Control Systems Replacement Facility 255, Vance AFB
Solicitation number
FP1024489
Issued by
Garfield County, Oklahoma

About this file

This is a Scope of Work document for the Control Systems Replacement project at Facility 255, Vance Air Force Base in Oklahoma, involving electrical contracting services under NAICS code 238210. The project requires replacement of the existing R7044 control system with new Honeywell BACnet Comfort Point Open (CPO) controllers and integration with the existing Honeywell EBI/EMCS system. The contractor must provide all required equipment, wiring, and Direct Digital Control (DDC) functionality to support the facility's HVAC and building automation systems. The scope encompasses complete system removal, installation, programming, testing, and commissioning of the new control infrastructure to ensure seamless operation with existing building management systems.

The project deliverables include equipment procurement, installation labor, system integration, factory acceptance testing, site acceptance testing, startup and commissioning services, operator training, and comprehensive documentation. The contractor is responsible for ensuring compatibility between the new CPO controllers and the existing Honeywell EMCS platform, with all work performed in accordance with applicable electrical codes and Air Force specifications. The contract requires the selected contractor to coordinate with base facilities personnel, maintain project schedules, and provide warranty coverage for all installed equipment and services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Percent Completion: 100%

April 30, 2026

Statement of Work

CONTROL SYSTEMS REPLACEMENT, F255

VANCE AIR FORCE BASE, OKLAHOMA

FACILITY PROJECT ID 1024489

PREPARED BY ZEB MCCOLLUM

400 Young Road Vance AFB, OK 73705 580.213.7174

FP1024489 Page 1 of 11 Control Systems Replacement, F255 SoW Version 4.0

INDEX

PART 1 GENERAL

1.01. PROJECT DESCRIPTION

1.02. INSTRUCTIONS TO BIDDERS

1.03. LOCATION OF WORK

1.04. SCOPE OF WORK

1.05. CHANGES

1.06. WARRANTY

1.07. SCHEDULE OF WORK

1.08. WORK RESTRICTIONS

1.09. CONTRACTOR’S REPRESENTATIVE

1.10. PROVIDED SERVICES AND UTILITIES

1.11. INSPECTION

1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE)

1.13. SPECIAL MATERIALS

1.14. MATERIALS

PART 2 EXECUTION

2.01. SITE SAFETY REQUIREMENTS

2.02. INSTALLATION

PART 3 SITE INFORMATION

PART 4 APPENDICES

4.01. APPENDIX A – SITE PHOTOS

4.02. APPENDIX B – BID FORM

4.02. APPENDIX C – DRAWINGS

580.213.7174

FP1024489 Page 2 of 11 Control Systems Replacement, F255 SoW Version 4.0

PART 1 GENERAL

1.01. PROJECT DESCRIPTION

A. The work covered under this Statement of Work shall consist of the following; Contractor is to remove and replace existing controls system for Facility 255-along with the installation and integration of new Comfort Point Open (CPO) controllers to the EMCS (Energy Management Controls System) EBI (Enterprise Building Integrator) System and any incidental work necessary for a complete and usable finished project.

1.02. INSTRUCTIONS TO BIDDERS

A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B – BID FORM, along with all required documentation as stated in Sam.gov.

B. Owner reserves the right to reject any bid which does not completely satisfy the Statement of Work.

1.03. LOCATION OF WORK

A. Location of work to be accomplished under this statement of work is at Vance Air Force Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility 255 is located Northeast of the intersection of Elam Road and Scott Road.

1.04. SCOPE OF WORK

A. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the Scope of Work. All quotes shall include all shipping charges for completion of the project. The contractor will coordinate all work with ASRC Federal Construction Management prior to execution. The list of items below are to be considered the general Scope of Work for the project.

B. The Contractor shall field verify location of work, dimensions, and existing site conditions prior to commencing work. The Contractor shall contact ASRC Construction Management for any discrepancies with the Scope of Work.

