Form D.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Water Main Leak Repair and Excavation
- Solicitation number
- 13026-0-2024-BG
- Issued by
- Wisconsin
About this file
This is a pricing form (Form D.xlsx) for a Water Main Leak Repair and Excavation contract opportunity in Wisconsin. The form establishes a comprehensive rate structure for labor, equipment, and services required for the project. Labor rates are divided into three categories—Crew Lead, Operator, and Laborer—with separate pricing for general regular time, Monday through Saturday overtime, and Sunday and holiday overtime. The contract also includes lump sum pricing for traffic control across three road classifications: local roads, major roads with two lanes, and major roads with more than two lanes. Equipment services encompass mobilization charges per round trip and hourly rates for specific machinery including excavators with rubberized tracks up to 30,000 pounds, skid loaders, wheel loaders, trucks, and hydro excavator trucks.
The pricing structure further details specialized services such as Closed-Pipe-In-Pipe (CIPP) pit excavation measured in cubic yards, saw cutting for concrete and bituminous pavements measured in linear feet, miscellaneous tipping fees, and material costs for select backfill and crushed aggregate base course measured in tons per unit. The form includes escalator provisions for calendar years 2025 through 2028, with percentage change adjustments from the prior year baseline. All pricing increases or additions during the contract extension period require written agreement from both parties prior to the beginning of each calendar year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB 13026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| A) | General | ||
| Regular Time Rates | |||
| Crew Lead | $ | Per Hour | |
| Operator | $ | Per Hour | |
| Laborer | $ | Per Hour |
| Overtime Rates - Monday thru Saturday | ||
| Crew Lead | $ | Per Hour |
| Operator | $ | Per Hour |
| Laborer | $ | Per Hour |
| Overtime Rates - Sunday and Holidays | ||
| Crew Lead | $ | Per Hour |
| Operator | $ | Per Hour |
| Laborer | $ | Per Hour |
| Traffic Control (Lump Sum) | ||
| Local Road | $ | LS/per event |
| Major Road 2 Lanes | $ | LS/per event |
| Major Road more than 2 Lanes | $ | LS/per event |
B) Equipment Mobilization per round trip $ Each
| C) | Equipment Rates | ||
| Excavator Up to 30,000 Lbs W/Rubberized tracks | $ | Per Hour | |
| Skid loader | $ | Per Hour | |
| Wheel Loader | $ | Per Hour | |
| Trucking | $ | Per Hour | |
| Hydro Excavator Truck | $ | Per Hour |
D) CIPP Pit Excavation $ C.Y.
| E) | Saw Cutting | ||
| Concrete Pavement, Full Depth | $ | L.F. | |
| Bituminous pavement, Full Depth | $ | L.F. |
| Miscellaneous | ||
| Tipping Fees | $ | Each |
| Select backfill | $ | Per Ton |
| Crushed Aggregate Base Course Gradation No. 2 | $ | Per Ton |
| G) | Extension Period Escalators | ||
| 1) Calendar Year 2025 , change from 2024 | % | Percent Change | |
| 2) Calendar Year 2026, change from 2025 | % | Percent Change | |
| 3) Calendar Year 2027, change from 2026 | % | Percent Change | |
| 4) Calendar Year 2028, change from 2027 | % | Percent Change | |
| Any pricing increases or additions must be agreed upon in writing by both parties prior to the beginning of the next calendar year |