Form D~4.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Bus facility paving - Albany
- Solicitation number
- BD-21-1206-40000-40000-58888
- Issued by
- Suffolk County, Massachusetts
About this file
This document appears to be an invoice backup form (Form D) for a state and local government contract opportunity related to a bus facility paving project in Massachusetts. The form itemizes various construction activities and their associated quantities and unit costs, including hot mix asphalt pavement milling, excavation, gravel base course, manhole/catch basin/valve cover adjustments, crack repair, tack coat, superpave surface and base courses, pavement markings, catch basins, manholes, reinforced concrete pipe, hydrants, wire loop installation, and various contingency estimates. The total lump sum amount is listed as $0.00. The related state and local contract opportunity is for a bus facility paving project in Albany, Massachusetts.
The pricing terms, set asides, incumbents, funding requirements and sources, and other salient information are not explicitly provided in the document. However, the contingency estimates suggest that the project may involve additional scope elements such as standpipe system repair, drainage installation permitting, monitoring well decommissioning, and police details, which could impact the total project cost and funding requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3~4.pdf | ||
| Initial Bid Opening Summary RFP ~4.pdf | ||
| Form C~2.xlsx | XLSX spreadsheet | |
| Site visit attendees~4.pdf | ||
| Boston PW~10.pdf | ||
| Albany Paving Plan V2.pdf | ||
| Addendum 2~13.pdf | ||
| Form C v2.xlsx | XLSX spreadsheet | |
| RFP Albany Paving RFP 24C-21 03.03.2021 v2.pdf | ||
| RFP Albany Paving RFP 24C-21 03.03.2021.pdf | ||
| Addendum 1~22.pdf | ||
| Boston PW~8.pdf | ||
| Albany As-Builts.zip | ZIP file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form D Invoice Backup
| Form D: Standard Invoice Backup |
| CONTRACTOR NAME: |
| LOCATION: |
| DATE: |
| No. | Item Description | Inv. Qty. | Unit | Unit Cost | Invoice Amount |
| 1 | Hot Mix Asphalt Pavement Milling 0-4" | SY | $ - 0 | $ - 0 | |
| 2 | Hot Mix Asphalt Pavement Milling 4-8" | SY | $ - 0 | $ - 0 | |
| 3 | Unclassified Excavation | CY | $ - 0 | $ - 0 | |
| 4 | Gravel Base Course | CY | $ - 0 | $ - 0 | |
| 5 | Adjust Manhole/Catch Basin/Valve Cover | EA | $ - 0 | $ - 0 | |
| 6 | Install New Frame and Cover/Grate | EA | $ - 0 | $ - 0 | |
| 7 | Crack Repair | LF | $ - 0 | $ - 0 | |
| 8 | Tack Coat | GAL | $ - 0 | $ - 0 | |
| 9 | 2.5" Superpave Surface Course 19.0 Polymer (SSC-19-P) | TON | $ - 0 | $ - 0 | |
| 10 | 4.5" Superpave Base Course 37.5 (SBC-37.5) | TON | $ - 0 | $ - 0 | |
| 11 | Saw Cut/Crack Seal | LF | $ - 0 | $ - 0 | |
| 12 | Pavement Markings | LF | $ - 0 | $ - 0 | |
| 13 | Catch Basin | EA | $ - 0 | $ - 0 | |
| 14 | Manhole | EA | $ - 0 | $ - 0 | |
| 15 | 12" Reinforced Concrete Pipe | LF | $ - 0 | $ - 0 | |
| 16 | Hydrant | EA | $ - 0 | $ - 0 | |
| 17 | Wire Loop Installation | LF | $ - 0 | $ - 0 | |
| 18 | Safety/Quality/Construction Management Plan | LS | $ - 0 | $ - 0 | |
| 19 | Contigency (10%) Lines 1-18 | LS | $ - 0 | $ - 0 | |
| 20 | Standpipe System Repair - Contingency estimate | ALL | $ - 0 | $ - 0 | |
| 21 | Drainage Install Permitting - Contingency estimate | ALL | $ - 0 | $ - 0 | |
| 22 | Monitoring Well Decommissioning - Contingency estimate | ALL | $ - 0 | $ - 0 | |
| 23 | Police Details - Contingency estimate | ALL | $ - 0 | $ - 0 | |
| TOTAL LUMP SUM (lines 1-23) | $ - 0 | ||||
| CONTRACTOR SIGNATURE | Contingency Explanation (if needed) |