12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222 Project
CENTRAL UTILITY PLANT UPGRADES
ISSUE FOR CONSTRUCTION
05/16/2025
9700 Wade Blvd. Frisco, TX 75035
COLLIN COLLEGE
FRISCO CAMPUS
24147-00
ISSUE FOR CONSTRUCTION 05/16/2025
PROJECT SHEET LIST
SHEET NO. SHEET NAME SHEET ISSUE DATE
STRUCTURAL
S1.1 STRUCTURAL NOTES, SPECIAL INSPECTIONS 05/16/2025
S2.1 FOUNDATION PLAN & DETAILS 05/16/2025
S2.2 FOUNDATION PLAN_ADDITIVE ALTERNATE NO. 2 & DETAILS 05/16/2025
S2.3 COOLING TOWER FRAMING PLANS & SECTIONS 05/16/2025
S2.4 ROOF FRAMING PLAN & DETAILS 05/16/2025
S5.1 STEEL DETAILS 05/16/2025
MECHANICAL/ELECTRICAL
ME1.00 SITE PLAN - PLANT OPERATION BUILDING 05/16/2025
ME1.01 DEMOLITION FLOOR PLAN - CENTRAL PLANT - HVAC PIPING 05/16/2025
ME1.02 DEMOLITION FLOOR PLAN - CENTRAL PLANT - MECHANICAL DUCTWORK & ELECTRICAL 05/16/2025
ME1.03 DEMOLITION FLOOR PLAN - COOLING TOWER - MECHANICAL & ELECTRICAL 05/16/2025
ME2.01 FLOOR PLAN - CENTRAL PLANT - HVAC PIPING & ELECTRICAL 05/16/2025
ME2.02 FLOOR PLAN - CENTRAL PLANT - MECHANICAL DUCTWORK & ELECTRICAL 05/16/2025
MECHANICAL
M0.00 GENERAL NOTES & LEGEND - MECHANICAL 05/16/2025
M2.01 FLOOR PLAN - COOLING TOWER - MECHANICAL 05/16/2025
M3.01 CHILLER AND PUMP DEMOLITION SECTIONS - MECHANICAL 05/16/2025
M3.02 CHILLER AND PUMP SECTIONS - MECHANICAL 05/16/2025
M4.01 FLOW DIAGRAMS - MECHANICAL 05/16/2025
M4.02 FLOW DIAGRAMS - MECHANICAL 05/16/2025
M4.03 FLOW DIAGRAMS - MECHANICAL 05/16/2025
M4.04 FLOW DIAGRAMS - MECHANICAL 05/16/2025
M5.01 DETAILS - MECHANICAL 05/16/2025
M6.01 SCHEDULES - MECHANICAL 05/16/2025
M7.01 CENTRAL UTILITY PLANT 3D VIEWS - MECHANICAL 05/16/2025
ELECTRICAL
E0.00 GENERAL NOTES, SCHEDULES, DIAGRAMS, AND DETAILS - ELECTRICAL 05/16/2025
Grand total: 24
PROJECT ISSUANCES:
DESCRIPTION DATE
O H
IO
D R .W
ADE BLVD.
OHIO DR.
H
IL
L C
R E
S T R
D
TRUE
NORTH
SCOPE OF WORK
GENERAL:
GN-1 THE DETAILS DESIGNATED AS "TYPICAL DETAILS", APPLY GENERALLY TO THE AREAS IN THE
DRAWINGS WHERE CONDITIONS ARE SIMILAR TO THOSE DESCRIBED IN DETAILS.
GN-2 THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE REQUIREMENTS OF OTHER
TRADES (ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, ETC.) WITH THE
STRUCTURAL DOCUMENTS PRIOR TO FABRICATION OR INSTALLATION OF ANY STRUCTURAL
MEMBERS.
GN-3 THE CONTRACTOR AND FABRICATOR SHALL VERIFY QUANTITIES, DIMENSIONS AND CONDITIONS
THOROUGHLY WITH THE CONTRACT DOCUMENTS AND THEN NOTIFY THE ARCHITECT/ENGINEER
OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE SUBMITTING SHOP DRAWINGS AND
PROCEEDING WITH THE WORK. DO NOT SCALE DRAWINGS FOR DIMENSIONS.
GN-4 COMPLETED SHOP DRAWINGS SHALL BE PROVIDED, AS SPECIFIED, FOR FABRICATED ITEMS
AND SHALL BE REVIEWED BY THE GENERAL CONTRACTOR PRIOR TO FABRICATION.
STRUCTURAL DRAWINGS SHALL NOT BE REPRODUCED FOR SHOP DRAWINGS. USE OF
STRUCTURAL DRAWINGS WITHOUT PERMISSION IS GROUNDS FOR REJECTION OF SHOP
DRAWINGS. THE STRUCTURAL ENGINEER WILL REVIEW SHOP DRAWINGS FOR THE LIMITED
PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN
CONCEPT EXPRESSED IN THE CONTRACT DOCUMENTS. THEREFORE, CLOUDED DIMENSIONS,
INDICATED ON ANY SHOP DRAWINGS, THAT ARE RELATIVE TO EXISTING STRUCTURES SHALL
BE VERIFIED BY THE CONTRACTOR AND FABRICATOR. AS A MINIMUM, THE FOLLOWING SHOP
DRAWINGS SHALL BE SUBMITTED AS WELL AS SHOP DRAWINGS LISTED IN THE DEFERRED
SUBMITTAL SECTION OF THESE NOTES:
A. CONCRETE MIX DESIGN FOR EACH TYPE OF CONCRETE TO BE USED.
B. CONCRETE REINFORCING STEEL SHOP DRAWINGS INCLUDING PLACEMENT
DRAWINGS AND CUT SHEETS.
C. STRUCTURAL STEEL SHOP DRAWINGS.
GN-5 SHOP DRAWINGS NOT PREVIOUSLY REVIEWED BY THE GENERAL CONTRACTOR SHALL BE
RETURNED WITHOUT REVIEW BY STRUCTURAL ENGINEER.
GN-6 GENERAL CONTRACTOR SHALL INSPECT JOB FOR COMPLETION BEFORE SCHEDULING ANY
OBSERVATION BY THE ENGINEER.
GN-7 THE STRUCTURE HAS BEEN DESIGNED TO RESIST DESIGN LOADS ONLY AS A COMPLETED
STRUCTURE. CONTRACTOR SHALL CONSIDER CONSTRUCTION LOADS APPLIED TO THE
PARTIALLY COMPLETED STRUCTURE UNTIL PERMANENT CONNECTIONS ARE MADE, AND
ENCLOSED PERMANENTLY AS PER CONSTRUCTION DOCUMENTS.
GN-8 THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING THE ADEQUACY OF THE
STRUCTURE TO SUPPORT CONSTRUCTION LOADS. THE STRUCTURAL ENGINEER IS NOT
RESPONSIBLE TO DESIGN OR CHECK THE STRUCTURE FOR CONSTRUCTION ACTIVITIES.
GN-9 STEEL FRAMING, CONNECTION AND LINTEL ANGLES THAT ARE EXPOSED TO WEATHER SHALL BE
CLEANED AND GALVANIZED UNLESS SPECIFIED OTHERWISE ON ARCH. DRAWINGS. APPLY
ZINC COATING BY THE HOT-DIP PROCESS AND ACCORDING TO A.S.T.M. A123. WHEN
APPLICABLE FIELD WELDS, BOLTED CONNECTIONS AND ABRADED AREAS SHALL BE CLEANED
AND "TOUCHED UP" WITH GALVANIZING REPAIR PAINT IN ACCORDANCE WITH A.S.T.M. A780.
THE GALVANIZING REPAIR PAINT SHALL HAVE A HIGH ZINC-DUST CONTENT WITH DRY FILM
CONTAINING NO LESS THAN 95% ZINC-DUST BY WEIGHT, AND COMPLYING WITH THE
DOD-P-21035A OR SSPC-PAINT 20.
GN-10 THE ENGINEER SHALL NOT HAVE CONTROL OF, AND SHALL NOT BE RESPONSIBLE FOR,
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR
SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACTS OR
OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSONS PERFORMING
ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
GN-11 PERIODIC SITE OBSERVATIONS BY FIELD REPRESENTATIVES OF ALPHA CONSULTING
ENGINEERS, INC. ARE SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE
CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE INTENT OF THE STRUCTURAL
CONTRACT DOCUMENTS. THESE LIMITED SITE OBSERVATIONS ARE NOT INTENDED TO BE A
CHECK OF THE QUALITY OR QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO
INFORM THE OWNER OF DEFECTS AND DEFICIENCIES IN THE WORK OF THE CONTRACTOR.
GN-12 ASSUMPTIONS HAVE BEEN MADE BY THIS OFFICE REGARDING EXISTING CONDITIONS. ACTUAL
CONDITIONS MAY VARY FROM THOSE ASSUMED. FIELD VERIFICATION OF EXISTING
CONDITIONS MAY BE REQUIRED TO PROVIDE ADEQUATE SHOP DRAWINGS. THE CONTRACTOR
IS TO COORDINATE EFFORTS AS REQUIRED AND IS TO REPORT ANY DISCREPANCIES
REGARDING THE EXISTING CONDITIONS TO THE ENGINEER FOR POSSIBLE MODIFICATIONS
NEEDED TO THE CONTRACT DRAWINGS.
GN-13 PROTECT REMAINING EXISTING STRUCTURES. ANY DAMAGE TO AN EXISTING STRUCTURE
SHALL BE REPAIRED TO EQUIVALENT OR BETTER CONDITION.
GN-14 IF CONFLICT EXISTS BETWEEN DRAWINGS, NOTES, AND SPECIFICATIONS; THE STRICTEST
REQUIREMENTS SHALL GOVERN.
DESIGN LOADS:
DL-1 APPLICABLE CODES AND STANDARDS
BUILDING CODE OF JURISDICTION: 2021 INTERNATIONAL BUILDING CODE
STRUCTURAL CONCRETE CODE: AMERICAN CONCRETE INSTITURE (ACI 318-19)
STRUCTURAL STEEL CODE: AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(16th edition)
DL-2 LIVE DESIGN LOADS
TYPICAL GROUND FLOOR 100 PSF
TYPICAL ROOF 20 PSF
TYPICAL CATWALK 40 PSF
DL-3 SNOW DESIGN LOADS
GROUND SNOW LOAD Pg 5 PSF
DL-4 WIND DESIGN LOADS
WIND RISK CATEGORY I
ULTIMATE WIND SPEED Vult 105 mph NOMINAL DESIGN WIN SPEED Vasd 82 mph 10 YEAR MEAN RECURRENCE WIND SPEED 76 mph
WIND EXPOSURE CLASSIFICATION B
DIRECTIONALITY FACTOR, Kd 0.85
SEE COMPONENTS & CLADDING WIND PRESSURE NOTES FOR WIND
DESIGN INFORMATION NOT INCLUDED IN THIS SECTION.
DL-5 SEISMIC DESIGN LOADS
SEISMIC RISK CATEGORY I
SEISMIC IMPORTANCE FACTOR 1.0
SITE CLASS B
SEISMIC DESIGN CATEGORY A
DL-6 MECHANICAL UNIT WEIGHTS INDICATED ON THE DRAWINGS ARE ASSUMED.
NOTIFY ENGINEER OF DEVIATIONS IN WEIGHT OR LOCATION.
COOLING TOWER MODEL & MANUFACTURER : BAC S3E-1222-12R
37585 LB (OPERATING WEIGHT)
STRUCTURAL STEEL:
SS-1 STRUCTURAL STEEL SHALL CONFORM TO THE 2010 "SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS" OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION, AISC 360-10.
SS-2 WELDING: CODE APPLICABLE EDITION OF THE STRUCTURAL WELDING CODE - STEEL,
AMERICAN WELDING SOCIETY (AWS D1.1 AND AWS D1.3).
SS-3 VERIFY THE SIZE AND LOCATION OF FLOOR AND ROOF OPENINGS FOR MECHANICAL
AND ELECTRICAL REQUIREMENTS AND COORDINATE WITH MECHANICAL AND ELECTRICAL
CONTRACTOR PRIOR TO FABRICATION OF MATERIALS.
SS-4 STEEL SHALL BE MEET THE FOLLOWING REQUIREMENTS:
WIDE FLANGES ASTM A992 Gr. 50
CHANNELS ASTM A36, ASTM A992 Gr.50 OTHER ROLLED SHAPES, PLATES, BARS ASTM A36, ASTM 572 Gr.50 PIPE (Fy 35ksi) ASTM A53 Gr. B HOLLOW STRUCTURAL SECTIONS - HSS (Fy 50ksi) ASTM A500 Gr. C
ERECTION BOLTS ASTM A307
ANCHOR BOLTS ASTM F1554 Gr. 36, Gr.55 HIGH STRENGTH ANCHOR BOLTS ASTM F1554 Gr. 105 DEFORMED BAR ANCHORS (DBA) ASTM A706 Gr. 60 OR ASTM A1064 Gr.60
SS-5 REFER TO SPECIFICATION FOR STEEL SURFACE TREATMENT AND COATING. DO NOT PAINT
STRUCTURAL STEEL AND ANCHOR RODS THAT ARE TO BE EMBEDDED IN CONCRETE OR TO
RECEIVE FIREPROOFING.
SS-6 WELDING SHALL BE PERFORMED BY WELDERS HOLDING VALID CERTIFICATES, IN
ACCORDANCE WITH SECTION 4 OF THE AWSD1.1 "STRUCTURAL WELDING CODE-STEEL",
AND HAVING CURRENT EXPERIENCE IN THE TYPE OF WELDS AS SHOWN ON THE DRAWINGS.
WELDS SHALL BE PERFORMED USING E70XX SERIES LOW HYDROGEN RODS. WELDS SHALL
BE VISUALLY INSPECTED IN ACCORDANCE WITH SECTIONS 6.5 AND 6.9 OF THE AWSD1.1
"STRUCTURAL WELDING CODE-STEEL". VISUAL INSPECTIONS OF WELDS SHALL BE
PERFORMED BY AN INDEPENDENT TESTING AGENCY. UNLESS NOTED OTHERWISE ON THE
PLANS, SHOP FABRICATED OR FIELD ASSEMBLED ADJOINING STEEL MEMBERS SHALL BE
CONNECTED USING CONTINUOUS, ALL AROUND/BOTH SIDES OF MEMBER FILLET WELDS IN
ACCORDANCE WITH THE MINIMUM SIZE FILLET WELD BELOW. UNLESS NOTED OTHERWISE
ON THE PLANS, THE CONTRACTOR MAY SHOP WELD OR FIELD WELD AT THEIR DISCRETION.
MINIMUM SIZE OF FILLET WELDS:
MATERIAL THICKNESS OF THINNER PART JOINED(IN.) MINIMUM SIZE OF FILLET WELD(IN.)
UP TO 1/4 3/16
OVER 1/4 TO 1/2 1/4
OVER 1/2 TO 3/4 5/16
OVER 3/4 3/8
LEG DIMENSIONS OF FILLET WELDS. SINGLE PASS WELDS MUST BE USED.
SS-7 BOLTED BEAM CONNECTIONS SHALL BE SIMPLE FRAMED SHEAR CONNECTIONS USING
A.S.T.M. A325N BOLTS AND SHALL BE IN ACCORDANCE WITH THE "SPECIFICATION FOR
STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS." JOINT TYPES FOR SIMPLE FRAMED
SHEAR CONNECTIONS SHALL BE "SNUG-TIGHTENED JOINTS" AND SHALL BE INSTALLED AND
VISUALLY INSPECTED PER SECTIONS 8.1 AND 9.1 RESPECTIVELY OF THE "SPECIFICATION
FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS." VISUAL INSPECTION OF BOLTED
CONNECTIONS SHALL BE PERFORMED BY AN INDEPENDENT TESTING AGENCY. UNLESS
NOTED OTHERWISE IN THE CONSTRUCTION DOCUMENTS THE CONNECTIONS MUST BE
DESIGNED TO SUPPORT ONE-HALF THE TOTAL UNIFORM LOAD CAPACITY SHOWN IN THE
"MAXIMUM UNIFORM LOAD TABLES", SHOWN IN PART 3 OF THE AISC MANUAL OF STEEL
CONSTRUCTION. DIRECT TENSION INDICATOR (DTI) BOLTS SHALL BE PERMITTED. THE
STEEL FABRICATOR SHALL PROVIDE CONNECTION DESIGN CALCULATIONS SEALED AND
SIGNED BY A REGISTERED ENGINEER LICENSED IN THE STATE OF TEXAS FOR
CONNECTIONS NOT SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS.
SS-8 IN FRAMED BEAM CONNECTIONS, WELDS MAY BE SUBSTITUTED FOR BOLTED CONNECTIONS
IN ACCORDANCE WITH TABLE 10-2 OF THE AISC MANUAL OF STEEL CONSTRUCTION. TO
OBTAIN WELDED CONNECTION IT IS RECOMMENDED SUCH CONNECTIONS BE CHOSEN
FROM TABLE 10-3 OF THE AISC MANUAL OF STEEL CONSTRUCTION.
SS-9 THE CONTRACTOR SHALL REVIEW SHOP AND FIELD WELD REQUIREMENTS FOR
COMPATIBILITY WITH THE CONSTRUCTION SEQUENCE. PROPOSED REVISIONS FROM SHOP
TO FIELD WELDS OR FROM FIELD TO SHOP WELDS SHALL BE IDENTIFIED BY THE
CONTRACTOR ON THE SHOP DRAWINGS.
SS-10 DRY PACK SHALL BE 5,000 PSI FIVE STAR NON-SHRINK GROUT OR EQUIVALENT. INSTALL
DRY PACK UNDER BEARING PLATES BEFORE FRAMING MEMBER IS INSTALLED. AT
COLUMNS, INSTALL DRY PACK UNDER BASE PLATES AFTER COLUMN HAS BEEN PLUMBED
BUT PRIOR TO FLOOR OR ROOF INSTALLATION.
SS-11 CONTRACTOR SHALL PROVIDE PROTECTION FOR EXISTING CONSTRUCTION DURING FIELD
WELDING OPERATIONS. A FIRE EXTINGUISHER SHALL BE ON THE JOB SITE AND IN THE
IMMEDIATE WORKING AREA OF FIELD WELDING.
ABBREVIATIONS
C Ø
AB
AESS
APPROX
ARCH
ADH
ALT
BP
BL
BUR
BM
BW
BOT
BLDG
BSMT
BRG
BTWN
CANT
CFMF
CIP
CJ
CLG
CLR
CMU
COL
CONC
CONN
CONST
CONT
CONTR
DBA
DE
DEMO
DIA
DIAG
DIM
DL
DBL
DN
DWL
DWG
EA
EF
EJ
EL/ELEV
EQ
EQUIP
EW
EXIST
EXP
EXT
FDN
FD
FS
FIN
FLD
FLR
FT
FTG
GA
GALV
GC
GR
HK
HORIZ
HCA
HS
HSA
- AND
- AT
- CENTERLINE
- DEGREE
- DIAMETER
- NUMBER/POUND
- ANCHOR BOLT
- ARCHITECTURALLY EXPOSED
STRUCTURAL STEEL
- APPROXIMATE
- ARCHITECT/ARCHITECTURAL
- ADHESIVE
- ALTERNATE
- BASE PLATE
- BUILDING LINE
- BUILT-UP ROOF
- BEAM
- BOTH WAYS
- BOTTOM
- BUILDING
- BASEMENT
- BEARING
- BETWEEN
- CANTILEVER
- COLD FORMED METAL FRAMING
- CAST-IN-PLACE
- CONSTRUCTION JOINT
- CEILING
- CLEAR
- CONCRETE MASONRY UNITS
- COLUMN
- CONCRETE
- CONNECTION
- CONSTRUCTION
- CONTINUOUS
- CONTRACTOR
- DEFORMED BAR ANCHOR
- DECK EDGE
- DEMOLITION
- DIAMETER
- DIAGONAL
- DIMENSION
- DEAD LOAD
- DOUBLE
- DOWN
- DOWEL
- DRAWING
- EACH
- EACH FACE
- EXPANSION JOINT
- ELEVATION
- EQUAL
- EQUIPMENT
- EACH WAY
- EXISTING
- EXPANSION
- EXTERIOR
- FOUNDATION
- FLOOR DRAIN
- FAR SIDE
- FINISH
- FIELD
- FLOOR
- FOOT OR FEET
- FOOTING
- GAGE
- GALVANIZED
- GENERAL CONTRACTOR
- GRADE
- HOOK
- HORIZONTAL
- HEADED CONCRETE ANCHOR
- HIGH STRENGTH
- HEADED STUD ANCHOR
ICF
ID
IN
INV
INT
JST
JT
K L
LBS
LDH
LF
LLH
LG
LLV
MAX
MECH
MEZZ
MFR
MID
MIN
MISC
MAS
NS
NOM
NTS
OC
OD
OH
OPNG
OPP
P/C
PREFAB
PSF
PSI
PL
R
RAD.
RD
REF
REINF
REQD
SPAC
SCHED
SECT
SHT
SIM
SPEC
SL
SSS
STIFF
STIR
SQ
STD
STL
STR
STRUCT
SYM
T T&B
THK
TOC
TOJ
TOS
TOW
TYP
UNO
VERT
w/
WP
WWF
WWM
- INSULATED CONCRETE FORM
- INSIDE DIAMETER
- INCH
- INVERTED
- INTERIOR
- JOIST
- JOINT
- KIP (THOUSAND POUNDS)
- ANGLE
- POUND
- LONG DIMENSION HORIZONTAL
- LINEAR FOOT
- LONG LEG HORIZONTAL
- LONG
- LONG LEG VERTICAL
- MAXIMUM
- MECHANICAL
- MEZZANINE
- MANUFACTURER
- MIDDLE
- MINIMUM
- MISCELLANEOUS
- MASONRY
- NEAR SIDE
- NOMINAL
- NOT TO SCALE
- ON CENTER
- OUTSIDE DIAMETER
- OPPOSITE HAND
- OPENING
- OPPOSITE
- PRECAST
- PREFABRICATED
- POUND PER SQUARE FOOT
- POUND PER SQUARE INCH
- PLATE
- RISER
- RADIUS
- ROOF DRAIN
- REFERENCE
- REINFORCING/REINFORCED
- REQUIRED
- SPACES/SPACING
- SCHEDULE
- SECTION
- SHEET/SHEATHING
- SIMILAR
- SPECIFICATION
- SLOPE
- STANDARD STRUCTURAL STEEL
- STIFFENERS
- STIRRUPS
- SQUARE
- STANDARD
- STEEL
- STAIR
- STRUCTURE/STRUCTURAL
- SYMMETRICAL
- TREAD
- TOP AND BOTTOM
- THICK/THICKNESS
- TOP OF CONCRETE
- TOP OF JOIST
- TOP OF STEEL
- TOP OF WALL
- TYPICAL
- UNLESS NOTED OTHERWISE
- VERTICAL
- WITH
- WORK POINT
- WELDED WIRE FABRIC
- WELDED WIRE MESH
C x
SCHED PIER MARK
SCHED STEEL
COL MARK
SYMBOL LEGEND:
TOP OF PIER EL
DROP STRUCTURE
SLOPE STRUCTURE
P x
'-0
4' - 0"
BEAM SPLICE
CONNECTION
SPLICE LOCATION
FROM CENTER OF COL
TC
TC INDICATE
TOP OF COL
MOMENT
CONNECTION
KNEE BRACING
X
S05-0X
ELEVATION
X
S05-0X
VERTICAL
BRACE
FRAMING
MECH EQUIPMENT
CONC MASONRY WALL
CONCRETE
TOC 99'-0"
TOS 99'-0"
TOW 99'-0"
99'-0"
TOP OF CONC. EL.
TOP OF STEEL EL.
TOP OF WALL EL.
SPOT EL.
X
S05-0X
SECTION
S01-0X
ENLARGE PLAN
OR PLAN DETAIL
CONCRETE AND REINFORCEMENT:
CN-1 STRUCTURAL CONCRETE SHALL BE IN ACCORDANCE WITH THE CODE APPLICABLE EDITION
OF "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318)", THE
AMERICAN CONCRETE INSTITUTE.
CN-2 CONCRETE REINFORCEMENT SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL,
CONFORMING TO ASTM A 615, GRADE 60, EXCEPT WELDABLE REBARS ASTM A706, GR. 60,
WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185, GRADE 70°
CN-3 DETAIL REINFORCING BARS AND PROVIDE BAR SUPPORTS AND SPACERS IN ACCORDANCE
WITH ACI 315.
CN-4 REINFORCING SHALL BE PROPERLY CHAIRED AND TIED PER ACI 315 (SP66) AND CRSI
(PLACING REINFORCING BARS) PRIOR TO PLACING CONCRETE.
CN-5 PLACEMENT OF REINFORCING STEEL SHALL BE OBSERVED BY THE OWNER'S INSPECTION AGENT
PRIOR TO CONCRETE PLACEMENT UNLESS APPROVED OTHERWISE.
CN-6 CONCRETE SHALL BE NORMAL WEIGHT STONE AGGREGATE CONCRETE UNLESS NOTED OTHERWISE.
PROVIDE ADMIXTURES AS REQUIRED TO IMPROVE WORKABILITY. PLASTIC CONCRETE TEMPERATURE SHALL NOT EXCEED 90 DEGREES PRIOR TO PLACEMENT. CONCRETE SHALL BE CURED FOR A MINIMUM OF 7 DAYS USING MOIST CURING PROCEDURES, OR CURING COMPOUNDS WHICH WILL NOT INTERFERE
WITH THE BONDING OF FLOORING. THE FLYASH CONTENT SHALL NOT EXCEED 30% OF THE
PERCENTAGE OF CEMENTITIOUS MATERIALS. NO FLY ASH SHALL BE USED AT ARCHITECTURALLY
EXPOSED CONCRETE WITHOUT PRIOR APPROVAL FROM ARCHITECT. IN ADDITION TO ABOVE THE
CONCRETE SHALL MEET THE FOLLOWING REQUIREMENTS:
DESCRIPTION OF USE 28-DAY COMP MAX MAX
DESIGN AGG. W/C AIR
STRENGTH SLUMP SIZE RATIO CONTENT
SLAB-ON-GRADE 3,500 PSI 3-5" 3/4" N/A N/A
DRILLED PIERS 3,000 PSI 5-7" 1-1/2" N/A N/A
CONCRETE COLUMNS 4,000 PSI 3-5" 3/4" 0.50 N/A
HOUSEKEEPING SLABS 3,500 PSI 3-5" 3/4" 0.50 N/A
CN-7 PROVIDE A SET OF CYLINDERS IN ACCORDANCE WITH ASTM C 31 TO BE TAKEN BY AN
INDEPENDENT TESTING LAB AT THE FREQUENCY SPECIFIED IN ACI 318 AND THE
GOVERNING BUILDING CODE WITH LOCAL AMENDMENTS. COMPRESSION TEST RESULTS
SHALL BE REPORTED TO THE ENGINEER WITHIN 24 HOURS.
CN-8 FORMWORK SHALL REMAIN IN PLACE AND NO SUBSEQUENT CONSTRUCTION WILL BE ALLOWED
UNTIL CONCRETE HAS REACHED 75% OF DESIGN COMPRESSIVE STRENGTH.
CN-9 PORTLAND CEMENT SHALL CONFORM TO ASTM - C150, TYPE I/II OR C595 TYPE 1L
CN-10 NO WELDING OF REINFORCING BARS OR TORCHING TO BEND REINFORCING BARS SHALL
BE ALLOWED WITHOUT THE SPECIFIC APPROVAL OF THE STRUCTURAL ENGINEER.
CN-11 CONCRETE COVER SHOULD BE AS FOLLOWS:
A. FOOTINGS AND OTHER PRINCIPAL STRUCTURAL MEMBERS IN WHICH CONCRETE IS
CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH - 3 INCHES.
B. WHERE CONCRETE SURFACES, AFTER REMOVAL OF FORMS, ARE EXPOSED TO
WEATHER OR EARTH - 2 INCHES.
C. WHERE SURFACES ARE NOT DIRECTLY EXPOSED TO WEATHER OR EARTH:
SLAB ON GRADE (FROM TOP OF SLAB) 1 1/2 INCHES
CN-12 SET AND BUILD INTO FORM WORK ANCHORAGE DEVICES AND OTHER EMBEDDED ITEMS
REQUIRED FOR OTHER WORK THAT IS ATTACHED TO OR SUPPORTED BY CAST-IN-PLACE
CONCRETE. REBAR PROJECTING FROM CONCRETE SHALL BE SECURED IN PLACE PRIOR
TO PLACING CONCRETE.
CN-13 TYPICAL LAP REINFORCING IS 30 BAR DIAMETERS UNLESS NOTED OTHERWISE.
CN-14 WELDED WIRE FABRIC SPLICE LENGTH SHALL BE AT LEAST ON SPACING OF CROSSWIRES PLUS
2-INCHES BUT NO LESS THAN 6-INCHES.
CN-15 CONCRETE SHALL BE FORMED INCLUDING GRADE BEAMS BOTH SIDES UNLESS SPECIFICALLY
NOTED ON THE DOCUMENTS OR APPROVED IN WRITING.
FLOOR SLAB:
FS-1 SOIL SUPPORTED SLAB
LOCATION OVERALL THICKNESS TYP SLAB REINFORCING
SEE PLAN 8-INCHES #3 @ 12" EACH WAY T&B
NOTES:
1. LOCATE TYPICAL SLAB REINFORCING 2 INCHES BELOW TOP OF SLAB.
2. SAWJOINTS:
A. SUBMIT PROPOSED SAWJOINT PLAN FOR APPROVAL PRIOR TO POURING
CONCRETE SLAB.
B. SAWJOINTS SHALL BE A MAXIMUM OF 15 FEET ON CENTER EACH DIRECTION.
C. SAWJOINTS SHALL BE LOCATED ON COLUMN GRID LINES WHENEVER POSSIBLE.
D. THE RATIO OF SAWJOINTS SPACING IN EACH DIRECTION SHALL BE AS
SQUARE AS POSSIBLE. RATIO SHALL NOT EXCEED 1.5 TO 1
FS-2 HOUSEKEEPING SLABS
LOCATION THICKNESS REINFORCING
SEE PLAN 6-INCHES #3 @ 12" EACH WAY
SEE PLAN 8-INCHES #3 @ 12" EACH WAY T&B
NOTES:
1. REINFORCEMENT SHALL BE CENTERED IN THE SLAB, UNO.
2. REFER TO MECHANICAL DRAWINGS FOR PAD LOCATIONS AND
COORDINATE WITH EQUIPMENT.
STEEL BAR GRATING:
SB-1 STEEL BAR GRATING SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A-123.
SB-2 STEEL BAR GRATING SHALL BE SERRATED AT THE TOP
SB-2 STEEL BAR GRATING SCHEDULE
TYPICAL TYP 19-W-4
BEARING BAR SIZE 1" X 3/16"
CONC SLAB/PAVING SUBGRADE PREPARATION:
UF-1 AT THE ENTIRE AREA OCCUPIED BY SLAB/PAVING (AND FOR A DISTANCE OF 3.0 FT. OUTSIDE
OF THE SLAB/PAVING), REMOVE ALL ORGANIC AND OTHER DELETERIOUS MATERIALS. DO NOT
USE FOR UNDERFLOOR FILL. REMOVE A MINIMUM OF 12 INCHES OF THE EXISTING SOIL OR
UNTIL SOLID ROCK IS ENCOUNTERED. EXPOSED SUBGRADE SHALL BE RELATIVELY LEVEL.
UF-2 THE EXPOSED SUBGRADE SHALL BE SCARIFIED AT LEAST 6 INCHES AND COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED USING TxDOT TEST METHOD
TEX-114-E WITH A LABORATORY COMPACTIVE EFFORT OF 6.63 FT LBS/CU IN. WHILE
MAINTAINING AT NEAR OR SLIGHTLY ABOVE THE OPTIMUM WATER CONTENT.
UF-3 BRING THE SUBGRADE TO UNDERSIDE OF SLAB WITH SELECT STRUCTURAL FILL AS
SPECIFIED ON NOTE UF-4. COMPACT THE SELECT MATERIAL TO AT LEAST 95% OF THE
MAXIMUM DRY DENSITY AS DETERMINED USING TxDOT TEST METHOD TEX-113-E WITH A
LABORATORY COMPACTIVE EFFORT OF 13.26 FT LBS/CU IN. MAINTAIN COMPACTIVE LIFT
THICKNESS TO 6 INCHES OR LESS AND OPTIMUM WATER CONTENT. IF CLAY GRAVEL (ITEM
"B", UF-4) IS USED, THE BUILDING PAD SHOULD BE CAPPED WITH 6 INCH THICK CRUSHED
LIMESTONE (TYPE A, GRADE 1 OR 2).
UF-4 A. TxDOT ITEM 247, TYPE A, GRADE 2.
B. SELECT BASE MATERIALS HAVE MAXIMUM PARTICLE LESS THAN 3 INCHES AND FREE OF
ORGANIC OR OTHER DELETERIOUS SOILS. MAXIMUM LIQUID LIMIT OF 35 AND A PI BETWEEN 7
AND 15. NO AGGREGATE PARTICLES GREATER THAN 3" IN DIAMETER, WITH THE FOLLOWING
GRADATION:
o PERCENT PASSING NO. 4 SIEVE 40% ~ 80% o PERCENT PASSING NO. 40 SIEVE 10% ~ 50% o PERCENT PASSING NO. 200 SIEVE LESS THAN 20%
UF-5 PERFORM EARTHWORK DESCRIBED ABOVE BEFORE TRENCHING FOR GRADE BEAMS OR
MECHANICAL LINES.
UF-6 EXCAVATE BEAM TRENCHES TO MEET PLANNED DIMENSIONS. PRIOR TO PLACEMENT OF
CONCRETE, HAND COMPACT BOTTOM OF BEAM TRENCHES TO AT LEAST 95% OF THE
MAXIMUM DRY DENSITY DETERMINED USING TxDOT TEST METHOD TEX-113-E CONDUCTED
WITH A LABORATORY COMPACTIVE EFFORT OF 6.63 FT LBS/CU. IN. MAINTAIN WATER
CONTENT HIGH OR OPTIMUM, BUT WITHIN A RANGE THAT WILL ALLOW THE SPECIFIED
PERCENTAGE OF COMPACTION. STANDING WATER SHOULD NOT BE PERMITTED IN THE
BEAM TRENCHES AFTER FINAL COMPACTION AND BEFORE PLACEMENT OF CONCRETE.
REMOVE ALL LOOSE MATERIALS AND UNSUITABLE SOILS DUE TO RAINFALL OR BY
DESICCATION.
UF-7 PLACE 15 MIL "STEGO WRAP" OR APPROVED EQUIVALENT ON TOP OF SELECT FILL. SMOOTH
SUBGRADE TO PREVENT PROTRUSIONS THAT MAY CAUSE DAMAGE OR RUPTURE FILM. LAY
FILM ON SUBGRADE INCLUDING BEAM AND FOOTING SOFFITS AND SIDES OF BEAMS AND
FOOTINGS USING WIDEST PRACTICAL WIDTHS. LAP EDGES OF FILM 6" WITH TOP LAP PLACED
IN DIRECTION OF CONCRETE FLOW AND TAPE ALL JOINTS. CUT FILM AROUND PIPES AND
ROUGH-INS AND SEAL CUTS WITH PRESSURE SENSITIVE TAPE.
UF-8 EMPLOY AN INDEPENDENT TESTING LABORATORY TO TAKE 3 (THREE) DENSITY TESTS FOR
SUBGRADE (NOTE UF-2) & EACH LIFT OF SELECT FILL (NOTE UF-3).
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :1
P
M
SB
JM
S1.1
STRUCTURAL NOTES,
SPECIAL
INSPECTIONS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
TC
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
STRUCTURAL NOTES
14. Inspect formwork for shape, location and dimensions of the concrete member being formed.
--- X
13. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
--- X
8. Verify maintenance of specified curing temperature and techniques.
--- X
7. Inspect concrete and shotcrete placement for proper application techniques
X ---
6. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.
X ---
5. Verify use of required design mix. --- X
b. Mechanical anchors and adhesive anchors not defined in 4.a
X
a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension loads.
X
4. Inspect anchors post-installed in hardened concrete...
3. Inspect anchors cast in concrete. --- X
c. Inspect all other welds. X
b. Inspect single-pass fillet welds, maximum 5/16"; and X
a. Verify weldability of reinforcing bars other than ASTM... --- X
2. Reinforcing Bar welding:
1. Inspect reinforcement, including prestressing tendons, and verify placement.
--- X
1705.3 CONCRETE CONSTRUCTION
For buildings, structures and other structural portions thereof shall be in accordance with the quality assurance inspection requirements of AISC 360.
1705.2.1 STRUCTURAL STEEL
3. Materials and systems required to be installed in accordance with additional manufacturer’s instructions that prescribe requirements not contained in this code or in standards...
2. Unusual design applications of materials described in this code.
1. Construction materials and systems that are alternatives to materials and systems prescribed by this code
1705.1.1 SPECIAL CASES (AS REQD BY THE BUILDING OFFICIAL) --- ---
Where fabrication of structural, load-bearing, or lateral load-resisting elements or assemblies is being conducted in a fabricator's shop and/or off-site, inspect fabrication and quality control procedures for completeness and adequacy, except where the fabricator has been approved to perform work without special inspections in accordance with IBC Section 1704.2.5.1.
1704.2.5 FABRICATED ITEMS --- ---
Qualifications listed in the testing and inspection requirements tables are recommendations of the local members of the Texas council of Engineering Laboratories. It is also recommended that the special inspectors should be employed by an agency accredited by any nationally recognized accredditing body such as AASHTO, A2LA, NVLAP, ICC, ETC..
1704.2.1 SPECIAL INSPECTOR QUALIFICATIONS
Continuous Periodic
TESTING, VERIFICATION AND INSPECTION
INSPECTION
FREQUENCY
SP-1 SPECIAL INSPECTION WORK IS NOT INCLUDED IN THE STRUCTURAL ENGINEER'S
SCOPE OF SERVICES. THE OWNER WILL ENGAGE A TESTING AGENCY TO CONDUCT
SPECIAL TESTS AND INSPECTIONS REQUIRED BY AUTHORITIES HAVING
JURISDICTION AS THE RESPONSIBILITY OF THE OWNER. ALL INSPECTION REPORTS
SHALL BE COPIED TO THE STRUCTURAL ENGINEER, AND A FINAL LETTER OF
COMPLIANCE SHALL BE PROVIDED BY THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE (TYPICALLY ARCHITECT) TO THE OWNER OR BUILDING
AUTHORITY.
SP-2 DEFINITIONS:
ACI - AMERICAN CONCRETE INSTITUTE
AISC - AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ASNT - AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING
ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS
AWS - AMERICAN WELDING SOCIETY
CWI - CERTIFIED WELDING INSPECTOR
IBC - INTERNATIONAL BUILDING CODE
SP-3 THE SPECIAL INSPECTOR CANNOT BE AN EMPLOYEE OF THE CONTRACTOR.
SPECIAL INSPECTIONS
When there is a resonable doubt to the structural integrity of a deep foundation element, engineering assessment shall be required including tests for defects performed in accordance with ASTM D4945, ASTM D5882, ASTM D6760 or ASTM...
1705.10 STRUCTURAL INTEGRITY OF DEEP FOUNDATION...
3. For concrete elements, perform tests and additional special inspections in accordance with Section 1705.3.
See 1705.3
2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if applicable), lengths, embedment into bedrock (if applicable) and adequate end-bearing strata capacity. Record concrete or grout volumes.
X ---
1. Inspect drilling operations and maintain complete and accurate records for each element.
X ---
1705.8 CAST-IN-PLACE DEEP FOUNDATIONS
5. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly.
--- X
4. During fill placement, verify use of proper materials and procedues in accordance with the provisions of the approved geotechnical report. Verify densities and lift thicknesses during placement and compaction of compacted fill.
X ---
3. Perform classification and testing of compacted fill materials. --- X
2. Verify excavations are extended to proper depth and have reached proper material.
--- X
1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity.
--- X
1705.6 SOILS
Continuous Periodic
TESTING, VERIFICATION AND INSPECTION
INSPECTION
FREQUENCY
1. FINISH FLOOR ELEVATION IS 100'-0" (RELATIVE TO DATUM 100-0) UNLESS
NOTED OTHERWISE.
2. TOP OF CONCRETE SLAB IS AT FINISH FLOOR UNLESS NOTED OTHERWISE.
3. MEP BACKGROUND ELEMENTS DEPICTED ON THE PLANS ARE INTENDED
FOR GENERAL COORDINATION PURPOSES AND ARE NOT INTENDED FOR
ANY OTHER PURPOSES. THIS PLAN MAY NOT REFLECT THE FINAL DESIGN,
SEE THE MEP DRAWINGS.
FOUNDATION PLAN NOTES
EXC2
EXC3
EXC4
EXCA EXCB EXCC EXCD EXCE
/2
(F V
(F
V
/2
(F
V
/4
(F V
(FV)
4' - 4"
(FV)
4' - 6" 20' - 11" (FV) 21' - 3" (FV) 7' - 0" (FV) 11' - 4 1/2" (FV)
EXC1
10 1/4" (FV)
EX1.2
EX2.6
EX3.2
EXC EXD EXE
EXISTING 3 1/2" DIA PIPE COL
FOR PIPE SUPPORT (FV),
TYP WHERE SHOWN
TOC 100' - 8"
8" THK
EXISTING
CHILLER PAD
(FV)
TOC 100' - 8"
8" THK NEW
CHILLER PAD
6" THK
EXISTING
PUMP PAD
(FV)
TOC 100' - 6"
6" THK
EXISTING
PUMP PAD
(FV)
TOC 100' - 6"
EXISTING 24" DIA
CONC COL (FV), TYP
WHERE SHOWN
EXISTING 36" DIA
CONC COL (FV), TYP
WHERE SHOWN
/2
(F
V
(F
V
/2
(F
V
S2.1
6" THK NEW
PUMP PAD
TOC 100' - 6"
6" THK NEW
PUMP PAD
TOC 100' - 6"3
S2.1
S2.1
S2.1
EXBEXA
EX4
EXIST PLANT FF EL = 100' - 0"
22' - 10 3/4" (FV) 22' - 10 3/4" (FV) 22' - 10 3/4" (FV) 22' - 10 3/4" (FV)
ALT 03
TOC 100" - 6"
6" THK NEW BOILER PAD
- REF MEP FOR SIZE & LOCATION
S2.1
S2.1
8" THK
EXISTING
PUMP PAD
(FV)
TOC 100' - 8"
8" THK
EXISTING
PUMP PAD
(FV)
TOC 100' - 8"
8" THK
EXISTING
PUMP PAD
(FV)
TOC 100' - 8"
S2.1
S2.1
S2.1
H
SS 3
.5 X0.
H
SS 3
.5 X0.
H
SS 3
.5 X0.
H
SS 3
.5 X0.
H
SS 3
.5 X0.
H
SS 3.5X0.25 H
SS 3
.5
X0.
4' - 4" (FV) 4' - 6" (FV) 11' - 5" (FV) 14' - 3" (FV) 14' - 3" (FV)
(F V
P2 99' - 4"
SEE , TYP
WHERE SHOWN
/6 S2.1
/2
(F V
S2.2
SEE , TYP
WHERE SHOWN
/6 S2.1
(FV)
ALT 01
TOC 100'-8"
8" THK NEW PUMP PAD
- REF MEP FOR SIZE & LOCATION
#3@12" OC EW
#3(1-6/AS REQD) @ 12"
OC EF DRILL & EPOXY
(3" EMBED)
TOC EL
- SEE PLAN
SEE MEP
3/4" CHAMFER
ROUGHEN
SURFACE, TYP
#3(1-6/AS REQD) @ 12"
OC DRILL & EPOXY
(3" EMBED), TYP
TOC EL
- SEE PLAN
SEE MEP
6" THK PAD
/REF
FOR ADDL INFO
5 S2.1
#3(0-5/AS REQD) @12"
OC DRILL & EPOXY
(3" EMBED)
w/ #3 CONT, TYP
TOC EL
- SEE PLAN
#3 @12" OC
DRILL & EPOXY
(3" EMBED), TYP
ROUGHEN
SURFACE, TYP
6' MIN
EXIST CONC
SLAB & PAD
#3@12" OC EW
DRILL & EPOXY
(MIN. 3" EMBED)
#3(1-6/AS REQD) @ 12"
OC DRILL & EPOXY
(3" EMBED), TYP
TOC EL
- SEE PLAN
1" CHAMFER, TYP
C L R
SEE MEP
ROUGHEN
SURFACE, TYP
TYP
4" MIN
PUMP BASE PLATE
- REF MEP
BASE PLATE - 1/2"x9"x9" w/ (4) 1/2" DIA. SIMPSON
STRONG-BOLT 2
(EMBED = 3")
HSS COL -
SEE PLAN
TYP
1 1/2" 3" 3"
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :1
P
M
SB
JM
S2.1
FOUNDATION PLAN &
DETAILS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
TC
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
SCALE : 1/4" = 1'-0"
FOUNDATION PLAN
PLAN NORTH
SCALE : 3/4" = 1'-0"5
SCALE : 3/4" = 1'-0"4
SCALE : 3/4" = 1'-0"
TYPICAL HOUSEKEEPING PAD
SCALE : 3/4" = 1'-0"3
SCALE : 3/4" = 1'-0"
TYPICAL COL BASE PL AND DETAILS
EXC2
EXC3
EXC4
EXCA EXCB EXCC EXCD EXCE
/2
(F V
(F
V
20' - 11" (FV) 21' - 3" (FV) 7' - 0" (FV) 11' - 4 1/2" (FV)
EXISTING 36" DIA
CONC COL (FV)
ALT 02
TOC EL TO MATCH EXISTING PAVING
8" THK NEW CONC SLAB
- REF MEP FOR SIZE & LOCATION
EXISTING CHAIN
LINK FENCE
NEW CHAIN LINK
FENCE FOR ALT 02
S2.2
S2.2
S2.2
S2.2
EXISTING CHAIN
LINK FENCE
SEE STRUCT NOTES
FOR SLAB REINF
#4(2-0/0-10/0-6/0-6) @ 12" OC w/ 2#4 CONT T&B
1/2" COMPRESSIBLE
JOINT FILLER @ PAVING
MOW STRIP
1' - 2"
CHAIN LINK FENCE POST
(8'-0" TALL MAX)
A T
E A
C O
R N
E R
POST BASE @ EA POST
10" DIA
2#3 CONT w/ #3 @ 18" OC
MIN
8"
G
A T
E
TOC EL
- SEE PLAN
SEE STRUCT NOTES
FOR SLAB REINF
#4(2-0/0-10/0-6/0-6) @ 12" OC w/ 2#4 CONT T&B
1/2" COMPRESSIBLE
JOINT FILLER @ PAVING
EXISTING CHAIN LINK
FENCE POST
MIN
8"
TOC EL
- SEE PLAN
EXISTING
CONC SLAB
1. FINISH FLOOR ELEVATION IS 100'-0" (RELATIVE TO DATUM 100-0) UNLESS
NOTED OTHERWISE.
2. TOP OF CONCRETE SLAB IS AT FINISH FLOOR UNLESS NOTED OTHERWISE.
3. MEP BACKGROUND ELEMENTS DEPICTED ON THE PLANS ARE INTENDED
FOR GENERAL COORDINATION PURPOSES AND ARE NOT INTENDED FOR
ANY OTHER PURPOSES. THIS PLAN MAY NOT REFLECT THE FINAL DESIGN,
SEE THE MEP DRAWINGS.
FOUNDATION PLAN NOTES
NOTES:
1. SAW JOINTS SHALL BE MADE AS SOON AS THE CONCRETE SURFACE IS
WALKABLE (U.N.O.) FILL SAW CUT JOINT WITH EUCO QWIK JOINT 200 BY EUCLID
CHEMICAL CORP. OR EQUIVALENT FOR ALL EXPOSED CONCRETE WHEN
CONCRETE IS AT LEAST 28 DAYS OLD. REF PLAN FOR LOCATIONS.
2. 1/2" DEEP PLASTIC JOINT FORM OR TOOLED JOINT MAY BE USED AS AN
ALTERNATIVE TO SAW-JOINTS.
SAW CUT JOINT
1/8" TYP.
T H
IC
K
N E
S S
/4
O F
S L
A B
REFER TO STRUCTURAL
NOTES FOR VAPOR RETARDER.
REFER TO STRUCTURAL NOTES
#4 x 4'-0" @ 12"o.c.
TOP
SLAB REINF.
1 1/2"
D E
P T
H
/3 S
L A
B D
E P
T H
/3
S L
A B
D E
P T
H
/3 S
L A
B
D E
P T
H S
L A
B
SPLICE 3'-0"
JT IN FLOORING.
REF TO PIER
SCHEDULE
FOR
REINF.
NOTE DP-7
NOTE DP-7
TO TIES
3" CLEAR
SHAFT DIA.
DRILLED PIER NOTES
DP-1 PIERS SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER OR BY HIS REPRESENTATIVE
PRIOR TO PLACING REINFORCING STEEL AND CONCRETE IN ORDER TO ASSURE THAT THE
BEARING SURFACES ARE CONSISTENT WITH DESIGN RECOMMENDATIONS.
DP-2 PIER EXCAVATIONS SHALL BE FREE OF WATER PRIOR TO PLACING CONCRETE.
DP-3 PIER HOLES SHALL NOT BE LEFT OPEN OVERNIGHT (NO EXCEPTIONS). PIERS SHALL BE
POURED THE SAME DAY THEY ARE DRILLED.
DP-4 PROVIDE STEEL CASING AS REQUIRED, TO PREVENT EXCAVATION SLOUGHING AND/ OR
SUBSURFACE WATER SEEPAGE. STEEL CASING MAY BE REMOVED DURING CONCRETE
PLACEMENT SEQUENCE PROVIDING THERE IS ENOUGH CONCRETE HEAD TO PREVENT
SLOUGHING SOIL FROM PENETRATING INTO THE PIER AREA.
DP-5 ANY CONSTRUCTION JOINT IN THE PIER SHAFT MUST OCCUR AT LEAST 6 INCHES ABOVE
GRADE ELEVATION.
DP-6 CONCRETE PLACEMENT SHALL BE MADE WITH A TREMIE WITH AT LEAST A 6 FOOT HOSE OR
METAL SNOUT.
DP-7 CENTER CAGE IN HOLE WITH 3 CONC. SPACER BLOCKS EVERY 8 FT. SUPPORT CAGE ON 3
CONC. SEAT BLOCKS. DO NOT RAISE CAGE OFF DRILLED PIER BOTTOM.
DP-8 EXTEND PIER SHAFTS & REINF. TO BOTTOM OF BEAM, WALL OR PLINTH SOFFIT USING
SONOTUBE ABOVE WORKING GRADE. USE SONOTUBE TO AN ELEVATION 2'-0" BELOW
WORKING GRADE AT TIME OF DRILLING. REFER TO SPECS. FOR CONDITIONS REQUIRING
ADDITIONAL SONOTUBE AND FOR CONSTRUCTION JOINT.
DP-9 TEMPORARY CASING TO BE INCLUDED IN BASE BID. SEE SPECIFICATIONS.
DP-10 OVERPOUR AT TOP OF PIERS (MUSHROOMS) SHALL BE REMOVED TO
RESULT IN THE REQUIRED PIER DIAMETER.
DP-11 STRAIGHT SHAFT PIER DESIGN CRITERIAS:
BEARING STRATUM: TAN WEATHERED LIMESTONE
APPROXIMATE TOP OF BEARING STRATUM: 8 FT BELOW GROUND FLOOR EL.
(FOR BIDDING ONLY)
ALLOWABLE BEARING PRESSURE: 10,000 PSF
POSITIVE SKIN FRICTION RESISTANCE: 2,000 PSF
(2) ADDL TIES
SPACED
EQUALLY
B E
A R
IN
G
S T
R A
T U
M
R E
F T
O P
IE
R
S C
H E
D F
O R
P E
N E
T R
A T
IO
N
I N
T O
R E
F T
O N
O T
E D
P -1
F
O R
D E
P T
H O
F B
E A
R
IN
G S
T R
A T
U M
BEARING
STRATUM,
TOP OF PIER EL
SEE PLAN
FF EL
SEE PLAN
S P
LI
C E
C
LA
S S A
#3 TIES AT
18" OC TYPICAL
/REF. 7 S2.2
6#7 (6-0) DOWELS
INTO COLUMN & PIER
TOP OF PIER EL
- SEE PLAN
SEE FOR
PIER REINF
1' - 6"
6#7 VERT w/ #4 TIES @
12" OC IN COLUMN
1/2" COMPRESSIBLE
JOINT FILLER @ PAVING
2 ADDITIONAL TIES
3' - 0" MAX INSTALL #3(1-6)
@ 18" OC DRILL &
EPOXY 6" INTO
EXIST SLAB, TYP
NEW CONC SLAB TO MATCH
EXISTING SLAB THICKNESS -
REINF w/ #3@18" OC EW
CENTERED IN SLAB, TYP
EXISTING SLAB
ON GRADE
/6 S2.2
SCALE : 1/2" = 1'-0"
TYPICAL STRAIGHT SHAFT PIER DETAIL & SCHEDULE
STRAIGHT SHAFT PIER SCHEDULE
PIER MARK SHAFT DIA. VERT. REINF. PENETRATION
P2 24" 6#6 3' - 0"
SCALE : 3/4" = 1'-0"7
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :1
P
M
Author
Checker
S2.2
FOUNDATION
PLAN_ADDITIVE
ALTERNATE NO. 2 &
DETAILS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
Approver
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
SCALE : 1/4" = 1'-0"
FOUNDATION PLAN _ADDITIVE ALTERNATE NO. 2
SCALE : 3/4" = 1'-0"2 SCALE : 3/4" = 1'-0"3
PLAN NORTH
SCALE : 1 1/2" = 1'-0"
TYPICAL SAW CUT JOINT DETAIL
4 SCALE : 1" = 1'-0"
TYPICALSLAB ON GRADE
CONSTRUCTION JOINT DETAIL
EXC4
EXCA EXCB EXCC EXCD EXCE
EXC1
/2
(F V
(F
V
/2
(F
V
/4
(F V
4' - 6" (FV) 7' - 3" (FV) 4' - 2" (FV) 9' - 6" (FV) 4' - 9" (FV) 14' - 3" (FV) 2' - 3" (FV)
(FV)
7' - 0"
(FV)
11' - 4 1/2"
/2
(F
V
(F V
(F V
(F V
/2
EX1.2
20' - 11" (FV) 21' - 3" (FV)
4' - 4" (FV) 4' - 6" (FV) 4' - 4 1/2" (FV) 6' - 2" (FV)
(FV)
10 1/2" 9' - 6" (FV) 4' - 9" (FV) 5' - 4" (FV) 8' - 11" (FV)
W18X35 (EXISTING)
W18X35 (EXISTING)
W X
E X
IS
T
IN
G
W X
E X
IS
T
IN
G
W X
E X
IS
T
IN
G
W X
E X
IS
T
IN
G
W X
E X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
W X
E X
IS
T
IN
G
W 12X16
(EXISTIN
G
W
X16
(E
XIS
TIN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
C X
.5
E
X
IS
T
IN
G
W X
E X
IS
T
IN
G
W X
W18X35
W
X16
W12X53
W 12X16
W18X35 W
X
W X
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
NEW 1 x 3/16" FLAT BAR GALVANIZED GRATING AT HATCH AREA
- SEE STRUCTURAL NOTES FOR MORE INFO.
- FIELD COORD FRAMING AND ELEVATION TO AVOID CONFLICT
w/ EQUIPMENTS & PIPES.
(F V
S5.1
S5.1
W T
X
.5
W T
X
.5
W T
X
.5
W X
E X
IS
T
IN
G
W T
X
W X
E X
IS
T
IN
G
W T
X
W X
E X
IS
T
IN
G
W12X26 (EXISTING)
W12X26 (EXISTING)
S5.1
S5.1
W X
C8X11.5
W
X16
C X
.5
C X
.5
C 8X11.5
C8X11.5
C X
.5
C8X11.5
C8X11.5
C8X11.5
C8X11.5 (EXISTING)
C8X11.5
C X
.5
C8X11.5
C8X11.5
H
SS 3
.5 X0.
H
SS 3
.5 X0.
H
SS 3.5X0.25
GRATING
SPAN
G
R A
T
IN
G
S P
A N
GRATING
SPAN12
S5.1
S5.1
S5.1
S5.1
1' - 8" MAX
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
S5.1
EXISTING GRATING AREA
S5.1
S5.1
TYP
8' - 4" (FV) 9' - 6" (FV)
C8X11.5C8X11.5C8X11.5 C X
.5
C X
.5
C X
.5
S5.1
C8X11.5 (EXISTING) C8X11.5 (EXISTING)
S5.1
S5.1
C L R
FACE OF NEW
COOLING TOWER
- REF MEP
EXC2
EXC3
EXC4
EXCA EXCB EXCC EXCD EXCE
EXC1
S2.3
EX1.2
S2.3
W X
W X
H I)
W X
L O
W X
L O
C8X11.5
C8X11.5C8X11.5
W X
W X
C8X11.5
W X
H I)
/2
(FV)
11' - 5"
(FV)
9' - 6"
(FV)
4' - 9"
(FV)
14' - 3"
(FV)
8' - 4"
(FV)
9' - 6"
(F V
/2
TYP
1' - 0" MIN
S2.3
OPP
S5.1
S5.1
TYP
S5.1
22 TYP
C8X11.5 C8X11.5 C8X11.5 C8X11.5
EXC1
EXISTING STEEL BEAM
TO BE REMOVED
NEW HSS 3.5x0.25
STEEL COL
NEW STEEL BEAM
- SEE PLAN
M
IN
S5.1
21 TYP
EXC1
S5.1
NEW HSS 3.5x0.25
STEEL COL
NEW STEEL BEAM
- SEE PLAN
S5.1
20 TYP
EXISTING COLUMN
TO BE REMOVED
DEMOLISH AND REMOVE PORTION OF EXISTING
CONCTRUCTION (RED HIGHLIGHTED)
- REMOVE EXISTING PIPE SUPPORT COLUMNS
- REMOVE EXISTING STEEL BEAMS
EXISTING CONC & STEEL STRUCT
NEW STEEL STRUCT
NOTE :
STRUCTURAL STEEL SAHLL BE HOT DIPPED GALVANIZED.
NEW CONC COL
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
/4
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :1
P
M
SB
JM
S2.3
COOLING TOWER
FRAMING PLANS &
SECTIONS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
TC
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
SCALE : 1/4" = 1'-0"
COOLING TOWER FRAMING PLAN1
PLAN NORTH
SCALE : 1/4" = 1'-0"
UPPER COOLING TOWER2 SCALE : 1/4" = 1'-0"5SCALE : 1/4" = 1'-0"4
SCALE :
ISOMETRIC VIEW3
SECTION
SECTION
EX1.2
EX2.6
EX3.2
EXC EXD EXEEXBEXA
EX4
EXISTING STL BM (EL VARIES)
SUPPORTING PIPING SYSTEM,
TYP WHERE SHOWN
NEW ROOF OPENING
- SEE
& REF MEP
EXISTING 10" (FV) ROOF
PURLINS @ 4'-0" OC (FV) EA
BAY TYP THROUGHOUT
EXISTING PRE-ENGINEERED METAL
FRAME, TYP WHERE SHOWN
NEW PIPES GREATER THAN 4" DIA
SHALL NOT BE HUNG FROM
EXISTING ROOF PURLINS, TYP
W4x13 WHERE NEEDED TO SUPPORT
PIPING SYSTEM (12'-0" MAX), TYP
- SEE
GC COORD MAX SPACING, LOC &
QUANTITY OF STEL BM
NEW STL BM CONN TO EXIST PRE-
ENGINEERED METAL FRAME TO
SUPPORT NEW PIPE SYSTEM
- SEE & MEP FOR ADDL
INFO
EXISTING 1.5" DEEP 22GA
MTL ROOF DECK
/2 S2.4
/3 S2.4
/4 S2.4
TOS 115' - 10" (FV)
TOS 115' - 10" (FV)
TOS 117' - 3" (FV)
TOS 117' - 3" (FV)
22' - 10 3/4" (FV) 22' - 10 3/4" (FV) 22' - 10 3/4" (FV) 22' - 10 3/4" (FV)
/2
(F
V
(F
V
/2
(F
V
L4x4x3/8x0-8 EA SIDE
OF BM WEB
NEW STL BM
- SEE PLAN
PRE-ENGINEERED
METAL FRAME
1/4
1/2" RETURN
T&B, TYP
BOS EL TO MATCH
EXISTING ADJACENT
STEEL BMS.
(IF REQD)
2' - 6" MAX SEE PLAN
(IF REQD)
2' - 6" MAX
NEW OR EXISTING STEEL BEAMS
CONN TO EXIST PRE-ENGINEERED
METAL FRAME
- SEE PLAN
NEW STEEL BEAM
- SEE PLAN
PIPE HANGER TYP -
SEE MEP
TYP
1/4 3
NOTE : ROOF DECK NOT SHOWN FOR CLARITY
PLAN
L3x3x1/4
L4x3x1/4 (LLV)
SEE PLAN FOR SPACING
EXISTING 10"
ROOF PURLINS (FV)
M A
X
EXISTING ROOF
DECKING
L3x3x1/4
OPENING
L4x3x1/4
EXISTING 10"
ROOF PURLINS (FV)
1/16 2
SECTION
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :1
P
M
SB
JM
S2.4
ROOF FRAMING PLAN
& DETAILS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
TC
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
SCALE : 1/4" = 1'-0"
UPPER COOLING TOWER & ROOF PLAN
SCALE : 3/4" = 1'-0"
TYPICAL FRAMING AT ROOF OPENING4SCALE : 3/4" = 1'-0"2 SCALE : 3/4" = 1'-0"3
EXC1
EXC1
EXC1
EXC1
EXC1
S E
C T
IO
NEXC1
CP. T&B TYP.
EXISTING STL BM
& STIFFINER PL.
1/2"
1 1/2" MIN
3/8" PL EA
SIDE OF WEB M
IN9
3 1/2" MIN
EXISTING EMBED PL.
EXISTING CONC COL
1/4
1/4
TYP
NEW STL BM
- SEE PLAN
NOTE:
REF. SOSI & SPEC FOR TESTING &
INSPECTION OF MOMENT CONNECTION.
CP. T&B TYP.
3/8" SHEAR PL.
1/4
TYP.
EXISTING STEEL BM
- SEE PLAN
NOTE:
REF. SOSI & SPEC FOR TESTING &
INSPECTION OF MOMENT CONNECTION.
3/8" STIFFINER
PL. EA SIDE OF
BM WEB
1/4
NEW STEEL BM
- SEE PLAN
EXISTING STEEL BM
- SEE PLAN
/REF
FOR ADDL INFO
6 S5.1
EXISTING CT BASE
/2
1/2" MIN
1/4
L3x3x1/4x0-7 AT EA
SIDE OF HANDRAIL
HANDRAIL POST
- REF MEP
L4x3x1/4 CONT (LLV)
1/4
1/4
TYP
1/4
TYP
1/2" MIN
NEW CT BASE
1"
STEEL BM
- SEE PLAN
3/8" STIFFENER PL. EA
SIDE OF BM WEB AT EA
INFRAMING BM & CENTER
OF COOLING TOWER
MOUNTING BOLT
REF MEP REF MEP
2 - 3/4" DIA MOUNTING BOLT
- REF MEP FOR ADDL INFO
1/4
NEW CT BASE
1' - 6"
EMBED PL - 1/2" x12"x12" w/ (4) 3/4" DIA x 8" HSA
6#7 VERT w/ #4 TIES @
12" OC IN COLUMN
2 ADDITIONAL TIES
1/4
2" TYP
NEW STEEL BM
- SEE PLAN
3/8" STIFFENER PL. EA
SIDE OF BM WEB AT
CENTER OF COOLING
TOWER MOUNTING BOLT
REF MEP
2 - 3/4" DIA MOUNTING BOLT
- REF MEP FOR ADDL INFO
1/4
NEW CT BASE
1/2" L3x3x1/4x0-7"
HANDRAIL POST
- REF MEP
L4x3x1/4 CONT (LLV)
BEYOND
1/4
EXISTING STEEL BM
- SEE PLAN
WT5x24.5 CONT w/ 3/8" STIFFINER PL
AT EA END, ANCHOR
POSITIONS & 6'-0" MAX
ANCHOR BOLTS
- GC COORD ANCHOR
BOLTS LOC & QUANTITY
1/4 2-12
1/4
EXISTING CT BASE
EXISTING STEEL BM
- SEE PLAN
WT4x14 CONT w/ 3/8" STIFFINER PL
AT EA END, ANCHOR
POSITIONS & 6'-0" MAX
ANCHOR BOLTS
- GC COORD ANCHOR
BOLTS LOC & QUANTITY
1/4 2-12
1/4
EXISTING CT BASE
EXISTING STEEL BM
- SEE PLAN
1/4
/REF
FOR ADDL INFO
6 S5.1
1/2" MIN 1/2"
USE EXISTING ANGLE OR
NEW L3x3x1/4 CONT
SHIM PLAT AS REQD
AT EA END
EXISTING STEEL
GRATING
STEEL BM
- SEE PLAN
1/4STEEL GRATING
- SEE PLAN
L2x2x1/4 CONT
3/16 2-12
1/4
STEEL CHANNEL
- SEE PLAN
/REF
FOR ADDL INFO
4 S5.1
1/2" MIN
STEEL BM
- SEE PLAN
1/4
1/2" RETURN
T&B, TYP
3/8" SHEAR PL.
STEEL GRATING
- SEE PLAN
T Y
P
1/2"
STEEL BM
- SEE PLAN
3/8" STIFFENER PL. EA
SIDE OF BM WEB AT EA
INFRAMING BM
1/4
NEW CT BASE
/2
L4x3x1/4 CONT
(LLV)
HANDRAIL POST
- REF MEP FOR
LOCATION
3/16
STEEL GRATING
- SEE PLAN
3/16 2-12
STEEL BM
- SEE PLAN
L4x3x1/4 CONT
(LLV)
STEEL GRATING
- SEE PLAN
1/4
1"
TYP
1 1/2"
/REF
FOR ADDL INFO
12 S5.1
HSS STEEL COL
w/ 1/4" CAP PL - 6 1/2"x6 1/2"
- SEE PLAN
HANDRAIL POST
BEYOND
STEEL BM
- SEE PLAN
1/4STEEL GRATING
- SEE PLAN
L2x2x1/4 CONT
3/16 2-12
1/4
3 SIDES, TYP
1/2" MIN
1/2"PL 3/8"x6"x6"
STEEL BM
- SEE PLAN
1"
L4x3x1/4 CONT
(LLV)
HSS STEEL COL
w/ 1/4" CAP PL - 4"x6 1/2"
- SEE PLAN
1 1/2" TYP
1/4
1/4
TYP
NEW CT BASE
/REF
FOR ADDL INFO
12 S5.1
NEW STEEL BM
- SEE PLAN
EXISTING STEEL BM
- SEE PLAN
1/2"
1/2" MIN
EXISTING CT BASE
WT5x24.5 CONT w/ 3/8" STIFFINER PL
AT EA END, ANCHOR
POSITIONS & 6'-0" MAX
L2x2x1/4 CONT
OR AS REQD
3/16 2-12
TYP
STEEL GRATING
- SEE PLAN
NEW CT BASE
1/4
TYP
STEEL GRATING
- SEE PLAN
L2x2x1/4 CONT
3/16 2-12
1/2" MIN
NEW STEEL BM
- SEE PLAN
L4x3x1/4 CONT
(LLV)
EXISTING
STEEL PIPE
NEW CT BASE
EXISTING
STEEL BM (FV)
/REF
FOR ADDL INFO
12 S5.1
1/4
NEW HSS COL
- SEE PLAN
EXISTING
STEEL BM (FV)
(FV)
3"
(FV)
2 1/2"
/REF
FOR ADDL INFO
16 S5.1
NEW HSS COL
- SEE PLAN
1/4 2-12
3/8" STIFFINER
PL AT EA SIDE
OF BM WEB
1/4
S5.1
1/4 2-12
SEE
FOR CONN
/23 S5.1
1/2"
1/2"
1/4
3 SIDES, TYP
PL 3/8"x6"x6"
NEW STEEL BM -
SEE PLAN & COPE
TOP FLANGE AS
REQD
1/4
NEW HSS COL
- SEE PLAN
EXISTING
STEEL BM (FV)
(FV)
2"/REF
FOR ADDL INFO
17 S5.1
NEW HSS COL
- SEE PLAN 1/4 2-12
S5.1
(FV)
3"
NEW L4x3x1/4
CONT (LLV)
EXISTING STEEL
GRATING
1 1/2"
1/4
NEW STEEL BM
- SEE PLAN & COPE
TOP FLANGE AS REQD
1/4
1/4
NEW STEEL BM
- SEE PLAN
EXISTING STEEL
GRATING
NEW STEEL GRATING
- SEE PLAN
EXISTING
STEEL BM (FV)
/REF
FOR ADDL INFO
16 S5.1
1/4
NEW L4x3x1/4
CONT (LLV)
M
IN
EXISTING
CHANNEL 1/4
TYP
1 1/2"
EXISTING 3 1/2" DIA
STEEL COL (FV)
HSS 3.5x0.25 COL w/ 1/4" CAP PL T&B - 6 1/2"x6 1/2"
- SEE PLAN
TYP
1 1/2"
1/2"
PIPE HANGER TYP
- SEE MEP
TOS EL
- REF MEP
TOS EL
- REF MEP
SEE
FOR CONN
/23 S5.1
/REF
FOR ADDL INFO
20 S5.1
HSS STEEL COL
w/ 1/2" CAP PL - 7 1/2"x7 1/2"
- SEE PLAN
TYP
1 1/2"
PIPE HANGER TYP
- SEE MEP
1/4
TOS EL
- REF MEP
TYP
1 1/2"
SECTION
TYP
1/2"
T Y
P
3/8" STIFFINER PL AT
EA SIDE OF BM WEB
TYP
3"
TYP
1 1/2"
/2
/2
L3 X 3 X 1/4" DIAG.
EACH CORNER
(COPE VERT. LEG)
M
IN
3"
TYP
1' - 0" MIN
SECTION
PLAN
3" MAX.
1 1/2"
/2
/2
3/8" SHEAR PL
w/ 3/4" DIA. BOLTS
C O
L
W
ID
T H
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k
D o c s /C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /D
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
T S
T R
U C
T R
.r v t
/1
/2
:1 :2
P
M
SB
JM
S5.1
STEEL DETAILS
C O
L L
IN
C O
L L E
G E
F R
IS
C
O C
A M
P U
S
W a d e B lv d
F ri s c o
T
X
05/16/2025
TC
C E
N T
R A
L U
T
IL
IT
Y
P L A
T U
P G
R A
D E
S
05/16/2025
SCALE : 3/4" = 1'-0"1 SCALE : 3/4" = 1'-0"3 SCALE : 3/4" = 1'-0"4SCALE : 3/4" = 1'-0"2 SCALE : 3/4" = 1'-0"5 SCALE : 3/4" = 1'-0"6
SCALE : 3/4" = 1'-0"7 SCALE : 3/4" = 1'-0"9 SCALE : 3/4" = 1'-0"10 SCALE : 3/4" = 1'-0"12
SCALE : 3/4" = 1'-0"13 SCALE : 3/4" = 1'-0"14 SCALE : 3/4" = 1'-0"15 SCALE : 3/4" = 1'-0"16 SCALE : 3/4" = 1'-0"17
SCALE : 3/4" = 1'-0"19SCALE : 3/4" = 1'-0"18
SCALE : 3/4" = 1'-0"8 SCALE : 3/4" = 1'-0"11
SCALE : 3/4" = 1'-0"21SCALE : 3/4" = 1'-0"20 SCALE : 3/4" = 1'-0"22
SCALE : 1" = 1'-0"
TYP SHEAR PLATE CONN AT COL23
E E M
J
EXC2
EXC3
EXC4
EXCB EXCE
EXC1
EX1.2
EX2.6
EX3.2
EXC EXD EXEEXB
EXA
EX4
N.I.C.
ME1.01
ME2.01
ME1.01
ME2.01
BOILER
ROOM
CENTRAL
RECEIVING
CHILLER
ROOM
OFFICE
111A
OFFICE
111B
OFFICE
113 RECEIVING
ELECTRICAL
RISER ROOM
WOMEN'S
RR
MEN'S
RR
OFFICE
ME2.02
BAS
CONTROL
PANELS
ICE STORAGE
TANKS TO REMAIN
(TYP.)
MSA-1
A
B
A5
3" G(E) @
TOWN PRESSURE
B
3" G(E) @
TOWN PLANT
3" G(E) @ (E)
TOWN PRESSURE
2" G @
TOWN PLANT
2" G AT
5-PSI
4" G @
TOWN PLANT
4" G @
TOWN PLANT
2" G @
5-PSI
4" G @
TOWN PLANT
EXISTING
GAS METER
ME2.02
C C
JUNCTION BOX
JUNCTION BOX
ELECTRICAL
COMMUNICATION / DATA
IRRIGATION
ELECTRICAL
EXISTING BURRIED
UTILITIES, FIELD
VERIFY AND
COORDINATE AS
REQUIRED
ELECTRICAL
COMMUNICATION / DATA
IRRIGATION
ELECTRICAL
TEMPORARY CHILLER PUMPS VFDs MSA-7
MSA-8
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
/8
A u to d e s k D o c s:
C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /2
-C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P .r v t
/2
/2
:5 :2
P
M
BB/JS
BJC
ME1.00
SITE PLAN - PLANT
OPERATION
BUILDING
C E
N T
R A
L U
T
IL
IT
Y
P L A
N T
U P
G R
A D
E S
C O
L L
IN
C O
L L E
G E
F
R
IS
C O
C A
M P
U S
W a d e B lv d
F ri s c o
T
X
05/16/2025
NPH
24147-00
TRUE
NORTH
PLAN
NORTH
SCALE: 1/8" = 1'-0"
SITE PLAN - PLANT OPERATION BUILDING1
◯ NOTES BY SYMBOL ' ':
1 PROVIDE TEMPORARY DISCONNECT FOR TEMPORARY EAST WATER-COOLED
CHILLER, FOLLOWING MANUFACTURER'S RECOMMENDATIONS.
2 PROPOSED LOCATION OF 500-TON TEMPORARY AIR COOLED CHILLER AND
DISTRIBUTION PUMPS TO BACKFEED CAMPUS CHILLED WATER SYSTEM
DURING CENTRAL PLANT UPGRADES PROJECT. PROVIDE (2) VARIABLE
PRIMARY PUMPS CAPABLE OF DELIVERING 1600 GPM AT 120 TDH, MIN.
480V/3PH, 75 HP EA. ALSO PROVIDE TEMPORARY NEMA 3R VARIABLE
FREQUENCY DRIVES.
3 AFTER ALL SITE WORK IS COMPLETE REMOVE TRASH, DEBRIS, AND SPOILS.
REWORK GRADE AND SEED/WATER TO ESTABLISH NEW GRASS. SHOULD ANY
DAMAGE TO IRRIGATION SYSTEMS OCCUR, CONTRACTOR SHALL COORDINATE
ANY REPAIRS REQUIRED TO EXISTING IRRIGATION SYSTEMS BACK TO
LIKE-NEW CONDITIONS.
4 LOCATE, MARK, AND FLAG EXISTING BELOW GRADE UTILITIES. COORDINATE
INSTALLATION WITH EXISTING IRRIGATION SYSTEM.
5 PROVIDE NEW 10" ISOLATION VALVES IN THE VERTICAL OF BRANCH MAINS
FOR TEMPORARY CHILLERCONNECTIONS APPROX 24" A.F.G. PROVIDE POWER
TO TEMPORARY CHILLER FROM EXISTING SWITCHBOARD 'MSA' IN MAIN
ELECTRICAL ROOM. TEMPORARY AND PERMANENT CHILLERS ARE NOT TO
RUN SIMULTANEOUSLY.
6 PLANNED LOCATION FOR 500-TON EMERGENCY WATER-COOLED CHILLER FOR
FUTURE USE. PROVIDE WALL MOUNTED ELECTRICAL DISCONNECT SWITCH.
REFER TO SHEET ME2.02
7 APPROXIMATE LOCATION OF EXISTING BELOW GRADE GAS PIPING. FIELD
VERIFY WITH GROUND PENETRATING RADAR AND COORDINATE TEMPORARY
CHILLER PROVISION AND PROTECT ALL BURIED UTILITIES FROM DAMAGE
DURING CONSTRUCTION.
8 APPROXIMATE LOCATION OF EXISTING BELOW GRADE HEATING WATER
SUPPLY AND RETURN PIPING. FIELD VERIFY WITH GROUND PENETRATING
RADAR AND COORDINATE TEMPORARY CHILLER PROVISION AND PROTECT ALL
BURIED UTILITIES FROM DAMAGE DURING CONSTRUCTION.
◯ ALTERNATE NOTES BY SYMBOL ' ':
A UNDER ALTERNATIVE NO.2, PROVIDE NATURAL GAS PIPING SLEEVE UNDER
EXTENTS OF NEW PAVING AREA AND TO THE EXTENT SHOWN. MATCH
EXISTING PIPE SLEEVE MATERIALS AND CONDITIONS.
B UNDER ALTERNATIVE NO.2, PROVIDE NEW CONCRETE SLAB IN THE LOCATION
SHOWN. REMOVE EXISTING FENCING TO THE EXTENT SHOWN AND INSTALL
NEW FENCING TO SURROUND THE NEW PARKING LOT FOOTPRINT BORDER.
C UNDER ALTERNATIVE NO.2, REMOVE AND RELOCATED EXISTING TREES AS
REQUIRED FOR NEW CONCRETE SLAB IN THE LOCATION SHOWN.
bclark Snapshot bclark Snapshot
"C
H R
"C
H S
18"CWR
14"CWR
12"CWR
GLYCOL CHILLED WATER
EXPANSION TANK (E)
GLYCOL CHILLED WATER
SHOT FEEDER (E)
CHILLED WATER EXPANSION TANK (E)
HOT WATER EXPANSION TANKS (E)
HOT WATER EXPANSION
TANK (E)
WATER HEATER (E)
MU SOFTENER (E)
10" CWS HEADER
N.I.C.
GUARDRAIL
AROUND PIT (E)
CONCRETE PAD (E)
(TYP.)
CONCRETE PAD (E)
(TYP.)
CONCRETE PAD (E)
(TYP.)
CONCRETE PAD (E)
(TYP.)
14"CHR 14"PCHR 14"PCHR
CT-4 (E)
CT-3 (E) CT-2 (E)
CT-1 (E)
"C
H S
"C
H S
10"CHS
14"CHS 14"CHS
"C
W S
18"CWS
14"CWS
18"CWR14"CWR
8" CHS BYPASS (E)
14" CHS
8"PCHR
3/4"MU
3/4"MU
3/4"MU
1 1/2"CHS
1 1/2"CHR
1 1/4"CHS
1 1/4"PCHR 8"CHS
"P
C H
S
1 1/4"CHR
1 1/4"CHS
1 1/4"CD
2 1/2"AR 2 1/2"AR
10"CWR
10"CWS
4"PCHR 8"PCHS
8"PCHS
8"PCHR
10"CWS
10"CWR
8"PCHR
10"CWR
8"PCHR
10"CWS
10"CWS
10"CWS
8"PCHR
8"CHR
10"CWR
8"CHS
6"CWR
10"CWR6"CWR
10"CWR
2 1/2"MU
20"CWR
18"CWR
10"CWR 10"CWR
12"CWR
1 1/2"MU
A
2 1/2"AR
FM-1 (E)
V-4 (E)
EXC2
EXC3
EXC4
EXCA EXCB EXCC EXCD EXCE
EXC1
EX1.2
EX2.6
EX3.2
EXC EXD EXEEXBEXA
5 5
CH-4(E)
CH-3(E)
CH-2(E)HWP-1(E) HWP-2(E) HWP-3(E)
SCHP-1
SCHP-2
SCHP-3
CP-1(E) PCHP-2 CP-2 CP-3(E) PCHP-4(E) CP-4(E)
AHU-1A(E)
GCHP-2(E)
GCHP-1(E)
AS-GCH(E)
HEX-1(E)
HWUH-4(E)
HWUH-5(E)
HWUH-1(E)
HWUH-2(E)
ME1.03
ME1.03
FM(E)
VF-1(E)
CH-1(E)
B
B
B
B
4 4
2 2 2 2
1 1 1
1 1 1
6 6
M3.01
M3.01
ME1.03
10"CWR
PCHP-1B(E)
PCHP-1A(E)
VF-2(E)
10"CHS
2 1/2"MU
ICE STORAGE
TANKS TO REMAIN
(TYP.)
CHILLER
ROOM
CENTRAL
RECEIVING
ELECTRICAL
WOMEN'S
RR
MEN'S
RR
OFFICE
BOILER
ROOM
OFFICE
111B
OFFICE
111A
C
CHILLED WATER SYSTEM CHEMICAL
TREATMENT SHOT FEEDER (E)
2 1/2"AR
A A
8"PCHR (HEADER)
1 1/2" G
3/4"HW
3/4"HWR
3/4"CW
2"G
2 1/2"CW
2"G
2"G
RPZ (E) 2"SS
2"CW
3/4"MU
3/4"CW
CONCRETE PAD
TYP.
12"Ø(E)12"HWS
10"HWR
12"HWR14"HWR
"H
W R
"H
W S
14"HWS
8"HWR
14"Ø(E)
6"HWR
6"HWS
1 1/2"G
(TYP.)
(TYP.)
(TYP.)
1 1/2"CW
BOILER
DISCONNECTS (E)
AS-HW (E)
GLYCOL CHILLED WATER
SHOT FEEDER (E)
WATER HEATER (E)
HEATING WATER SHOT FEEDER (E)
D
UH (E)
E
1 1
1 1 1 1
GUH-1(E)
B-4(E) B-3(E)
B-2(E)
B-1(E)
D
BOILER
ROOM
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
/4
A u to d e s k D o c s:
C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P /2
-C o lli n C o lle g e F ri s c o H y d ro n ic
L o o p
C U
P .r v t
/2
/2
:1 :2
P
M
BB/JS
BJC
ME1.01
DEMOLITION FLOOR
PLAN - CENTRAL
PLANT - HVAC PIPING
C E
N T
R A
L U
T
IL
IT
Y
P L A
N T
U P
G R
A D
E S
C O
L L
IN
C O
L L E
G E
F
R
IS
C O
C A
M P
U S
W a d e B lv d
F ri s c o
T
X
05/16/2025
NPH
24147-00
TRUE
NORTH
PLAN
NORTH
SCALE: 1/4" = 1'-0"
DEMOLI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .