FP24_Eng.pdf
PDF 6 MB Posted
- Attached to
- Project TN ERFO FS CHRKE804 2020-2(5) - Cherokee National Forest Federal contract opportunity
- Solicitation number
- 693C73-26-B-000013
About this file
This file contains the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24), a comprehensive technical specification document issued by the Federal Highway Administration that governs construction practices for federally-funded transportation projects. The specifications establish requirements for labor, materials, equipment, quality control, measurement, and payment for all highway and bridge construction work performed under federal contracts. Key divisions address general contract requirements including authority and control of work, dispute resolution, value engineering, contractor records, and partnering arrangements; project-level requirements encompassing mobilization, survey and staking, quality control and testing, construction schedules, traffic control, and erosion/sediment control; and specific construction work categories including earthwork, retaining systems, aggregate and base courses, asphalt and rigid pavements, and bridge construction with detailed technical requirements for materials, methods, tolerances, and acceptance criteria.
The specifications require contractors to implement comprehensive quality control plans with qualified personnel, maintain strict construction tolerances, conduct material sampling and testing according to AASHTO and ASTM standards, submit detailed submittals and as-built drawings, and comply with environmental protection, safety, and wage requirements. Measurement and payment provisions establish that work is paid based on actual quantities performed within specified tolerances, with statistical evaluation methods and pay factors applied to evaluate conformance. The specifications reference the Federal Acquisition Regulation (FAR) and Transportation Acquisition Regulation (TAR) for contract administration and incorporate numerous federal requirements including Davis-Bacon wage rates, equal employment opportunity compliance, and OSHA safety standards. These standard specifications become binding contract documents when designated and apply to the related Cherokee National Forest road repair project valued between $5,000,000 and $7,000,000, which includes grading, resurfacing, culvert replacement, ditch reconditioning, and slope stabilization work on Spring Creek Road and Citico Creek Road in Tennessee, with sealed bids solicited from certified HUBZone Small Business Concerns only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - TN ERFO FS CHRKE804 2020-2(5).pdf | ||
| Amendment 0002 - TN ERFO FS CHRKE804 2020-2(5).pdf | ||
| Amendment 0001 - TN ERFO FS CHRKE 2020-2(5).pdf | ||
| IFB Solicitation - TN ERFO FS CHRKE804 2020-2(5).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Geotech Report.pdf | ||
| VETS-4212 Form.pdf | ||
| Plans - TN ERFO FS CHRKE804 2020-2(5).pdf | ||
| Categorical Exclusion Form (NEPA).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD
SPECIFICATIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY
PROJECTS
FP-24
Standard Specifications for Construction of
Roads and Bridges on Federal Highway Projects
FP-24
UNITED STATES DEPARTMENT
OF TRANSPORTATION
Federal Highway Administration i
PREFACE
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-24" indicating "Federal Project" Standard Specifications issued in 2024.
When designated in a contract, the FP-24 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Federal Highway Administration are also governed by the following regulations:
• Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and
• Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.
The FAR and TAR regulations are not included in the FP-24. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Publishing Office, Washington, DC 20402.
U.S. Customary units of measure are used in the FP-24. The references to Metric or Metric units apply only where standardized testing requires Metric units of measure.
ii
METRIC TO U.S. CUSTOMARY CONVERSION FACTORS (approximate) Symbol When You Know Multiply By To Find Symbol
LENGTH
µm micrometers 3.9 × 10-5 inches in mm millimeters 0.039 inches in m meters 3.28 feet ft m meters 1.09 yards yd km kilometers 0.621 miles mi
AREA
mm2 square millimeters 0.0016 square inches in2 m2 square meters 10.764 square feet ft2 m2 square meters 1.195 square yards yd2 ha hectares 2.47 acres ac km2 square kilometers 0.386 square miles mi2
VOLUME
mL milliliters 0.034 fluid ounces fl oz L liters 0.264 gallons gal m3 cubic meters 35.31 cubic feet ft3 m3 cubic meters 1.308 cubic yards yd3
MASS
g grams 0.035 ounces oz kg kilograms 2.2046 pounds lb Mg megagrams 1.1023 short tons T
(or "t") (or "metric ton") (2000 lb) TEMPERATURE (exact)
°C Celsius temperature
1.8C +32 Fahrenheit temperature
°F
ILLUMINATION
