Form_260_FirstArticle_REPORT.pdf

PDF 96 KB Posted

Attached to
AN/ASK-7 Data Transfer System (DTS) Federal contract opportunity
Solicitation number
SPRWA1-20-R-0026
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to AN/ASK-7 Data Transfer System (DTS), newest first.
File Type Posted
AFMC_260_Revision3.pdf PDF
CDRL_A011_Revision4.pdf PDF
SPRWA120R0026_0006.pdf PDF
SPRWA120R0026_0005.pdf PDF
CDRL_A009_Revised.pdf PDF
AFMC_260_FirstArticle_Rev2.pdf PDF
SPRWA120R0026_0004.pdf PDF
CDRL_A011_Revision3.pdf PDF
7025_01_14_2659AY_Revised.zip ZIP file
SPRWA120R0026_0003.pdf PDF
BIDSET_015142659_02DEC2020.pdf PDF
CDRL_A011_Revision2.pdf PDF
D675_60000_28.pdf PDF
AFMC_260_FA_Revision2.pdf PDF
SPRWA120R0026_0002.pdf PDF
Class_Deviation_2021-O0001_Attachment.pdf PDF
StatementOfWork_SOW_Revision1.pdf PDF
SPRWA120R0026_0001.pdf PDF
CDRL_A011_Revised.pdf PDF
AFMC_260_FA__REVISED.pdf PDF
Form_1653_TRNSPDATA_REPORT.pdf PDF
Form_158_PKGRQMT_REPORT.pdf PDF
ATTACHMENT_1_PricingMatrix.xlsx XLSX spreadsheet
SPRWA1-20-R-0026.pdf PDF
StatementOfWork.pdf PDF
CDRL_REPORT.pdf PDF
Form_807_QAIRQMT_REPORT.pdf PDF
BIDSET_015142659.pdf PDF
TDP.zip ZIP file
EDL_REPORT.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

08 APR 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

82918 / 754-11300-2

4. NSN

7025015142659AY

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM ITEM

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Contractor's Design Engineering Specifications

B. The detailed technical requirements for First Article approval tests are contained in

Section 4 of the B-52H Data Transfer System Source Control Drawing, 754-11300

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 10 days.

D. Contractor's notification to ACO and

407th SCMS/GUEA

(Requesting Activity) of test time and location due 60 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

JONATHAN ELLIS

407 SCMS/GUEAE

235 BYRON ST STE 19A

ROBINS AFB, GA 31098-1670

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 300 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

JONATHAN ELLIS

407 SCMS/GUEAE

235 BYRON ST STE 19A

ROBINS AFB, GA 31098

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 270 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$115,884.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 7Generated by PRPS using Jasper Reports on 10 Apr 2020

FIRST ARTICLE REQUIREMENTS 1. DATE

08 APR 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Ellis, Jonathan ANAME: 09 APR 2020DATE:

First Articles will be installed on Next Higher Assembly (NHA) to determine proper Form, Fit, Function (F3) and Interface.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Ellis, Jonathan A

407 SCMS / GU E A

478-327-4660

497-4660

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 7Generated by PRPS using Jasper Reports on 10 Apr 2020

File details come from the government source that posted it. Updated .