FOUO C04.0 Attachment J-2 LET KIT 3 - 5-way Breakout.xls
XLS spreadsheet 49 KB Posted
- Solicitation number
- N4523A20R1068
About this file
This document contains a solicitation for a firm-fixed-price contract to perform maintenance, repair, and preservation on the SSN-21 Logistic Escape Truck Kit 3. The contractor will be required to blast, preserve, and label various components of the LET houses and cofferdams. Modifications will also be made, including installing new de-smoking fan assemblies and service penetrations. Upon completion, the contractor must deliver the equipment to Naval Submarine Base Bangor. The period of performance is from December 16, 2020 to February 17, 2021. This is a 100% small business set-aside under NAICS code 336611 with size standard of 11,250 employees. The Navy intends to award the contract on a lowest-price technically acceptable basis in October 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YON-326
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | LET KIT #3 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16.1 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Renew Door Tracks & Brackets | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 | L.E.T. House and Handrail Deck Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.4 | L.E.T. Incline Step Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.5 | L.E.T. Vertical Ladder and Cage Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.6 | L.E.T. House Water Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.7 | 3.3.7 L.E.T. House Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.8 | L.E.T. Davit Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.9 | L.E.T. Cofferdam Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.10 | L.E.T Cofferdam Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10 | Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.12 | Weight Handling Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH**: | G&A Rate***: | Profit Rate****: | ||||||||
| Total Bid: | $0.00 | ||||||||||
| *ODC = Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc. | |||||||||||
| **Labor Rate/Hr = Represents a composite value of all categories of direct labor to accomplish the outcomes of the requirement | |||||||||||
| ***G&A = General and Administrative Overhead factor associated with | |||||||||||
| ****Profit = Incentive factor associated with materials, to include subcontracting expenses, directly attributable to the contract |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it. Updated .