lx lux 0.0929 foot-candles fc cd/m2 candela/m2 0.2919 foot-Lamberts fl
MISCELLANEOUS
J joule 0.7376 foot·poundforce ft·lbf N newtons 0.225 poundforce lbf kPa kilopascals 0.145 Poundforce per square inch lbf/in2 iii
Table of Contents
DIVISION 100 GENERAL REQUIREMENTS
Section 101. — TERMS, FORMAT, AND DEFINITIONS
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT
Section 103. — SCOPE OF WORK
Section 104. — CONTROL OF WORK
Section 105. — CONTROL OF MATERIAL
Section 106. — ACCEPTANCE OF WORK
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 108. — PROSECUTION AND PROGRESS
Section 109. — MEASUREMENT AND PAYMENT
DIVISION 150 PROJECT REQUIREMENTS
Section 151. — MOBILIZATION
Section 152. — CONSTRUCTION SURVEY AND STAKING
Section 153. — CONTRACTOR QUALITY CONTROL
Section 154. — CONTRACTOR SAMPLING AND TESTING
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
Section 156. — PUBLIC TRAFFIC
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
Section 158. — WATERING FOR DUST CONTROL
DIVISION 200 EARTHWORK
Section 201. — CLEARING AND GRUBBING
Section 202. — ADDITIONAL CLEARING AND GRUBBING
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Section 204. — EXCAVATION AND EMBANKMENT
Section 205. — ROCK BLASTING
Section 206. — RESERVED
Section 207. — EARTHWORK GEOSYNTHETICS
Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR
STRUCTURES
Section 209. — STRUCTURE EXCAVATION AND BACKFILL
Section 210. — RESERVED
Section 211. — ROADWAY OBLITERATION iv
Section 212. — LINEAR AND SITE GRADING
Section 213. — SUBGRADE STABILIZATION
DIVISION 250 EARTH RETAINING SYSTEMS AND SLOPES
Section 251. — RIPRAP
Section 252. — ROCKERY, SPECIAL ROCK EMBANKMENT, AND ROCK BUTTRESS
Section 253. — GABIONS AND REVET MATTRESSES
Section 254. — SOLDIER PILE RETAINING WALLS
Section 255. — MECHANICALLY-STABILIZED EARTH WALLS
Section 256. — PERMANENT GROUND ANCHORS
Section 257. — CONTRACTOR-DESIGNED RETAINING STRUCTURES
Section 258. — REINFORCED CONCRETE RETAINING WALLS
Section 259. — SOIL NAIL RETAINING WALLS
Section 260. — ROCK BOLTS AND DOWELS
Section 261. — REINFORCED SOIL SLOPES
Section 262. — SLOPE SCALING
Section 263. — DRAPED ROCKFALL PROTECTION
Section 264. — MIDSLOPE ROCKFALL ATTENUATOR
Section 265. — ROADSIDE ROCKFALL PROTECTION
Section 266. — ANCHORED WIRE MESH SYSTEM
Section 267. — DRAIN HOLES IN ROCK
Section 268. — HORIZONTAL DRAINS
DIVISION 300 AGGREGATE AND BASE COURSES
Section 301. — UNTREATED AGGREGATE COURSES
Section 302. — CRUSHED AGGREGATE
Section 303. — ROAD RECONDITIONING
Section 304. — FULL DEPTH RECLAMATION
Section 305. — FULL DEPTH RECLAMATION WITH CEMENT
Section 306. — FULL DEPTH RECLAMATION WITH ASPHALT
Section 307. — RESERVED
Section 308. — EMULSIFIED ASPHALT-TREATED BASE COURSE
Section 309. — COLD CENTRAL PLANT RECYCLED ASPHALT BASE COURSE
Section 310. — COLD IN-PLACE RECYCLED ASPHALT BASE COURSE
Section 311. — STABILIZED AGGREGATE SURFACE COURSE
Section 312. — DUST PALLIATIVE v
Section 313. — AGGREGATE-TOPSOIL COURSE
Section 314. — STOCKPILED AGGREGATES
Section 315. — RECYCLED AGGREGATE
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 401. — ASPHALT CONCRETE PAVEMENT BY GYRATORY MIX DESIGN
METHOD
Section 402. — ASPHALT CONCRETE PAVEMENT BY HVEEM OR MARSHALL MIX
DESIGN METHOD
Section 403. — ASPHALT CONCRETE
Section 404. — THIN LIFT ASPHALT CONCRETE PAVEMENT
Section 405. — OPEN-GRADED ASPHALT FRICTION COURSE
Section 406. — FOG SEAL
Section 407. — CHIP SEAL
Section 408. — ULTRATHIN BONDED WEARING COURSE
Section 409. — MICRO SURFACING
Section 410. — SLURRY SEAL
Section 411. — ASPHALT PRIME COAT
Section 412. — ASPHALT TACK COAT
Section 413. — ASPHALT PAVEMENT MILLING
Section 414. — ASPHALT PAVEMENT CRACK AND JOINT SEALING AND FILLING
Section 415. — PAVING GEOTEXTILES
Section 416. — RESERVED
Section 417. — RESERVED
Section 418. — ASPHALT CONCRETE PAVEMENT PATCHING
DIVISION 500 RIGID PAVEMENTS
Section 501. — MINOR CONCRETE PAVEMENT
Section 502. — CONCRETE PAVEMENT RESTORATION
DIVISION 550 BRIDGE CONSTRUCTION
Section 551. — DRIVEN PILES
Section 552. — STRUCTURAL CONCRETE
Section 553. — PRESTRESSED CONCRETE
Section 554. — REINFORCING STEEL
Section 555. — STEEL STRUCTURES
Section 556. — BRIDGE RAILING
Section 557. — TIMBER STRUCTURES vi
Section 558. — DAMPPROOFING
Section 559. — WATERPROOFING AND SEALING
Section 560. — REMOVAL OF CONCRETE BY HYDRODEMOLITION
Section 561. — CONCRETE CRACK REPAIR BY EPOXY INJECTION
Section 562. — TEMPORARY WORKS
Section 563. — COATING
Section 564. — BEARING DEVICES
Section 565. — DRILLED SHAFTS
Section 566. — SHOTCRETE
Section 567. — MICROPILES
Section 568. — SERVICE LIFE DESIGN CONCRETE
Section 569. — CONCRETE OVERLAYS FOR BRIDGE DECKS
Section 570. — POLYESTER POLYMER CONCRETE OVERLAYS FOR BRIDGE DECKS
Section 571. — ULTRA-HIGH PERFORMANCE CONCRETE
Section 572. — CONCRETE REPAIR
Section 573. — HELICAL PILES
Section 574. — GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM
Section 575. — TEMPORARY BRIDGES
