Freedom Park Restroom-Snack Bar Renovation Project.pdf
PDF 622 KB Posted
- Solicitation number
- FWRR.09.26.27
- Issued by
- Ventura County, California
About this file
This is a request for sealed bids issued by the Pleasant Valley Recreation and Park District in Camarillo, California, for the Freedom Park Restroom/Snack Bar Renovation Project (Specification No. FWRR.09.26.27). The project involves renovating and modernizing the existing Restroom/Snack Bar building at Freedom Park Baseball Fields to meet current building codes and ADA standards. Work includes demolition, concrete slab repairs, metal roof and awning installation, window and door replacement, tile flooring and wall applications, plumbing and electrical system upgrades, kitchen equipment installation, and interior/exterior painting. A mandatory informational pre-bid meeting is scheduled for Tuesday, June 22, 2026, at 10:00 a.m. at Freedom Park (275 W. Pleasant Valley Road, Camarillo, CA 93010). Sealed bids must be received by Wednesday, July 22, 2026, at 12:00 p.m. at the District's Administration Department (1605 E. Burnley Street, Camarillo, CA 93010). The contract completion period is 135 consecutive working days from the Notice to Proceed. Bid questions must be submitted to Matthew Parker, Park Services Manager (mparker@pvrpd.org) by July 10, 2026, at 5:00 p.m. Bid results will be posted on the District's website within 48 hours of the bid opening.
All bids must be accompanied by a bid bond or check equal to ten percent (10%) of the bid amount. The successful contractor must obtain and maintain commercial general liability insurance of $5,000,000 per occurrence and $10,000,000 general aggregate, automobile liability insurance of $5,000,000 combined single limit, pollution liability insurance of $1,000,000 per occurrence, workers' compensation insurance at statutory limits, and builder's risk insurance. A faithful performance bond and payment bond, each in the amount of 100% of the total contract price, are required. The contractor must be licensed as a California State Contractor with a valid "A" or "B" classification at the time of award. Liquidated damages of $250 per day apply for failure to meet the 135-day completion schedule. The project is subject to prevailing wage requirements as established by the California Department of Industrial Relations, with certified payroll records to be submitted weekly to the District and electronically to the Labor Commissioner. The District reserves the right to reject any or all bids. No bidder may withdraw their bid for 60 days after the bid opening date. Bid results shall be available on the District's website within 48 hours after bid opening, and the contract award is anticipated within 60 days of bid opening.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLEASANT VALLEY RECREATION AND PARK DISTRICT
CONTRACT DOCUMENTS
SPECIFICATIONS AND STANDARD DRAWINGS
FREEDOM PARK RESTROOM / SNACK BAR RENOVATION
PROJECT
FISCAL YEAR 2026-2027_
SPEC NO. FWRR.09.26.27
BID OPENING: Wednesday, July 22, 2026, AT 12:00 P.M.
1605 E. Burnley Street Camarillo, CA 93010
Phone: (805) 482-1996 / Fax: (805) 482-3468
PLEASANT VALLEY RECREATION & PARK DISTRICT
CALIFORNIA
CONTRACT DOCUMENTS,
SPECIFICATIONS AND STANDARD DRAWINGS
FOR THE
FISCAL YEAR 2026-2027
IN THE CITY OF CAMARILLO, CALIFORNIA
TABLE OF CONTENTS
TABLE OF CONTENTS ...........................................................................................i
NOTICE INVITING SEALED BIDS .......................................................................A-1 - A-4
INSTRUCTIONS TO BIDDERS ..............................................................................B-1 - B-6
BID FORM ................................................................................................................C-1 - C-5
BID BOND ................................................................................................................D-1 - D-2
INFORMATION REQUIRED OF BIDDERS ..........................................................E-1 - E-8
AGREEMENT ...........................................................................................................F-1 - F-4
FAITHFUL PERFORMANCE BOND .....................................................................G-1
LABOR AND MATERIAL BOND ..........................................................................H-1 - H-2
WORKERS’ COMPENSATION CERTIFICATE ....................................................I-1
APPRENTICESHIP REQUIREMENTS ...................................................................J-1
GENERAL PROVISIONS ........................................................................................GP-1 - GP-6
SPECIAL PROVISIONS ...........................................................................................SP-1 - SP-23
TECHNICAL SPECIFICATIONS ............................................................................TP-1 – TP-__
CONSTRUCTION DRAWINGS ..............................................................................APPENDIX A i
A-1
NOTICE INVITING SEALED BIDS
FOR THE
FREEDOM PARK RESTROOM / SNACK BAR RENOVATION
PROJECT
SPEC NO. FWRR.09.26.27
PUBLIC NOTICE IS HEREBY GIVEN THAT:
Sealed bids will be received at the Office of the Administration Department, 1605 E. Burnley Street Camarillo, CA 93010, up to the hour of 12:00 P.M. Wednesday, July 22., 2026, at which time they will be publicly opened and read aloud in the Administration Conference Room, Camarillo, California, for performing the following work:
FREEDOM PARK RESTROOM / SNACK BAR RENOVATION
PROJECT
SPEC NO. FWRR.09.26.27
All in accordance with the plans, specifications, and other contract documents on file in the Parks Department of the Pleasant Valley Recreation & Park District.
The words “FREEDOM PARK RESTROOM / SNACK BAR RENOVATION PROJECT, SPEC NO. FWRR.09.26.27” shall appear on the envelope of each sealed bid, and each sealed envelope shall be addressed to the Pleasant Valley Recreation and Park District Attn: Park Services Manager, 1605 E. Burnley Street, Camarillo, CA 93010.
MANDATORY INFORMATIONAL PRE-BID MEETING. There will be a Mandatory Informational Pre-Bid meeting on Tuesday, June 22, 2026, at 10:00 A.M., at Freedom Park (Baseball fields parking lot), 275 W. Pleasant Valley Road, Camarillo, CA 93010.
DESCRIPTION OF WORK: The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required in the Plans, Specifications and Contract documents for said project to renovate and modernize the Restroom/Snack Bar building to current building and ADA standards. The work will take place at the Freedom Park Baseball Field’s Restroom/Snack Bar building in Camarillo, California, and other related work as described in the Specifications and Contract Documents, by reference, made a part hereof. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
THE ENGINEER’S ESTIMATE FOR THIS PROJECT IS: $ ______.
COMPLETION OF WORK: All work to be done under this contract shall be completed within ONE HUNDRED, THIRTY-FIVE (135) consecutive working days, exclusive of maintenance
N/A
A-2 periods, beginning on the date stipulated in the written "Notice to Proceed" to be issued by the Engineer.
LIQUIDATED DAMAGES: Liquidated damages of $250/day will apply to this project. See Special Provisions for detailed information on liquidated damages.
OBTAINING CONTRACT DOCUMENTS: Plans, Specifications, and contract documents may be obtained on the District’s website at: http://www.pvrpd.org/request-for-proposals-bids.
STATE LABOR STANDARDS & WAGE REQUIREMENTS: In entering into a public works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor and all subcontractors agree to follow the State Labor standards. State Labor standards provisions, including prevailing wage requirements, will be enforced such that the general rate of per diem wages (prevailing wage) shall be paid for each craft, classification, or type of worker needed to execute the contract to all workers employed in the execution of the contract. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) as further described in Article IX of the Agreement. The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm). The prevailing rate of per diem wages are on file at the Pleasant Valley Recreation & Park District, Department of Parks, 1605 E. Burnley Street, Camarillo, CA 93010, and are available to any interested party on request.
AWARD OF CONTRACT: Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5, subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded).
SUBCONTRACTOR'S LIST: Bidder understands that if he or she fails to specify a subcontractor for any portion of the work to be performed under the contract, he or she shall be deemed to have agreed to perform such portion himself and that he or she shall not be permitted to sublet or subcontract that portion of the work except in cases of public emergency or necessity.
In compliance with the provisions of Section 4100 through 4107 of the Public Contract Code of the State of the California and any amendments thereto, the undersigned bidder has set forth on the form provided therefor, the name and location of the place of business of each subcontractor who will perform work or labor or render services to the prime contractor, in or about the construction of or improvements to be performed, under the contract documents to which the attached bid is responsive including special fabrication and installation, and the portion of the work which will be done by each subcontractor for each subcontract in excess of one-half of one percent (1/2%) of this total bid or, in the case of bids for the construction of street and highways, including bridges, in excess of one-half of one percent (1/2%) of this total bid or $10,000.00, whichever is greater. Additionally, once a subcontractor has been listed in the bid, another subcontractor may not be substituted unless the appropriate statutory procedure is followed and the District consents to the substitution.
http://www.dir.ca.gov/DLSR/PWD/index.htm https://advance.lexis.com/document/?pdmfid=1000516&crid=2d876df3-82c0-4971-980f-04c936b6efde&pddocfullpath=%2Fshared%2Fdocument%2Fstatutes-legislation%2Furn%3AcontentItem%3A5CK9-2GK0-R03K-F2Y7-00000-00&pddocid=urn%3AcontentItem%3A5CK9-2GK0-R03K-F2Y7-00000-00&pdcontentcomponentid=4867&ecomp=8hyg&earg=sr0&prid=5937e7e5-a6ed-42a0-93a2-422744db43fb https://advance.lexis.com/document/?pdmfid=1000516&crid=2d876df3-82c0-4971-980f-04c936b6efde&pddocfullpath=%2Fshared%2Fdocument%2Fstatutes-legislation%2Furn%3AcontentItem%3A5CK9-2GK0-R03K-F2Y7-00000-00&pddocid=urn%3AcontentItem%3A5CK9-2GK0-R03K-F2Y7-00000-00&pdcontentcomponentid=4867&ecomp=8hyg&earg=sr0&prid=5937e7e5-a6ed-42a0-93a2-422744db43fb
A-3
BID GUARANTY: Bids must be accompanied by cash, or by cashier's or certified check made payable to the Pleasant Valley Recreation & Park District, or by a bid bond executed by an admitted surety insurer on the bond form provided herein, in the amount of ten percent (10%) of the amount of bid price, made payable to the Pleasant Valley Recreation & Park District as a guarantee that the bidder, whose bid is accepted, will promptly execute the contract, secure payment of workers’ compensation insurance, and furnish a satisfactory faithful performance bond in the amount of one hundred percent (100%) of the total bid price and a payment bond (labor and material bond) in the amount of one hundred percent (100%) of the total bid price which complies with all of the requirements of Civil Code Section 9554.
RETENTION: The District will deduct a five percent (5%) retention from all progress payments as specified in Section 7-3.2 of the 2021 Standard Specifications for Public Works Construction.
The District in accordance with Public Contract Code Sect. 22300 shall permit the substitution of securities for any moneys withheld by a public agency to ensure performance under a contract.
The District hereby incorporates herein all of the provisions set forth in Public Contract Code Sect.
22300.
CONTRACTOR'S LICENSE: At the time of “Award of the Contract”, the Prime Contractor must have a valid California State Contractor's License with a classification of “A” or “B” in accordance with provisions of California Business and Professions Code Sections 7000 through 7145 and the contractor shall warrant that it and all subcontractors are properly licensed, which includes each entity having a local business license.
DISTRICT'S RIGHTS RESERVED: The District reserves the right to reject any and all bids or to waive any irregularities or informalities in any bids or in the bidding, should it deem this necessary for the public good, and also the bid of the bidder who has been delinquent or unfaithful in any former contract with the Pleasant Valley Recreation & Park District. No bidder may withdraw his or her bid for a period of sixty (60) days after the date from the opening thereof.
BID REGISTRATION: N/A
BID QUESTIONS: All bid questions shall be submitted by email to Matthew Parker, Park Services Manager at mparker@pvrpd.org for the benefit of all proposed bidders. The questions shall be submitted no later than July 10, 2026 (5:00 PM) for a response.
BID RESULTS: Bid results shall also be available on the Pleasant Valley Recreation & Park District’s website (http://www.pvrpd.org/) within 48 hours after bid opening.
mailto:mparker@pvrpd.org http://www.fillmoreca.com/
B-1
INSTRUCTIONS TO BIDDERS
BID REGISTRATION: N/A
BID FORM: All bids shall be submitted on the Bid Forms provided herein for the FREEDOM
PARK RESTROOM / SNACK BAR RENOVATION PROJECT, SPEC NO.
FWRR.09.26.27. All information requested therein must be clearly and legibly set forth in the manner and form indicated. The District will not consider any bid not meeting these requirements.
DELIVERY OF BIDS: The bids shall be delivered by the time and to the place stipulated in the "Notice Inviting Sealed Bids.” It is the bidder's sole responsibility to see that his or her bid is received in proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. Bidders or their authorized agents are invited to be present at bid opening.
MODIFICATIONS AND ALTERNATIVE BIDS: Unauthorized conditions, limitations, or provisos attached to a bid will render it unresponsive and may cause its rejection. The complete bid forms shall be without alterations or erasures, unless each such correction is suitably authenticated by affixing in the margin immediately opposite the correction the surname or surnames of the person or persons signing the bid. Alternative bids will not be considered unless called for. No oral, telegraphic, or telephonic bid or modifications will be considered.
WITHDRAWAL OF BID: The bid may be withdrawn upon request by the bidder without prejudice to himself prior to, but not after the time fixed for opening of bids, provided that the request is in writing, has been executed by the bidder or his or her duly authorized representative, and is filed with the Clerk of the Board. No bid may be withdrawn during the period of sixty
(60) days after the opening of bids.
BID GUARANTY: Each bid shall be accompanied by cash, or a cashier's or certified check, or by a bid bond in the amount of ten percent (10%) of the amount named in the bid. Said check or bond shall be made payable to the District and shall be given as a guarantee that the bidder, if awarded the work, will enter into a contract within fifteen (15) days after written notice of the award and will furnish the necessary bonds as hereinafter provided. In case of refusal or failure to enter into said contract, the check or bond, as the case may be, shall be forfeited to the District. No bidder's bond will be accepted unless it conforms substantially to the form furnished by the District, which is bound herein, and is properly filled out and executed.
DISCREPANCIES IN BIDS: In case of discrepancy between numeric and handwritten amounts, the handwritten amount shall prevail. In case of discrepancy between the unit cost and the total set forth for that item, the unit cost shall prevail, provided however, if the amount set forth as a unit cost is ambiguous, unintelligible, or uncertain for any cause, or if is omitted, or in the case of unit basis items, is the same amount as the entry in the "Total Item Amount" column, then the amount set forth in the "Total Item Amount" column for the item shall prevail in accordance with the following:
B-2
(1) As to lump sum items, the amount set forth in the "Total Item Amount" column shall be the item price.
(2) As to unit basis items, the amount set forth in the "Total Item Amount" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit costs.
If the "Total Contract Amount" does not equal the sum of the item totals, then the Engineer, after resolving any discrepancy in the item price totals, shall sum the total column and the resultant amount shall be considered the "Total Contract Amount".
COMPETENCY OF BIDDERS: In selecting the lowest responsible bidder, consideration will be given not only to the financial standing but also to the general competency of the bidder for the performance of the work covered by the plans and specifications. To this end, each bid shall be supported by a statement of the bidder's experience on the form entitled "Information Required of Bidder" bound herein. No bid will be awarded to a Contractor who, at the time of the bid opening and “Award of the Contract”, is not licensed in accordance with the laws of the State of California under applicable provisions of the Business and Professions Code or from a Contractor who has failed to demonstrate the attributes of trustworthiness, quality, fitness, capacity and experience to satisfactorily perform the public works contract. The Contractor shall include the Contractor's license number, license classification, and license expiration date on the form furnished herein entitled "Information Required of Bidders.” The licensing requirements for Contractors shall apply also to Subcontractors. In addition, any contractor or subcontractor who is ineligible under Lab C §§1777.1 and 1777.7 is prohibited from working on this Project.
SUBCONTRACTOR'S LIST: Bidder understands that if he or she fails to specify a subcontractor for any portion of the work to be performed under the contract, he or she shall be deemed to have agreed to perform such portion himself and that he or she shall not be permitted to sublet or subcontract that portion of the work except in cases of public emergency or necessity.
In compliance with the provisions of Section 4100 through 4107 of the Public Contract Code of the State of the California and any amendments thereto, the undersigned bidder has set forth on the form provided therefor, the name and location of the place of business of each subcontractor who will perform work or labor or render services to the prime contractor, in or about the construction of or improvements to be performed, under the contract documents to which the attached bid is responsive including special fabrication and installation, and the portion of the work which will be done by each subcontractor for each subcontract in excess of one-half of one percent (1/2%) of this total bid or, in the case of bids for the construction of street and highways, including bridges, in excess of one-half of one percent (1/2%) of this total bid or $10,000.00, whichever is greater. Additionally, once a subcontractor has been listed in the bid, another subcontractor may not be substituted unless the appropriate statutory procedure is followed and the District consents to the substitution.
BIDDER'S EXAMINATION OF SITE: Each bidder shall examine carefully the site of the proposed work and the contract documents herein. It will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered; as to the character, quality, and quantity of the materials to be furnished; and as to the requirements of the contract, specifications, http://online.ceb.com/CalCodes/code.asp?code=LAB§ion=1777.1 http://online.ceb.com/CalCodes/code.asp?code=LAB§ion=1777.7
B-3 and drawings. The name of the individual who examined the site of the work and the date of such examination shall be stated in the form entitled "Information Required of Bidder" in the space provided therefor.
