This is an Air Force First Article Requirements form (AFMC IMT 260) issued on March 11, 2026, for procurement request number 63005/23052623. The document establishes requirements for first article testing and approval of a component identified by NSN 2840013477857OJ and part number 23052623. Three units of the item must be submitted as first articles in addition to production quantities.

The first articles will serve as a manufacturing standard and long lead time items are required. All items must be manufactured at the facilities designated for production under the contract, with appropriate certification required. Government testing will be conducted to verify compliance with drawing PN 23052623, its reference specifications, and the attached Engineering Data List (EDL). The contractor must deliver the first articles within 180 calendar days from contract date and notify the government 30 calendar days prior to shipment. First article delivery must be directed to DDOO-SOP/FIRST ARTICLES with DODAAC FY2303, with markings clearly identifying "FIRST ARTICLE" on the exterior packaging. Government written approval or disapproval will be issued within 45 days of receiving the first article package. A test report is required and must be submitted within 180 calendar days from contract date, with government approval/disapproval due 45 days after report receipt. The estimated cost of government testing and inspection is $15,000. Approved first articles will be forwarded to AFMC Supply; one unit will be expended in testing, and disapproved articles will be returned to the contractor. First article testing may be waived for offerors who previously supplied the same or similar articles with satisfactory performance records or if the offeror is Rolls Royce Corporation, the original equipment manufacturer. The cognizant engineering organization responsible for approval is AFLCMC/LP S E, represented by Justin M. Sneed (405-734-5340 or 884-5340).

View the file

Other files

File Type Posted
DID_DI_NDTI_80809B_Test_Report.pdf PDF
CDRL_Test_Report_Rev_001.pdf PDF
SPRTA126Q0263_SOL.pdf PDF
Form_1653_Initial.pdf PDF
Form_158_Initial.pdf PDF
IUID_Checklist.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

11 MAR 2026(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

63005 / 23052623

4. NSN

2840013477857OJ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM Item

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

All requirements shown in the latest rev of drawing PN 23052623 and its reference specifications, unless otherwise specified in the attached EDL

B. The detailed technical requirements for First Article approval tests are contained in

Drawing 23052623, its reference specs, and the attached EDL.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

See CDRL

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 16 Mar 2026

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

See Block 12

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 45 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$15,000.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

AFMC Supply

X 1 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor

X will be retained by AFMC pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

See Block 12

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 16 Mar 2026

12. REMARKS

Sneed, Justin MNAME: 11 MAR 2026DATE:

First article shall include one complete unassembled item for parts with multiple sub-assembly components.

BLOCK 9F(3): DELIVER GOVERNMENT FIRST ARTICLES TO

DDOO-SOP/FIRST ARTICLES

DODAAC:FY2303

MARK FOR: FIRST ARTICLES

Attn: DDOO-SOP

DO NOT POST, NON-ACCOUNTBALE, DO NOT PUT IN SUPPLY

DODAAC: FY2303

Please ensure the words "FIRST ARTICLE" are marked on the outside of the box in large red conspicuous letters.

FIRST ARTICLE INSPECTION JUSTIFICATION

This item is used in the safe operation and use of the end item. The engineering data (blue prints, technical data package, etc.) contain close tolerances and complex processes and/or operations which require verification of a contractor's ability to produce this item. Not all of the critical characteristics may be measureable, therefore fit verification test articles are required. For these reasons, 3 parts are required. Conditions of first article waiver are as previously outlined.

CONDITIONS OF WAIVER OF FIRST ARTICLE INSPECTION. Offerors who have previously furnished production quantities of the same articles for Government, DOD or Air Force provided articles thus furnished have exhibited satisfactory performance in service, in the opinion of the Air Force.

First Article testing is waived if the offeror is the OEM, Rolls Royce Corporation.

For FMS contracts, forward approved First Articles to contractor for shipment with production quantities

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Sneed, Justin M

AFLCMC/LP S E

405-734-5340

884-5340

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 16 Mar 2026

File details come from the government source that posted it. Updated .