Section 576. — RESERVED
Section 577. — FIBER-REINFORCED POLYMER STRUCTURES
Section 578. — PRECAST CONCRETE ELEMENTS
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 601. — MINOR CONCRETE
Section 602. — CULVERTS AND DRAINS
Section 603. — STRUCTURAL PLATE STRUCTURES
Section 604. — MANHOLES, INLETS, AND CATCH BASINS
Section 605. — UNDERDRAINS, SHEET DRAINS, AND PAVEMENT EDGE DRAINS
Section 606. — CORRUGATED METAL SPILLWAYS
Section 607. — CLEANING, RELAYING, AND REPAIRING EXISTING DRAINAGE
STRUCTURES
Section 608. — PAVED WATERWAYS
Section 609. — CURB AND GUTTER
Section 610. — SIDEWALKS, PADS, AND MEDIANS vii
Section 611. — WATER SYSTEMS
Section 612. — SANITARY SEWER SYSTEMS
Section 613. — SIMULATED STONE MASONRY SURFACE
Section 614. — FLOWABLE BACKFILL
Section 615. — RESERVED
Section 616. — SLOPE PAVING
Section 617. — GUARDRAIL
Section 618. — CONCRETE BARRIERS
Section 619. — FENCES, GATES, CATTLE GUARDS, AND BOLLARDS
Section 620. — STONE MASONRY
Section 621. — MONUMENTS AND MARKERS
Section 622. — RENTAL EQUIPMENT
Section 623. — GENERAL LABOR
Section 624. — TOPSOIL
Section 625. — TURF ESTABLISHMENT
Section 626. — PLANTS, TREES, SHRUBS, VINES, AND GROUND COVERS
Section 627. — SOD
Section 628. — TEMPORARY STREAM DIVERSIONS
Section 629. — ROLLED EROSION CONTROL PRODUCTS AND CELLULAR
CONFINEMENT SYSTEMS
Section 630. — RESERVED
Section 631. — RESERVED
Section 632. — LOCATING UTILITIES
Section 633. — PERMANENT TRAFFIC CONTROL
Section 634. — PERMANENT PAVEMENT MARKINGS
Section 635. — TEMPORARY TRAFFIC CONTROL
Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING, AND ELECTRICAL
SYSTEMS
Section 637. — FACILITIES AND SERVICES
DIVISION 700 MATERIAL
Section 701. — CEMENTITIOUS MATERIAL
701.01 Hydraulic Cement
701.02 Reserved
701.03 Pozzolans
701.04 Grout
viii
701.05 Mortar
Section 702. — ASPHALT MATERIAL AND ADDITIVES
702.01 Asphalt Binder
702.02 Emulsified Asphalt
702.03 Hot-Applied Asphalt Aggregate-Filled Mastic
702.04 Asphalt Mastic
702.05 Antistrip Additive
Section 703. — AGGREGATE
703.01 Fine Aggregate for Concrete
703.02 Coarse Aggregate for Concrete
703.03 Underdrain Backfill
703.04 Reserved
703.05 Subbase, Base, and Surface Course Aggregate
703.06 Crushed Aggregate
703.07 Asphalt Concrete Aggregate
703.08 Open-Graded Asphalt Friction Course Aggregate
703.09 Chip Seal Aggregate
703.10 Slurry Seal and Micro Surfacing Aggregate
703.11 Reserved
703.12 Blotter
703.13 Aggregate for Aggregate-Topsoil Course
703.14 Sand
703.15 Flowable Backfill Aggregate
703.16 Shotcrete Aggregate
703.17 Granular Rock Backdrain
703.18 Ultrathin Bonded Wearing Aggregate
703.19 Polyester Polymer Concrete Aggregate
703.20 Geosynthetic Reinforced Soil Open-graded Backfill
Section 704. — SOIL
704.01 Soil and soil-aggregate materials
704.02 Select Borrow
704.03 Select Granular Backfill
Section 705. — ROCK
705.01 Gabion and Revet Mattress Rock
ix
705.02 Rock for Riprap
705.03 Rock for Masonry Structures
705.04 Rock for Special Rock Embankments
705.05 Rock for Buttresses
705.06 Rock for Rockeries
705.07 Rock Mulch
705.08 Filter Rock
705.09 Wall Facing Fill
Section 706. — CONCRETE PIPE
706.01 Non-Reinforced Concrete Pipe
706.02 Reinforced Concrete Pipe
706.03 Perforated Concrete Pipe
706.04 Reinforced Arch-Shaped Concrete Pipe
706.05 Reinforced Elliptically-Shaped Concrete Pipe
706.06 Reinforced D-Load Concrete Pipe
706.07 Precast Reinforced Concrete Box Sections
706.08 Gaskets for Concrete Pipe
706.09 Supplemental Concrete Pipe Ties
Section 707. — METAL PIPE
707.01 Ductile Iron Culvert Pipe
707.02 Metallic-Coated Corrugated Steel Pipe
707.03 Aluminum-Alloy Corrugated Pipe
707.04 Asphalt-Coated Pipe
707.05 Steel Structural Plate Structures
707.06 Aluminum-Alloy Structural Plate Structures
707.07 Asphalt-Coated Structural Plate Structures
707.08 Polymer-Coated Steel Pipe
707.09 Corrugated Metal Units
707.10 Metallic-Coated Slotted Drain Pipe
707.11 Metallic-Coated Spiral Rib Pipe
707.12 Aluminum-Alloy Spiral Rib Pipe
707.13 Concrete-Lined Corrugated Steel Pipe
707.14 Invert-Paved Corrugated Steel Pipe
707.15 Cast Iron Soil Pipe and Fittings
x
707.16 Seamless Copper Water Tube and Fittings
707.17 Gaskets for Metal Pipe
707.18 Gaskets for Ductile Iron Pipe
Section 708. — PLASTIC PIPE
708.01 Smooth Wall Polyethylene Pipe
708.02 Corrugated Polyethylene Pipe
708.03 Profile Wall (Ribbed) Polyethylene Pipe
708.04 Corrugated Polyethylene Drainage Tubing
708.05 Corrugated Polypropylene Pipe
708.06 Smooth Wall Polyvinyl Chloride Pipe
708.07 Profile Wall (Ribbed) Polyvinyl Chloride Pipe
708.08 Acrylonitrile-Butadiene-Styrene (ABS) Pipe
708.09 Gaskets for Plastic Pipe
Section 709. — REINFORCING STEEL AND WIRE ROPE
709.01 Reinforcing Steel
709.02 Prestressing Steel
709.03 Wire Rope
Section 710. — FENCING AND MESH FABRICS
710.01 Barbed Wire
710.02 Smooth Wire
710.03 Woven Wire
710.04 Chain Link Fence
710.05 Fence Posts and Bollards
710.06 Split Rail
710.07 Fence Gates
710.08 Temporary Plastic Fence
710.09 Draped Rockfall Protection Fabric
710.10 Midslope Rockfall Attenuator Materials
Section 711. — CONCRETE CURING MATERIAL AND ADDITIVES
711.01 Curing Material
711.02 Air-Entraining Admixtures
711.03 Chemical Admixtures
711.04 Latex Emulsion
711.05 Concrete Coloring Agents
xi
711.06 Reinforcing Fibers
Section 712. — JOINT MATERIAL
712.01 Sealants, Fillers, and Seals
Section 713. — ROADSIDE IMPROVEMENT MATERIAL
713.01 Topsoil
713.02 Agricultural Limestone
713.03 Fertilizer
713.04 Seed
713.05 Mulch
713.06 Plant Material
713.07 Cellular Confinement Systems
713.08 Miscellaneous Planting Material
713.09 Sod
713.10 Pegs for Sod
713.11 Tackifiers
713.12 Fiber Rolls
713.13 Gravel Bags
713.14 Sandbags
713.15 Temporary Culvert Pipe
713.16 Silt Fence
713.17 Rolled Erosion Control Products
713.18 Turf Reinforcement Mats
713.19 Sediment Filter Bags
713.20 Prefabricated Filter Insert
713.21 Floating Turbidity Curtains
713.22 Plastic Lining
Section 714. — GEOSYNTHETIC MATERIAL
714.01 Geotextile
714.02 Geocomposite Drain
714.03 Stabilization Geogrid
714.04 Reinforcement Geotextile and Geogrid
714.05 Geomembrane
714.06 Geosynthetic Reinforced Soil Reinforcement Geosynthetic
Section 715. — PILING xii
715.01 Untreated Timber Piles
715.02 Treated Timber Piles
715.03 Steel Pipes
715.04 Steel H-Piles
715.05 Sheet Piles
715.06 Pile Shoes
715.07 Splices
715.08 Helical Piles
Section 716. — MATERIAL FOR TIMBER STRUCTURES
716.01 Untreated Structural Timber and Lumber
716.02 Treated Structural Timber and Lumber
716.03 Structural Glued Laminated Timber
716.04 Wood-Plastic Composite
716.05 Hardware
Section 717. — STRUCTURAL METAL
717.01 Structural Steel
717.02 Steel Forgings
717.03 Pins and Rollers
717.04 Castings
717.05 Welded Stud Shear Connectors
717.06 Steel Pipe
717.07 Galvanized Coatings
717.08 Steel Grid Floors
717.09 Bearings
717.10 Aluminum Alloy for Bridge Rail
717.11 Aluminum Bolt Heads and Nuts
717.12 Aluminum Welding Wire
Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL
718.01 Retroreflective Sheeting
718.02 Legends and Borders
718.03 Panels
718.04 Sign Posts
718.05 Delineator and Object Marker Posts
718.06 Hardware
xiii
718.07 Delineator and Object Marker Retroreflectors
718.08 Solventborne Pavement Markings
718.09 Waterborne Pavement Markings
718.10 High-Build Waterborne Pavement Markings
718.11 Epoxy Pavement Markings
718.12 Thermoplastic Pavement Markings
718.13 Preformed Pavement Marking Tape
718.14 Glass Beads
718.15 Pavement Markers
718.16 Temporary Pavement Markings
718.17 Epoxy Resin Adhesives
718.18 Methyl Methacrylate Pavement Markings
Section 719. — COATING MATERIAL
719.01 General
719.02 Coating for Iron and Steel Structures
719.03 Coating for Aluminum Structures
719.04 Coating for Other Structural Material
719.05 Penetrating Stain for Concrete
Section 720. — STRUCTURAL WALL AND STABILIZED EMBANKMENT MATERIAL
720.01 Mechanically-Stabilized Earth Wall Material
720.02 Gabion and Revet Mattress Material
Section 721. — ELECTRICAL AND ILLUMINATION MATERIAL
721.01 Electrical Material
721.02 Lighting Material
Section 722. — ANCHOR MATERIAL
722.01 Anchorage Devices
722.02 Anchor Tendons
722.03 Rock Bolts and Rock Dowels
722.04 Soil Nails
722.05 Anchor Nails
722.06 Micropile Materials
722.07 Rockfall Protection Anchor Materials
Section 723. — DAMPPROOFING AND WATERPROOFING MATERIAL
723.01 Dampproofing Material
xiv
723.02 Waterproofing Material
Section 724. — GUARDRAIL
724.01 Rail Elements
724.02 Guardrail Posts
724.03 Guardrail Blockouts
724.04 Guardrail Hardware
Section 725. — MISCELLANEOUS MATERIAL
725.01 Water
725.02 Calcium Chloride, Magnesium Chloride, and Lignosulfonate
725.03 Lime
725.04 Reserved
725.05 Mineral Filler
725.06 Concrete Building Brick
725.07 Concrete Masonry Units
725.08 Paving Brick
725.09 Precast Concrete Units and Accessories
725.10 Frames, Grates, Covers, and Ladder Rungs
725.11 Detectable Warning Tape
725.12 Epoxy Resin Adhesives
725.13 Slurry (Drilling Fluids)
725.14 Polymer Concrete and Mortar
725.15 Color Coating
725.16 Galvanic Anodes
725.17 Polyester Resin Binder
725.18 High Molecular Weight Methacrylate
725.19 Fiber-Reinforced Polymer
725.20 Penetrating Sealant
DIVISION 100
GENERAL REQUIREMENTS
Section 101
Section 101. — TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor", is implied. Also implied in this language are "shall", "shall be", or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project. Wherever "directed", "required", "prescribed", "requested", or "ordered" are used, the "direction", "requirement", "prescription", or "order" of the Contracting Officer is intended. Wherever something is to be "submitted" or "submitting to", the Contracting Officer is intended. Similarly, wherever "approved", "acceptable", "suitable", "satisfactory", or similar words are used, the words mean "approved by", "acceptable to", or "satisfactory to" the Contracting Officer.
The word "will" generally pertains to decisions or actions of the Contracting Officer.
101.02 Specifications Format. These specifications are divided into 10 Divisions. Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 apply to all contracts.
Division 150 consists of project contract requirements that apply to all contracts. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05. If there is no pay item in the bid schedule, no direct payment is made.
Divisions 200 through 600 consist of construction contract requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to Subsection 109.05. If there is no pay item in the bid schedule, no direct payment is made.
Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.
The first three digits of the pay item number in the bid schedule identify the Section under which the work is performed.
101.03 Abbreviations.When these abbreviations are used, they represent the following:
(a) Acronyms.
3D — Three-Dimensional
AASHTO — American Association of State Highway and Transportation Officials
ACI — American Concrete Institute
AISC — American Institute of Steel Construction
AITC — American Institute of Timber Construction
AMG — Automated Machine Guidance
ANSI — American National Standards Institute
ASR — Alkali-Silica Reactivity
ASTM — American Society for Testing and Materials (ASTM International)
ATSSA — American Traffic Safety Services Association
AWG — American Wire Gauge
AWPA — American Wood Protection Association
AWS — American Welding Society
AWWA — American Water Works Association
BMP — Best Management Practice
CFR — Code of Federal Regulations
CO — Contracting Officer and authorized representatives
CPM — Critical Path Method
CRSI — Concrete Reinforcing Steel Institute
CTSM — Contingent Sum
EPA — Environmental Protection Agency
FAR — Federal Acquisition Regulations (48 CFR Chapter 1)
FHWA — Federal Highway Administration
FLH — Federal Lands Highway
FRP — Fiber-Reinforced Polymer
GPS — Global Positioning System
GRS — Geosynthetic Reinforced Soil
GSA — General Services Administration
HDPE — High Density Polyethylene
HPC — High-Performance Concrete
HPS — High-Performance Steel
HMA — Hot Mix Asphalt
HMWM — High Molecular Weight Methacrylate
IMSA — International Municipal Signal Association
ISO — International Organization for Standardization
ISSA — International Slurry Surfacing Association
IWRC — Independent Wire Rope Core
JMF — Job-Mix Formula
LPSM — Lump Sum
LRFD — Load and Resistance Factor Design
MASH — Manual for Assessing Safety Hardware
MPI — Master Painters Institute
MSE — Mechanically-Stabilized Earth
MTV — Material Transfer Vehicle
MUTCD — Manual on Uniform Traffic Control Devices for Streets and Highways
NACE — National Association of Corrosion Engineers
NCHRP — National Cooperative Highway Research Program
NEMA — National Electrical Manufacturers Association
NIST — National Institute of Standards and Technology
NMSA — Nominal Maximum Size Aggregate
NPCA — National Precast Concrete Association
NTP — Notice to Proceed
OSHA — Occupational Safety and Health Administration
PCI — Precast/Prestressed Concrete Institute
PPC — Polyester Polymer Concrete
PTFE — Polytetrafluoroethylene
PTI — Post-Tensioning Institute
PVC — Polyvinyl Chloride
QA — Quality Assurance
QC — Quality Control
QCM — Quality Control Manager
QCP — Quality Control Plan
RAP — Recycled Asphalt Pavement
RECP — Rolled Erosion Control Product
RSS — Reinforced Soil Slope
SDS — Safety Data Sheet
SF — Standard Form
SRWU — Segmental Retaining Wall Unit
SSPC — The Society for Protective Coatings
SWPPP — Storm Water Pollution Prevention Plan
S4S — Surfaced four sides (lumber)
TAR — Transportation Acquisition Regulations (48 CFR Chapter 12)
TSR — Tensile Strength Ratio
UL — Underwriter’s Laboratory
U.S. — United States
U.S.C. — United States Code
UV — Ultraviolet
VFA — Voids Filled with Asphalt
VMA — Voids in Mineral Aggregate
VOC — Volatile Organic Compounds
WMA — Warm Mix Asphalt
(b) Unit abbreviations and symbols.
°F — degree Fahrenheit temperature ft — feet length ft2 — square feet area ft3 — cubic feet volume gal — gallon volume in — inches length in2 — square inches area in3 — cubic inches volume kip — 1000 pounds mass ksi — kilopound per square inch pressure lb — pound mass lbf — pound-force force mi — mile length min — minute time oz — ounces mass ppm — parts per million concentration psi — pounds per square inch pressure sec — second time
V — volt electric potential yd — yards length yd2 — square yards area yd3 — cubic yards volume
(c) Slope notation. Slopes are expressed as the ratio of vertical to horizontal (V:H).
101.04 Definitions. Unless otherwise specified, the following terms are defined as follows:
Automated Machine Guidance — An application that can be applied to highway construction projects to provide construction efficiencies through enhanced location referencing. AMG involves using construction equipment mounted with onboard computers. Using a combination of 3D modeling data along with GPS technology, AMG provides horizontal and vertical guidance in real time to construction equipment operators.
Award — The written acceptance of a bid by the CO.
Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.
Base — The lift or lifts of material placed on a subbase or subgrade to support a surface course.
Bid — A written offer by a bidder to perform work at a quoted price.
Bidder — An individual or legal entity submitting a bid.
Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and provide required bonds.
Bid Schedule — The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.
Bridge — A structure including supports erected over a depression or an obstruction (such as water, highway, or railway), having a track or passageway for carrying traffic or other moving loads, and having an opening measured along the center of the roadway of more than 20 feet between undercopings of abutments or spring lines of arches, or extreme ends of openings for multiple boxes. It may also include multiple pipes, where the clear distance between openings is less than half of the smaller contiguous opening.
Clear Zone — The portion of the roadside, including the shoulder, available for the safe use by an errant vehicle.
