Form C Tank Repairs and Maintenance.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- 115-25: Systemwide Tank Maintenance and Repair
- Solicitation number
- BD-26-1206-40000-40000-118984
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Form C RFP Pricing Form for Systemwide Tank Maintenance and Repairs issued by the Massachusetts Bay Transportation Authority (MBTA), detailing a comprehensive labor and materials pricing request for tank-related maintenance services. The contract is structured for an initial three-year term with two additional option years, requesting pricing for various skilled labor categories including welders, pipefitters, electricians, painters, laborers, and equipment operators. The estimated annual labor hours range from 100 hours for welders to 1,000 hours for laborers, totaling approximately 2,950 estimated annual labor hours across multiple trades and specialties.
The pricing form allows vendors to quote firm fixed labor costs and material markup percentages, with the MBTA reserving the right to adjust quantities up to 125% of the original estimated amounts without changing unit pricing. Vendors are required to complete green-colored cells in the spreadsheet, with total costs calculated automatically. The bid submission mandates comprehensive pricing that includes ancillary charges such as prevailing wages, tooling, equipment, transportation, and customs duties. The MBTA explicitly states that bids with incomplete individual item pricing may be rejected, emphasizing the need for thorough and precise cost submissions by potential contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Form C: Requested RFP Pricing Form | |
| Systemwide Tank Maintenance and Repairs | |
| 7/23/25 | VENDOR TO COMPLETE GREEN CELLS, totasl will auto calculate, do not hand write |
1. Bidders are required to quote firm fixed Labor Cost(s) in the Labor Cost column below. The quoted prices shall be inclusive of ancillary charges including but not limited to prevailing wages, tooling, equipment, transportation costs, customs, duty charges, and other associated charges. Bidders shall quote only on goods and services in strict accordance with the specifications / requirements. Bidders must fill in each individual item. The MBTA reserves the right to reject any bid if one or more individual item is left blank.
2. The quantities set forth herein are merely estimates of what may be required under the contract, and the MBTA reserves the right to increase or diminish the quantities in any of the items as he/she may deem necessary, without change of price per unit, provided the increase of the sum of all said items does not exceed one hundred and twenty-five (125%) percent of the sum of all said items of all unit prices.
| Description | Estimated Hours (annual) | Labor Cost $/HR | Extended Cost |
| Welder | 100 | $ - 0 | |
| Pipefitter & Steamfitter | 750 | $ - 0 | |
| Electrician | 500 | $ - 0 | |
| Painter | 300 | $ - 0 | |
| Laborer | 1000 | $ - 0 | |
| Hoist Engineer/Cranes/Gradalls | 150 | $ - 0 | |
| Backhoe/Front end loader operator | 150 | $ - 0 | |
| LABOR TOTAL | $ - 0 |
| Description | Estimated Materials Cost | Markup (%) | Extended Cost |
| Materials (Vendor cost) | $ - 0 | ||
| Vendor Materials Markup (%) | $ - 0 | ||
| $ - 0 | |||
| COMBINED ANNUAL TOTAL | $ - 0 | ||
| BASIS OF AWARD Three year total | $ - 0 |
| Option Years | |
| First option year, % markup of annual total | $ - 0 |
| Second option year, % markup of annual total | $ - 0 |