580.213.7174

FP1024489 Page 3 of 11 Control Systems Replacement, F255 SoW Version 4.0

C. Contractor is to replace existing R7044 Controller with new Honeywell BACnet Comfort Point Open controllers. New control points will connect back to existing Honeywell Building Automation system network tied back to EMCS. Contractor will provide and install all required equipment, wiring and DDC (Direct Digital Control). Contractor will integrate applicable datapoints, for affected mechanical systems to match existing system and devices not referenced to remain for reuse. Additional details are described below:

1. REMOVE AND REPLACE:

a. Existing R7044 Controls system with new Honeywell CPO controllers.

1. Integrate with existing EBI system.

2. Replace existing thermistors with new system.

3. Reuse existing field devices.

CI. The Contractor shall always maintain clean areas free of clutter and debris during construction. After the work is completed, clean site to preconstruction conditions, or better.

CII. Protection of Government Property

Take special care to protect Government property. Return areas damaged as a result of construction under this contract to their original condition. In addition to FAR 52.236-9, Protection of existing vegetation, structures, equipment, utilities, and improvements, perform the following:

1. Remove or alter existing work or facilities in such a manner as to prevent injury or damage to any portion of the existing work or facilities to remain.

2. Repair or replace portions of existing work altered during construction operations to match existing or adjoining work, as approved by ASRC Construction Management. At the completion of operations, existing work must be in a condition equal or better than that which existed before any new work started.

FP1024489 Page 4 of 11 Control Systems Replacement, F255

1.05. CHANGES

A. No oral statement by any person other than the Contracting Officer as provided in the Federal Acquisition Regulation (FAR) will in any manner or degree modify or otherwise affect the terms of this contract.

1.06. WARRANTY

A. The Contractor shall provide a standard 1-year Warranty for all labor and material from date of the base’s acceptance of completion in accordance with Federal Acquisition Regulation (FAR) clause 52.246-21. For warranted items furnish the Manufacturer’s original warranty accompanied by a copy of the supplier’s receipt showing place of purchase, telephone number of supplier, address, delivery order if applicable and ticket number.

1.07. SCHEDULE OF WORK

A. The Contractor shall be responsible for establishing a schedule to meet construction time.

B. The Contractor shall submit a schedule of all project work in advance to ASRC Construction Management indicating all work activities including required interruptions of utilities, facilities activities, or traffic flow.

C. The Contractor shall complete work on this contract such that interferences to necessary activities within and adjacent to the construction site are minimized and all Government property and personnel are always protected from incidental damage.

D. The Contractor shall coordinate work of all trades to prevent any conflicts. The Contractor shall resolve any conflicts of components before proceeding with construction.

E. The Contractor shall submit a Schedule of Values to ASRC Construction Management for approval. Schedule of Values to be provided on AIA G702 or similar.

FP1024489 Page 5 of 11 Control Systems Replacement, F255

1.08. WORK RESTRICTIONS

A. EXISTING UNDERGROUND UTILITIES

Any underground utilities within the work areas will initially be located and identified with paint markings on the surface by Vance AFB personnel. The Contractor shall maintain all utility markings, after base personnel have located them, for the duration of the contract. The Contractor shall obtain an approved Air Force Form 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST before beginning any underground work. The Contractor shall notify ASRC Construction Management at least two weeks in advance of desired commencement of work. The Contractor is responsible for repairing any utilities damaged during construction.

B. WORK HOURS, ACCESS, AND PASSES

All Contractor employees, including subcontractors, subcontractors' employees, suppliers, and suppliers' employees are required to comply with the Installation Security Requirements regarding personnel, vehicle, and equipment security passes and access to the jobsite. Nothing in the contract is to be construed in any way to limit the authority of the Commanding Officer to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while on VAFB, including but not limited to, the rights of search of all persons or vehicles on the Installation.

