAV
I H
| M-101 |
| M-102 |
| MD-101 |
| MD-102 |
| Electrical Combined |
File details come from the government source that posted it. Updated .