This solicitation seeks proposals for maintenance, repair, and preservation of SSN-21 Logistic Escape Trunk Kit 3. The Naval Supply Systems Command will award a firm-fixed-price contract to retrieve LET houses, cofferdams, and associated equipment from Naval Submarine Base Bangor and transport to the contractor's facility. Work will include blast cleaning, preserving, installing non-skid coatings and new components on LET houses, cofferdams, davits, and associated structures. Electrical and mechanical modifications and testing are also required. The period of performance is from 16 December 2020 to 17 February 2021. This is a 100% small business set-aside for NAICS code 336611 with a size standard of 11,250 employees. Proposals are due in October 2020 and award will be made to the responsible offeror with the lowest priced technically acceptable proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOGISTIC ESCAPE TRUNK HOUSES/EQUIPMENT
LET SSN-21 Kit 3
SOLICITATION: N4523A-20-R-1068
COVER SHEET – STATEMENT OF WORK (SOW)
SOLICITATION COPY
Date Prepared:
05/29/2020
ERRAERRTA One:
ERRATA24 June 200
E
Table of Contents
Paragraph / Section Page Number
1.0 General Requirements
1.1 Vessel Characteristics 4
1.2 Scope Overview 4
1.3 Definitions 4/5
1.4 Arrival Conference 5
1.5 Required Documents 5/6
1.6 Progress Meetings 6
1.7 Availability Requirements 6/7
1.8 Care of Vessel 7
1.9 Workmanship 7/8
1.10 Corrective Action Request (CAR) 8
1.11 Condition Found/Inspection Discrepancy Report (CFR/IDR) 8/9
1.12 Interferences 10
1.13 Safety Requirements 10/11
1.14 Hot Work/Welding 11/12
1.15 Threaded Fasteners 12
1.16 Preservation 13/14
1.17 Environmental and Hazardous Waste Management 14/15
1.18 Materials 15
1.19 Weight Control 15
1.20 Label Plates 15/16
1.21 Integrated Logistic Support 16
1.22 Gas Free 16
1.23 General Requirements for Testing 16/17
2.0 References
2.1 Order of Precedence 18
2.2 Discrepancies 18
Consolidated List of References 18/29
3.0 Work Requirements
3.1 Docking and Undocking the Vessel 19
3.2 Hull Repairs 19
3.3 Structural Repairs 19/25
3.4 Tanks/Voids 25
3.5 Main Deck Repairs 25
3.6 Superstructure 25
3.7 Main Propulsion Repairs 25
3.8 Steering System Repairs 25
3.9 Machinery Systems 25
3.10 Electrical Systems 25/26
3.11 Piping Systems 26
3.12 Weight Handling Systems 26/27
3.13 Dock and Sea Trials 27
4.0 Government Furnished Material (GFM) 27
Statement of Work (SOW)
1.0 General Requirements: This document invokes the requirements applicable to the maintenance and repair work to be performed on 21-Class Logistic Escape Trunk (L.E.T.) Kit
3. Kit 3 consists of Quantity (2 EA) LET Houses, Quantity (2 EA) Cofferdams, and associated incline steps, landings, landing handrails, upper deck handrails and lower deck handrails. Work performed and accomplished shall be in accordance with the highest quality workmanship standards and practices commonly accepted in the commercial industry and the technical references listed herein. The Contractor is responsible for understanding and complying with all requirements specified herein.
1.1 Vessel Characteristics:
LET SSN-21
Kit-3
House Cofferdam FWD.
Ladder & platform
Exterior Vertical Ladder
AFT.
Ladder & platform
Length(ft.-in): 12-1.35 6-6 3-3 10-9.5 6-2
Width(ft.-in): 12-1.35 6-6 3-6 1-2 3-6
Height(ft.-in): 8-9.06 4-8 2-3 - 2-3
Approximate Weight(lbs.):
8,700 4,700 796 1,300 1000
1.2 Scope Overview: Coordinate with the Contracting Officer, via the Contracting
Officer’s Representative (COR) to retrieve L.E.T. houses, cofferdams, and associated equipment from Naval Submarine Base Bangor (NSBB), Silverdale, WA and deliver to the
Contractor’s facility. L.E.T. Houses (FWD, and AFT): Pull Test pad-eyes and label. Blast, preserve and label houses. Install non-skid on upper deck platforms, lower deck platforms, ladder platforms and top of upper deck sliding doors. Install new gasket material on upper deck doors. Install new door tracks, door guides, door hangars, door stops, door brackets, and door rain guards on each L.E.T. house. Adjust door hangers and verify operation. Plug unused existing holes. Seal and caulk all seams of bulkheads and accesses. Blast, preserve, and label, house ladders, incline stairs, landings, and landing platforms. Perform various mechanical and electrical modifications to the LET houses and cofferdams to include the installation of new de-smoking fan assemblies in each house. Install new service penetrations in each cofferdam. Install new service sleeves in each LET house and cofferdam. Blast, preserve and label davits, davit extensions and davit bases. Pull Test the
L.E.T. cofferdam (FWD, and AFT) pad-eyes and label. Blast, preserve and label cofferdams.
Install new cofferdam rubber gaskets. Upon completion of all work deliver L.E.T. houses, cofferdams, and associated equipment to Naval Submarine Base Bangor (NSBB), Silverdale, WA. Arrange and coordinate the delivery with the Contracting Officer via the COR.
1.3 Definitions: As used throughout this Specification, the following definitions and terms have meanings as indicated:
1.3.1 Unless otherwise stated, “As shown”, “as indicated”, “as detailed”, or other words of similar import refer to the contractual documents including reference documents and publications.
1.3.2 The words “as directed”, “as approved”, “when authorized” or words of similar import refer to the direction, requirements, permission, approval, or acceptance by the
Contracting Officer.
1.3.3 The term “Objective Quality Evidence” (OQE) shall mean current, accurate, and complete objective documentation and information submitted together as a complete data package sufficient that a qualified and disinterested third party could analyze and evaluate whether technical requirements were achieved.
1.3.4 Where “in accordance with Regulatory Body requirements” is stated, the industrial efforts shall be in accordance with the appropriate commercial regulatory body requirements unless otherwise authorized by the Government.
1.3.5 The term “marine” or “marine quality” means an item constructed of materials unaffected by moisture, sea spray, extremes in temperature or other hazards of the marine environment, and designed and constructed to perform its intended functions under marine operating conditions.
1.3.6 The term “herein” means the applicable section(s) of this Specification.
1.3.7 The term “NAVSEA” means the Naval Sea Systems Command, one of five system commands, responsible for engineering, building, supporting, and maintaining the
Navy’s fleet of vessels.
1.4 Arrival Conference: The Government will arrange an arrival conference with the
Contractor after contract award.
1.5 Required Documents: Administrative requirements of this SOW shall commence at contract award and be updated throughout the contract period.
1.5.1 Prepare and keep current schedules necessary for the purpose of establishing an orderly and systematic accomplishment of production work and material ordering. (CDRL
A001)
1.5.2 Maintain a list of all subcontractors with extent of work to be accomplished by each subcontractor.
1.5.3 Maintain a list of manufacturer’s Technical Representatives to be provided per the particular specification requirement.
1.5.4 Maintain a Welder Qualification List, with name, type of qualification(s) and date of last qualification test for each qualification and a list of qualified silver brazers.
1.5.5 Maintain Manufacturer’s Product Data Sheet for all materials to be used by the
Contractor to accomplish the requirements of this contract. (CDRL A002)
1.5.6 Maintain Safety Data Sheets (SDS) for all materials to be used by the
Contractor to accomplish the requirements of this contract. (CDRL A003)
1.5.7 Maintain a list of key Contractor personnel with names, positions, telephone numbers, e-mail addresses, and emergency contact information.
1.5.8 Maintain a copy of the Contractor’s Inspection and Quality Control System with copies of all related forms, reports, and other supporting documentation.
1.5.9 Maintain a copy of the Contractor’s Environmental Protection and Hazardous
Waste Management Plan, including Risk Management/Mitigation plans specific to this contract.
1.5.10 Maintain copies of required federal, state and local environmental notifications and permits for performance of the work (or a schedule of when they will be obtained).
1.6 Progress Meetings: Weekly progress meetings shall be held at the Contractor’s facility near the equipment. The day and time of the meeting shall be set by the COR upon consultation with the Contractor. A review of percentage completion for each work item shall be conducted including the Contractor’s assessment of schedule adherence. Production schedule, corrective action reports, material lead times and other issues shall be discussed.
1.7 Availability Requirements:
1.7.1 Arrange for and transport the equipment from the Government facility at Naval
Submarine Base Bangor (NSBB) DLA Laydown Area, Silverdale, WA to the Contractor’s repair facility. Upon completion of all work, coordinate delivery of the equipment to the
Government facility at Naval Submarine Base Bangor (NSBB) DLA Laydown Area, Silverdale, WA. Provide all materials, labor, and insurance bonds necessary for the safe transport of the Equipment to and from the Contractor’s facility and for the period that the
Equipment is located at the Contractor’s repair facility.
1.7.1.1 Equipment pickup and delivery shall be scheduled with the COR 5 working days prior to equipment pickup and delivery.
1.7.2 Provide heated/air conditioned office space measuring a minimum of 160 square feet and located within 1/4 mile of the equipment from 2 days prior to project start to 2 days after project completion for use by the COR.
1.7.2.1 The office space shall be equivalent to Satellite model 820MO, 8 feet X
20 feet interior size, with lockable doors and platform with stairs.
1.7.2.2 The office space shall be lockable, secure, and safe for personnel and equipment.
1.7.2.3 Provide quantity 2 each keys for all doors and quantity 2 each master keys to fit all locks to the COR.
1.7.2.4 Furnish quantity One each work station with the following at each workstation:
1.7.2.4.1 Quantity (One EA) duplex 110 volt receptacle.
1.7.2.4.2 Quantity (One EA) desk, 30 inches wide x 48 inches in length, with chair. Chair shall be adjustable in height, with swivel and adjustable arm rests.
1.7.2.4.3 Quantity (One EA) CAT-5 cable connection at 35 MBPS minimum download speed for a COR supplied desktop/laptop computer. This connection shall be separate from Contractor’s computer servers/networks.
1.7.2.4.4 Quantity (One EA) trash can.
1.7.2.5 Provide Quantity (One EA) parking space adjacent to the office space of
1.7.2 for the entire contract period.
1.7.2.5.1 Designate each parking space with a sign stating "PSNS
PARKING ONLY".
1.7.3 Document the result of each inspection requirement throughout this SOW.
1.8 Care of Vessel: The Contractor shall be responsible for the care of equipment, materials, and components related to the work being performed as follows:
1.8.1 Equipment shall be maintained in a broom clean condition on a daily basis.
1.8.1.1 Remove and dispose of industrial debris and extraneous materials from all equipment on a daily basis.
1.8.2 Temporary protective measures shall be taken to avoid wear and damage to the equipment and all associated components. Water shall not be allowed to accumulate in the structure during work performance.
1.8.2.1 Open areas in structure shall be covered to prevent water entry.
1.8.3 All preservation coatings shall be fully cured prior to final delivery to the
Government.
1.9 Workmanship: Workmanship provided by Contractor employees shall be consistent with the highest standards of commercial marine practices and regulatory bodies. The
Government reserves the right to accept or reject material and workmanship nonconformance.
Noncompliance with Contractor’s quality control processes will influence past performance rating provided on contract evaluation. Plating and structural member cuts shall be neatly and accurately made with edges cleaned and prepared for welding. Sharp edges shall be ground smooth to avoid injury to personnel. Equipment, machinery and associated support systems shall not leak oil, water or other type of fluids. Machinery and equipment shall be protected against weather hazards.
1.9.1 At the time of delivery, work performed shall meet the performance requirements specified. In the event that deficiencies are discovered during the Guarantee period, an opportunity will be afforded the Contractor to witness, inspect and comment on such deficiencies. Materials and articles used for work performed shall be of commercial marine quality, conforming to the requirements of the Regulatory Bodies listed herein, unless specified to be otherwise.
1.9.2 The decision that an area is inaccessible shall be determined by inspection and agreed to by the COR prior to proceeding with the requirements of this SOW.
1.10 Corrective Action Request (CAR): The Contractor is solely responsible for implementation of the Inspection and Quality Control System submitted in 1.5.8. Government observer(s) will monitor production work performed at any time where work is ongoing. If, during the performance of work, the Government observer(s) witness work that: fails to meet specifications within this SOW, would lead to an unsatisfactory end product, damages
Government Property, is a Safety Violation; the observer will alert the COR and advise the
Contractor of the deficiency. Conditions that fail to meet specifications within this SOW may result in the Contractor being issued a CAR. Contractor shall respond in writing within 2 work days of CAR receipt to the COR concerning the corrective action taken to remedy the issue and prevent future occurrences.
1.11 Condition Found / Inspection Discrepancy Report (CFR/IDR): Utilize FIGURE A
(or Company correspondence containing same information) in transferrable media, to communicate to the Contracting Officer and Contracting Officers Representative concerning all conditions found, discrepancies noted, and other information requiring formal documentation. Provide the Contractor’s recommendation for corrective action and include
Contractor’s estimated pricing (man-hours and materials) to correct the condition found.
Provide all inspection results including detailed measurements, photographs, sketches, and other means to accurately detail inspection results using FIGURE A, with attachments as necessary. The Government will review and respond to the submitted report. Additional repairs related to the found condition will be tasked if determined necessary by the
Government. In the event difficulty is encountered in meeting requirements or difficulty is anticipated in complying with the contract schedule dates, immediately notify the Contracting
Officer via verbal communication with the COR. Government receipt of notifications are not to be construed as a waiver of the requirements, delivery schedule, or waiver of rights or remedies provided by law or under this contract, or any other requirements in the SOW relating to jeopardy of contract schedule dates. Reports and notifications do not authorize the
Contractor to perform additional work not covered by the contract or authorized by the
Contracting Officer. (CDRL A004)
FIGURE A - CONDITION FOUND/INSPECTION DISCREPANCY
REPORT
CFR Number________ Date: ______________
From:________________________________ (Contractor Authorized Representative)
To: PSNS & IMF, NWRMC IND MAN, C400, Contracting Officer
Via: PSNS & IMF, NWRMC IND MAN, C400, Contracting Officer’s Representative
(COR)
Vessel: LET SSN-21 KIT #3
Section of Contract Affected: _____________________________________________
Description:
Impact:
Recommended Action:
C400 Response:
Signature of C400 Representative Date
Page ___ of ____
1.12 Interferences: Contractor pricing offered shall include removal and re-installation of all interferences associated with performance of the required work. The fact that interference is not shown on a plan or specifically identified in the specification item is not justification for a contract change. A physical check of each work site prior to bid submittal is strongly encouraged.
1.13 Safety Requirements: Comply with the requirements of 29 CFR Part 1915, 29 CFR
1910, and 29 CFR Part 1926, state and local laws, rules, and ordinances during contract performance and as follows:
1.13.1 General: Contractor shall be responsible for the compliance of the above requirements by all subcontractor personnel performing work related to this contract. In cases of conflict between the above regulations, the stricter of the requirements shall take precedence.
1.13.2 Accidents and Injuries: Immediately report injuries to Contractor and subcontractor employees to the COR. Investigation shall be completed within 7 work days of each accident/injury. Document a report that includes narratives of the circumstances leading up to and including the injury and any actions (immediate and contemplated) taken to mitigate future reoccurrences of injuries. (CDRL A005)
1.13.3 Scaffolding: PSNS & IMF has established additional standards above the
OSHA minimum requirements when PSNS & IMF personnel are required to access or work from any scaffolding and associated ladders. These additional requirements are hereby invoked and are applicable to Contractor assembled scaffolding and ladders at any location where PSNS & IMF personnel administer the contract. Scaffolds and ladders shall meet the requirements of 29 CFR 1910.27, 29 CFR 1910.28 and as follows:
1.13.3.1 Install a swinging gate guardrail at each scaffold ladder and through-platform access opening.
1.13.3.1.1 Install standard railing around the non-access sides and a swinging gate guardrail on the entrance side of through-platform access openings.
1.13.3.1.2 Install standard toe-boards around all scaffold floor openings, except at the entrance to the swinging gate guardrail, on all exposed sides of through-platform access openings.
1.13.3.2 Install each ascending ladder section with a landing platform and with each ladder section platform in an offset position from the previous or adjacent ladder section for heights above 21 feet. Position each ladder perpendicular to each landing or work platform to the greatest extent practicable.
1.13.3.3 Install commercial scaffolding that is configured and designed by a qualified person when OSHA, ANSI, and manufacturers’ designed guidelines exist.
Construct, load, and maintain scaffolding in accordance with the qualified person’s design.
1.13.3.4 Develop detailed engineered drawings and specifications for scaffolds when OSHA, ANSI, or manufacturers’ designed guidelines do not exist, such as for “hanging scaffolding”. Drawings and specifications shall be designed by a registered professional engineer and meet the following:
1.13.3.4.1 Maintain on the jobsite a copy of the detailed engineering drawings and specifications showing the sizes and spacing of members and the calculations developed for the engineered design(s).
1.13.3.4.2 Construct, load, and maintain scaffolding in accordance with the registered professional engineer’s design.
1.13.3.5 Install a commercially available scaffold tag system on all scaffolds.
The tagging system, as a minimum, shall be prominently attached to the scaffold structure, consist of green colored “Okay to Use” tag(s), red colored “Danger” tag(s), and accomplish the following:
1.13.3.5.1 Ensure that only qualified Competent Person’s apply tags;
1.13.3.5.2 Ensure that any scaffolds not properly tagged shall not be used;
1.13.3.5.3 Apply all tags on the scaffold structure as close as practicable to each ladder access and/or entry point;
1.13.3.5.4 Apply a red tag to indicate to users that the scaffold is being dismantled, is not yet completely erected, or for some reason is unsafe for use;
1.13.3.5.5 Apply a green tag to indicate to users that the scaffold is safe for use and is compliant with all OSHA regulations and other applicable requirements;
1.13.3.5.6 Ensure green tags contain the following information as a minimum: the location of the scaffolding structure; a unique reference number to identify each separate scaffolding structure, the date the scaffolding structure was first erected; the name(s) of the scaffold builder(s); the load rating of the scaffold structure; and the Competent Person’s printed name and signature.
1.14 Hot Work/Welding: Prior to performance of any hot work on the equipment, certify a safe atmosphere exists in and around the work area before starting any work that may produce the heat of ignition, sparks or flame. Accomplish steps to make each area safe for hot work. A copy of the gas free certification shall be posted at the work site for the entire period that personnel entry into and around the work area is required.
1.14.1 All welding equipment and materials shall comply with the applicable requirements of American National Standards Institute/American Welding Society
(ANSI/AWS) D1.1, Structural Welding Code requirements. Welding shall be sequenced to keep the thermal expansion of structures to a minimum.
1.14.2 Remove existing preservation / coatings prior to each expected welding, cutting, and hot work operation.
1.14.2.1 Preservation / coatings shall be removed 4 inches in each direction and each opposite side.
1.14.3 Perform visual inspection of new welds, to determine conformance, in accordance with the requirements of American Society for Testing and Materials (ASTM)
International. All new welds shall be 100 percent visually inspected. All defects shall be repaired in accordance with approved procedures. All welders shall be certified in accordance with AWS requirements.
1.14.4 Perform radiographic, ultrasonic, magnetic particle or dye penetrant inspection of new welds, when invoked by the requirements of section 3.0 of this SOW, in accordance with the requirements of American Society for Testing and Materials (ASTM) International.
1.14.5 Maintain documentation of each proposed access cut and a list of each proposed bolted/riveted access removal. Documentation is not required where access cuts are authorized per a NAVSEA approved drawing.
1.15 Threaded Fasteners: Except as otherwise specified herein, or on the drawings listed, threaded fasteners shall be in accordance with applicable ASTM standards. Coarse thread series shall be used unless the component’s design indicates a necessity to use fine thread series. Bore diameters for mounting bolts shall not exceed the diameters produced using standard size drill bits. Black oxide coated brass and cadmium plated fasteners are prohibited. Where drawings specify the use of brass fasteners on a fuel or fuel oil tank, CRES
316 fasteners shall be substituted in lieu of brass. Consult the requirements of MIL-STD-777 and Naval Ships’ Technical Manual (NSTM) Chapter 075 for guidance in instances where there is a question as to the material to be utilized.
1.15.1 Threads on externally threaded fasteners, after being installed and tightened, shall protrude a minimum of 2 threads to a maximum of 5 threads beyond the face of the nut with the exception of minimum thread protrusion for self-locking (plastic insert) nut installations. For those installations, bolt or stud end minimum thread protrusion shall be flush with the face of the nut. For self-locking nuts, the bolt or stud end shall protrude a maximum of 5 threads beyond the face of the nut after the nut is tightened.
1.15.2 Clean, chase, and tap exposed threaded areas of each fastener and threaded socket.
1.15.3 Tighten threaded fasteners in the sequence, patterns, and the torque values, when not otherwise specified, using the requirements of Section 4, paragraph 075-4.1 through
075-4.6.2 of NSTM Chapter 075 for guidance.
1.16 Preservation: Accomplish all preservation installation and repairs as follows:
1.16.1 OQE Information and Data Records: Measure, record, and maintain objective quality evidence (OQE) information on current year Appendix’s One through 8 throughout the entire performance of preservation operations. OQE information for the process being performed shall be made immediately available for onsite review upon request by the COR.
(CDRL A006)
1.16.1.1 Appendices One through 8 shall be in accordance with Reference
QA_Appendix_Forms_C411_2018_Contractors.
1.16.1.1.1 All spaces that are not applicable shall be marked N/A.
1.16.1.1.2 Unused sections shall be crossed out and marked N/A.
1.16.1.1.3 Any errors shall be one lined thru; initialed and dated by the person making the correction.
1.16.1.1.4 Any markings that are illegible or unclear shall be considered invalid.
1.16.2 Environmental Establishment: Comply with the coating Manufacturer’s Product
Data Sheet requirements for the establishment and maintenance of environmental conditions and for coating thickness applications throughout the entire removal and preservation operation(s).
1.16.3 Contrasting Colors: Apply contrasting colors between the primer, stripe, intermediate, and topcoat using coating products that are from the same manufacturer; that are compatible with each other; that are a different color from both the preservation over which it is being applied and the next coat in the system; and in accordance with the Manufacturer’s
Product Data Sheet.
1.16.4 Stripe Coats: Apply stripe coats to all edges, weld seams, welds of attachments and appendages, cutouts, corners, butts, foot/handholds, including back side of piping, underside of beams and other mounting hardware (non-flat surface) after each previous full coat has dried. The stripe coat shall encompass and extend a minimum of One-inch beyond the intersection of two flat surface planes, each radii edge, and all perpendicular shapes, edges, or angles.
1.16.5 Protective Covering: Mask and/or install temporary expandable foreign material exclusion (FME) plugs, blanks, or other hard and durable protective covers, painted blaze orange, in hull openings and surfaces to prevent system contamination or equipment damage from abrasive blasting, surface preparation, and preservation operations. The use of cloth, polyvinyl sheet, paper, tape, rubber sheeting, and wood or wood products as FME prevention devices is prohibited.
1.16.5.1 Establish an FME log, record, and identify the location of each protective covering installed and removed, including each corresponding and specific measurement(s), location(s), and/or area(s) in relationship to structural members or from suitable hull reference points.
1.16.5.2 Remove each temporary FME plug, blank, and protective covering, record removal date in FME log, and restore each system to its original configuration upon final completion of testing, blasting, and preservation operations.
1.16.6 Surface Cleanliness: Solvent clean surfaces prior to the start of each blasting, and preservation operation. Accomplish the requirements of Surface Preparation Specification
SSPC-SP-1 of Systems and Specifications, SSPC Painting Manual, Volume 2.
1.16.7 Disturbed Surfaces: Accomplish touch-up preservation for new and disturbed surfaces to match surrounding coating system(s) in accordance with the Manufacturer’s
Product Data Sheet.
1.16.8 Feathering: Feather edges of well adhered paint remaining after cleaning for all surface preparation methods. Visible areas of defective existing paint shall be removed until an area of completely intact and adhering paint is attained around the defective area by feathering (tapering) the edges of tightly adhering existing paint at an approximate 30 degree slope into the newly prepared bare metal surface thus preventing application of new paint over loose or cracked paint.
1.16.9 Thinning: Paints shall not be thinned.
1.17 Environmental and Hazardous Waste Management: Comply with all federal, state, and local laws, codes, regulations, acts, ordinances, and rules for Environmental
Protection and Hazardous Waste Management / Disposal, including obtaining required licenses, generator identification number, and permits. Designate one employee responsible for Environmental and Hazardous Waste Management. All contract, manifests, invoices, and other documents related to the removal, storage, handling, transportation or disposal of hazardous waste shall bear a generator identification number issued to the Contractor pursuant to applicable law. Take actions to mitigate creation of hazardous waste by recycling and other available methods. All hazardous waste generated by work under this contract is anticipated to be Contractor generated and shall be the responsibility of the Contractor. Estimated hazardous waste associated with work required in these Specifications is listed below:
Product Amount
Cleaning Solvents 20 gallons
Paint (enamel, latex, epoxy, thinners, oil based, rubber, non-skid, lacquer, varnishes, removers)
25 gallons
Rags (contaminated with a known source) 100 pounds
Blast Media and paint chips contaminated with heavy metals and other contaminants
36000 pounds
Hazardous waste generated during the actual performance of the work may vary in type or amount from the waste listed above. The above is an estimate of the amount of waste anticipated to be generated; not an estimate of the amount of work in generating that waste.
1.17.1 The Contractor shall ensure that their cost proposal for the work proposed herein includes reasonable compensation for all anticipated cost of managing and disposing of the wastes listed above, and/or created or generated in the execution of the delivery order issued, in accordance with the requirements of 42 USC 6901-6992 Rev 1996, 49 USC 5103, 10 USC 7311 Rev 1/22/11. The Contractor shall include a 5-way break down of the anticipated costs associated with this effort in their offer. Pursuant to the requirements of
Paragraph (b) of 10 USC 7311 Rev 1/22/11, total cost greater or less than the above dollar amount when authorized by the Contracting Officer will be the subject of an equitable adjustment. (CDRL A007)
1.17.2 Consider coatings to contain heavy metals (e.g. lead, chromium, cadmium), hexavalent chromium, crystalline silica, and/or other toxic or hazardous substances until laboratory analysis establishes otherwise. Comply with all procedures and precautions required for employee protection, sampling, removal, and disposal.
1.17.3 Consider insulation, lagging, and mastics to be asbestos-containing material
(ACM) until it can be established by laboratory analysis, or other reliable method(s), that the material does not contain asbestos. Ensure compliance with the requirements of 29 CFR
1915.1001.
1.17.4 Consider materials, debris, and/or residue associated with ventilation systems to contain toxic/hazardous substances including but not limited to cadmium, chromium, and
PCB’s until laboratory analysis establishes otherwise.
1.18 Materials: All Contractor furnished materials (CFM) installed shall be new. Materials shall be as indicated on the listed drawings, publications or as specified in this Specification.
The use of asbestos, polychlorinated biphenyl (PCB), magnesium, cadmium, or mercury in any materials is prohibited.
1.19 Weight Control: Institute a weight control program in which actual weights, for removed, relocated and installed equipment/structure, are measured by either weighing or from manufacturer certified data. The location of the center of the load must be recorded along with each weight entry in the weight control report. This location will show the distance vertically from the baseline of the vessel, longitudinally from amidships and tangentially from the centerline of the vessel. Items that are permanently removed and replaced with the identical item, in the same location, are not required to be included in the weight control program.
Items that are replaced with like items of differing material or quantity shall be included in the weight control program. Items that are new installations shall be included in the weight program.
1.20 Label Plates: Label plates installed in locations exposed to the weather shall be CRES and shall be prepared by the “Metal-Photo” process and sealed to exclude moisture between the plate and the mounting surface. Label plates shall be installed to assure maximum visibility. Label plates shall be attached with corrosion-resistant steel (CRES) screws or adhesive, using drawing S2803-980209 Rev L for guidance. Where adhesive is used, surface preparation shall be in strict accordance with the adhesive manufacturer’s instructions. Test label plates shall be attached on or adjacent to all equipment or components tested without interference to equipment or component operation. The label shall identify the equipment or component, the test load, the dynamic and static load (if applicable), the rated load, the date of testing, and the activity performing the test, using the layout format of drawing S2803-980209
Rev L for guidance.
1.21 Integrated Logistic Support: Maintain legible original copies in approved transferrable media, of manufacturer supplied operating instructions, warranty information, service manuals and other supporting documents for all new equipment and parts to the COR, for items supplied by the Contractor.
1.22 Gas Free: Not used.
1.23 General Requirements for Testing: Test all Contractor affected equipment, systems and subsystems for compliance with this SOW and Commercial Marine standards and practices. Demonstrate workmanship, alignment, strength, rigidity, water tightness, functionality, and suitability for the purpose intended.
1.23.1 Develop a Test Plan for each Test required by this SOW, containing paragraph number or listed applicable reference requiring Tests; identification of each component/system; description of each Test; accept/reject criteria; date scheduled;
Government notifications; date completed; and each Test result. (CDRL A008)
1.23.1.1 Fully integrate the Test Plan with the Contractor’s production schedule.
1.23.1.2 Provide the number of tests for a given system, component, or installation required to demonstrate required satisfactory performance. This section specifies tests to be performed in support of the work performed.
1.23.2 Provide a detailed description of preoperational checks to be conducted, operations to be performed, and the parameters to be satisfied. Develop data sheets which provide spaces for recording the quantitative values measured during the test, for each test procedure. Specify the minimum and maximum allowable tolerance limits for each measured value. Develop signature sheets for fill-in by the person conducting the test, the Government witness present, and the date of the test. Block diagrams, simplified schematics or diagrams may be used to clarify the procedure or test method. Include a comment sheet to record significant events and observations by either the Government witness or Contractor.
1.23.3 Provide materials, supplies, utilities, equipment, calibrated equipment/ instrumentation, services and personnel to accomplish each test. Incorporate safety precautions into each test procedure. Prepare all test documentation during the development and implementation of the acceptance test.
1.23.3.1 Whenever Government and/or Ships Force support is required for the operation of vessel equipment and/or systems, a minimum of 2 workday’s prior notification of the operational/test support requirement shall be provided to the COR.
1.23.3.2 Tests and equipment/systems operation requiring Government and/or
Ship’s Force operational support shall be scheduled for accomplishment during normal day shift working hours, as much as practicable.
1.23.3.3 Provide a minimum of 3 workdays prior notification to the COR for tests and equipment/system operations requiring Government and/or Ships Force operational support for work being performed on weekends, after normal dayshift working hours, and immediately before and/or after Federal holidays.
1.23.3.4 The COR or his representative shall receive notification a minimum of
2 work days prior to each test/inspection. Equipment shall not be adjusted during acceptance testing. The COR may countersign the acceptance test/inspection report, however the
Government’s signature does not constitute approval or concurrence in any aspect of the testing/inspection, other than the presence of the Government at the test.
1.23.3.5 Gage range shall be such that test pressure is in the middle third of each scale.
1.23.4 Perform tests using the applicable test procedure for systems and subsystems.
Demonstrate compliance with the Specification requirements by satisfactory completion of the test. Complete all work prior to initial testing of that particular system or subsystem and in a timeframe sufficient to allow for correction of deficiencies prior to dock trials, sea trials, or other applicable milestones established in these specifications. Perform adjustments and testing prior to each scheduled acceptance test.
1.23.4.1 Stop the test if the equipment, system, or subsystem tested fails to satisfy the acceptance criteria of the established test procedure. Identify the cause and correct.
1.23.5 Document the result of each test requirement throughout this SOW.
2.0 References: All references shall be of the latest issue and/or revision or as indicated in the
Consolidated List of References. It is incumbent on the Contractor to maintain current commercial specifications and be thoroughly familiar with Federal, State and Local laws, regulations and ordinances. Contractor is prohibited from using Government provided technical information for any purpose other than that contemplated by the specifications.
Contractor is prohibited from further use, release, or disclosure of this information.
References provided on CD-ROM, including any information contained thereon, must be destroyed in accordance with the instructions included on the CD-ROM label, at completion of the contract. After award, for those Contractors in receipt of a CD-ROM and not awarded a delivery order, the CD-ROM including any information contained thereon, shall be destroyed in accordance with the instructions included on the CD-ROM label.
2.1 Order of Precedence: Unless otherwise noted within this specification, hierarchy, priority, or order of precedence of requirements shall be as follows:
2.1.1 Specification Definite Item
2.1.2 Specification General Requirement
2.1.3 Military/Navy Drawings
2.1.4 Military/Navy Technical Manuals
2.1.5 Commercial Drawings
2.1.6 Commercial Technical Manuals
2.1.7 Commercial or Industrial Standards
2.1.8 Commercial Practices
2.2 Discrepancies: Drawing, technical reference, or other discrepancies associated with this specification shall be reported using the Request for Specification Clarification form, during proposal, or the “Condition Found / Inspection Discrepancy Report” form (FIGURE A) during delivery order period of performance.
CONSOLIDATED LIST OF REFERENCES
The following publication and drawing requirements are applicable to this SOW:
Publication Number Title
1) 29 CFR 1910 Occupational Safety and Health Standards
2) 10 USC 7311 Repair or Maintenance of Naval Vessels: Handling of Hazardous Waste
3) 15 USC 2601, et seq. Toxic Substances Control Act
4) 29 CFR 1915 Occupational Safety and Health Standards for
Shipyard Employment
5) 29 CFR 1926 Safety and Health Regulations for Construction
6) 33 USC 1251 to 1387 Federal Water Pollution Control Act
7) 33 USC 1342 National Pollutant Discharge Elimination System
8) 33 USC 2701 to 2761 Oil Pollution Control Act of 1990
9) 42 USC 6901 to 6992 Resource Conservation and Recovery Act of 1976
10) 42 USC 7401, et seq. Clean Air Act
11) 49 USC 5103 Hazardous Materials Transportation Authorization
Act of 1994
12) ANSI/AWS D1.1 Structural Welding Code, Steel
13) ANSI/AWS D1.2 Structural Welding Code, Aluminum
14) ASTM A1011 Grade, 30, 36 or 40 Plate (1/8 inch or greater)
15) ASTM A131 Bars and Shapes
16) MIL-STD-777 Schedule of Piping, Valves, Fittings and Associated
Piping Components for Naval Surface Ships
17) NSTM Chapter 074 Volume One Welding and Allied Processes
18) NSTM Chapter 075 Threaded Fasteners
19) SSPC Manual 05-03 Surface Preparation Specifications and Practices
20) SSPC Painting Manual, Volume 1 Good Painting Practice
21) SSPC Painting Manual, Volume 2 Systems and Specifications
22) NFPA 70 National Electrical Code (NEC)
Drawing Number Title
1) 6408543 Rev E Lifting Pads
2) 6404859 Rev C 21 Class Logistic Escape Trunk Deck Enclosure
CONSOLIDATED LIST OF REFERENCES
The following publication and drawing requirements are applicable to this SOW:
Publication Number Title
3) 804-5184155 Liferails, Lifelines & Awning Stantions (AL &
STL) Details & L/M
4) M-1306 Rev C House Interior Ladder Mod
5) M-1385 21 Class L.E.T. House Upper & Lower Deck
Safety Rail Modifications
6) M-1386 21 Class L.E.T. House Electrical
7) M-1386 Rev A 21 Class L.E.T. House Electrical Revised
8) M-1386 Rev B 21 Class L.E.T. House Electrical Revised
9) M-1388 Rev A 21 Class L.E.T House Modifications
10) M-1393 21-Class L.E.T. Upper Deck Door Modification
11) M-1406 REV A 21 Class LET House & Cofferdam NAVSEA 8010
Mods
12) M-1406 REV B 21 Class LET House & Cofferdam NAVSEA 8010
Mods
13) X90044 LET House Davit Extension
14) S2803-980209 Rev L Label Plates
15) S9086-KC-STM-010 Chapter 300 ELECTRIC PLANT - GENERAL
16) QA_Appendix_Forms_C411_2018_Contractors
3.0 WORK REQUIREMENTS:
3.1 DOCKING AND UNDOCKING THE VESSEL: NOT USED.
3.2 HULL REPAIRS: NOT USED.
3.3 STRUCTURAL REPAIRS: Accomplish structural repairs as follows:
3.3.1 Identify Distinguishing Figures and Markings: Identify and record existing distinguishing markings, figures in sketch form listing colors, locations, sizes, distinguishing marking(s), and figure(s) using drawing 6404859 Rev C, and M-1406 REV B for guidance.
3.3.2 L.E.T. House and Sliding Door Modifications: Accomplish repairs to
FWD, and AFT L.E.T. House as follows:
3.3.2.1 Remove existing and install new door tracks (PC 49), brackets
(PC 292) and associated mounting hardware for each L.E.T. House in accordance with the requirements of drawing 6404859 Rev C.
3.3.2.2 Remove existing and install new, hangers (PC 52) and
associated mounting hardware (PC 85, 97 and 103) for each L.E.T. House per the requirements of drawing 6404859 Rev C and note D-2 for guidance.
3.3.2.2.1 Align and adjust hangers in accordance with the
requirements of the manufacturer’s instructions and in accordance with the requirements of drawing 6404859 Rev C.
3.3.2.2.2 Test fit hangers and guides on new door tracks to
ensure proper contact. Straighten tracks if not in plane with deck and readjust guides to ensure proper operation using manufacturer’s instructions and in accordance with the requirements of drawing 6404859 Rev C. Acceptance criteria: 0% binding.
3.3.2.3 Remove existing and install new synthetic rubber (PC 308) and synthetic rubber (PC 309) per the requirements of drawing 6404859 Rev C, detail 6-2A, 6-3D, 6-6A and 6-6D
3.3.2.4 Remove existing and install new doorstops and associated hardware for each L.E.T. House in accordance with the requirements of drawing M-1388-
Rev A and using drawing 6404859 Rev C for guidance.
3.3.2.5 Caulking: remove existing caulking prior to surface preparation caulk/seal all seams after prime coat of paint has been applied. Caulking shall be a single component polyurethane meeting requirements of products Sikaflex or Stampede or equivalent per the requirements of drawing M-1406 REV B note 6.
3.3.2.6 Accomplish LET House structural modifications on each LET
House per drawing M-1406 REV B:
3.3.2.7 Plug weld unused existing holes in accordance with the requirements of ANSI/AWS D1.2.
3.3.2.8 Accomplish the requirements of 1.16.7 for new and disturbed surfaces.
3.3.3 L.E.T. House Handrail and Deck Modifications: Accomplish structural repairs as follows:
3.3.3.1 Accomplish the following using drawing M-1393 as guidance:
3.3.3.1.1 Remove and renew latch (PC 10). Template to
existing conditions.
3.3.3.1.2 Remove and renew rubber (PC 2, 4, and 5).
3.3.3.1.3 Adjust (2 EA) roof latch for leak tight closure.
3.3.4 L.E.T. Incline Step Preservation: Remove existing and install new coating system to include FWD and Aft Incline Steps, FWD and AFT landings, and FWD and Aft Landing Handrails on each LET House per the requirements of M-1406 REV B
Note 6 for guidance and as follows:
3.3.4.1 Near white blast clean and preserve entire FWD and Aft
Incline Steps, FWD and AFT landings, and FWD and Aft Landing Handrails on each LET
House Accomplish the requirements of Surface Preparation SSPC- SP-10. Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater than 5 Mils.
3.3.4.1.1 Approved blast media for aluminum surface shall be
garnet, aluminum oxide, crushed glass, or walnut shells.
3.3.4.1.2 Power tool clean inaccessible areas where abrasive
blasting equipment cannot reach. Accomplish the requirements of Surface Preparation
Specification SSPC-SP-11 of Systems and Specifications, SSPC Painting Manual, Volume
2. Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater than 5 Mils.
3.3.4.2 Apply prime coat that is equal to the performance characteristics of MIL-PRF-23236 Type VI Class 5, and applied in accordance with the
Manufacturer’s Product Data Sheet. Prime coat DFT shall be a minimum 3-5 mils.
3.3.4.2.1 Apply a low solar absorption (LSA) commercial
marine polysiloxane coating system that is equal to the performance characteristics of
MIL-PRF-24635 Type V Class 2 and applied in accordance with the Manufacturer’s
Product Data Sheet. Top coat DFT to be 5-7 mils. Total system DFT shall not exceed
12 Mils DFT.
3.3.4.2.1.1 Final Top coat of all FWD house incline steps
shall be FED STD Red 11105.
3.3.4.1.2 Final Top coat of all AFT house incline steps
shall be FED STD Blue 15048.
3.3.4.3 Label each LET house incline step and incline step handrail in accordance with drawing M-1406 REV B sheet 13.
3.3.5 L.E.T. Vertical Ladder and Cage Preservation: Remove existing and install new coating system to each LET House vertical ladder and safety cage surface per drawing M-1406 REV B Note 6 and drawing M-1306 Rev C for guidance and as follows:
3.3.5.1 Near white blast clean and preserve entire vertical ladder and safety cage surface. Accomplish the requirements of Surface Preparation SSPC- SP-10.
Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater
3.3.5.1.1 Approved blast media for aluminum surface shall be
3.3.5.1.2 Power tool clean inaccessible areas where abrasive
Specification SSPC-SP-11 of Systems and Specifications, SSPC Painting Manual, Volume
2. Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater
3.3.5.2 Apply prime coat that is equal to the performance characteristics of MIL-PRF-23236 Type VI Class 5, and applied in accordance with the Manufacturer’s
Product Data Sheet. Prime coat DFT shall be a minimum 3-5 mils.
3.3.5.2.1 Apply a low solar absorption (LSA) commercial
marine polysiloxane coating system that is equal to the performance characteristics of MIL-
PRF-24635 Type V Class 2 and applied in accordance with the Manufacturer’s Product Data
Sheet. Top coat DFT to be 5-7 mils. Total system DFT shall not exceed 12 Mils DFT.
3.3.5.2.2 Final Top coat of all FWD house platforms and incline steps shall be FED STD Red 11105.
3.3.5.2.3 Final Top coat of all AFT house platforms and incline steps shall be FED STD Blue 15048.
3.3.5.3 Label each LET house vertical ladder in accordance with drawing M-1406 REV B sheet 13.
3.3.6 L.E.T. House Water Test: Accomplish a water hose test to verify deck seal and door tightness. (CDRL A009)
3.3.7 L.E.T. House Preservation: Remove existing and install new coating system to the House structure and framing using drawings M-1406 REV B note 6, M-1385 and M-1388 Rev A for guidance and as follows:
3.3.7.1 Near white blast clean and preserve all L.E.T. house surfaces.
Accomplish the requirements of Surface Preparation SSPC- SP-10.
3.3.7.1.1 Approved blast media for aluminum surface shall be
3.3.7.1.2 Power tool clean inaccessible areas where abrasive
Specification SSPC-SP-11 of Systems and Specifications, SSPC Painting Manual, Volume 2.
3.3.7.2 Apply prime coat that is equal to the performance characteristics
3.3.7.2.1 Apply a low solar absorption (LSA) commercial
marine polysiloxane coating system that is equal to the performance characteristics of MIL-
PRF-24635 Type V Class 2 and applied in accordance with the Manufacturer’s Product Data
Sheet. Top coat DFT to be 5-7 mils. Total system DFT shall not exceed 12 Mils DFT.
3.3.7.2.1.1 Final Top coat of the FWD LET house shall
be FED STD Red 11105.
3.3.7.2.1.2 Final Top coat of the AFT LET house
shall be FED STD Blue 15048.
3.3.7.2.1.3 Final Interior Top coat of each LET house
shall be FED STD White 17925.
3.3.7.3 Install new non-skid system conforming to the performance characteristics requirements of MIL-PRF-24667, type II, composition G to the upper deck, lower deck, and top surface of upper sliding doors of each L.E.T. House in accordance with
Manufacturer’s Product Data Sheet using the information recorded in 3.3.1, in accordance with drawing M-1406 REV B note 6.
3.3.7.3.1 Establish and maintain a 2-inch boarder free from non-skid around each deck socket fitting and horizontal door track.
3.3.7.4 Apply the primer and non-skid forward and aft and from side to side with the non-skid peaks and valleys coarsely and reasonably uniform, in the same direction, reasonably uniform in color, presenting a roughly uniform course appearance over the entire surface receiving non-skid, and using the layout information recorded in 3.3.1 and in accordance with drawing M-1406 REV B note 6 and as follows:
3.3.7.4.1 Apply the non-skid primer up 4-6 inches on vertical surfaces; on each removable flush mounted deck sockets and fittings; surfaces not receiving non-skid.
3.3.7.4.2 Apply a non-skid compatible silicon alkyd topcoat at
2-3 mils DFT to prepared surfaces not receiving non-skid, conforming to the performance characteristics requirements of MIL-PRF-24635; Type III, in accordance with Manufacturer’s
Product Data Sheet using the information recorded in 3.3.1, in accordance with drawing M-
1406 REV B note 6.
3.3.7.5 Label each LET house by applying labels to the port and starboard side of each house in accordance with drawing M-1406 REV B sheet 13.
3.3.7.5.1 Verify directional arrows with COR.
3.3.8 L.E.T. Davit Preservation: Remove existing and install new coating system to Quantity (2 EA) Davit Base per each LET house, Quantity (One EA) Davit
Extension per each LET house, and Quantity (One EA) Davit per each LET house IAW M-
1406 REV B note 6 and using drawing X90044 for guidance and as follows:
3.3.8.1 Near white blast clean and preserve all LET davit surfaces.
Accomplish the requirements of Surface Preparation Specification SSPC-SP-10 of Systems and Specifications, SSPC Painting Manual, Volume 2. Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater than 5 Mils.
3.3.8.1.1 Power tool clean inaccessible areas where abrasive