EQUIVALENT MATERIALS: Approval of equipment and materials offered as equivalents to those specified must be obtained in writing from the District. Requests for consideration of equivalents must be submitted in writing allowing five (5) working days for complete consideration of all specifications, samples, references, tests, and other details to the full satisfaction of the District.
TAXES: No mention shall be made in the bid of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes that may be applicable.
DISQUALIFICATION OF BIDDERS: More than one bid from an individual, firm partnership, corporation, or association under the same or different names will not be considered. Reasonable grounds for believing that any bidder is interested in more than one bid for the work contemplated will cause the rejection of all bids in which such bidder is interested. If there is reason for believing that collusion exists among the bidders, all bids will be rejected and none of the participants in such collusion will be considered in future bids. Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, as further described in the Notice Inviting Bidders, will disqualify a Bidder.
RETURN OF BID GUARANTIES: Within ten (10) days after award of the contract, the District will return the bid guaranties made by check accompanying each of the bids except for the three
(3) lowest bidders. All other bid guaranties made by check will be held until the contract has been finally executed. They will then be returned to the respective bidders whose bids they accompany.
Bid guaranties made by bond shall be void according to the bid bond language, page D-1.
AWARD OF CONTRACT: Bids will be compared on the basis of the lowest possible cost and the contract, if awarded, will be awarded to a responsible bidder whose bid complies with the requirements of these specifications. The award, if made, will be made within sixty (60) days after the opening of the bids, provided that the award may be made after said period if the successful bidder shall not have given the District written notice of the withdrawal of his or her bid.
EXECUTION OF CONTRACT: The bidder to whom award is made shall execute a written contract with the District on the form agreement provided, and shall secure all insurance and bonds as herein provided within fifteen (15) days from the date of written notice of the award. Failure or refusal to enter into a contract as herein provided, or to conform to any of the stipulated requirements in connection therewith shall be just cause for the annulment of the award and the forfeiture of the bid guaranty.
If the successful bidder refuses or fails to execute the contract, the District may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder refuses or fails to execute the contract, the District may award the contract to the third lowest responsible bidder. On the failure or refusal of such second or third lowest bidder to execute the contract, such bidder's guaranty shall be likewise forfeited to the District. The work may then be re-advertised.
B-4
INSURANCE: Certificates in the amounts required shall be furnished by the Contractor to the District and approved by the District prior to the commencement of work.
The Contractor and its subcontractors shall maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, Contractor agrees to amend, supplement, or endorse the existing coverage to do so.
Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to Contractor or its subcontractors in excess of the limits and coverage identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to District.
Contractor shall provide the following types and amounts of insurance:
Without limiting Contractor’s indemnification of District, and prior to commencement of
Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to District:
General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $5,000,000 per occurrence, $10,000,000 general aggregate on an “occurrence” basis, for bodily injury, personal injury, and property damage, and a $10,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $5,000,000 combined single limit for each accident.
Umbrella or excess liability insurance. Contractor shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
• Pay on behalf of wording as opposed to reimbursement;
B-5
• Concurrency of effective dates with primary policies;
• Policies shall “follow form” to the underlying primary policies; and
• Insureds under primary policies shall also be insureds under the umbrella or excess policies.
Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.
Contractor shall submit to District, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of District, its officers, agents, employees and volunteers.
Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on a Contractor’s Pollution Liability form or other form acceptable to District providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per occurrence or claim, and $2,000,000 policy aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.
Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The District, its officials, officers, agents, and employees, shall be included as insureds under the policy.
Builder’s risk insurance. Upon commencement of construction and with approval of District, Contractor shall obtain and maintain builder’s risk insurance for the entire duration of the project until only the District has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.
The named insureds shall be Contractor and District, including its officers, officials, employees, and agents. All subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the project following transfer of control thereof to District. The policy shall contain a
B-6 provision that all proceeds from the builder’s risk policy shall be made payable to the District. The District will act as a fiduciary for all other interests in the project.
The policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. The policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications;
(2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction;
(5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to District to ensure adequacy of terms and sublimits and shall be submitted to the District prior to commencement of construction.
Other provisions or requirements
Proof of insurance. Contractor shall provide certificates of insurance to District as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by District’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with District at all times during the term of this contract. District reserves the right to require complete, certified copies of all required insurance policies, at any time.
Duration of coverage. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. District and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by District shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of District before the District’s own insurance or self-insurance shall be called upon to protect it as a named insured.
District’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, District has
B-7 the right but not the duty to obtain the insurance it deems necessary and any premium paid by District will be promptly reimbursed by Contractor or District will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, District may cancel this Agreement.
Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the District’s risk manager.
Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against District, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against District, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
Enforcement of contract provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the District to inform Contractor of non-compliance with any requirement imposes no additional obligations on the District nor does it waive any rights hereunder.
Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the District requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the District.
Notice of cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to District with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
Additional insured status. General liability policies shall provide or be endorsed to provide that District and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to District and approved of in writing.
Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is
B-8 made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Pass through clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor.
Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section.
Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to District for review.
Agency’s right to revise requirements. The District reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the Contractor, the District and Contractor may renegotiate Contractor’s compensation.
Self-insured retentions. Any self-insured retentions must be declared to and approved by District.
District reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by District.
Timely notice of claims. Contractor shall give District prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
BONDS: The required bonds in the amounts required shall be furnished by the Contractor to the District and approved by the District prior to the commencement and throughout the duration of the work.
The Contractor shall secure with a responsible corporate surety or corporate sureties, satisfactory bonds conditioned upon faithful performance by the Contractor, of all requirements under the contract and upon the payment of claims of material supplier and laborers thereunder. The Faithful Performance Bond shall be in the sum of not less than one hundred percent (100%) of the estimated aggregate amount of the payments to be made under the contract computed on the basis of the prices stated in the bid. The Payment Bond (Labor and Material Bond) shall be in the sum of not less than one hundred percent (100%) of the estimated aggregate amount of the payments to be made under the contract computed on the basis of the prices stated in the bid.
The payment bond shall contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his power of attorney. The payment bond shall be unconditional and remain in force during the entire term of the
B-9 contract agreement and shall be null and void only if the Contractor completely and faithfully pays all subcontractors and suppliers
SUFFICIENCY OF INSURER OR SURETY FOR PAYMENT BOND AND
PERFORMANCE BOND: All insurers are to be rated A or better according to the most recent Best Rating Guide or The Key Rating Guide, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the District due to unique circumstances. All sureties shall be admitted surety insurers authorized to do business in the State of California by the Insurance Commissioner. Should the District object to the sufficiency of the insurer or surety the Contractor shall immediately deliver to the District the following documents:
(a) A copy of the “Certificate of Authority” of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California; or
(b) A certificate from the Clerk of the County of Ventura that the “Certificate of Authority” of the Insurer or Surety has not been surrendered, revoked, canceled, annulled, or suspended or, in the event the “Certificate of Authority” of the Insurer or Surety has been suspended, that renewed authority has been granted.
Failure of Contractor to timely deliver these documents shall require the District to refrain from entering the agreement, as Contractor will be deemed to have failed to ensure the sufficiency of the Insurer or Surety to the satisfaction of the District, as required by the provisions of the Bond and Undertaking Law, Code of Civil Procedure 995.660. Upon receipt of any bonds, District shall contact the bond company to verify the bond’s validity.
EVIDENCE OF RESPONSIBILITY: Upon the request of the District, a bidder whose bid is under consideration for the award of the contract shall submit promptly to the District satisfactory evidence showing the bidder's financial resources, his or her construction experience, and his or her organization and plant facilities available for the performance of the contract.
EMPLOYMENT OF APPRENTICES: Attention is directed to the provisions in Sections
1777.5 and 1777.6 of the California Labor Code concerning employment of apprentices by the Contractor, or any Subcontractor under the Contractor. The Contractor, and any Subcontractor under the Contractor, shall comply with the requirements of said sections in the employment of apprentices; however, the Contractor shall have full responsibility for compliance with said Labor Code sections for all apprenticeable occupations, regardless of any other contractual or employment relationships alleged to exist.
WAGE RATES: In entering into a public works contract, or a subcontract, to supply goods services, or materials pursuant to a public works contract, the Contractor, or subcontractor, offers and agrees to follow the State Labor standards. State Labor standards provisions, including prevailing wage requirements, will be enforced. The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm). The general rate of per diem wages (prevailing wage) shall be paid for each craft, classification, or type of worker needed to execute the contract http://www.dir.ca.gov/DLSR/PWD/index.htm
B-10 to all workers employed in the execution of the contract. The prevailing rate of per diem wages are on file at the Pleasant Valley Recreation & Park District, Department of Parks, 1605 E. Burnley Street, Camarillo, CA 93010, and are available to any interested party on request.
California Labor Code section 1773.3 requires that public agencies notify the DIR when public projects are awarded within 30 days of award and the imposition of a fine at a rate of $100 per day, not to exceed $10,000, was authorized for failure to provide notification. At the time of award, the bidder will be requested to provide DIR Award Notification Data for each General Contractor and for each Sub-contractor performing work on the project which data will be necessary to notify DIR of the award. If the Contractor fails to provide the requested DIR Award Notification Data within 30 days after the issuance of the Notice of Award/Notice to Proceed, thereby causing District to incur the imposition of a fine by the DIR, such fine will be imposed upon the General Contractor for reimbursement.
SAFETY PERMIT: The Contractor, and not the District, shall be responsible for performing safety inspections for this project. Particular attention is called to Subsection 7-10.4.1 of the Standard Specifications for Public Works Construction, which requires orders issued by the California Division of Occupational Health and Safety (Cal/OSHA). The Contractor, if needed, shall secure a permit for excavation and trenching from Cal/OSHA and shall file a copy of such permit with the Engineer prior to commencement of work.
CARB CERTIFICATES: Before award of contract and for a project involving the use of in-use off-road diesel-fueled vehicles, as defined by 13 CCR 2449, bidder shall obtain and provide to District copies of the valid Certificates of Reported Compliance, as described in 13 CCR 2449(n), for the fleet performing services pursuant to this bid and all listed subcontractors.
OTHER PERMITS, FEES, AND LICENSES: The Contractor shall, prior to the start of construction, obtain a "Construction Permit" from the District. This will be a NO FEE Permit.
In addition, the Contractor, and ALL sub-contractors, shall possess a City business license at the time of application for the Construction Permit and for the duration of the contract. The amount of the business license fee may be obtained from the City of Camarillo.
C-1
BID FORM
FIRM NAME:
POINT OF CONTACT:_________________________________________________________
ADDRESS:
TELEPHONE NUMBER: _____________________________________
FAX NUMBER: _____________________________________
FOR THE
C-2
BID FOR THE
TO THE PLEASANT VALLEY RECREATION & PARK DISTRICT:
This Bid is submitted in accordance with the advertised “Notice Inviting Sealed Bids” to perform all work and improvements therein described, and to furnish all labor and materials, equipment and incident insurance necessary therefor, in accordance with the specifications therefor known as
“FREEDOM PARK RESTROOM / SNACK BAR RENOVATION PROJECT, SPEC NO.
FWRR.09.26.27” which are on file in the office of the Parks of the Pleasant Valley Recreation & Park District.
Definition of Terms (for a complete definition of terms, see Standard Specifications for Public Works Construction, 2021 Edition):
CY ..........................................Cubic yard EA ..........................................Each LF ...........................................Linear foot LS ...........................................Lump sum SF ...........................................Square foot SY ..........................................Square yard TON .......................................Ton
The undersigned Bidder hereby proposes and agrees to enter into a contract to perform the work and improvements therein mentioned to the satisfaction of and under the supervision of the Parks of the Pleasant Valley Recreation & Park District, duly appointed for said work in the matter of the construction and installation of “FREEDOM PARK RESTROOM / SNACK BAR RENOVATION PROJECT, SPEC NO. FWRR.09.26.27”, for the sum set forth in the following schedule:
NOTE: The estimated quantities shown herein are approximate and to be used only for comparison of bids. Payment for quantities will be made for actual materials used on the job and based on the unit costs shown below. The District reserves the right to increase or decrease the amount of any quantity shown and to delete all or any item from the contract.
C-3
FREEDOM PARK RESTROOM / SNACK BAR RENOVATION PROJECT
BID SCHEDULE
THE FOLLOWING SCHEDULE OF VALUES IS ONLY A LIMITED LIST AND MAY NOT CAPTURE ALL ITEMS IN THE
CONSTRUCTION DOCUMENTS
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT UNIT COST TOTAL ITEM
AMOUNT DRAWING SHEET
1.
MOBILIZATON, DEMOLITION,
INSURANCE AND BONDS
1 LS
2.
CONCRETE SLAB 1 LS A1.0, A4.1
3.
DETECTABLE WARNING DOMES 1 LS A4.1
4.
METAL ROOF DORMER, METAL
AWNING, METAL
LOUVERS, & METAL GATE
1 LS A2.0, A3.0,
A4.0, A4.1
5.
MISCELLANEOUS CARPENTRY 1 LS A4.0
6.
METAL FLASHING, AND ROOF
REPAIR
1 LS A2.0, A3.0,
A4.0, A4.1
7.