Commercial Certification — See Subsection 106.03.
Completion Date — The date by which all contract work is to be complete.
Construction Limits — The limits that establish the area disturbed by construction operations and beyond which no disturbance is allowed.
Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.
Contracting Officer — An official of the Government with the authority to execute, administer, and terminate contracts, and make related determinations and findings. The term includes authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Contract Modification — A written change in the terms of the contract. Contract modifications are of the following forms:
(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (such as a change in the paying office or the appropriation data).
(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-4 Changes authorizes the CO to order without the Contractor’s consent.
(c) Supplemental agreement. A contract modification that is accomplished by the signature of the CO (unilateral contract modification) or by the signature of the CO and the Contractor (bilateral contract modification).
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work.
Contract Time — The specified time allowed for completion of the contract work.
Crashworthy — A highway feature that has been successfully crash tested under applicable standards defined in MASH, the NCHRP Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features, or approved through analysis by FHWA based on similarity to other crashworthy features.
Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the roadway or other work.
Culvert — A structure, not classified as a bridge, that provides an opening under the roadway.
Day — A calendar day starting and ending at midnight.
Density — Mass per unit volume of material. Specific gravity multiplied by the density of water.
Detour — A temporary rerouting of public traffic onto alternate existing roadways to avoid the work or part of the work.
Dewatering — Lowering and controlling water levels to allow excavation and construction to be performed.
Drawings — Design sheets or fabrication, erection, shop drawing, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Federal Land Management Agencies — Federal agencies including, but not limited to, the National Park Service, U.S. Forest Service, U.S. Fish & Wildlife Service, U.S. Army Corps of Engineers, Bureau of Land Management, and Bureau of Reclamation.
Final Acceptance — The point at which the Government formally accepts the work and relieves the Contractor of further responsibility for the maintenance of the project. This excludes warranties, which remain in effect until they expire. See FAR Clause 52.246-21 Warranty of Construction.
Government — The Government of the United States of America.
Highway, Street, or Road — A general term denoting a public way primarily designed for purposes of multimodal travel.
Lane Mile — An area of pavement 1 mile long and 1 lane wide; not including turn lanes, turnouts, parking area lanes, or other auxiliary lanes.
Lift — When placing and compacting soils, aggregates, or pavement; a lift is a single, continuous layer of material that is uniformly compacted.
Material — Substances specified or necessary to complete the contract work.
Measurement — The process of identifying the dimensions, quantity, or capacity of a pay item. See Section 109 for measurement methods, terms, and definitions.
Neat Line — A line defining the proposed or specified limits of excavation or structure element for purposes of calculating quantities.
Notice to Proceed — Written notice to the Contractor to start the contract work.
Offeror — An individual or legal entity submitting a bid.
Pavement Structure — The combination of subbase, base, paving geotextiles, and surface courses placed on a subgrade to support and distribute the traffic load to the roadbed.
Pay Item — A specific item of work consisting of a unit, quantity, and method of measurement furnished by the Government and a price established by the contract.
Payment Bond — The security executed by the Contractor and surety or sureties and provided to the CO to ensure payments as required by law to persons supplying labor or material according to the contract.
Performance Bond — The security executed by the Contractor and surety or sureties and provided to the CO to guarantee completion of the contract work.
Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.
Production Certification — See Subsection 106.03.
Professional Engineer — Engineers holding valid state licenses permitting them to offer engineering services directly to the public. Engineers that are experienced in the work for which they are responsible, take legal responsibility for their engineering designs, and are bound by a code of ethics to protect the public health.
Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed road construction located according to the plans, usually along the longitudinal centerline of the roadbed.
Profile grade means either elevation or gradient of the trace according to the context.
Project — The specific section of the highway or other property on which construction is to be performed under the contract.
Right-of-Way — Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Roadbed — The graded portion of a highway prepared as a foundation for the pavement structure and shoulders.
Roadside — The area between the outside shoulder edge and the right-of-way limits. The area between roadways of a divided highway may also be considered roadside.
Roadway — In general, the portion of a highway, including shoulders, primarily for vehicular use. A divided highway has two or more roadways. In construction specifications, the portion of a highway within the construction limits.
Roadway Prism — The area between the original and the final design cross-section.
Roller Pass — One trip of a roller in one direction over one spot.
Shop Drawings — See "Drawings"
Shoulder — A portion of the roadway contiguous with the traveled way that accommodates pedestrians, bicycles, stopped vehicles, and emergency use; and is used for lateral support of the subbase, base, and surface courses.
Sieve — See AASHTO M 92.
Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Special Contract Requirement — An addition or revision to the Standard Specifications applicable to an individual project.
Specifications — The written requirements for performing work.
Standard Form — Numbered form issued by the GSA for use as contract documents.
Standard Specifications — Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects approved for general application and repetitive use. Also referred to as the FP.
Station — A precise location along a survey line.
Structures — Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, manholes, endwalls, buildings, sewers, service pipes, underdrains, foundation drains, and other constructed features that may be encountered in the work.
Subbase — The lift or lifts of material placed on a subgrade to support a base.
Subcontract — The written agreement between the Contractor and an individual or legal entity setting forth the obligations of the parties for the performance of and payment for a specific portion of the work to be performed by the subcontractor.
Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes subcontractors and material suppliers in all tiers.
Subgrade — The top surface of a roadbed upon which the pavement structure, shoulders, and curbs are constructed.
Substantial Completion — The point at which the project is complete and can be safely and effectively used by the public without further delays, disruption, or other impediments. For conventional bridge and highway work, the point at which bridge deck, parapet, pavement structure, shoulder, drainage, sidewalk, major demolition, roadway obliteration, permanent signing and markings, traffic barrier, safety appurtenance, utility, and lighting work is complete.
Substructure — Components of a bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.
Suitable Material — Rock or earth material that will provide stable foundations, embankments, or roadbeds, and is without organic matter, muck, frozen lumps, roots, sod, or other deleterious material.
Suitable material may require drying or adding water, and other methods of manipulation before use.
Suitable material includes the classifications of material for which the project was designed.
Superintendent — The Contractor’s on-site representative who has authority to act for the Contractor and is responsible for directing and supervising construction operations on behalf of the Contractor.
Superstructure — The entire bridge, except the substructure.
Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.
Surface Course — The top lift or lifts of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.
Target Value — A number established as a center for operating a given process. Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well-controlled process should cluster closely around the established target value and the mean of the test results should be equal to, or nearly equal to, the established target value.
Temporary Stormwater Diversion — A temporary rerouting of stormwater runoff in a controlled, non-erosive manner.
Temporary Stream Diversion — A temporary rerouting of water into a temporary channel or through a system of structures within the construction limits to maintain water flow through or around the project.
Temporary Traffic Diversion — A temporary rerouting of public traffic onto a temporary alignment within the construction limits to bypass the work or part of the work.
Traveled Way — The portion of the roadway designated for the movement of vehicles, not including the shoulders.
Unsuitable Material — Material that cannot create stable foundations, embankments, or roadbeds.
Unsuitable material includes muck, sod, and soils with high organic contents.
Well-graded — Graded from coarse to fine with a wide range of particle sizes and substantial amounts of the intermediate particle sizes.
Work — The providing of labor, material, equipment, and other incidentals necessary to complete the project according to the contract.
Section 102
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT
102.01 Acquisition Regulations. Bid, award, and execution of the contract is governed by the FAR and
TAR.
102.02 Preparation of Bids. Follow the requirements of FAR Provision 52.214-18 Preparation of Bids-Construction.
Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. If mathematical checks made by the Government show a mistake in the amount bid, the corrected unit price extension governs.
If "LPSM" appears as a unit of measure in the bid schedule, insert an amount bid for each lump sum pay item.
If "CTSM" appears as a unit of measure in the bid schedule, include the Government inserted amount for the pay item in the total bid amount.
Total the amounts bid for each pay item and show the total bid amount.
The quantities listed in the bid schedule are approximate, unless designated as a contract quantity, and are used for the comparison of bids. Payment will be made for the actual quantities of work performed and accepted or material provided according to the contract. The scheduled quantities may be increased, decreased, or deleted. Bid schedule quantities are considered the original contract quantities.
102.03 Bid Guarantee. Follow the requirements of FAR Clause 52.228-1 Bid Guarantee.
102.04 Individual Surety. Follow the requirements of FAR Clause 52.228-11 Individual Surety-Pledge of Assets.
Complete and date the SF 28, Affidavit of Individual Surety after the solicitation date. The individual surety shall personally sign the SF 28. Bidders cannot serve as their own surety. See FAR 28.203 Individual Sureties.
After reviewing the SF 28, the CO may request the surety to submit further documentation with respect to its assets, debts, or encumbrances. The information may be required to be provided under oath. Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.
Any material misstatement by the surety, overstatement of assets (either as to ownership or value), or understatement of liabilities is cause for rejection of the surety. Substitution of individual sureties to support a bid bond after the bid opening will not be allowed.
Provide documentary evidence as to the ownership and value of the assets pledged in support of the bond and details of the security interest in the assets by the individual sureties for the apparent low bidder within 14 days after the opening of bids. Failure to submit evidence within the time required will be grounds for declaring the surety unacceptable.
Section 102
After reviewing the SF 28 and documentary information on the security interest and the assets pledged, the CO may request the surety to submit further information and documents with respect to the documents submitted. The information may be required to be provided under oath. Failure of the surety to respond with the requested information or documents within 7 days of receipt of the request is cause for rejection of the surety.
102.05 Public Opening of Bids. Bids will be publicly opened at the time specified in the SF 1442, Solicitation, Offer, and Award. All bid openings will be conducted according to FAR Part 14 – Sealed Bidding.
102.06 Performance and Payment Bonds. Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction.
Use SF 25, Performance Bond and SF 25A, Payment Bond for submitting the bonds.
Follow the requirements of Subsections 102.03 and 102.04.
Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged. A Contractor submitting an unacceptable individual surety in satisfaction of a performance or payment bond before the issuance of the NTP will be allowed one opportunity to substitute an acceptable surety or sureties within 7 days of receipt of notification that the surety is unacceptable.
The Government’s right to direct the substitution of sureties to ensure the continuing acceptability of the bonds during the performance of the contract according to FAR Clause 52.228-2 Additional Bond Security is not restricted.
The requirements of this Subsection are in addition to the requirements in FAR 28.203, except where in conflict with the requirements in the FAR, in which case the FAR supersedes the requirements of this Subsection.
Section 103
Section 103. — SCOPE OF WORK
103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described in the contract documents. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Provide labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
103.02 Disputes. Follow the requirements of FAR Clause 52.233-1 Disputes (Alternate I).
103.03 Value Engineering. Follow the requirements of FAR Clause 52.248-3 Value Engineering - Construction.
Before undertaking significant expenditures, submit a written description of the value engineering change proposal (VECP) concept. Within 14 days, the CO will inform the Contractor as to whether the concept appears to be viable or if the concept is unacceptable. If the CO indicates that the concept appears to be viable, then the Contractor can prepare and submit the formal VECP.
103.04 Contractor Records. Follow the requirements of FAR Clause 52.222-8 Payrolls and Basic Records.
Upon request, provide records related to the contract to the Government for up to 3 years after final payment or for longer periods as provided by law.
Include a provision in subcontracts at all tiers giving the Government the same rights as provided above with respect to the subcontractor’s records.
103.05 Partnering. To facilitate the contract, the CO offers to participate in a partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals. Partnering strives to resolve problems in a timely, professional, and non-adversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim process. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule.
Acceptance of this partnering offer by the Contractor is optional, and the partnership is bilateral.
If the partnering offer is accepted by the Contractor, mutually agree with the CO on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor representatives and the CO to attend a partnership development and team-building workshop. Hold additional progress meetings upon mutual agreement.
The direct cost of partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings will be shared by the Contractor and Government. Secure and pay for facilities, professional fees, and miscellaneous requirements. Submit invoices to the CO. The Government will reimburse the Contractor for 50 percent of the agreed costs incurred for the partnering process. The Government’s share will not exceed $5,000.
Section 103
Each party is responsible for making and paying for its own travel, lodging, and meal arrangements. No time extension for the completion of the project will be made for the use of partnering. No changes to the contract can result from discussions during partnering sessions.
Section 104
Section 104. — CONTROL OF WORK
104.01 Authority of the Contracting Officer. As stated in FAR 1.602-1(a), the CO has authority to execute, administer, or terminate contracts and make related determinations and findings. The CO may delegate authority to representatives to decide on acceptability, progress, and suspension of work, interpretation of the contract, and acceptable fulfillment of the contract.
104.02 Authority of Contracting Officer’s Representative. As stated in FAR 1.602-2(d), CORs will be designated in writing by the CO to act on behalf of the CO to administer the contract. The COR will administer the contract according to the contract documents and the FAR. The COR lacks authority to make commitments outside of the terms of the contract; issue changes that affect price, quality, quantity, delivery, or other terms and conditions of the contract; or direct the Contractor or its subcontractor to operate in conflict with the contract terms and conditions.
104.03 Authority of Inspectors. Inspectors are authorized to inspect work, including the preparation, fabrication, or manufacture of material for the project. Inspectors are not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreperson for the Contractor, or direct the Contractor’s operations. Inspectors have the authority to identify non-conforming work until the issue can be referred to and decided by the CO. An inspector is permitted to stop work in circumstances of imminent and substantial risk of death or injury.
104.04 Electronic Documentation. After award of the contract, provide documents in an approved electronic format.
Provide documents in their native file format (the format produced by the software that the document was created in) upon request.
Provide a resolution quality with color, text, and lines clearly discernible. Submit each document in an individual file. Name files with a unique document name that includes the document date, document description, and project number, or as requested.
Deliver electronic documents to the email address identified at the preconstruction conference or otherwise amended in writing by the CO. Documents delivered on removable media will not be accepted.
Documents delivered after 5:00 p.m. local time will be considered received on the following business day.
In addition to electronic documents, provide paper copies of the following documents and other documents as directed:
(a) Documents required under Section 102;
(b) Weight records required under Subsection 109.03;
(c) Receiving records required under Subsection 109.04; and
(d) Concrete batch tickets required under Subsection 552.04.
Provide one paper copy of each document upon request, unless more paper copies are specified.
The CO will reject without review documents that are unreadable, corrupted, illegible, or include malicious content.
104.05 Signatures for Electronic Documentation. Sign documents requiring a signature by electronic signature or by wet signature.
(a) Definitions.
(1) Electronic signature. A computer data compilation of symbols or series of symbols executed, adopted, or authorized by an individual to be the legally binding equivalent of the individual’s handwritten signature.
(2) Wet signature. A signature of ink from pen, or a scanned copy of an actual signature of ink from pen.
(b) Electronic signature. Unless the CO requests a wet signature, an electronic signature may be provided. Assume responsibility for the validity of electronic signatures. The Government will assume that the authorized individual’s electronic signature is authentic.
Provide electronic signatures in the following formats:
(1) A digital signature from an encryption application;
(2) A digitized image of a paper signature; or
(3) A unique form or individual identification that can be used as a means of authenticating a record, record entry, or document.
(c) Wet signature. After signing a document by wet signature, scan the complete document into an electronic format.
104.06 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.
(a) General. Submittals include both documents and drawings required to construct the work. Review submittals for accuracy, completeness, and compliance with the contract. Submittals that do not include evidence of Contractor review and verification may be returned for resubmission.
Time for approval starts over when submittals are returned for revision or when additional information is requested. Perform work related to submitted documents or drawings only after they are approved.
Obtain written approval before changing or deviating from the approved submittals.
Submit documents and drawings according to Subsection 104.04.
(1) Drawings. Drawings include:
(a) Layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed;
(b) Fabrication details for manufactured items and assemblies;
(c) Installation and erection procedures;
(d) Details of post-tensioning and other systems;
(e) Detailed trench and excavation procedures that conform to OSHA standards;
(f) Traffic control implementation drawings;
(g) Methods for performing work near existing structures or other areas to be protected; and
(h) Calculations that support each drawing.
Show drawing dimensions in the same units as shown in the plans. Limit drawings to a maximum size of 24 by 36 inches. Include the project number, name, and other identification as shown in the contract on each drawing and calculation sheet.
Drawings will be reviewed in the order they are received. Allow 30 days for approval of drawings and 40 days for approval of railroad structure drawings unless otherwise specified. Submit additional drawings for unique situations to clarify layout, construction details, or method if requested.
(2) Documents other than drawings. Documents other than drawings include descriptive literature, illustrations, schedules, performance and test data, certifications, and similar material submitted to certify or explain specific portions of the work required by the contract. Allow 14 days for approval unless otherwise specified.
(b) Specific requirements for concrete and miscellaneous structures.
(1) Submit drawings for the following:
(a) Site-specific layouts and installation procedures for all wall types;
(b) Site-specific layouts and installation procedures for gabion and revet mattress installations;
(c) Forms and falsework for cast-in-place non-bridge concrete structures and retaining walls less than or equal to 6 feet in height;
(d) Shoring systems and cofferdams less than 6 feet in height;
(e) Fabrication drawings for railings and parapets;
(f) Fabrication drawings for prestressed members;
(g) Fabrication and installation drawings for expansion joint assemblies;
(h) Fabrication drawings for bearing assemblies;
(i) Construction joint location and concrete deck placement sequences not according to the plans;
(j) Erection diagrams for structural plate structures (multi-plate structures);
(k) Steel fabrication and assembly drawings;
(l…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .