Fossil House Plan Set.pdf
PDF 36 MB Posted
- Attached to
- NV FLAP 300(1) Fossil House Road
- Solicitation number
- 6982AF20B000023
About this file
This document provides details for a federal contract opportunity to improve roads providing access to the Berlin Ichthyosaur State Park in Nye County, Nevada. The solicitation number is 6982AF20B000023 and is advertised as a HUBZone set-aside. The project involves improvements along Union Canyon Road and Fossil House Road that include installing five low water crossings and widening and adding a soldier pile wall to Fossil House Road. The Department of Transportation Federal Highway Administration is the issuing agency. Bids are being requested and plans and specifications are available.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation Fossil House Road.pdf | ||
| Bid Opening Summary NV FLAP 300(1).pdf | ||
| QnA 12.4.2020.pdf | ||
| QnA 12.3.2020.pdf | ||
| QnA 12.2.2020.pdf | ||
| A002.pdf | ||
| QnA 11.16.2020.pdf | ||
| A001.pdf | ||
| Fossil House Road Geotechnical Report.pdf | ||
| 6982AF20B000023.pdf | ||
| Fossil House Final Drainage Report.pdf | ||
| FP-14.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2020.09.11 07:35:50 -06'00'
A2
STATE PROJECT
A
M Q P r o je c ts .0
F o s s il H o u s e R o a d D e s ig n C
F L
H D N
V F
L A
P
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M F
O H
O N
V .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r p p e c c h ia
NUMBER
SHEET
NV
FOSSIL HOUSE ROAD
NV FLAP 300(1)
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Fiber Roll
Fiber Roll (Slope Protection)
Fiber Roll (Ditch and/or Cut Slope)
Riprap
Rolled Erosion Control Product
Check Dam
Bonded Fiber Matrix Mulching
A3
A
M Q P r o je c ts .0
F o s s il H o u s e R o a d D e s ig n C
F L
H D N
V F
L A
P
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M F
O H
O N
V .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r p p e c c h ia
NUMBER
SHEET
NV
FOSSIL HOUSE ROAD
NV FLAP 300(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
Minor Concrete Pavement
Surface Course
Roadway Aggregate, Method 2, Revet Mattress
A4
SITE MAP
1000'500'0
Scale in Feet to Gabbs
17.1 miles
A5
Potential staging area
Berlin Ghost Town
Potential staging area
Potential staging area
Ranger house
Fossil House Road
Union Canyon Road
Potential staging area
End Fossil House Road
Fossil House Road 21+50
Union Canyon Road 97+25 =
Begin Fossil House Road
Fossil House Road 10+73
Station 52+61 to Station 54+59
Site 1 - Low water crossing 1
Station 59+76 to Station 61+51
Site 2 - Low water crossing 2
Station 64+16 to Station 67+09
Site 3 - Low water crossing 3
Station 84+41 to Station 86+61
Site 4 - Low water crossing 4
Station 87+49 to Station 90+74
Site 5 - Low water crossing 5
Berlin Ichthyosaur State Park
B e r li n I c h th y o s a u r S ta te P a r k
N a ti o n a l F o r e s t
H u m b o ld t-
T o iy a b e boundary is trimmed to within approximately 1000' of the project site.
2. Park boundary shown is from GIS linework provided by Nevada State Parks. The
1. Stationing control is only provided along Union Canyon Road where there is work.
Notes:
National Forest
Humboldt-Toiyabe area and parking
Fossil House
House rear of Fossil access to
Construction
STATE PROJECT
A
M Q P r o je c ts .0
F o s s il H o u s e R o a d D e s ig n C
F L
H D N
V F
L A
P
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S T
E F
O H
O N
V .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r p p e c c h ia
NUMBER
SHEET
NV
FOSSIL HOUSE ROAD
NV FLAP 300(1)
0 7
0 8
+00
Roadway only
Sheet and Description
B3 B4 B5 B6 B7 B8 B9 B10 B11
Grading
Summary
Drainage
Summary
Erosion
Control
Summary
Surfacing
Summary
Survey and
Staking
Summary
Wall
Summary
Tabulation of
Quantities
Permanent
Sign
Summary
Temporary
Traffic
Control
Summary
Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL LPSM All ALL
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE LOW WATER
CROSSING EACH 5 5
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE CULVERT EACH 2 2
A0100 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 1 1
A0120 15216-1000 SURVEY AND STAKING, ROADWAY CROSS-SECTIONS MILE 0.136 0.136
A0140 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 0.075 0.075
A0160 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0180 15401-0000 CONTRACTOR TESTING LPSM ALL
A0200 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,098 52 1,150
A0240 15706-0200 SOIL EROSION CONTROL, CHECK DAM (PERMANENT) EACH 13 1 14
A0260 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 14 2 16
A0280 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0300 20101-0000 CLEARING AND GRUBBING ACRE 3.196 0.104 3.300
A0320 20301-0700 REMOVAL OF DELINEATOR EACH 1 1
A0340 20301-1100 REMOVAL OF GATE EACH 1 1
A0360 20301-2300 REMOVAL OF SIGN/MARKER EACH 7 7
A0380 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS EACH 1 1
A0400 20303-2300 REMOVAL OF PAVEMENT, CONCRETE SQYD 246 14 260
A0420 20402-0000 SUBEXCAVATION CUYD 200 200 As directed by CO
A0440 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,080 70 1,150
A0460 20702-0500 GEOTEXTILE FILTER, CLASS 1, TYPE E SQYD 114 3,336 350 3,800
A0480 20801-0000 STRUCTURE EXCAVATION CUYD 329 11 340
A0500 20803-0000 STRUCTURAL BACKFILL CUYD 1,141 34 1,175
A0520 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 68 7 75
A0540 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED CUYD 311 19 330
A0560 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED SQYD 824 41 865
A0580 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE TON 1,623 152 1,775
A0600 30302-1000 DITCH RECONDITIONING LNFT 138 12 150
A0620 30303-2000 AGGREGATE SURFACE RECONDITIONING SQYD 1,255 70 1,325
A0640 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH SQYD 1,096 1,096
A0660 55505-0000 STRUCTURAL STEEL SOLDIER PILE LNFT 1,708 1,708
A0680 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED MFBM 28.15 28.15
A0700 56301-2000 PAINTING, STEEL STRUCTURE LPSM All ALL
A0720 56501-0310 DRILLED SHAFT, 30-INCH DIAMETER, H-PILE CORE LNFT 996 996
A0740 60201-0200 6-INCH PIPE CULVERT LNFT 30 5 35
A0760 60201-1200 48-INCH PIPE CULVERT LNFT 46 4 50
A0780 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 2 2
MileStone: 100%
Date Completed: 09/14/20
Report Date: 09/14/20
A
M
E
N
D
Line Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES
-S e p -2
:2
A
M
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated
Quantities
Q
P ro je c ts
\1 -0
.0
F o s s il H o u s e R o a d
D e s ig n
C F L H
D \N
V F
L A P
(1
R o a d w a y \C
A D
D S h e e ts
\B -S u m m \S p re a d s h e e ts s u m m a ry
.x ls m ]S h e e t
STATE PROJECT
B1
NV FLAP 300(1)
FOSSIL HOUSE ROAD
NV
SHEET
NUMBER
Sheet and Description
B3 B4 B5 B6 B7 B8 B9 B10 B11
Grading
Summary
Drainage
Summary
Erosion
Control
Summary
Surfacing
Summary
Survey and
Staking
Summary
Wall
Summary
Tabulation of
Quantities
Permanent
Sign
Summary
Temporary
Traffic
Control
Summary
Allowance Bid
Schedule
A0800 60212-0200 ELBOW, 6-INCH EACH 2 2
A0820 61102-2200 3-INCH WATERLINE, POLYVINYL CHLORIDE (PVC) LNFT 800 800
A0840 61108-4000 ADJUST VALVE BOX EACH 6 6
A0860 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 487.5 25.0 512.5
A0880 61702-0000 TERMINAL SECTION EACH 1 1
A0900 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 1 1
A0920 61801-0000 CONCRETE BARRIER LNFT 1,357 68 1,425
A0940 61902-1900 GATE, METAL, 26 FEET WIDTH EACH 1 1
A0960 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20 20
A0980 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 20 20
A1000 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20 20
A1020 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER HOUR 20 20
A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20 20
A1060 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 20 20
A1080 62301-0000 GENERAL LABOR HOUR 20 20
A1100 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20 20
A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20 20
A1140 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.798 0.102 1.900
A1160 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.798 0.102 1.900
A1180 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B SQYD 385 15 400
A1200 63301-0000 SIGN SYSTEM EACH 8 8
A1220 63303-0500 SIGN, PLYWOOD PANEL, TYPE 3 SHEETING EACH 1 1
A1240 63309-0000 DELINEATOR EACH 1 1
A1260 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A1280 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 3 3
A1300 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN EACH 2 2
A1320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 48 48
-S e p -2
:2
A
M
MileStone: 100%
Date Completed: 09/14/20
Report Date: 09/14/20
Q
P ro je c ts
\1 -0
.0
F o s s il H o u s e R o a d
D e s ig n
C F L H
D \N
V F
L A P
(1
R o a d w a y \C
A D
D S h e e ts
\B -S u m m \S p re a d s h e e ts s u m m a ry
.x ls m ]S h e e t
(2
SUMMARY OF QUANTITIES
A
M
E
N
D
Line Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B2
NV FLAP 300(1)
FOSSIL HOUSE ROAD
NV
SHEET
NUMBER
6/30/21
Cantilever Soldier Pile Wall
A
M Z P r o je c ts G r o v e r M u ll e r C
F L F o s s il H o u s e R d .3 E m b a n k m e n t
B e n c h in g E m b a n k m e n t
B e n c h in g a n d S u b e x c a v a ti o n D e ta il .d g n
U s e r j c r a v e n s
NUMBER
SHEET
NV
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FOSSIL HOUSE ROAD
NV FLAP 300(1)
204-A
F1
No Scale
Finished grade
Existing ground
Finished grade
Existing ground
P ro p o sed em b an km en t slo p e (varies)
THAN EXISTING
DETAIL B: EMBANKMENT STEEPER
5' min.
5' min.
m in .8' min.
m in .8' min.
Proposed em bankm ent slope (varies)
Finished grade
Existing ground
EMBANKMENT WIDENING/RECONSTRUCTION
Proposed em bankm ent slope (varies)
5' min.
8' min.
m in
NOTE:
F1
EXISTING SLOPE
DETAIL A: EMBANKMENT ON
AND SUBEXCAVATION
EMBANKMENT BENCHING
TYPICAL SECTION
SUBEXCAVATION
Geotextile structural section
See typical sections for
Finished grade
Embankment Benching:
Subexcavation:
based on field conditions.
slopes to be determined by the CO details, and conforming to existing
Final station limits, transitions between 7.
except where noted on these details.
Keying and benching not required 6.
1V:4H.
behind existing slopes steeper than proposed embankment catches on or existing slopes and where grade of
Use Detail A or B to conform to 5.
and eroded soil when directed by CO.
remove existing side-cast fill, loose
Excavate beyond 5' horizontally to 4.
before placing fill.
existing slopes to flatter than 1V:1H embankment fill in layers. Excavate least 5' horizontally as you place new
Cut existing slope or embankment at 3.
width.
toe of embankment and 8' minimum
Excavate toe key to 2' below proposed 2.
slope at 1V:4H or flatter.
Benching is not required for ground 1.
approved by the CO.
construct slopes steeper than 1:2 unless match the subgrade hinge point. Do not fill slope or make slope adjustments to
At daylight locations, match the existing 12.
than 2%.
existing roadway cross slope when steeper the daylight for drainage, or match the
Slope the excavation bottom 2% toward within 4 ft of the subgrade hinge point.
Daylight to drain when the excavation is 11.
structural section.
Do not place backfill material within the 10.
6 ft wide x 6 ft long.
Minimum subexcavation dimensions are 9.
specified.
to Subsection 204.07 unless otherwise
Replace unsuitable material according 8.
Section 204 material according to recompact with
Subexcavate and by CO Width as directed b y C
O a s d ir e c te d m in o r
6-30-21
Cantilever Soldier Pile Wall Design
C PilesL
Excavation
Structure Backfill
Structure
30" � Drilled Hole Steel 14x117 Soldier Pile in
Bottom of Timber Lagging
Finish Grade
Wall
Front Face of
Finish Grade at
Approximate Original Grade
STATE PROJECT
A
M Z P r o je c ts G r o v e r M u ll e r C
F L F o s s il H o u s e R d .2 R e ta in in g W a ll D e s ig n c o s ts Y e h C
A D p la n s F o s s il H o u s e S o ld ie r P il e W a ll T y p ic a l S e c ti o n .d g n
U s e r j c r a v e n s
NUMBER
SHEET
NV
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FOSSIL HOUSE ROAD
NV FLAP 300(1)
NOTE:
Number of lagging members can be varied within limits of lean concrete backfill.
TYPICAL SECTION
Top of Wall
1" = 10'
Timber Lagging
Treated 6" x 12"
Bottom of Pile
S5
TYPICAL SECTION
SOLDIER PILE WALL
AA AA
B B BB
555-D
Lagging and Width of
Full Height
Material, Geosynthetic
Non-woven
Class 1 -Type E
Layout line of wall is at back face of lagging, approximately 7-foot offset from ETW.
and Structure Backfill
Structure Excavation
3.
2.
1.
o.c., and equidistant between piles.
Weep holes to be located 4" above finish grade at front of wall, at 6' spacing
Construct 2" � weep holes in lagging, one weep hole per lagging member.
(ETW)
Traveled Way
Edge of
Wall Layout Line (LOL) 2
Original Grade
Approximate
Grade
Finish
Varies Wall Height (H) =
2.5'
3"
3" min. Clear
= Varies Backfill Lean Concrete
= Varies Length of Pile (L)
= Varies (Soldier Pile Wall) Concrete Backfill
4'
2' min.
3'
7'
6/30/216/30/21
Drilled Hole
C Drilled Hole
Steel Soldier Pile
Drilled Hole
C Drilled Hole
System 2 on all Pile Surfaces
Primer and Intermediate Paint
STATE PROJECT
P
M Z P r o je c ts G r o v e r M u ll e r C
F L F o s s il H o u s e R d .3 Y e h P la n s F o s s il H o u s e S o ld ie r P il e W a ll D e ta il s .d g n
U s e r j c r a v e n s
NUMBER
SHEET
NV
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FOSSIL HOUSE ROAD
NV FLAP 300(1)
NOTE:
No Scale
S6
DETAILS
SOLDIER PILE WALL
SECTION A-A
C PileL
Timber Lagging, typ.
Concrete Removal
Area of Lean
L
C PileL
L
(Soldier Pile Wall)
Concrete Backfill
Cl ea r, t yp
3" m in
240 psf equivalent to 2 feet soil weight.LIVE LOAD:
k = 0.20 SEISMIC PARAMETERS:
h a
ASTM A572, ASTM 572M Grade 36 Min.STEEL SOLDIER PILES:
Timber to be full sawn.
Treated Douglas Fir, Grade No. 1 or better. STRUCTURAL TIMBER:
p
Passive Pressure Coefficient, K = 3.2
Active Pressure coefficent, K = 0.28 (Retained and Foundation)
= 34° (Foundation)
Friction Angle = 34° (Retained)
= 123 lb/ft (Foundation)
Soil Unit Weight = 120 lb/ft (Retained)
(For determination of Design Lateral Earth Pressures)SOIL PARAMETERS:
555-E
AASHTO LRFD Bridge Design Specifications, 8th Edition DESIGN:
f'c = 4,500 psi (Class A)CONCRETE:
Pile Surfaces (Exterior Face) on the Three Exposed Steel
Finish Coat (Paint System 2)
No Scale
STEEL SOLDIER PILE
LIMITS OF CLEAN & PAINT
No Scale
SECTION B-B
Cl ea r, t yp
3" m in
P
M Z P r o je c ts G r o v e r M u ll e r C
F L F o s s il H o u s e R d .2 R e ta in in g W a ll D e s ig n Y e h C
A D p la n s F o s s il H o u s e S o ld ie r P il e W a ll L a g g in g D e ta il s .d g n
U s e r j c r a v e n s
NUMBER
SHEET
NV
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FOSSIL HOUSE ROAD
NV FLAP 300(1)
S7
LAGGING DETAILS (ALTERNATIVE 1)
PART ELEVATION
No Scale
C Soldier PileL
Parallel to Top of Wall
Cut Edge of Lagging
Minimum Dimension
Must be Cut to Satisfy
Top Two Lagging Members
Members
Top Two Lagging
No Gap Between
C Soldier PileL
Nails, Typ.
Secure with Two Gavlanized
Between Lagging Members.
Polyethylene Shim, Total Two, " x 18" High Density2
LC Pile
LC Pile
Treated Timber Lagging Two Galvanized Spikes, typ.
No Scale
PART PLAN
3"
3"
Lagging Thickness
Same Width as
Common Nail (Galvanized)
",4 1" * x 38
Polyethylene
High Density
No Scale
SHIM DETAIL
3.
2.
1.
NOTE:
No clipping of timber lagging corners allowed.
and 40d Galvanized wire spikes for 6 x 12 lagging.
Use 16d Galvanized wire spikes for 4 x 12 lagging, Spikes shall not be bent.
LAGGING DETAILS
SOLDIER PILE WALL
555-F
3" typ.
3" min. typ.
| A-1 |
| A-2 |
| A-3 |
| A-5 |
| A-6 |
| A-7 |
| B-3 |
| B-4 |
| B-5 |
| B-6 |
| B-7 |
| B-8 |
| B-9 |
| B-10 |
| B-11 |
| C-1 |
| C-2 |
| C-3 |
| C-4 |
| C-5 |
| C-6 |
| D-1 |
| D-2 |
| D-3 |
| D-4 |
| D-5 |
| D-6 |
| D-7 |
| D-8 |
| E-1 |
| E-2 |
| E-3 |
| E-4 |
| E-5 |
| E-6 |
| E-7 |
| G-1 |
| G-2 |
| G-3 |
| R-1 |
| R-2 |
| S-1 |
| S-2 |
| S-3 |
| S-4 |
| T-1 |
| T-2 |
| T-3 |
| T-4 |
| T-5 |
| T-6 |
| T-7 |
| T-8 |
| T-9 |
| T-10 |
| T-11 |
| T-12 |
| T-13 |
| T-14 |
| T-15 |
| T-16 |
| T-17 |
| X-1 |
| X-2 |
| X-3 |
| X-4 |
| Z-1 |
File details come from the government source that posted it. Updated .