WINDOWS, DOORS & DOOR FRAMES
WITH HARDWARE,
ROLL-UP DOORS, AND SOLATUBES
1 LS A1.0, A3.0,
A4.0, A4.1
8.
PATCHING OF PLASTER & GYP
BOARD @ WALLS
1 LS A1.0, A2.0,
A3.0
9.
PRESSURE WASH INTERIOR &
EXTERIOR AND PAINTING OF
BUILDING, AND CAULKING
1 LS A1.0, A3.0
10.
CONCRETE POLISH AT RESTROOMS
FLOORS
1 LS A1.0, A2.0
11.
SELECTED FLOOR AREAS WITH
NEW QUARRY TILE AT CONCRETE
FLOOR AND NEW QUARRY BASE
TILE WORK,
COMPLETE WITH GROUT AND
SEALING
LS
A1.0, A2.0
12.
RESTROOMS WALLS PORCELAIN
TILE, COMPLETE WITH
GROUT AND SEALING
1 LS A3.0, A4.0
13.
ALL RESTROOM ACCESSORIES, AND
RESTROOM SIGNAGES
1 LS A1.0, A3.0,
A4.0
C-4
Bidder's Signature Title
Company Name Date
IN CASE OF DISCREPANCY BETWEEN THE WORDS AND FIGURES, THE WORDS SHALL PREVAIL.
Quantities provided for the Freedom Park Restroom and Snack Bar Building Accessibility Improvements, are approximate numbers. The contractor shall verify quantities by means of construction drawings and site visit to verify measurements. These numbers herein are provided for contractor convenience.
THE FOLLOWING SCHEDULE OF VALUES IS ONLY A LIMITED LIST AND MAY NOT CAPTURE ALL ITEMS IN THE
CONSTRUCTION DOCUMENTS
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT UNIT COST TOTAL ITEM
AMOUNT DRAWING SHEET
14.
ALL RESTROOM SOLID PHENOLIC
PARTITION SYSTEMS
1 LS A1.0, A3.0
15.
ALL NEW KITCHEN EQUIPMENT &
LOCKERS
1 LS A1.0, A2.0,
A3.0
16.
SUPPLY FAN 1 LS A2.0, A3.0
17.
ALL PLUMBING FIXTURES,
REQUIRED BACK SUPPORTS,
VENTING PIPES, SUPPLY PIPES, AND
ACCESSORIES
1 LS A1.0, A3.0,
A4.0
18.
SERVICE, ELECTRICAL PANELS,
TRANSFORMER, BREAKER, POWER,
SWITCHING, DISTRIBUTION,
OCCUPANCY SENSORS, INTERIOR &
EXTERIOR LIGHT FIXTURES, DATA
COMMUNICATION CONDUITS,
LS
A1.0, A2.0, A3.0, ELECT. SHEETS
19. AND EVERYTHING NOT INCLUDED IN THE
ABOVE LIST
20.
21.
22.
TOTAL BID AMOUNT IN FIGURES
TOTAL BID AMOUNT IN WORDS
C-5
RESOLUTION OF CONSTRUCTION CLAIMS
(To Be Executed By Bidder and Submitted With Bid)
When a Public Works claim is made to the District, the District will conduct a reasonable review of the claim and, within 45 days, provide the claimant with a written statement identifying what portion of the claim is disputed and what portion is undisputed and both parties shall work to resolve the claim as by Public Contract Code 9204. (A copy of Section 9204 may be found in the Special Provisions, under “Resolution of Construction Claims”).
Additionally, in all Public Works claims, which may arise between the Contractor and the District which do not exceed the sum of three hundred seventy-five thousand dollars ($375,000), the requirements of California Public Contract Code, Section 20104 through 20104.6, inclusive, shall apply. (A copy of said Code Sections may be found in the Special Provisions, under “Resolution of Construction Claims of $375,000 or Less”.) Said Code Sections shall apply for the purpose of filing claims and civil actions for claims as defined in Section 20104 of the Public Contract Code.
The bidder’s signature is required to verify he/she has reviewed the Code Sections.
Bidder Name
Signature of Bidder
Dated
D-1
BID BOND
(10% of the Bid Amount)
KNOW ALL MEN BY THESE PRESENTS that we _________________________________ as Principal, hereinafter referred to as “Contractor” and _________________________________ as Surety, are held and firmly bound unto the Pleasant Valley Recreation & Park District, hereinafter called the “District,” in the sum of _____________________________________________ Dollars ($____________), for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
This is the start of the file's text. The full file is on GovTribe.