Form D~4.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Bus facility paving - Albany
Solicitation number
BD-21-1206-40000-40000-58888
Issued by
Suffolk County, Massachusetts

About this file

This document appears to be an invoice backup form (Form D) for a state and local government contract opportunity related to a bus facility paving project in Massachusetts. The form itemizes various construction activities and their associated quantities and unit costs, including hot mix asphalt pavement milling, excavation, gravel base course, manhole/catch basin/valve cover adjustments, crack repair, tack coat, superpave surface and base courses, pavement markings, catch basins, manholes, reinforced concrete pipe, hydrants, wire loop installation, and various contingency estimates. The total lump sum amount is listed as $0.00. The related state and local contract opportunity is for a bus facility paving project in Albany, Massachusetts.

The pricing terms, set asides, incumbents, funding requirements and sources, and other salient information are not explicitly provided in the document. However, the contingency estimates suggest that the project may involve additional scope elements such as standpipe system repair, drainage installation permitting, monitoring well decommissioning, and police details, which could impact the total project cost and funding requirements.

View the file

Other files

File Type Posted
Addendum 3~4.pdf PDF
Initial Bid Opening Summary RFP ~4.pdf PDF
Form C~2.xlsx XLSX spreadsheet
Site visit attendees~4.pdf PDF
Boston PW~10.pdf PDF
Albany Paving Plan V2.pdf PDF
Addendum 2~13.pdf PDF
Form C v2.xlsx XLSX spreadsheet
RFP Albany Paving RFP 24C-21 03.03.2021 v2.pdf PDF
RFP Albany Paving RFP 24C-21 03.03.2021.pdf PDF
Addendum 1~22.pdf PDF
Boston PW~8.pdf PDF
Albany As-Builts.zip ZIP file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form D Invoice Backup

Form D: Standard Invoice Backup
CONTRACTOR NAME:
LOCATION:
DATE:
No.Item DescriptionInv. Qty.UnitUnit CostInvoice Amount
1Hot Mix Asphalt Pavement Milling 0-4"SY$ - 0$ - 0
2Hot Mix Asphalt Pavement Milling 4-8"SY$ - 0$ - 0
3Unclassified ExcavationCY$ - 0$ - 0
4Gravel Base CourseCY$ - 0$ - 0
5Adjust Manhole/Catch Basin/Valve CoverEA$ - 0$ - 0
6Install New Frame and Cover/GrateEA$ - 0$ - 0
7Crack RepairLF$ - 0$ - 0
8Tack CoatGAL$ - 0$ - 0
92.5" Superpave Surface Course 19.0 Polymer (SSC-19-P)TON$ - 0$ - 0
104.5" Superpave Base Course 37.5 (SBC-37.5)TON$ - 0$ - 0
11Saw Cut/Crack SealLF$ - 0$ - 0
12Pavement MarkingsLF$ - 0$ - 0
13Catch BasinEA$ - 0$ - 0
14ManholeEA$ - 0$ - 0
1512" Reinforced Concrete PipeLF$ - 0$ - 0
16HydrantEA$ - 0$ - 0
17Wire Loop InstallationLF$ - 0$ - 0
18Safety/Quality/Construction Management PlanLS$ - 0$ - 0
19Contigency (10%) Lines 1-18LS$ - 0$ - 0
20Standpipe System Repair - Contingency estimateALL$ - 0$ - 0
21Drainage Install Permitting - Contingency estimateALL$ - 0$ - 0
22Monitoring Well Decommissioning - Contingency estimateALL$ - 0$ - 0
23Police Details - Contingency estimateALL$ - 0$ - 0
TOTAL LUMP SUM (lines 1-23)$ - 0
CONTRACTOR SIGNATUREContingency Explanation (if needed)

MBTA REPRESENTATIVE

File details come from the government source that posted it. Updated .