1. Access to Buildings / Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the ASRC Construction Management, to obtain access to building and facilities and arrange for them to be opened and closed. Do not enter the building(s) without prior approval of the ASRC Construction Management. Keep the existing buildings and their contents secure at all times. Provide temporary closures as required to maintain security.

2. Passes: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor) and have a Real ID driver’s license. All Contractor employees must obtain the required passes. Failure to obtain security and base access passes must not be a cause for contract performance time extension.

The Contractor is required to immediately turn in all terminated employee's passes to the issuing office.

FP1024489 Page 6 of 11 Control Systems Replacement, F255

3. Contractor Vehicles: All vehicles must display a valid state license plate and safety inspection sticker, if applicable, and must be maintained in good condition. The company name must be displayed in a clearly visible manner and size on each Contractor vehicle used in the course of work. Registration, proof of insurance and driver’s licenses are required to obtain a station vehicle pass.

4. Work Hours: Normal working hours are from 7:30 a.m. to 4:30 p.m., Monday through Friday. Night, Weekend (Saturday and Sunday) and Federal Holiday work will be subject to approval by the ASRC Construction Management. The Contractor must provide a written request of their intention to work outside of normal working hours to ASRC Construction Management at least 48 hours in advance of the specified time.

a. The Contractor shall perform all work during normal working hours except as otherwise approved to accommodate agreed upon "shutdowns" and other required "after hours" work. At no time will any facility have their services or utilities disrupted during normal working hours without prior approval from the ASRC Construction Management.

5. Contractor employees must conduct themselves in a proper, efficient, courteous, and businesslike manner. Remove from the site any individual whose continued employment is deemed by the ASRC Construction Management to be contrary to the public interest or inconsistent with the best interests of National Security.

1.09. CONTRACTOR’S REPRESENTATIVE

A. Superintendent: A representative of the Contractor shall directly supervise accomplishment of this work. The representative will be responsible for coordinating all phases of work with the ASRC Construction Management. The representative shall always be on the job site when work is being performed and shall have authority to execute no cost field changes on behalf of the Contractor if agreed to by all parties involved.

1. Qualifications: Must have a minimum of 3 years of experience as a Superintendent on previous projects of similar size and complexity. Provide a Superintendent Resume for the proposed on-site Project Superintendent describing experience with references and qualifications to ASRC Construction Management for approval. ASRC Construction Management reserves the right to interview the proposed on-site Project Superintendent at any time in order to verify the submitted qualifications.

B. Quality Control (QC): A representative of the Contractor responsible for all quality control of the job site and will be held responsible by the ASRC Construction Management for the removal and installation of all products in accordance with the statement of work. The representative shall be competent and familiar with all phases of work under their authority.

FP1024489 Page 7 of 11 Control Systems Replacement, F255

1. Qualifications: Must have a minimum of 2 years combined experience as a Superintendent, Inspector, QC manager, Project manager, or Construction Manager on similar size and type construction contracts which included major trades included in this statement of work. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance.

C. A single representative of the Contractor for supervising the project, ensuring quality control (QC) and site safety is permitted provided that the representative is competent and familiar with all phases of work under their authority, and it is qualified to perform these duties.

D. Contractor Personnel: Provide ASRC Construction Management the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of the key personnel for the Contractor and Subcontractors including addresses and telephone numbers (main and cell) for use in the event of an emergency.

1.10. PROVIDED SERVICES AND UTILITIES

A. All reasonable required amounts of electric power will be made available to the Contractor at the discretion of ASRC Construction Management from the nearest suitable and available connection.

B. All reasonable required amounts of water will be made available to the Contractor at the discretion of ASRC Construction Management.

C. The Contractor shall be required to provide their own latrines that are staked down to prevent being turned over.

1.11. INSPECTION

A. The work shall be conducted in accordance with the Statement of Work and is subject to the inspection of the ASRC Construction Management and Government Representative to ensure strict compliance with the terms of the statement of work.

1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE)

A. All waste materials resulting from execution of work shall become the property of the Contractor. The Contractor shall haul all non-hazardous waste off Vance AFB and dispose of it in a legal manner.

B. The Contractor shall be required to control all foreign objects debris (FOD) from exiting the job site at all times.

FP1024489 Page 8 of 11 Control Systems Replacement, F255

C. At no time shall the Contractor dispose of any recyclable materials in the landfill. All recyclable material shall be taken to an approved recycling center at no cost to the government.

D. The Contractor shall submit tonnage of waste and recycled material to ASRC Construction Management at project completion.

E. The Contractor shall provide the removed controllers as attic stock items. The Contractor shall deliver attic stock to a location at Vance AFB as directed by ASRC Construction Management.

1.13. SPECIAL MATERIALS

A. Prohibited Material: The manufacturer of materials to be used shall certify the products do not contain mercury, toluene, chlorinated solvents, hydrolysable chlorine derivatives, ethylene base glycol ethers and their acetates, nor any carcinogen, as defined in 29 CFR

1910.1200. Materials used shall not contain lead and hexavalent chromium compounds.

B. At no time shall class 1 Ozone Depleting Chemical (ODC’s) be specified and shall not be used unless otherwise allowed by ASRC Construction Management.

1.14. MATERIALS

A. All materials must meet the Buy American Act.

B. Material Submittals:

1. Copies of all materials and shop drawings are to be submitted to ASRC Construction Management and must be approved prior to purchasing any items.

2. All hazardous chemicals used on the project are required to have Safety Data Sheets (SDS) approved by the Vance Environmental Office prior to transport to the installation.

3. The Contractor shall use the Short-Term Hazardous Material Inventory and Usage Report Form to get Hazardous Materials authorized for use inside the fence.

C. List of Materials

1. Refer to Section 1.04 Scope of Work, within this Statement of Work

2. Refer to APPRNDIX C – DRAWINGS

a. A101 – FACILITY 255 FLOOR PLAN

FP1024489 Page 9 of 11 Control Systems Replacement, F255

D. Material Delivery: The Contractor shall have all materials delivered during normal working hours and will have a representative present to receive shipments. The Contractor shall ensure all delivery vehicles have sufficient project information and are prepared to undergo inspection upon entering the Installation. This includes name and address of the project site, name of prime contractor and a point of contact for delivery.

Material will be delivered to a location for staging as approved by ASRC Construction Management.

PART 2 EXECUTION

2.01. SITE SAFETY REQUIREMENTS

A. All work shall be done in compliance with the safety standards as defined in DAFMAN 91- 203, Air Force Occupational Safety, Fire, and Health Standards.

B. The Contractor shall comply with all applicable standards and provisions of the Occupational Safety and Health Act (OSHA) (29 CFR OSHA 1926).

C. The Contractor shall take all necessary and prudent safety precautions to ensure safety of the workforce and other exposed personnel.

D. The Contractor shall coordinate all requests for entry to the airfield or Air Force control/restricted areas through ASRC Construction Management.

2.02. INSTALLATION

A. Project Duration:

1. The total period of performance is 40 calendar days as described below.

a. Non-Performance Period: The Contractor shall have up to 30 calendar days of nonperformance for mobilization and material lead time. If material lead time exceeds this number of days, the nonperformance period may be extended with coordination of the ASRC Construction Management and approval by Contracting Officer.

b. Performance Period: All work shall be completed within 10 calendar days after obtaining a Notice to Proceed from the Contracting Officer.

B. Installation shall include all items listed in this statement of work, and any incidental work necessary to provide a complete and usable finished product.

C. Contractor shall remove equipment and material from the site upon completion of work as directed by ASRC Construction Management.

FP1024489 Page 10 of 11 Control Systems Replacement, F255

PART 3 SITE INFORMATION

Figure 1: Project Location

FP1024489 Page 11 of 11 Control Systems Replacement, F255

PART 4 APPENDICES

4.01. APPENDIX A – SITE PHOTOS

4.02. APPENDIX B – BID FORM

4.03. APPENDIX C – DRAWINGS

A101 – FACILITY 255 FLOOR PLAN

END OF STATEMENT OF WORK

FP1024489 Control Systems Replacement, F255

APPENDIX A – SITE PHOTOS

FP1024489 APPENDIX A – SITE PHOTOS Control Systems Replacement, 255

APPENDIX A – SITE PHOTOS

Figure 2:F255 Mech Room Controls Panel

Figure 3: R7044 Controls System

Figure 4: R7044 Number

Figure 5: Mechanical Room

APPENDIX B – BID FORM

580.213.7174

APPENDIX B - BID FORM

Fac. Proj. ID: 1024489 Proj. Name: CONTROL SYSTEMS REPLACEMENT, F255

UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL

Base Bid

1 CONTROL SYSTEMS REPLACEMENT LS 1 -$

2 Total Cost Base Bid -$

Address:

Phone Number: _______________________________________

E-mail address: _______________________________________

DateContractor's Name

Contractor's Signature

APPENDIX C – DRAWINGS

FACILITY 255 FLOOR PLAN

3/16" = 1'-0"

GENERAL NOTES

1. CONTRACTOR IS TO CONFIRM ALL DIMENSIONS.

KEYNOTES

N

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 CHANNEL STREET

SUITE 138

VANCE AIR FORCE BASE

ENID, OKLAHOMA

580.213.7076

DRAWING INTENDED TO BE 11"X17"1 12" ACTUAL SIZE

DRAWN BY:

CHECKED BY:

FP NUMBER:

DATE:

DESIGN STAGE:

M

FA

C

IL

IT

Y

IN

FO

R M

A

TI

O N

\2

E nt om ol og y\

Fa ci lit y

Pr oj ec ts

O ps

F2

C on tr ol

S ys te m s R ep la ce m en t\

A ct iv e D ra w in gs

\2

.d w g

R

EV

IS

IO

N

D

ES

C R

IP

TI

O

N D

A

TE

A

PP

EN

D

IX

C

D

R A W

IN

G

S

A101

C O

N

TR

O L

S

YS

TE

M

S R

EP

LA

C

EM

EN

T, F

ZM

JO

FP1024489

30APR2026

100%

1 FACILITY 255 MECHANICAL ROOM

2 ENTRANCE TO MECHANICAL ROOM

FP1024489 SoW - CONTROL SYSTEMS REPLACEMENT - 255.pdf
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of the following; Honeywell is to remove and replace existing controls system for Facility 255-along with the installation and integration of new Comfort Point Open (CPO) controllers to th...
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B – BID FORM, along with all required documentation as stated in Sam.gov.
B. Owner reserves the right to reject any bid which does not completely satisfy the Statement of Work.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility 255 is located Northeast of the intersection of Elam Road and Scott Ro...
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the Scope of Work. All quotes shall include all shipping charges for completion of the ...
B. The Contractor shall field verify location of work, dimensions, and existing site conditions prior to commencing work. The Contractor shall contact ASRC Construction Management for any discrepancies with the Scope of Work.
C. Honeywell is to replace existing R7044 Controller with new Honeywell BACnet Comfort Point Open controllers. New control points will connect back to existing Honeywell Building Automation system network tied back to EMCS. Honeywell will provide and ...
1. REMOVE AND REPLACE:
a. Existing R7044 Controls system with new Honeywell CPO controllers.
1. Integrate with existing EBI system.
2. Replace existing thermistors with new system.
3. Reuse existing field devices.
D. The Contractor shall always maintain clean areas free of clutter and debris during construction. After the work is completed, clean site to preconstruction conditions, or better.
E. Protection of Government Property
1.05. CHANGES
A. No oral statement by any person other than the Contracting Officer as provided in the Federal Acquisition Regulation (FAR) will in any manner or degree modify or otherwise affect the terms of this contract.
1.06. WARRANTY
A. The Contractor shall provide a standard 1-year Warranty for all labor and material from date of the base’s acceptance of completion in accordance with Federal Acquisition Regulation (FAR) clause 52.246-21. For warranted items furnish the Manufactur...
1.07. SCHEDULE OF WORK
A. The Contractor shall be responsible for establishing a schedule to meet construction time.
B. The Contractor shall submit a schedule of all project work in advance to ASRC Construction Management indicating all work activities including required interruptions of utilities, facilities activities, or traffic flow.
C. The Contractor shall complete work on this contract such that interferences to necessary activities within and adjacent to the construction site are minimized and all Government property and personnel are always protected from incidental damage.
D. The Contractor shall coordinate work of all trades to prevent any conflicts. The Contractor shall resolve any conflicts of components before proceeding with construction.
E. The Contractor shall submit a Schedule of Values to ASRC Construction Management for approval. Schedule of Values to be provided on AIA G702 or similar.
1.08. WORK RESTRICTIONS
A. EXISTING UNDERGROUND UTILITIES
B. WORK HOURS, ACCESS, AND PASSES
All Contractor employees, including subcontractors, subcontractors' employees, suppliers, and suppliers' employees are required to comply with the Installation Security Requirements regarding personnel, vehicle, and equipment security passes and acces...
1. Access to Buildings / Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the ASRC Construction Management, to obtain access to building and facilities and arrange for them to be ...
2. Passes: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor) and have a Real ID driver’s license. All Contr...
3. Contractor Vehicles: All vehicles must display a valid state license plate and safety inspection sticker, if applicable, and must be maintained in good condition. The company name must be displayed in a clearly visible manner and size on each Contr...
4. Work Hours: Normal working hours are from 7:30 a.m. to 4:30 p.m., Monday through Friday. Night, Weekend (Saturday and Sunday) and Federal Holiday work will be subject to approval by the ASRC Construction Management. The Contractor must provide a wr...
a. The Contractor shall perform all work during normal working hours except as otherwise approved to accommodate agreed upon "shutdowns" and other required "after hours" work. At no time will any facility have their services or utilities disrupted dur...

5. Contractor employees must conduct themselves in a proper, efficient, courteous, and businesslike manner. Remove from the site any individual whose continued employment is deemed by the ASRC Construction Management to be contrary to the public inter...

1.09. CONTRACTOR’S REPRESENTATIVE
A. Superintendent: A representative of the Contractor shall directly supervise accomplishment of this work. The representative will be responsible for coordinating all phases of work with the ASRC Construction Management. The representative shall alwa...
1. Qualifications: Must have a minimum of 3 years of experience as a Superintendent on previous projects of similar size and complexity. Provide a Superintendent Resume for the proposed on-site Project Superintendent describing experience with referen...
B. Quality Control (QC): A representative of the Contractor responsible for all quality control of the job site and will be held responsible by the ASRC Construction Management for the removal and installation of all products in accordance with the st...
1. Qualifications: Must have a minimum of 2 years combined experience as a Superintendent, Inspector, QC manager, Project manager, or Construction Manager on similar size and type construction contracts which included major trades included in this sta...
C. A single representative of the Contractor for supervising the project, ensuring quality control (QC) and site safety is permitted provided that the representative is competent and familiar with all phases of work under their authority, and it is qu...
D. Contractor Personnel: Provide ASRC Construction Management the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of the key personnel for the Contractor and Subcontractors including a...
1.10. PROVIDED SERVICES AND UTILITIES
A. All reasonable required amounts of electric power will be made available to the Contractor at the discretion of ASRC Construction Management from the nearest suitable and available connection.
B. All reasonable required amounts of water will be made available to the Contractor at the discretion of ASRC Construction Management.
C. The Contractor shall be required to provide their own latrines that are staked down to prevent being turned over.
1.11. INSPECTION
A. The work shall be conducted in accordance with the Statement of Work and is subject to the inspection of the ASRC Construction Management and Government Representative to ensure strict compliance with the terms of the statement of work.
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE)
A. All waste materials resulting from execution of work shall become the property of the Contractor. The Contractor shall haul all non-hazardous waste off Vance AFB and dispose of it in a legal manner.
B. The Contractor shall be required to control all foreign objects debris (FOD) from exiting the job site at all times.
C. At no time shall the Contractor dispose of any recyclable materials in the landfill. All recyclable material shall be taken to an approved recycling center at no cost to the government.
D. The Contractor shall submit tonnage of waste and recycled material to ASRC Construction Management at project completion.
E. The Contractor shall provide the removed controllers as attic stock items. The Contractor shall deliver attic stock to a location at Vance AFB as directed by ASRC Construction Management.
1.13. SPECIAL MATERIALS
A. Prohibited Material: The manufacturer of materials to be used shall certify the products do not contain mercury, toluene, chlorinated solvents, hydrolysable chlorine derivatives, ethylene base glycol ethers and their acetates, nor any carcinogen, a...
B. At no time shall class 1 Ozone Depleting Chemical (ODC’s) be specified and shall not be used unless otherwise allowed by ASRC Construction Management.
1.14. MATERIALS
A. All materials must meet the Buy American Act.
B. Material Submittals:
1. Copies of all materials and shop drawings are to be submitted to ASRC Construction Management and must be approved prior to purchasing any items.
2. All hazardous chemicals used on the project are required to have Safety Data Sheets (SDS) approved by the Vance Environmental Office prior to transport to the installation.
3. The Contractor shall use the Short-Term Hazardous Material Inventory and Usage Report Form to get Hazardous Materials authorized for use inside the fence.
C. List of Materials
1. Refer to Section 1.04 Scope of Work, within this Statement of Work
2. Refer to APPRNDIX C – DRAWINGS
a. A101 – FACILITY 255 FLOOR PLAN

D. Material Delivery: The Contractor shall have all materials delivered during normal working hours and will have a representative present to receive shipments. The Contractor shall ensure all delivery vehicles have sufficient project information and ...

PART 2 EXECUTION
2.01. SITE SAFETY REQUIREMENTS
A. All work shall be done in compliance with the safety standards as defined in DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards.
B. The Contractor shall comply with all applicable standards and provisions of the Occupational Safety and Health Act (OSHA) (29 CFR OSHA 1926).
C. The Contractor shall take all necessary and prudent safety precautions to ensure safety of the workforce and other exposed personnel.
D. The Contractor shall coordinate all requests for entry to the airfield or Air Force control/restricted areas through ASRC Construction Management.
2.02. INSTALLATION
A. Project Duration:
1. The total period of performance is 40 calendar days as described below.
a. Non-Performance Period: The Contractor shall have up to 30 calendar days of nonperformance for mobilization and material lead time. If material lead time exceeds this number of days, the nonperformance period may be extended with coordination of th...
b. Performance Period: All work shall be completed within 10 calendar days after obtaining a Notice to Proceed from the Contracting Officer.
B. Installation shall include all items listed in this statement of work, and any incidental work necessary to provide a complete and usable finished product.
C. Contractor shall remove equipment and material from the site upon completion of work as directed by ASRC Construction Management.
PART 3 SITE INFORMATION
PART 4 APPENDICES
4.01. APPENDIX A – SITE PHOTOS
4.02. APPENDIX B – BID FORM
4.03. APPENDIX C – DRAWINGS
A101 – FACILITY 255 FLOOR PLAN
FP1024489 SoW - CONTROL SYSTEMS REPLACEMENT - 255 pkg.pdf
Appendices Cover Sheets.pdf
FP1024489 APPENDIX A - SITE PHOTOS.pdf
Appendices Cover Sheets
FP1024489 APPENDIX B - BID FORM.pdf
2.a_BID FORM_LUMP SUM
Appendices Cover Sheets
255-11x17 (2).pdf
Sheets and Views
11x17 (2)

File details come from the government source that posted it. Updated .