Frequently Asked Questions - Chiller and Cooling Tower Treatment - 528A6.pdf
PDF 41 KB Posted
- Solicitation number
- 36C24226Q0642
About this file
This is a Questions and Answers document addressing facility specifications and operational parameters for a cooling tower system maintenance requirement.
The facility operates three 400-ton electric chillers capable of simultaneous operation and one 400-ton steam absorption chiller that remains inactive. The cooling system runs seasonally from April through October/November. The circulation system comprises four pumps, each with a recirculation rate of 1,270 gallons per minute, for a combined total capacity of 5,080 gallons per minute. The chilled water is pre-treated with nitrates and utilizes two biocides for biological control. Makeup water data is available to the selected vendor. Physical cleaning is performed in-house during springtime, and the system has been operational for approximately four years. The facility is equipped with Logical Controls automation equipment onsite for system monitoring and control.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frequently Asked Questions
1. What are the tonnages of each cooling tower and do they run seasonally?
a. There are 3 400 ton electric chillers that can operate simultaneously and 1
400 ton steam absorption chiller that will never operate. The cooling tower runs from the beginning of April until October/November.
2. What is the tower circulation pump recirculation rate?
a. 1,270 per pump. 4 pumps total.
3. Is there makeup water data available?
a. Yes, it is available to the vendor working on the requirement.
4. Is the chilled water already treated? If so, what chemistry?
a. Yes, it is treated with nitrates.
5. Is there a biocide used on the chilled water?
a. Yes.
6. Does the cooling tower current program use 1 or 2 biocides?
a. 2.
7. Do the cooling towers require a “physical” cleaning in the spring and or fall?
a. Yes, we perform this cleaning in-house during the springtime.
8. How long has the system been in place?
a. Approximately 4 years.
9. Is there automation equipment onsite?
a. Yes, Logical Controls is in place.