Pages from FORT SHERIDAN VOLUME I 161209.pdf
PDF 8 MB Posted
- Solicitation number
- Not on record
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E C
T
D A
T E
D R
A W
IN
G C
O D
E
S
A L E
D A
T
Y
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
R P
R
ID
S
H
IF
F L E
T T
S H
E E
T
S O
IL
C L
A S
S
IF
IC
A T
IO
N
A1
SOIL CLASSIFICATION SHEET
NO SCALE
F Y
P N
H E
R
ID
A N
IL
L
IN
O
IS
S H
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
C
L O
U
IS
V
IL
L E D
IS
T R
IC
T
F -1
-4
-1
D P
F O
U T S
O
F
IN
E S
L
IT
T L
R
C L E
N D
S
A M
O U
E S
A
P P
R E
C
IA
B L E
S A
N
W
IT
E S
A M
O U
E S
A
P P
R E
C
IA
B L E
G R
A V
E
W
E S
F
IN
E S
L
IT
T
C L E
G
A V
E L S
IE
V
IZ
E
E Q
U
IV
A L E
S
M
B
U
F
IS
U
A S
S
IF
IC
A T
IO
N
T
A L L
.4
E
M O
A R
A C
T
IO
N
S A
N D
R G
.4
E
M O
A R
A C
T
IO
N
G R
A V
E L S
WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
LITTLE OF NO FINES.
POORLY-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES.
SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES.
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES.
WELL-GRADED SANDS, GRAVELLY SANDS, LITTLE OR
NO FINES.
POORLY-GRADED SANDS,GRAVELLY SANDS, LITTLE OR
NO FINES.
SILTY SANDS, SAND-SILT MIXTURES.
CLAYEY SANDS, AND-CLAY MIXTURES.
SEE CL BELOW).
PLASTIC FINES (FOR IDENTIFICATION PROCEDURES
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW).
NONPLASTIC FINES OR FINES WITH PLASTICITY
WITH SOME INTERMEDIATE SIZES MISSING.
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES
OF ALL INTERMEDIATE PARTICLE SIZES.
WIDE RANGE IN GRAIN SIZE AND SUBSTANTIAL AMOUNTS
SEE CL BELOW).
PLASTIC FINES (FOR IDENTIFICATION PROCEDURES
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW)
NONPLASTIC FINES OF FINES WITH LOW PLASTICITY
SOME INTERMEDIATE SIZES MISSING.
AMOUNTS OF ALL INTERMEDIATE PARTICLE SIZES.
WIDE RANGE IN GRAIN SIZES AND SUBSTANTIAL
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES WITH
M O
T E
R
IA
R G
E
C O
A R
S E
G R
A
IN
IL
S
T
B
O
A L L E
R T
IC
IB
K
E
M O
T E
R
IA
A L L
E
F
IN
E
G R
A
IN
IL
S
S
IL
A Y
S
L
IQ
IM
IT
L E
A N
TION'' THIS SHEET INDICATING MEANS BY WHICH THE BORINGS WERE ADVANCED.
WATER ELEVATIONS INDICATED ( V ) IN CORE (C), STANDARD PENETRATION (SPT),
FISHTAIL (F), DENISON (U) AND WASH (W) BORINGS MAY HAVE BEEN INFLUENCED
BY DRILLING OPERATIONS AND SHOULD NOT BE CONSTRUED AS INDICATING THE
GROUND WATER LEVELS WILL VARY IN ACCORDANCE WITH RAINFALL AND STREAM
STAGES, THEREFORE, ACTUAL LEVEL OF GROUND WATER ON ANY DATE OTHER THAN
THAT SHOWN ON THE LOGS MUST BE DETERMINED BY SEPARATE OBSERVATIONS.
THE OMISSION OF GROUND WATER ELEVATIONS SHALL NOT NECESSARILY BE
CONSTRUED AS INDICATING THE ABSENCE OF GROUND WATER AT A PARTICULAR
BORING LOCATION.
WHEREVER THE METHOD OF EXPLORATION PRECLUDED THE POSSIBILITY OF
RECOVERING SAMPLES ABOVE ROCK, SUITABLE FOR EXAMINATION OR TESTS, THE
MATERIAL IS DENOTED AS OVERBURDEN.
ON THE LOGS WERE DETERMINED IN THE FIELD AND LATER SUPPLEMENTED BY
ANALYSIS MADE BY THE DISTRICT GEOLOGIST AND THE LABORATORY TECHNICANS.
FIELD BOOKS, FIELD LOGS, LABORATORY LOGS (PRESENTING THE RESULTS OF
LABORATORY TESTS FOR SHEAR, CONSOLIDATION, PERMEABILITY, ETC, WHEN
PERFORMED) AND EDITED LOGS MAY BE VIEWED IN THE OFFICE OF THE DISTRICT
TO AVAIL HIMSELF OF THE INFORMATION REPRESENTED BY THE BORING LOGS,
ENGINEER. U.S. ARMY ENGINEER DISTRICT, LOUISVILLE, CORPS OF ENGINEERS,
INCLUDING LABORATORY TEST RESULTS, SHALL NOT BE GROUNDS FOR A CLAIM
THAT THE GOVERNMENT WITHELD INFORMATION ON SUBSURFACE CONDITIONS.
6 .
GENERAL NOTES
TERMS FOR HARDNESS OF BEDROCK
VERY SOFT OR PLASTIC- CAN BE INDENTED EASILY
SOFT- CAN BE SCRATCHED WITH FINGERNAIL.
WITH THUMB.
HARD- DIFFICULT TO SCRATCH WITH KNIFE.
WEATHERING
MATERIAL CAN BE REMOVED
BY HAND TOOLS.
MODERATE WEATHERING- MATERIAL MAY BE OXIDIZED BUT
MOST PHYSICAL CHARACTERISTIC
REMAIN. OCCASIONAL BLOCKS MAY
BE REMOVED WITH HAND TOOLS.
- LOSS OF ROCK COHERANCE,
THE TERM ''LOST WATER'' AS SHOWN ON THE LOGS INDICATES A QUANTITY OF
DRILLING WATER LOST IN THE DRILL HOLE.
INDICATED ON GRAPHIC LOGS.
CORE HOLES WERE COMPLETED BY AN NXM OR NQ WIRE LINE SIZE CORE BARREL
WITH DIAMOND BIT, UNLESS OTHERWISE INDICATED ON THE GRAPHIC LOG.
DOUBLE ASTERISK.
OPTIMUM MOISTURE WAS OBTAINED BY STANDARD PROCTOR OR CE 55 COMPACTION
METHOD 100; RESPECTIVELY, AS NOTED ON BORING LOG.
DC-10
7-26-56
=BORING NO. & DATE MADE
PARTING 0.02
BAND 0.02'-0.2
THIN BED 0.2'-0.5
MEDIUM BED 0.5'-1.0'
THICK BED 1.0'-3.0
MASSIVE 3.0'
FEDERAL OFFICE BUILDING, LOUVILLE, KY..FAILURE OF THE CONTRACTOR
DRIVE SAMPLES WERE TAKEN WITH A 1 3/8'' I.D.-2'' O.D. X 2'-8'' SPLIT
SPOON SAMPLER USING A 140# HAMMER WITH A 30'' DROP, UNLESS OTHERWISE
15. GENERAL NOTES 5 AND 6 MAY NOT BE APPLICABLE WHEN EXPLORATION AND TESTING
IS PERFORMED BY OTHERS.
REFUSAL IS DEFINED AS THE POINT BEYOND WHICH FURTHER PENETRATION WAS
TRUE GROUND WATER LEVEL.
IMPRACTICAL WITH THE EXPLORATION METHOD USED. SEE ''METHODS OF EXPLORA-
CLASSIFICATIONS AND PHYSICAL CHARACTERISTICS OF SOIL AND ROCK AS SHOWN
''X-RAY DIFFRACTION ANALYSIS'' PERFORMED ON SAMPLES DENOTED BY
TESTS IN ACCORDANCE WITH EM 1110-2-1906, APP. VI OR MIL. STD. 621 A
RETAINES
TERMS FOR THICKNESS OF ROCK BEDDING
CORRELATION OF PENETRATION RESISTANCE (ASTM D 1586) WITH
RELATIVE DENSITY AND CONSISTENCY
PENETRATION RESISTANCE,N
Blows per foot
5 - 10
0 - 4
PENETRATION RESISTANCE,NRELATIVE DENSITY
Very Loose
Loose
Med Dense
Dense
Very Dense Over 50
3 - 4
Very Soft
Med Stiff
Stiff
Very Stiff
Blows per foot
0 - 2 Very Soft
SILTS AND 5 - 8
31+
Soft
Hard
CLAYS 9 - 15
16 - 30
GRAVELS 31 - 50
SANDS AND 11 - 30
KNIFE; CANNOT BE SCRATCHED WITH FINGERNAIL.
MODERATELY HARD- CAN BE SCRATCHED EASILY WITH
VERY HARD- CANNOT BE SCRATCHED WITH KNIFE.
SEVERE WEATHERING
SLIGHT WEATHERING
ALONG JOINTS AND BEDDING.
VARIOUS DEGREES OF WEATHERING
- MATERIAL GENERALLY FRESH, WITH
CONTENT OF MATERIAL ON DATE MADE.
WATER CONTENT (WC) AS SHOWN ON GRAPHIC LOG REPRESENTS THE MOISTURE
TIME OF DRILLING. THE ELEVATION MAY HAVE CHANGED SINCE THAT TIME.
TOP OF GROUND SHOWN ON THE GRAPHIC LOGS IS THE ELEVATION AT THE
METHOD OF EXPLORATION FOR EXAMPLE: DC=DRIVE SAMPLER AND CORE BORING.
THE LETTER DESIGNATION USED BEFORE BORING NUMBER INDICATES THE
STRUCTURE
SOME EVIDENCE OF ROCK
3 INCHES TO 8 INCHES
3/4 INCH TO 3 INCH
0.4 MM TO 2 MM
0.075 MM TO 0.4 MM
I/4 INCH TO INCH3 4/
2 MM TO 1 4 INC/ H
SIZE
8 INCHES
VEL
S
A
C
D
F
U
W
T
TP
R
P
= SEISMIC
POWER AUGER
= CORE BORING
= DRIVE SAMPLER
= FISHTAIL
= UNDISTURBED DENSION
= WASH BORING
= TRENCH
= TEST PIT
= ROCK BIT
= PROBE ROD
METHODS OF EXPLORATION
S = UNDISTURBED SHELBY TUBE
A = AUGER
F = FISHTAIL
U = UNDISTURBED DENISON
CU = UNDISTURBED CUBE
C = CORE
SAMPLE TYPE
TRACE 1 TO 10%
LENSE 10 MM TO 50 MM
OCCASIONAL 11 TO 35%
LAMINAE 0 TO 10 MM
AND 36 TO 50%
BAND
LAYER
50 MM TO 2.5 INCH
2.5 INCH TO 6 INCH+
= SHELBY TUBE OR PISTON SAMPLER
HA = HAND AUGER
DS = DRIVE SAMPLE (STANDARD PENETRATION TEST)
SOIL DESCRIPTIVE TERMS
J = JAR
BX = BOX (CORE)
FINE SAND
MEDIUM SAND
COARSE SAND
FINE GRAVEL
COARSE GRAVEL
COBBLE
BOULDER
T = TOP SOIL
= FILL
OB = OVERBURDEN (SEE GENERAL NOTE 4)
SS = SANDSTONE
SH = SHALE
SLS = SILTSTONE
LS = LIMESTONE
F
CO = COAL
UC = UNDERCLAY
IC = INDURATED CLAY
DOL = DOLOMITE
CON = CONGLOMERATE
OTZ = QUARTZ
DK = DARK
SL = SLIGHTLY
MOD = MODERATELY
MED = MEDIUM
WP = WELL POINT
W/ = WITH
GR = GRAIN
OCC = OCCASIONAL
(W) = WEATHERED
BD = BEDDED OR BEDS
INTBD = INTERBEDDED
LAM = LAMINAE
XLYN = CRYSTALLINE
ARGIL = ARGILLACEOUS
V = VERY
BLK = BLACK
BR = BROWN
GRY = GRAY
BLU = BLUE
YEL = YELLOW
MICA = MICACEOUS
STY = STYLOLITIC
B/P = BEDDING PLANE
F/W = FREE WATER
H/A = HIGH ANGLE
CAL = CALCAREOUS
CARBO = CARBONACEOUS
FREQ = FREQUENT
FOS = FOSSILIFEROUS
FRAG = FRAGMENTS
X=BD = CROSSBEDDING
= SHEAR PLANE
V/J
JT = JOINT
SOL = SOLUTION
DIAG = DIAGONAL
ALT = ALTERNATING
VERT = VERTICAL
HOR = HORIZONTAL
FRAC = FRACTURE
PIEZ = PIEZOMETER
= X=RAY DIFFRACTION ANALYSIS
(SEE GENERAL NOTE 11)
LEGEND
RQD = ROCK QUALITY DESIGNATION
= VERTICAL JOINT
OR FILLED)
OB/P = OPEN BEDDING PLANE
SP
NOD = NODULES
GRN = GREEN
NUM
TR
HD
TRACE
HARD CMTD
MOT
CEMENTED
MOTTLED
BOH
TOR
BOTTOM OF HOLE
TOP OF ROCK
STAIN, STAINEDST
ANG
RND
ANGULAR
ROUNDED
NUMEROUS
MED = MEDIUM
NUM
TR
HD
TRACE
HARD
NUMEROUSNUMEROUS
VIS
WT
WOR = WEIGHT OF RODS
WEIGHT OF HAMMERWOH
WEIGHT
VISCOSITY (MARSH)
LT = LIGHT
GRAV = GRAVEL OR GRAVELLY
= CAVITY (OPEN
UNIFIED SOIL CLASSIFICATION
(INCLUDING IDENTIFICATION AND DESCRIPTION)
MAJOR DIVISIONS
GROUP
SYMBOLS
FIELD IDENTIFICATION PROCEDURES
TYPICAL NAMES LABORATORY CLASSIFICATION CRITERIA
A L
IN
E
CL-ML
CL
ML
0 10 20 30 40 50 60 70 80 90
P L
A S
T
IC
A R
T
LIQUID LIMIT
PLASTICITY CHART
FOR LABORATORY CLASSIFICATION OF FINE-GRAINED SOILS
C = 60 GREATER THAN
D
D
U
C = 60 GREATER THAN
D
D
U
C = 30 BETWEEN ONE AND 3
(D )
C D X D 10 60
C = 30 BETWEEN ONE AND 3
(D )
C D X D 10 60
NOT MEETING ALL GRADATION REQUIREMENTS FOR SW
NOT MEETING ALL GRADATION REQUIREMENTS FOR GW
ABOVE ''A'' LINE WITH
PI BETWEEN 4 AND 7
ARE BORDERLINE CASES
REQUIRING USE OF DUAL
SYMBOLS.
U
A
IN
S
R V
E
IN
ID
E N
T
IF
Y
A C
T
IO
IV
D
L D
ID
E N
T
IF
IC
A T
IO
N
S
IL
A Y
S
L
IQ
IM
IT
G R
E A
T
A N
GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS.
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY,
INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS.
PEAT AND OTHER HIGHLY ORGANIC SOILS.
IDENTIFICATION PROCEDURES
ON FRACTION SMALLER THAN NO. 40 SIEVE SIZE.
DRY STRENGTH
(CRUSHING
CHARACTERISTICS)
DILATANCY
(REACTION
TO SHAKING)
NONE TO SLIGHT QUICK TO SLOW NONE
MEDIUM TO HIGH MEDIUM
SLOW SLIGHT
SLOW TO NONE
MEDIUM TO HIGH
NONE HIGH
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
1 2 3 4 5
HIGHLY ORGANIC SOILS
CH
AND BASING FRACTIONS ON ESTIMATED WEIGHTS)
(EXCLUDING PARTICLES LARGER THAN 3 INCHES
WITH INCREASING PLASTICITY INDEX
TOUGHNESS AND DRY STRENGTH INCREASE
COMPARING SOILS AT EQUAL LIQUID LIMIT
MH
OH
S
IE
A R
S E
G R
A
IN
IL
A S
S
IF
L L
O W
S
D E
P E
N D
R C
E N
T A
E S
F
R A
C T
IO
A L L
D E
T E
R M
R C
E N
T A
G
A V
A
IN
S
R V
E
N O
A N
L E
A N
U
N B
O L S
B O
R D
E R
L
S
Q U
IR
IN
G
G M
G C
S M
S C
G W
G P
S W
S P
WITH PI LESS THAN 4
ATTERBERG LIMITS BELOW ''A'' LINE
WITH PI LESS THAN 4
ATTERBERG LIMITS BELOW ''A'' LINE
WITH PI GREATER THAN 7
ATTERBERG LIMITS ABOVE ''A'' LINE
WITH PI GREATER THAN 7
ATTERBERG LIMITS ABOVE ''A'' LINE
SYMBOLS.
REQUIRING USE OF DUAL
ARE BORDERLINE CASES
PI BETWEEN 4 AND 7
HTCHED ZONE WITH
LIMITS PLOTTING IN
CLAYEY SILTS WITH SLIGHT PLASTICITY.
FLOUR, SILTY OR CLAYEY FINE SANDS OR
INORGANIC SILTS AND VERY FINE SANDS,ROCK
PLASTICITY.
ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW
FINE SANDY OR SILTY SOILS, ELASTIC SILTS.
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS
ORGANIC SILTS.
ORGANIC CLAYS OF MEDIUM TO HIGH PLASITICITY,
NEAR PL)
(CONSISTENCY
TOUGHNESS
SLOW
NONE TO VERY
MEDIUM
SLIGHT TO
MEDIUM
SLIGHT TO
MEDIUM
SLIGHT TO
MEDIUM
SLIGHT TO
HIGH
HIGH TO VERY
SLOW
NONE TO VERY
FREQUENTLY BY FIBROUS TEXTURE.
READILY IDENTIFIED BY COLOR, ODOR, SPONGY FEEL AND
CB101
N T S
M A
Y
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
GTW-1
B-1
B-2
B-3
B-4
B-5
P-3
P-2
P-1
S-2
P-4
P-5
P-6
S-1
S-3
P-8
P-7
B-7
B-6
B-9 B-8
6"
6"
6"
6"
6"
8"
6"
8"
8"
6"
6"
6"
6"
6"
6"
6"
6"
6"
U
IS
V
IL
L E D
IS
T R
IC
T
C
G R
A S
S
P N
F -1
-4
-1
GENERAL SHEET NOTES
80' 160'0
N
F Y
E R
A L L C
O N
C E
P T
A1
BORING LOCATION PLAN
1" = 80'- 0"
B-1
N
B R
Y A
N
S S
H
IF
F L E
T T
S S
H
IF
F L E
T T
B O
R
IN
G L
O C
A T
IO
N P
L A
N
S H
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
C
S H
E R
ID
A N
IL
L
IN
O
IS
CB102
TRNG BLDG.
PROPOSED
UHS.
PROP.
OMS
PROP.
P
GTW-1
LEGEND
GEOTHERMAL TEST WELL LOCATION
B
P
S
(B-1 TO B-9)
SOIL BORING IN PROPOSED BUILDING LOCATION
(P-1 TO P-8)
SOIL BORING IN A PROPOSED PARKING LOCATION
(S-1 TO S-3)
GENERAL SITE BORING
AND SOME PARKING AREAS APPEAR TO BE MISALIGNED.
BORING LOCATIONS FOR THE UHS BUILDING, THE OMS BUILDINGS
GEOTECHNICAL INVESTIGATION WAS COMPLETED. THEREFORE
FEATURES OF THE PROJECT WERE RELOCATED AFTER THE
3. SOME BUILDINGS, PARKING AREAS, AND OTHER ASSOCIATED
2. REFER TO SHEETS CB201 TO CB210 FOR SOIL BORING LOGS.
GEOTECHNICAL REPORT.
1. COORDINATES FOR THE BORING LOCATIONS ARE AVAILABLE IN THE
M A
R C
H
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
B -1
CB201
N T S
N
B R
Y A
N
P
O C
T O
B E
R
REFER TO CB102 FOR BORING LOCATIONS.
S S
H
IF
F L E
T T
1/12
684.0
683.5
682.5
679.2
679.0
678.0
669.1
BORING NO.
VERTICAL INCLINED
14.5
16.4
15.7 with some graywith some gray
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.5
0.71
1.5
1.5
0.86
0.86
0.6
GW
CL
GW
CL
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
50.5'
SHEET 1B-1 OF 4
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/19/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
684.0'
11/19/11
THELEN
N/A
N/A
E: 1125554.15
Ft. Sheridan ARC
N: 2019083.29
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-1
HOLE NO.
660.0
655.0
654.0
645.0
16.8
16.2 soft
No recovery soft
No recovery
1.5
1.5
1.5
1.5
0.9
1.3
1.5
1.3
CL
Hole No. B-1
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-1
HOLE NO.
18.8
Bottom of hole at 50.5 feet.End of boring at 633.5 feet.
1.5
1.5
1.5
1.5
CL
Hole No. B-1
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-1
HOLE NO.
LL=29
PL=17
PI=12
LL=31
PL=17
PI=14
stiffstiff
50.5'
CME-55 Automatic Hammer
Fill, Gravel trace gravel, brown to graytrace gravel, brown to gray
3.25" I.D. Halloow Stem Auger medium stiff, gray fill Gravel
CLAY with trace gravel, stiff, brown, moist
NAVD 88
LL=27
PL=16
PI=11
Medium Stiff
Lean CLAY with some gravel, stiff, brown to dark brown, moistLean CLAY with some gravel, stiff, brown to dark brown, moist medium stiff
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
B -2 A
N D B -3
CB202
N T S
N
B R
Y A
N
P
O C
T O
B E
R
REFER TO CB102 FOR BORING LOCATIONS.
685.0
684.7
681.0
675.5
671.0
666.0
15.1
14.1
16.1
17.2
TopsoilTopsoil
1.5
1.5
1.5
1.5
1.5
1.5
0.6
1.92
1.5
1.4
1.5
1.58
1.3
T
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
50.5'
SHEET 1B-2 OF 3
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/19/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
685.0'
11/19/11
THELEN
N/A
N/A
E: 1125679.82
Ft. Sheridan ARC
N: 2019111.61
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-2
HOLE NO.
646.0
16.4
17.7
15.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
CL
Hole No. B-2
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 685
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-2
HOLE NO.
1/12
636.0
Bottom of hole at 50.5 feet.
End of boring at 634.5 feet.
1.5
1.5
1.5
1.1
CL
Hole No. B-2
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 685
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-2
HOLE NO.
684.5
683.0
680.5
675.5
670.5
665.5
16.8
16.1
17.2
16.3
Fill, gravel and sand, dry graygray
1.5
1.5
1.5
1.5
1.5
1.5
0.9
1.2
1.7
1.5
1.5
1.5
0.84
1.5
GW
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
50.5'
SHEET 1B-3 OF 3
10. DATUM FOR ELEVATION
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/18/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
684.5'
11/18/11
THELEN
N/A
N/A
E: 1125667.02
Ft. Sheridan ARC
N: 2019003.61
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-3
HOLE NO.
3.25" I.D. Halloow Stem Auger 3.25" I.D. Halloow Stem Auger
CME-55 Automatic Hammer CME-55 Automatic Hammer
50.5' 50.5'
NAVD 88
SHOWN ITEM (TBM OR MSL)
NAVD 88
PL=16
LL=28
qu=8,200 psf γdry=120.6 pcf Gs=2.69
PI=12
medium stiff
Lean CLAY with trace gravel, medium stiff, brown, moist brown with gray mottles, stiff qu=3,680 psf γdry=122.6 pcf More plastic
PI=12
PL=16
LL=28
very soft qu=7,910 psf
PI=14
LL=20
PL=32
More Plastic qu=6,880 psf γdry=117.5 psf
PI=16
LL=19
PL=35
stiffstiff
Lean CLAY, stiff, brown to dark brown brown with gray mottles, moist brown and gray, very stiff
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
B -3 A
N D B -4
CB203
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
645.5
17.2
16.8
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
CL
Hole No. B-3
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684.5
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-3
HOLE NO.
16.5
End of boring at 634 feet.
1.5
1.5
1.5
0.3
CL
Bottom of hole at 50.5 feet.
Hole No. B-3
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684.5
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-3
HOLE NO.
684.0
683.7
683.1
681.7
680.0
675.0
16.6
17.7
15.4
Asphalt
Fill, gravel and sand
Lean CLAY with some gravel, stiff, dark brown, moist olive gray brown
Asphalt
Fill, gravel and sand
Lean CLAY with some gravel, stiff, dark brown, moist olive gray brown
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.1
1.3
1.5
1.5
1.3
0.3
1.4
GW
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
50.5'
SHEET 1B-4 OF 3
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/17/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
684.0'
11/17/11
THELEN
N/A
N/A
E: 1125667.13
Ft. Sheridan ARC
N: 2018818.55
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-4
HOLE NO.
15.6
17.3
1.5
1.5
1.5
1.5
1.5
1.5
1.4
1.2
CL
Hole No. B-4
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-4
HOLE NO.
trace gravel
PI=13
LL=16
PL=29
50.5
NAVD 88
3.25" I.D. Hallow Stem Auger
CME 55 Automatic Hammer trace gravel, brown
PI=11
LL=16
PL=27
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
B -4 A
N D B -5
CB204
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
17.9
Bottom of hole at 50.5 feet.End of boring at 633.5 feet.
1.5
1.5
1.5
CL
Hole No. B-4
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-4
HOLE NO.
684.5
683.7
680.5
673.5
670.1
16.4
14.7
17.1
Fill, sand and gravel brown and gray
Fill, sand and gravel brown and gray
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.86
0.71
1.25
1.5
0.9
0.84
1.31
1.5
1.5
More plastic
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
50.5'
SHEET 1B-5 OF 3
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/20/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
684.5'
11/20/11
THELEN
N/A
N/A
E: 1125722.07
Ft. Sheridan ARC
N: 2018914.95
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-5
HOLE NO.
655.5
650.5
645.5
16.9
16.1
16.8 softsoft
1.5
1.5
1.5
1.5
1.4
1.1
1.5
1.4
Hole No. B-5
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684.5
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-5
HOLE NO.
635.5
16.3
End of boring at 634 feet.
1.5
1.5
1.2
1.1
Bottom of hole at 50.5 feet.
Hole No. B-5
SHEET
3OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684.5
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-5
HOLE NO.
stiffstiff stiff, graystiff, gray
3.25" I.D. Hollow Stem Auger
CME 55 Automatic Hammer
50.5'
Sandy CLAY with some gravel, very stiff, brown, moist less sand
Gs=2.714
PI=14
PL=19
LL=33
PI=13
PL=17
LL=30
medium stiff
NAVD 88
CL
CL CL
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
B -6 A
N D B -7
CB205
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
677.0
676.7
673.0
668.0
662.7
658.0
14.9
14.5
14.9
15.1
Topsoil olive gray stiff, gray
Topsoil olive gray
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.4
1.4
1.5
1.5
1.5
0.8
T
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
25.5'
SHEET 1B-6 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/16/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
677.0'
11/16/11
THELEN
N/A
N/A
E: 1126615.04
Ft. Sheridan ARC
N: 2018652.3
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-6
HOLE NO.
15.7
Bottom of hole at 25.5 feet.
1.5
1.5
1.5
1.5
CL
Bottom of hole at 25.5 feet.
Hole No. B-6
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 677
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-6
HOLE NO.
677.0
676.5
676.0
675.5
673.0
669.5
14.8
12.8
15.1
15.5
Topsoil
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.3
1.5
1.5
1.5
1.5
1.5
1.5
T
GW
CL
CH
More plastic
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
25.5'
SHEET 1B-7 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/16/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
677.0'
11/16/11
THELEN
N/A
N/A
E: 1126474.97
Ft. Sheridan ARC
N: 2018795.83
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-7
HOLE NO.
16.7
End of boring at 651.5 feet.
1.5 1.4
CL
Bottom of hole at 25.5 feet.
Hole No. B-7
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 677
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-7
HOLE NO.
NAVD 88
3.25" I.D. Hollow Stem Auger
CME 55 Automatic Hammer
25.5 very stiff, brown with gray mottlesvery stiff, brown with gray mottles stiff
NAVD 88
CME 55 Automatic Hammer
3.25" I.D. Hollow Stem Auger
25.5'
Lean CLAY with trace gravel, stiff, dark brown, moist
PI=13
PL=18
LL=31
Less plastic
GRAVEL and sand, medium dense, gray dry
Lean CLAY with trace gravel, very stiff, brown, moist olive gray brown with gray mottles, moist gray qu=4,720 psf Υdry=119.8 pcf
PI=12
PL=17
LL=29
stiff
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
B -8 A
N D B -9
CB206
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
677.0
676.6
675.1
670.7
669.5
662.0
658.0
25.7
14.5
14.6
17.7
15.6
Topsoil gray stiff, gray with brown mottles
Topsoil gray stiff, gray with brown mottles
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.6
1.2
1.2
1.3
1.2
1.5
1.5
1.5
T
CL-
ML
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
25.5'
SHEET 1B-8 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/16/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
677.0'
11/16/11
THELEN
N/A
N/A
E: 1126407.2
Ft. Sheridan ARC
N: 2018638.07 B
L O
W S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-8
HOLE NO.
Bottom of hole at 25.5 feet.End of boring at 651.5 feet.
1.5 1.5
CL
Hole No. B-8
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 677
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-8
HOLE NO.
676.0
675.5
675.1
670.0
667.0
666.0
15.2
14.9
14.8
15.6
16.8
Topsoil very stiff gray
Topsoil
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.2
1.5
0.9
1.5
1.5
1.5
T
GW
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
25.5'
SHEET 1B-9 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/16/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
676.0'
11/16/11
THELEN
N/A
N/A
E: 1126514.07
Ft. Sheridan ARC
N: 2018666.36
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-9
HOLE NO.
Bottom of hole at 25.5 feet.
End of boring at 650.5 feet.
1.5 1.5
CL
Hole No. B-9
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 676
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID B-9
HOLE NO.
NAVD 88
3.25" I.D. Hallow Stem Auger
CME 55 Automatic Hammer
25.5
SM
Lean CLAY, stiff, brown and gray, moist
Fill, Silty CLAY, soft, brown, moist
Fill, Silty SAND, fine to coarse, well graded, loose, brown, moist to wet
Lean CLAY with trace gravel, stiff, olive gray, moist very stiff
PI=14
PL=16
LL=30
NAVD 88
25.5'
CME 55 Automatic Hammer
3.25" I.D. Hallow Stem Auger
Gravel with sand, medium dense, gray trace gravel qu=13,650 psf Υdry=120.8 pcf Gs=2.739
PI=14
PL=19
LL=33
Wc 16.2 k=1.3 x 10-8 cm/s
PI=15
PL=19
LL=34
highly plastic Bulk Sample 0.5'
Wc = 24.2
PI=16
PL=21
LL=37
Bulk Sample 0.5'
PI=16
PL=19
LL=39
Bulk Sample 0.5'
WC=22.4
CBR=8.1
opt wc=12.8 Υ=121.3
PI=15
PL=21
LL=36
Bulk Sample 0.5'
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
P -1 T
O P -4
CB207
N T S
N
B R
Y A
N
P
O C
T O
B E
R
REFER TO CB102 FOR BORING LOCATIONS.
very stiff
End of boring at 674.5 feet.
1.5
1.5
1.5
1.5
1.5
0.8
1.3
1.5
GW
CL
685.0
681.0
679.0
676.0
9.7
Less plastic
Bottom of hole at 10.5 feet.
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-1 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/21/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
685.0'
11/21/11
THELEN
N/A
E: 1125874.09
Ft. Sheridan ARC
N: 2019119.61
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-1
HOLE NO.
685.0
684.2
683.5
681.0
676.0
19.1
15.7
23.6
Fill, sand and gravel brown
Bottom of hole at 10.5 feet.
brown
End of boring at 674.5 feet.
1.5
1.5
1.5
1.5
1.5
0.9
1.4
1.5
0.6
1.5
GC
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-2 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/21/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
685.0'
11/21/11
THELEN
N/A
N/A
E: 1125974.02
Ft. Sheridan ARC
N: 2018923.32
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-2
HOLE NO.
End of boring at 675 feet.
1.5
1.5
1.5
1.5
1.5
0.95
1.09
1.4
0.7
GW
CH
GW
CL
685.5
685.0
684.5
684.0
681.5
676.5
14.8
16.7
Bottom of hole at 10.5 feet.
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-3 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/21/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
685.5'
11/21/11
THELEN
N/A
N/A
E: 1125883.41
Ft. Sheridan ARC
N: 2018865.55
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-3
HOLE NO.
682.0
681.7
681.2
678.0
18.3
16.7
Topsoil
Bottom of hole at 10.5 feet.End of boring at 671.5 feet.
1.5
1.5
1.5
1.5
1.5
1.4
0.8
1.5
1.5
1.5
T
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-4 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/20/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
682.0'
11/20/11
THELEN
N/A
N/A
E: 1125960.51
Ft. Sheridan ARC
N: 2019321.78
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-4
HOLE NO.
3.25" I.D. Hallow Stem Auger
CME 55 Automatic Hammer
N/A10.5
NAVD 88 NAVD 88 NAVD 88 NAVD 88
10.5' 10.5' 10.5'
CME 55 Automatic Hammer CME 55 Automatic Hammer CME 55 Automatic Hammer
3.25" I.D. Hallow Stem Auger 3.25" I.D. Hallow Stem Auger 3.25" I.D. Hallow Stem Auger
Lean CLAY with trace of gravel, very stiff, olive gray, moist stiffstiff stiff, trace gravel, brown with gray mottles dry to moist Lean CLAY with some sand and gravel, soft, greenish to gray, gravelly clay or clayey gravel with trace of bricks med stiff moist Fill, GRAVEL with sand, well graded, medium dense, brown to gray, Fill, FAT CLAY, very stiff, brown and gray, moist moist Fill, GRAVEL with sand, well graded, medium dense, brown to gray, medium stiff, brown to gray, moist
Lean CLAY with trace of gravel, very stiff, dark gray, moist to dry soft
Lean CLAY, soft, dark brown, moist very stiff
CL
Sandy Lean CLAY, medium stiff, brown, moist
Fill, sand and gravel
Fill, Gravelly Lean CLAY, dark brown, moist
Wc = 24.6% k=5.1 x 10-9cm/s
PI=17
PL=25
LL=42
Bulk Sample 0.5'
Wc = 19.8%
CBR=3.8
opt wc = 7.2% Υdry=136.9 pcf
PI=20
PL=23
LL=43
Bulk Sample 0.5' k=3.0 x 10-8 cm/s
CBR=6.0
max opt w.c.=11.2% Υdry=126.3 pcf
PI=16
PL=20
LL=36
Bulk Sample 0.5'
Wc =22.4
PI=24
PL=22
LL=46
Bulk Sample 0.5'
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S S
H
IF
F L E
T T
P -5 T
O P -8
CB208
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
682.0
681.7
680.5
677.4
676.0
673.0
21.4
24.7
24.8
Topsoil med. stiff
Bottom of hole at 10.5 feet.
Topsoil
End of boring at 671.5 feet.
1.5
1.5
1.5
1.5
1.5
1.2
0.8
1.3
1.5
0.9
T
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-5 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/20/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
682.0'
11/20/11
THELEN
N/A
N/A
E: 1126023.33
Ft. Sheridan ARC
N: 2019195.65
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-5
HOLE NO.
677.0
676.7
673.0
671.0
21.4
24.7
24.8 very stiff
Bottom of hole at 10.5 feet.End of boring at 666.5 feet.
1.5
1.5
1.5
1.5
1.5
0.9
0.5
1.5
1.5
1.5
T
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-6 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/20/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
677.0'
11/20/11
THELEN
N/A
N/A
E: 1126177.61
Ft. Sheridan ARC
N: 2019163.24
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-6
HOLE NO.
674.0
673.5
673.2
672.5
670.0
668.0
665.0
18.3
Aspahlt
Fill, sand and gravel gray with brown mottles very stiff brown to gray
Bottom of hole at 10.5 feet.
End of boring at 663.5 feet.
1.5
1.5
1.5
1.5
1.5
1.09
1.4
1.5
1.5
GW
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-7 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/17/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
674.0'
11/17/11
THELEN
N/A
N/A
LONG: deg W
Ft. Sheridan ARC
LAT: deg S
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-7
HOLE NO.
678.0
676.5
674.0
6.4
15.1
Topsoil moist olive gray, moist
Bottom of hole at 10.5 feet.
Topsoil moist moist olive gray, moist
End of boring at 667.5 feet.
1.5
1.5
1.5
1.5
1.5
0.5
1.5
1.5
1.5
T
GW
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
10.5'
SHEET 1P-8 OF 1
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/16/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
678.0'
11/16/11
THELEN
N/A
N/A
E: 1126719.22
Ft. Sheridan ARC
N: 2018752.61
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID P-8
HOLE NO.
Lean CLAY with trace of gravel, very stiff, brown with gray mottles, dry toLean CLAY with trace of gravel, very stiff, brown with gray mottles, dry to
NAVD 88
3.25" I.D. Hollow Stem Auger
CME 55 Automatic Hammer
10.5'
CME 55 Automatic Hammer CME 55 Automatic Hammer CME 55 Automatic Hammer
3.25" I.D. Hollow Stem Auger 3.25" I.D. Hollow Stem Auger 3.25" I.D. Hollow Stem Auger
NAVD 88 NAVD 88
NAVD 88
10.5' 10.5' 10.5'
CL
medium stiff
CL
Lean CLAY with trace of gravel, medium stiff, brown and gray, moist mottles, moist Sandy Lean CLAY with some gravel, medium stiff, brown with gray trace of gravel, stiff, brown to gray less sand
Sandy Lean CLAY, soft, brown to dark brown, moist trace of gravel, stiff, brown with some gray less sand
Fill, gravel and sand, well graded, medium dense, black to gray, Υdry=118.7 pcf k=2.3 x 10-6 cm/s
PI=14
PL=18
LL=32
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S -1 A
N D S -2
CB209
N T S
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
S S
H
IF
F L E
T T
679.0
678.2
677.0
675.0
673.0
666.0
661.0
15.6
25.3
Topsoil
Lean CLAY with some gravel, stiff, moist brown with red trace of gravel, brown and gray very stiff very stiff
Topsoil
Lean CLAY with some gravel, stiff, moist brown with red trace of gravel, brown and gray very stiff very stiff
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.4
1.5
0.9
1.5
1.5
0.4
1.5
1.5
1.4
T
CL
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
20.5'
SHEET 1S-1 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/21/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
679.0'
11/21/11
THELEN
N/A
N/A
E: 1126289.46
Ft. Sheridan ARC
N: 2018795.06
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID S-1
HOLE NO.
Bottom of hole at 20.5 feet.End of boring at 658.5 feet.
CL
Hole No. S-1
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 679
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID S-1
HOLE NO.
684.5
684.0
678.5
674.5
670.5
665.5
Matt Lozier
N/A
20.5'
SHEET 1S-2 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/20/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
684.5'
11/20/11
15.2
15.5
17.2
Topsoil gray moist to wet
Topsoil gray moist to wet
1.5
1.5
1.5
1.5
1.5
1.5
1.2
1.4
1.42
1.1
1.5
1.3
1.5
1.5
T
CL
More plastic
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
THELEN
N/A
N/A
E: 1125824.45
Ft. Sheridan ARC
N: 2019268.23
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID S-2
HOLE NO.
End of boring at 664 feet.
CL
Bottom of hole at 20.5 feet.
Hole No. S-2
SHEET
2OF
SHEETS1. PROJECT Ft. Sheridan ARC
BORING LOG (cont sheet) ELEVATION TOP OF HOLE 684.5
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft. Sheridan ARCLRL FORM 1202
JUNE 2000
PREVIOUS EDITIONS ARE OBSOLETE.
SYMBOLS: WATER LEVELS AT COMPLETION PARTIAL LOSS OF DRILL FLUID S-2
HOLE NO.
stiff, trace of gravel, brown to gray stiffstiff very stiff, wetvery stiff, wet
3.25" I.D. Hollow Stem Auger
CME 55 Automatic Hammer
20.5
NAVD 88
20.5'
CME 55 Automatic Hammer
3.25" I.D. Hollow Stem Auger
NAVD 88
Lean CLAY with some gravel, medium stiff, brown to dark brown, moist
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
P R
O J E
C T E
N G
IN
E E
R /A
R C
H
IT
E
T E
D R
A W
IN
G C
O D
A L E
D A
T
M B
O L
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
OF ENGINEERS
US ARMY CORPS
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
LOUISVILLE DISTRICT
SHEET REF NUMBER:
SHEET OF
1 2 3 4 5 6 7 98
F
E
D
A
B
C
$$$DATE
$$$FILENAME
M A
R C
H
RECORD DRAWING
W
Q R -1
-R -0
U
IS
V
IL
L E D
IS
T R
IC
T
R P
R
ID
E
P N
F -1
-4
-1
F Y
E R
ID
A N A
R M
Y R
E S
E R
V E C
E N
T E
R
A R
E R
ID
A N
IL
L
IN
O
IS
BORING LOGS
SCALE: NA
A1
D P
F O
U T S
B O
R
IN
G L
O G
S
S -3
S S
H
IF
F L E
T T
N T S
CB210
O C
T O
B E
R
N
B R
Y A
N
P
REFER TO CB102 FOR BORING LOCATIONS.
gray
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.7
0.9
1.5
1.5
0.71
1.5
1.5
CL
678.0
676.5
674.0
669.0
663.6
659.0
14.6
15.2
15.3
16.1
BORING NO.
VERTICAL INCLINED
9. DIRECTION OF BORING
5. DRILL TYPE
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
3. DRILLING AGENCY
4. NAME OF DRILLER
2. LOCATION
1. PROJECT
Matt Lozier
N/A
20.5'
SHEET 1S-3 OF 2
10. DATUM FOR ELEVATION
SHOWN ITEM (TBM OR MSL)
11. DRILL METHOD
12. ELEVATION TOP OF HOLE
13. TOTAL NUMBER CORE BOXES
14. ELEVATION GROUND WATER
COMPLETED
11/21/11
STARTED
15. DATE HOLE
16. INSPECTOR
Jackson Parker
678.0'
11/21/11
THELEN
N/A
N/A
E: 1126581.63
Ft. Sheridan ARC
N: 2018886.32
B L
O W
S -I
N C
H
ELEVATION
D E
P T
H S
C A
L E
M O
IS
T U
R E
S A
M P
L E T
Y P
E
L E
G E
N D
CLASSIFICATION
OF MATERIALS
CLASSIFICATION
OF MATERIALS
P E
N E
T R
A T
IO
N
R Q
D
R E
C O
V E
R Y
U S
C S C
L A
S S
S A
M P
L E
REMARKS
PROJECT: Ft.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .