For construction package - Manchester Chiller 100_CD_R2 Drawings.pdf

PDF 18 MB Posted

Attached to
4130--608-20-110 - Bldg. 1 Chiller Replacement Federal contract opportunity
Solicitation number
36C24124B0019
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is soliciting bids to replace the chiller at Building 1 under solicitation number 36C24124B0019. Attached is a 18MB file containing drawings related to the Manchester Chiller 100 construction package. Bids for the 4130--608-20-110 - Bldg. 1 Chiller Replacement opportunity are due under the Pre-Solicitation type. The contract aims to replace an existing chiller to continue providing HVAC services to Building 1.

View the file

Other files for this federal contract opportunity

Other files attached to 4130--608-20-110 - Bldg. 1 Chiller Replacement, newest first.
File Type Posted
Manchester Chiller 100_CD_R1 Narrative.pdf PDF
36C24124B0019.docx DOCX document
Manchester Chiller 100 CD R2 Electrical Drawings.pdf PDF
Manchester Chiller 100_CD R1 Construction Specifications.pdf PDF
608-20-110 Building 1 Chiller Repacement SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

N

EAST

ENTRANCE

WEST

ENTRANCE

SMYTH

ROAD

W2 W

W3

W

W5

N1

GOVERNMENT

VEHICLES

N3

N2

E2

E1

NO PARKING

CONSTRUCTION

SITE

EAGLE

ENTRANCE

SEACOAST

ENTRANCE

MOUNTAIN

ENTRANCE

BUILDING #4

B U

I L D

IN

G

BUILDING #6

BUILDING

#7

BUILDING

#18

BUILDING #5

SMYTH

TOWER

BU

IL

D

IN

G

URGENT

CARE

PRIMARY

CARE

BOILER PLANT

#20

BUILDING

#15

VETERANS

HEALTHCARE

ADDITION

BUILDING

#1

410 7

DRAWING INDEX

G-001 COVER PAGE

G-002 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

AE-101 ROOF PLAN

AE-501 ROOF DETAILS

AE-502 ROOF DETAILS

SD-001 CHILLER STRUCTURAL FRAME - DEMOLITION

SF-001 CHILLER STRUCTURAL FRAME - NEW WORK

MD-001 PENTHOUSE AND ROOF PLAN - DEMO PLAN

MH-001 GROUND LEVEL - TEMPORARY CHILLER

MH-002 PENTHOUSE AND ROOF PLAN - TEMPORARY CHILLER

MH-003 PENTHOUSE AND ROOF PLAN

MH-004 SECTIONS AND ISOMETRIC VIEWS

MI-101 PHASE 1 TEMPORARY PIPING DIAGRAM

MI-102 DEMO PIPING DIAGRAM

MI-103 NEW WORK PIPING DIAGRAM

MI-200 DETAILS

MI-300 EQUIPMENT SCHEDULES

MI-400 CONTROLS

E-000 ELECTRICAL LEGEND

E-001 ELECTRICAL GROUND PLAN - DEMOLITION

E-002 ELECTRICAL GROUND PLAN - NEW WORK

E-003 ELECTRICAL PENTHOUSE ROOF DEMOLITION

E-004 ELECTRICAL PENTHOUSE ROOF NEW WORK

E-005 ELECTRICAL LEVELS 1-6 CONDUIT ROUTING PLAN

E-006 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION

E-007 ELECTRICAL ONE-LINE DIAGRAM - NEW WORK

E-008 ELECTRICAL DETAILS + SCHEDULES

100% CONSTRUCTION DOCUMENTS

U.S. Department of Veterans Affairs

Manchester VAMC Chiller Replacement

718 Smyth Road, Manchester, NH 03104

Project Name:

Project Address:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:1

P M

COVER SHEET

DM HL

G-001

7/1/2021Revisions: Date:

SAD SOUND ATTENUATING DEVICE

SSD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SEN SENSIBLE HEAT

SI SQUARE INCHES

SP STATIC PRESSURE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

LC

M

DRAWING SYMBOLS

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION NUMBER

VENT LINE

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

V

CWR

CHR

GCR

CWS

CHS

GCS

MW

D

X EXISTING PIPE TO BE REMOVED

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

VENTURI FLOW METER

PIPE UP

PIPE DOWN

TT TEMPERATURE TRANSMITTER

PT PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

FT FLOW TRANSMITTER

IT CURRENT TRANSMITTER

SPS STATIC PRESSURE SENSOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

HS HAND SWITCH (HAND-OFF-AUTO SWITCH)

ZC VALVE OR DAMPER POSITION CONTROLLER

PDS PRESSURE DIFFERENTIAL SWITCH

CONTROLS SYMBOLS

LTCP LOCAL TEMPERATURE CONTROL PANEL

HVAC HVAC CONTROL PANEL

ECC

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

VSMC VARIABLE SPEED MOTOR CONTROLLER

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

MODULATING (AUTOMATIC) CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

FLOW METER

1-CH-1

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

CHILLER NO. 1 IN BUILDING NO. 1

EQUIPMENT ABBREVIATION

FS FLOW SWITCH

MC MOTION CONTROLLER

VFD VARIABLE FREQUENCY DRIVE

FM FLOW METER

STS STATUS

S/S START/STOP

D/L DEMAND/LIMIT

FA FAULT ALARM

FLA LOAD STATUS / FULL LOAD AMPS

RS RUN STATUS

PIPING SYMBOLS

A/E ARCHITECT / ENGINEER

ACCH AIR COOLED CHILLER

AFF ABOVE FINISHED FLOOR

AMP AMPERE

AP ACCESS PANEL

AQST AQUASTAT

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CV CONSTANT VOLUME

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

Db DRY-BULB TEMPERATURE

DB DECIBELS

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DP DEW POINT TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EGT ENTERING GLYCOL TEMPERATURE

EJ EXPANSION JOINT

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

FC FLEXIBLE CONNECTION

FD FLOOR DRAIN

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FV FACE VELOCITY

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HZ HERTZ

I/O INPUT/OUTPUT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR METERS/SECOND)

MAX MAXIMUM

MBH 1,000 BTUH

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MTD MEAN TEMPERATURE DIFFERENCE

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RPM REVOLUTIONS PER MINUTE

RV RELIEF VALVE

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

V VALVE

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VPS VARIABLE PRIMARY SYSTEM

VSD VARIABLE SPEED DRIVE

W WATTS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

VALVE SYMBOLS

ABBREVIATIONS

GENERAL NOTES

1. COORDINATE ALL SYSTEM SHUTDOWNS WITH VA COR AT LEAST ONE MONTH AHEAD OF TIME.

2. PHASING PLAN IS INCLUDED AS DESIGN INTENT. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING DEDICATED PHASING PLAN. PLAN MUST BE APPROVED BY VA COR.

3. SEISMIC PROVISIONS REQUIRED - SEE SPECS

RECOMMENDED CONSTRUCTION PHASING PLAN

PHASE1: PROVIDE TEMPORARY CHILLERS AND PIPING

- PROVIDE 2x100 TON TEMPORARY CHILLERS AND PUMPS ON 40 FEET FLAT TRAILERS.

- PROVIDE TEMPORARY POWER FOR CHILLER TRAILERS. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO

- PROVIDE TEMPORARY 4" CHWS/R FROM TEMPORARY CHILLERS TO THE ROOF AND REMOVE AT COMPLETION OF THE PROJECT.

- PROVIDE FLEXIBLE HOSES TO CONNECT TEMPORARY CHILLED WATER PIPING AND EXISTING CHILLED WATER SYSTEM IN

MECHANICAL ROOM. FLEXIBLE HOSES SHALL BE INCLUDED IN CHILLER RENTAL PACKAGE.

- PROVIDE 6" BUTTERFLY ISOLATION VALVE ON CHILLED WATER SUPPLY BEFORE HOOKING UP TEMPORARY CHILLER TO EXISTING

CHILLED WATER SYSTEM.

- THIS PHASE REQUIRES A SHUTDOWN. CONTRACTOR SHALL COORDINATE SHUTDOWN WITH THE VA COR.

PHASE 2: REPLACE CHILLERS AND PRIMARY LOOP PUMPS

- DEMOLISH CHILLERS CH-1 & CH-2 AND ACCESSORIES ENTIRELY.

- DEMOLISH CHILLER SUPPORTING STRUCTURE AND PATCH THE ROOF ACCORDING TO THE VA SPECIFICATIONS.

- DEMOLISH CHILLERS CHILLED WATER PIPING BACK TO MAINS.

- DEMOLISH PUMPS P-1 & P-2 AND ACCESSORIES ENTIRELY.

- PROVIDE NEW STRUCTURAL FRAME TO SUPPORT NEW CHILLERS.

- INSTALL NEW CHILLERS CH-1 & CH-2 AND ACCESSORIES. CHILLER MODEL IS YVAA0200 OR EQUAL AS BASIS OF DESIGN.

- INSTALL NEW PUMPS P-1 & P-2 AND ACCESSORIES.

- INSTALL NEW CHILLED WATER PIPING AS INDICATED ON DRAWINGS.

- INSTALL BUTTERFLY VALVES TO BYPASS BUFFER TANK

- RELOCATE THREE SPLIT SYSTEM CONDENSING UNITS. PROVIDE NEW ROOF CURB AT NEW LOCATIONS. REMOVE EXISTING

ROOF CURBS AND PATCH THE ROOF ACCORDING TO THE VA SPECIFICATIONS

PHASE 3 REPLACE SECONDARY LOOP PUMPS AND MODIFY SECONDARY LOOP PIPING

- AFTER NEW CHILLERS AND PRIMARY PUMPS ARE INSTALLED AND OPERATED.

- REMOVE ALL TEMPORARY CHILLERS, PIPING, HOSES. HOWEVER, THE TEMPORARY CHILLERS AND ACCESSORIES CAN BE KEPT

UNTIL THE PROJECT IS COMPLETE AS AN OPTION

- DEMOLISH PUMPS P-4, P-5, P-6 & P-7 AND ACCESSORIES ENTIRELY

- DEMOLISH 3", 4" AND 6" CHILLED WATER SUPPLY PIPE AS INDICATED ON DRAWINGS

- INSTALL NEW PUMPS P-4 & P-5 AND ACCESSORIES.

- CONNECT 3"Ø OPERATING ROOM RISER, 4"Ø RISER AND 6"Ø RISER TO CHILLED WATER SUPPLY MAIN HEADER AS SHOWN ON

DRAWING.

- PROVIDE SEISMIC BRACING FOR PIPING IN MECHANICAL ROOM

- THIS PHASE REQUIRES A SHUTDOWN. CONTRACTOR SHALL COORDINATE SHUTDOWN WITH THE VA COR.

MH-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:1

P M

GENERAL NOTES ABBREVIATIONS AND

SYMBOLS

DM HL

G-002

� &'()*+,�-./0*'1.234256�-./0*'7'89256�-./0*'&'()*+,�:2,3*;(+8,2(5<==.*�78,* >?*+@*4 7'895

7'89256�:2,3*ABB'(C*4D

A E

FFGHI�JF�JKLMNOHMGJKPKQ� PHGRGMGIL�PKPSITIKMUVWV�XYZ[\]̂Y_]à�bY]Y\[_cdaa[e\c f g

A f g hi j k l m n o ip

&?8=*������������������� Ehi j k l m n o ipq*C2=2(5=D 78,*D hjn�>(B*3854�r,'**,s.25+tu�vA�philo&D�limwjniwlEopgD�limwlnmwkoop�����NGHxLMJKI��yOPNI�KQJzIN{�����

��|�}" ��}%�%��" |�}" ��"���"% �GN��JJRIQ��~GRRIN��I�RPHITIKM El>hjihp>ppjki��PKH~ILMIN�����IQGHPR��IKMIN"

��T�M~��JPQ{��PKH~ILMIN{�����!

�����JKLMNOHMGJK��JHOTIKML

��������������������������������������������������������������������������������������� �¡���������¢���£££�£¤¥¥¦§̈©ª«¬§®¤¬®¥�¬̄° ±������²��������³��� ��� &́ -µ&v

������������������¹����� �����������������������������$�

·�º�

�¹���������������������$

¼½¾¿À¾ÁÂ�Ã�ÄÅÅÆ�Ç¿ÈÁ

�����������������
��
�����������������
��
���������
�������������������"�����������
����
������������
�������
�����������"���
�����������
��
!)������������ ����������������
��& ������#��
!�"�����
������*�
���������
��#��
!�"�����
��
����
�����������
�����#��
���� �"���
������"�������������������������

0123456�789:41;8<=><?@�789:41A1BC<?@�789:410123456�D<6=4E25B6<2?FGG84�AB64 HI45J4> A1BC?

A1BC<?@�D<6=4KLL12M4>N

K O

�PPQRS�TP�TUVWXYRWQTUZU[��ZRQ\QWQSV�ZUZ]Ŝ SUW_̀à�bcdefghcigjk�lcgcfeimnkkeofm

H A p q

K H A p q rs t u v w x y sz

0IBG4

Ors t u v w x y sz{4M<G<2?GN AB64N rtx�H2L4=B?>�|61446}8<?5~���K�zrsvy0N�vsw�txs�vOyzqN�vsw�vxw�uyyz����"XQR�VWTUS���YZXS

U[T�SX)��

QX��TT\S[���Q\\SX��S�\ZRŜ SUW OvHrtsrzHzztus��ZUR�SVWSX��

��S[QRZ\��SUWSX��&��̂ �W���TZ[)��ZUR�SVWSX)�

������'������TUVWXYRWQTU��TRŶ SUWV

��������������������������������������������������������� ����¡��¢������£¤�����¥�£�¦§¦¦̈ §������©�ª�£�¦§¦¦̈ §«¤��¬¬¬¥¬®®̄°±²³́µ¶°·µ·®¥µ̧¹ º������»���§���§¼��� ��(��0½7¾0�

���������������������������������������������������������������������������
������������������������������
��������
������
(���������������������
����������
�����������
������������������
���������������
�����$������
��������
�������������
����
��������������
��������
�������������
����
��������������

0123456�789:41;8<=><?@�789:41A1BC<?@�789:410123456�D<6=4E25B6<2?FGG84�AB64 HI45J4> A1BC?

A1BC<?@�D<6=4KLL12M4>N

K O

�PPQRS�TP�TUVWXYRWQTUZU[��ZRQ\QWQSV�ZUZ]Ŝ SUW_̀à�bcdefghcigjk�lcgcfeimnkkeofm

H A p q

K H A p q rs t u v w x y sz

0IBG4����

Ors t u v w x y sz{4M<G<2?GN AB64N rtx�H2L4=B?>�|61446}8<?5~���K�zrsvy0N�vsw�txs�vOyzqN�vsw�vxw�uyyz%##��XQR�VWTUS� �YZXS�U[T�SX*����#���#�(��/��%�.�.%%/�(��/��$/&�&/.� �QX��TT\S[���Q\\SX��S�\ZRŜ SUW OvHrtsrzHzztus��ZUR�SVWSX�����S[QRZ\��SUWSX/���

̂ �W���TZ[*��ZUR�SVWSX*����# �#$�##���TUVWXYRWQTU� TRŶ SUWV

/+�+%#%������������������������������������������������������� ��¡������¢£�����¤�¢�¥¦¥¥§¦������̈�©�¢�¥¦¥¥§¦ª£��«««¤«¬®̄°±²³́µ̄¶¬́¶¤́·̧ ¹������º���¦���¦»��� ���&#%0¼7½0�

SF-001

SF-001

NOTES:

1. EXISTING BEAM W12X40 AND ROOF MEMBRANCE TO BE

REMOVED ENTRIRELY. PATCH THE ROOF ACCORDING TO THE

VA'S SPECIFICATIONS

2. EXISTING STRUCTURAL POST TO BE REMOVED

3. EXISTIING SUPPORT BEAM W10X33 TO BE REMOVED

3 3 3

2 2 2 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

CHILLER STRUCTURAL FRAME - DEMOLITION

DM HL

SD-001

SF-001

17' - 4" 20' - 0" 20' - 6"

5' - 1" 16' - 2" 4' - 4"

SF-001

1-CH-2

1-CH-1

W X

W X

W X

W X

W10X33

W10X33

W10X33

W10X33

W X

W X

W X

LEVEL AND ANCHOR W12X40 TO CONCRETE WITH (2) 5/8"

HILTI KIWK BOLT TZ WITH WASHER. MAX SPACE 3'0",

COVER WITH ROOF MEMBRANE

Level 7 105' - 0"

High Roof 120' - 0"

Low Roof 107' - 0"

17' - 4" 20' - 0" 20' - 6"

SF-001

W12X40 W12X40 W12X40

W10X33 HSS 6X1/2

1-CH-2

BUFFER TANK

EXISTING FRAME

SUPPORT BUFFER

TANK

RELOCATED

CONDENSING UNIT

EXISTING

CONDENSING UNIT

EXISTING

CONDENSING UNIT

TOP OF STEEL

SF-001

Low Roof 107' - 0"

W10X33 W10X33 W10X33

W10X33

1-CH-1 1-CH-2

W8X10 W8X10

W12X40

HSS 6X1/2

HSS 6X1/2 HSS 6X1/2

HSS 6X1/2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

CHILLER STRUCTURAL FRAME - NEW WORK

DM HL

SF-001

7/1/2021

1/4" = 1'-0"

Chiller Support Structure

1/4" = 1'-0"

Chiller Support Structure Section 1 1/4" = 1'-0"

Chiller Support Structure Section 2

CHILLERS STRUCTURE ISO VIEW

NOTES:

1.0 - STRUCTURAL STEEL

1. STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION SHALL CONFORM TO THE AISC "MANUAL OF STEEL CONSTRUCTION", "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND BRIDGES" (ANSI/AISC 360-10), AND "CODE OF STANDARD PRACTICE FOR

STEEL BUILDINGS AND BRIDGES" (ANSI/AISC 303-10).

2. STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:

(A) WIDE FLANGE SHAPES:_____ASTM A992

(B) OTHER STEEL SHAPES, PLATES AND BARS:_____ASTM A572 OR ASTM A36.

(C) STRUCTURAL TUBING:_____ASTM A500 GR B.

3. ALL WELDED CONNECTIONS SHALL BE MADE BY APPROVED CERTIFIED WELDERS AND SHALL CONFORM TO A.W.S. SPECIFICATIONS

AMENDED TO DATE. ELECTRODES SHALL BE E70XX.

4. BEAM TO BEAM CONNECTION SHALL BE BOLTED CONNECTION. BOLTS SHALL CONFORM TO ASTM A325 AND BE INSTALLED SNUG-TIGHT

UNLESS NOTED OTHERWISE

5. STRUCTURAL STEEL FRAMING SHALL BE WITHIN TOLERANCE BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED.

6. FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT

PRIOR WRITTEN APPROVAL BY THE ENGINEER FOR EACH SPECIFIC USE.

7. STRUCTURAL STEEL SHAPES AND PLATES EXPOSED TO WEATHER AND AT ROOF SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123 U.N.O. FASTENERS SHALL BE HOT-DIPPED GALVANIZED PER ASTM A153 U.N.O. HOT-DIPPED GALVANIZING SHALL ALSO CONFORM TO ASTM A385. THE GALVANIZER SHALL SUBMIT A CERTIFICATE OF CONFORMANCE FOR RECORD.

8. PROVIDE FIELD TOUCH-UP AND REPAIR OF GALVANIZING AS REQUIRED PER ASTM A780 USING AN INORGANIC ZINC-RICH PRIMER.

9. WHEN DISSIMILAR METALS ARE IN CONTACT (E.G. STAINLESS STEEL IN CONTACT WITH GALVANIZED STEEL), COAT SURFACE WITH

COAL TAR EPOXY OR PROVIDE OTHER APPROVED MEANS TO PROVIDE A BARRIER.

10. WELDS SHALL BE 1/4" FILLET WELDS MINIMUM UNLESS NOTED OTHERWISE ON THE DRAWINGS.

11. PROVIDE TEMPORARY ERECTION BRACING AND SUPPORTS TO HOLD STRUCTURAL STEEL FRAMING SECURELY IN POSITION. SUCH TEMPORARY BRACING AND SUPPORTS SHALL NOT BE REMOVED UNTIL PERMANENT BRACING HAS BEEN INSTALLED.

12. SUBMIT SHOP DRAWINGS AND PRODUCT DATA FOR APPROVAL PRIOR TO FABRICATION.

2.0 - POST INSTALLED CONCRETE ANCHORS

1. EXPANSION ANCHORS SHALL BE HILTI KWIK BOLT TZ EXPANSION ANCHORS.

2. INSTALL ANCHORS IN STRICT CONFORMANCE WITH THE MANUFACTURER'S REQUIREMENTS.

3. HOLES SHALL BE THOROUGHLY CLEANED AND DRY PRIOR TO INSTALLING ANCHORS.

4. DO NOT DAMAGE EXISTING REINFORCING. LOCATE REINFORCING WITH PROFOMETER OR OTHER MEANS PRIOR TO DRILLING

CONCRETE.

Revisions: Date:

ROOF

NO 3

NO 2

NO 1

N 702A

E 701

E 703

MECHANICAL

ELEVATOR

ELEVATOR

ELEVATOR

SERVICE

MECH.RM

ROOM

STAIR NO.2

"ø

"ø

"ø

"ø

3"ø

3"ø

6"ø

6"ø

6"ø

1-P-7

P

P

1-P-6

1-P-5

1-P-4

CH

CH

"ø

"ø 4 "ø

6"ø 6"ø

6"ø

AS

ET

4" CHWS/R

RISER

6" CHWS/R

RISER

3" CHWS/R

TO OR

GLYCOL

SUPPLY

BUFFER

TANK

"ø 6

"ø

4"ø

3"ø

4" CHWS/R FOR

FUTURE

CH-1 & CH-2 AND

ACCESSSORIES SHALL BE

DEMOLISHED ENTIRELY AS OF

PHASE 2

ELEVATED

PLATFORM

MH-004

MH-004

MH-004

DEMOLITION WORK KEY NOTES:

1. EIXSITNG CH-1 & CH-2 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 2

2. SPLIT SYSTEM CONDENSING UNITS TO BE RELOCATED (TYP. 3) AS PART OF PHASE 2

3. NEW P1 & P2 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 2

4. NEW 6" BUTTERFLY VALVE SHALL BE INSTALLED BEFORE HOOKING UP TEMPORARY

CHILLERS

5. NEW P4, P5, P6, P7 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 3

6. SECONDARY PIPING SHALL BE MODIFIED AS PART OF PHASE 3

7. EXISTING ELEVATED PLATFORM SHALL BE DEMOLISHED AS PART OF PAHSE 2.

8. TEMPORARY FLEXIBLE HOSES SHALL BE DEMOLISHED WHEN CHILLERS ARE INSTALLED

AND OPERATIONAL.

9. TEMPORARY CHILLED WATER PIPES SHALL BE DEMOLISHED WHEN CHILLERS ARE

INSTALLED AND OPERATIONAL.

10. EXISTING DUMBWAITER EQUIPMENT AND DOORS SHALL BE REMOVED FOR ALL FLOORS.

KEEP SHAFT CLEAR FOR NEW ELECTRICAL WORK. IMMEDIATELY PROVIDE NEW 2-HOUR

RATED ACCESS HATCHES FOR SAFETY. COORDINATE WITH VA COR TO ENSURE

DUMBWAITER SHAFT REMAINS ACCESSIBLE FOR OTHER ACTIVE PROJECTS.

PHOTO 1: PUMP P-1 & 2 TO BE

DEMOLISHED

PHOTO 2: PUMP P-4 & 5 TO BE

DEMOLISHED

PHOTO 3: PUMP P-6 & 7 TO BE

DEMOLISHED

PHOTO 5: CHILLERS TO BE

DEMOLISHED

PHOTO 4: EXISTING 6" AND 4"

RISER TO REMAIN

PHOTO 6: SPLIT SYSTEM

CONDENSING UNITS TO BE

RELOCATED

PHOTO 7: EXISTING BUFFER TANK

TO REMAIN

DUMBWAITER SHAFT

PHOTO KEYNOTE #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:2

P M

PENTHOUSE AND ROOF PLAN - DEMO PLAN

DM HL

MD-001

SCB-B

13,312 S.F.

TRAVEL DISTANCE TO

SMOKE BARRIER = 192'

M A

T C

H L

IN

E

A

M A

T C

H L

IN

E

B

BUILDING 15

EXISTING

ELECTRICAL

EQUIPMENT

TEMPORARY 100 TON CHILLER

AND PUMPS ON 40 FEET FLAT

TRAILER.

EXISTING FENCE SHALL BE

TEMPORARILY REMOVED

TEMPORARY FENCE

TEMPORARY 4" CHWS/R FROM TEMPORARY

CHILLERS TO THE ROOF SHALL BE INSTALLED BY

MECHANICAL CONTRACTOR AND REMOVED AT

COMPLETION OF THE PROJECT.

TEMPORARY PIPES SHALL BE

INSTALLED HIGH ENOUGH TO

MAINTAIN EXISTING EGRESS.

TEMPORARY 100 TON CHILLER

AND PUMPS ON 40 FEET FLAT

TRAILER.

TEMPORARY 4" CHWS/R FROM TEMPORARY

CHILLERS RISER TO THE ROOF SHALL BE

INSTALLED BY MECHANICAL CONTRACTOR AND

REMOVED AT COMPLETION OF THE PROJECT.

CONTRACTOR SHALL PROVIDE TEMPORARY

PIPING SUPPORT SUBMITAL TO THE VA AND A/E

TO REVIEW.

"ø

"ø

PROVIDE GATE WITH LOCK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:2

P M

GROUND LEVEL - TEMPORARY CHILLER

DM HL

MH-001

NO 2

NO 1

N 702A

E 701

E 703

MECHANICAL

ELEVATOR

ELEVATOR

ELEVATOR

SERVICE

MECH.RM

ROOM

STAIR NO.2

"ø

"ø

"ø

"ø

3"ø

3"ø

6"ø

6"ø

6"ø

P

P

P

P

P

P

CH

CH

"ø

"ø 4 "ø

6"ø 6"ø

6"ø

AS

ET

4" CHWS/R

RISER

6" CHWS/R

RISER

3" CHWS/R

TO OR

GLYCOL

SUPPLY

BUFFER

TANK

"ø 6

"ø

4"ø

3"ø

4" CHWS/R FOR

FUTURE

TEMPORARY CHILLED WATER

SUPPLY AND RETURN HOSES TO BE

PROVIDED BY CHILLER RENTAL

COMPANY. APPROXIMATE 150 FEET

HOSES ARE REQUIRED.

6" VALVE SHALL BE

INSTALLED BEFORE

HOOKING UP TEMPORARY

CHILLERS

P1 & P2 ISOLATION VALVES

SHALL BE CLOSED BEFORE

HOOKING UP TEMPORARY

CHILLERS.

ELEVATED

PLATFORM

TEMPORARY CHILLED WATER

SUPPLY AND RETURN RISER..

LOCATIONS FOR CONNECTION TO TEMPORARY CHILLER HOSES

PHOTO 1: CHWS CONNECTION

PHOTO KEYNOTE #

PHOTO 2: CHWR CONNECTION

CHWR CONNECTION

CHWS CONNECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:2

P M

PENTHOUSE AND ROOF PLAN - TEMPORARY

CHILLER

DM HL

MH-002

NO 2

NO 1

N 702A

E 701

E 703

MECHANICAL

ELEVATOR

ELEVATOR

ELEVATOR

SERVICE

MECH.RM

ROOM

STAIR NO.2

UP

MH-004

"ø

"ø

"ø

3"ø

3"ø

6"ø

6"ø

6"ø6"ø 6"ø

6"ø

AS

ET

4" CHWS/R

RISER

6" CHWS/R

RISER

3" CHWS/R

TO OR

GLYCOL

SUPPLY

BUFFER

TANK

"ø 6

"ø

4"ø

4" CHWS/R FOR

FUTURE

"ø

"ø

1-P-1

1-P-2

3"ø

1-P-5

1-P-4

"ø

"ø

6"ø

6"ø

MH-004

MH-004

6"ø

6"ø

"ø6 "ø

"ø 6

"ø

1-CH-1

1-CH-2

ACV

ACV

3" CHWS/R

TO OR

BUFFER

TANK

SECONDARY PIPING

SHALL BE MODIFIED

AS PART OF PHASE 3

NEW WORK KEY NOTES:

1. NEW CH-1 & CH-2 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 2

2. SPLIT SYSTEM CONDENSING UNITS TO BE RELOCATED (TYP. 3) AS PART OF PHASE 2

3. NEW P1 & P2 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 2

4. NEW 6" BUTTERFLY VALVE SHALL BE INSTALLED BEFORE HOOKING UP TEMPORARY

CHILLERS

5. NEW P4, P5 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 3

6. SECONDARY PIPING SHALL BE MODIFIED AS PART OF PHASE 3

7. SEISMIC BRACING LOCATION. REFER TO DETAIL SHEET FOR MORE INFO

8. THREE (3) 6" BUTTERFLY VALVES SHALL BE INSTALLED ON CHILLED WATER RETURN LINES

AND BYPASS LINE TO BYPASS BUFFER TANK IF NEEDED AS PART OF PHASE 2

9. NEW ELEVATED PLATFORM AND STAIR SHALL BE INSTALLED AS PART OF PHASE 2

10. PROVIDE 2-HOUR RATED ACCESS HATCHES FOR DUMBWAITER SHAFT ON ALL FLOORS.

KEEP SHAFT CLEAR FOR NEW ELECTRICAL CONDUITS.

11. WALL PENETRATION SHALL BE PATCHED AFTER NEW CHILLERS ARE OPERATIONAL AND

TEMPORARY CHILLERS ARE REMOVED. SEE ARCHITECTURAL DRAWING FOR WALL

PATCHING DETAIL.

DUMBWAITER SHAFT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

PENTHOUSE AND ROOF PLAN

DM HL

MH-003

Level 7 105' - 0"

High Roof 120' - 0"

MH-004

1-CH-2

BUFFER TANK

EXISTING

CONDENSING

UNIT

EXISTING

CONDENSING

UNIT

RELOCATED

CONDENSING

UNIT Low Roof 107' - 0"

Level 7 105' - 0"

High Roof 120' - 0"

MH-004

1-CH-1 1-CH-2

6"ø

6"ø

Low Roof 107' - 0"

Level 7 105' - 0"

High Roof 120' - 0"

1-P-4 1-P-5 1-P-1 1-P-2

"ø

"ø 6

"ø

4"ø

6"ø

6"ø

6"ø

6"ø

CHWS FROM

CHILLERS

CHWR TO

CHILLERS

6"ø

Low Roof 107' - 0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

SECTIONS AND ISOMETRIC VIEWS

DM HL

MH-004

7/1/2021

1/4" = 1'-0"

CHILLER SECTION 1

1/4" = 1'-0"

CHILLER SECTION 2

CHILLERS ISO VIEW

PUMP ROOM ISO VIEW

1/4" = 1'-0"

PUMP ROOM SECTION

Revisions: Date:

BUFFER

TANK

PENTHOUSE

6" CHWS

6" CHWR

6" CHWR

6" CHWS

6" CHWR

4" CHWR

6" CHWR

6" CHWS

4" CHWR

4" CHWS

ROOF

TEMPORARY CHILLED WATER

SUPPLY AND RETURN HOSES

TO BE PROVIDED BY CHILLER

RENTAL COMPANY.

APPROXIMATE 150 FEET

HOSES ARE REQUIRED.

6" VALVE SHALL BE

INSTALLED BEFORE

HOOKING UP TEMPORARY

CHILLERS

P1 & P2 ISOLATION VALVES

SHALL BE CLOSED BEFORE

HOOKING UP TEMPORARY

CHILLERS.

TEMPORARY 4" CHWS/R FROM

TEMPORARY CHILLERS TO THE ROOF

SHALL BE INSTALLED BY

MECHANICAL CONTRACTOR.

TEMPORARY 100 TON CHILLER AND

PUMP ON 40 FEET FLAT TRAILER.

PHASE 1 - TEMPORARY FLOW DIAGRAM - CHILLED WATER SYSTEM

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

LEVEL 6

PENTHOUSE/ROOF

LEVEL 0

4" CHWS/R

RISERS

6"

CHWS/R

RISERS

3"

CHWS/R

TO OR

AS

ET

GLYCOL

FEED

6"

CHWS/R

HEADER

4" CHWS/R

FOR FUTURE

4" CHWS/R

TO CHILLER

4" CHWS/R

TO CHILLER

1-P-4 1-P-5 1-P-6 1-P-7 1-P-1 1-P-2

1-CH-1 1-CH-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

PHASE 1 TEMPORARY PIPING DIAGRAM

DM HL

MI-101

4" CHWS

TANK

PENTHOUSE

6" CHWS

6" CHWR

6" CHWR

6" CHWS

6" CHWR

4" CHWR

6" CHWR

6" CHWS

4" CHWR

4" CHWS

ROOF

TEMPORARY 4" CHWS/R FROM

TEMPORARY CHILLERS TO THE ROOF

SHALL BE INSTALLED BY

MECHANICAL CONTRACTOR.

TEMPORARY 100 TON CHILLER AND

PUMP ON 40 FEET FLAT TRAILER.

4" CHWS/R

TO CHILLER

4" CHWS/R

TO CHILLER

1-P-1 1-P-2

1-CH-1 1-CH-2

1-P-4 1-P-5 1-P-6 1-P-7

6" CHWS

DEMO FLOW DIAGRAM - CHILLED WATER SYSTEM

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

LEVEL 6

PENTHOUSE/ROOF

LEVEL 0

4" CHWS/R

RISERS

6"

CHWS/R

RISERS

3"

CHWS/R

TO OR

AS

ET

GLYCOL

FEED

6"

CHWS/R

HEADER

4" CHWS/R

FOR FUTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

DEMO PIPING DIAGRAM

DM HL

MI-102

6" CHWS

6" CHWS

3" CHWS

BUFFER

TANK

PENTHOUSE

6" CHWS

6" CHWR

4" CHWR

6" CHWR

6" CHWS

4" CHWR

ROOF

6" CHWS/R

TO CHILLER

6" CHWS/R

TO CHILLER

4" CHWS BRANCHES

OFF FROM 6" CHWS

MAIN

1-P-4 1-P-5 1-P-1 1-P-2

1-CH-1 1-CH-2

CIRCUIT SETTER

CIRCUIT SETTER

NEW WORK FLOW DIAGRAM - CHILLED WATER SYSTEM

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

LEVEL 6

PENTHOUSE/ROOF

LEVEL 0

4" CHWS/R

RISERS

6"

CHWS/R

RISERS

3"

CHWS/R

TO OR

AS

ET

GLYCOL

FEED

6"

CHWS/R

HEADER

6" CHWS

6" CHWR

6" CHWR

4" CHWS/R

FOR FUTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

NEW WORK PIPING DIAGRAM

DM HL

MI-103

m m

M

A X

CONFIGURATION WORKS

FOR EITHER SIDE

ANGLE

MIN: 30

MAX: 60

CONNECTION

TO STRUCTURE

1-5\8" X 1-5\8" X 12 GA

STRUT UNISTRUT P1000

SERIES OR SIMILAR

A 307 STEEL

BOLT

CONFIGURATION WORKS

FOR EITHER SIDE

ANGLE

MIN: 30

MAX: 60

CONNECTION

TO STRUCTURE

1-5\8" X 1-5\8" X 12 GA

STRUT UNISTRUT P1000

SERIES OR SIMILAR

A 307 STEEL

BOLT

TYPICAL CIRCUIT SETTER DETAIL

DETAIL FOR SUPPORTING PIPE ON ROOF

NTS

NTS

SIDE VIEW TRAPEZE HANGER FOR UP TO

453KG [1000 LB.] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

PROVIDE INSULATION

SHIELD

& INSERT FOR ALL

PIPING

(200mm [8"] MIN.)

BAND

43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm

[2"X2"X1/4"] ANGLE

15mm [1/2"] DIA.

HANGER RODS WITH

900mm [36"] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

PIPE HANGERS DETAIL

NOTE:

SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS

mm

[IN]

mm

[FT]

mm

[FT]

THRU 20

[THRU 3/4]

[7]

[5]

[1]

[7]

[6]

[11/4]

[7]

[7]

[11/2]

[9]

[8]

[2]

[10]

[8]

[21/2]

[11]

[9]

[3]

[12]

[10]

[4]

[14]

[12]

[5]

[16]

[13]

[6]

[17]

[14]

[8]

[19]

[16]

[10]

[22]

[12]

[23]

[14]

[25]

[16]

[27]

[18]

[28]

[20]

[30]

[24]

[32]

RISERS

SUPPLY RETURN

NTS

NOTE:

1. BRANCH VALVE LOCATIONS INDICATED BY

GATE VALVE SYMBOL ON RISER

DIAGRAMS.

PROVIDE BUTTERFLY

VALVES, P/T PLUGS

AND CIRCUIT SETTER

FOR EACH RISER.

NTS

STEEL EXPANSION SHIELD FOR EXISTING

CONSTRUCTION AND INSERTS FOR NEW

CONSTRICTION THIS TYPE SHALL BE USED

ONLY IN SLABS OR BEAMS OF 4" [100mm]

MIN DEPTH

3/8" [10mm] MIN DIA EXPANSION BOLTS FOR

EXISTING CONSTRUCTION AND INSERTS

FOR NEW CONSTRUCTION

CONCRETE

FLOOR SLAB

CLIP

ANGLE

NUTS & WASHERS

3/8" [10mm] MIN DIA

HANGER RODS

FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]

ANGLE

TURNBUCKLE

3/8" [10mm] MIN DIA

HANGER RODS

3/8" [10mm] MIN DIA

INSERTS NEW

CONSTRUCTION ONLY.

SECURING HANGER RODS IN CONCRETE

NTS

GREATER THAN 50mm [2"] DIA.

PIPE

50mm [2"] DIA. & SMALLER

VERTICAL

GREATER THAN 50mm [2"] DIA.

PIPE

50mm [2"] DIA. & SMALLER

HORIZONTAL

65mm [2 1/2"] DIA.

INSTALLATION OF THERMOMETER WELLS

NOTE:

PROVIDE THE APPROPRIATE WELL DEPTH TO HAVE THE

NECESSARY INSULATION STAND-OFF DISTANCE.

65mm [2 1/2"] DIA.

PRESSURE TRANSMITTER INSTALLATION

NTS

NOTES:

1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO

RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.

1/2" [15mm] STEEL PIPE OR

STEEL TUBING TO SENSORS

DIFFERENTIAL PRESSURE

TRANSMITTER (FLOW, LEVEL)

BLOWDOWN

PT

ELEVATION

(WITH BTU METER)

NTS

WATER FLOW MEASURING STATION

TE

TEMPERATURE ELEMENT

INTERFACE WITH

METERING STATION

TEFE

SUPPLY

OUTLET

FLOW

ELEMENT

BACNET INTERFACE

NOTE:

MAINTAIN UPSTREAM AND DOWNSTREAM DISTANCES RECOMMENDED BY METER

MANUFACTURERS.

NTS

NOTES:

SEE SPECIFICATION SECTION "PUMPS" FOR Y STRAINER OPTION

FIRST 3 HANGERS FOR EACH PIPE AND

BRANCH SHALL BE SPRING & NEOPRENE

TYPE. TYPE "H" FOR 4" [100mm] DIA. PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm] DIA.

PIPE & LARGER.

RIGID PIPE

HANGER

INSTALL HANGER AS CLOSE TO

PIPE ELBOW AS POSSIBLE

(TYPICAL)

1/2" [15mm]

FLEXIBLE CONNECTOR (TYPICAL)

PUMP

FLOOR

VIBRATION

ISOLATOR (TYPICAL)

1" [25mm] MIN.

DIA. PIPE STAND

CONCRETE INERTIA

BASE

DRAIN

SUCTION DIFFUSER

WITH BUILT IN STRAINER.

OPTIONAL: LONG RADIUS

ELBOW AND INLET

STRAINER WITH 3XDIAM

STRAIGHT INLET TO PUMP

1/2" [15mm]

PRESSURE GAUGE

RIGID PIPE

HANGER

SINGLE SUCTION FLOOR-MOUNTED PUMPS -

CONNECTIONS WITH FLEXIBLE CONNECTORS

OPTIONAL STRAINER

BUTTERFLY OR BALL

SHUT OFF VALVE, TYP.

CHECK VALVE

WATER TREATMENT - CLOSED SYSTEMS

NTS

NOTE:

TOP OF CHEMICAL POT FEEDER

TANK SHALL NOT BE MORE THAN

4'-0" [1200mm] ABOVE FINISHED

FLOOR.

1" [25mm]

CHEMICAL POT

FEEDER-

MINIMUM CAPACITY 5

GALLONS [19L]

1" [25mm]

FUNNEL

3/4" [20mm]

TO

DRAIN

FROM PUMP DISCHARGE TO PUMP SUCTION

AUTOMATIC FLOW

CONTROL AND

BALANCE DEVICE

AIR COOLED CHILLER - PIPING CONNECTIONS

NTS

THERMOMETER

FLOW SWITCH

FLEXIBLE

CONNECTORS

IF REQUIRED

TEST PLUGS

CHS

EVAPORATOR

CHR

DDC

TEMPERATURE

SENSOR TO ECC

PRESSURE

GAUGE

UNDER CANOPY

FS

TT TT

PROVIDE SEISMIC BRACING AT

THE LOCATION INDICATED ON

THE DRAWINGS

NTS

EXTERIOR SKIN

PREFAB. WALL PANEL

AS SPECIFIED

MASTIC

INTERIOR SKIN

GASKET

S.S. WALL PLATE

SECURED WITH S.S.

SCREWS

PIPE

INSULATION

AS SPECIFIED

SEAL

INSULATION

AGAINST SKIN OF

WALL PANEL

TUBING, PIPING

OR CONDUIT

S.S. WALL PLATE

SECURED WITH S.S.

SCREWS

FIELD APPLIED INSULATION

AFTER INSERTION OF

RESPECTIVE SERVICE FACILITY

THRU REFRIGERATOR OR

FREEZER WALL

TUBING, PIPING, AND CONDUITS PASSING

THROUGH PRE-FAB INSULATED WALL PANELS

GUY WIRES SHALL BE ANCHORED TO THE ROOF. CONTRACTOR SHALL ALSO

PROVIDE ISOLATION PADS.

INSERT LEGS OF PIPE SUPPORT INTO BASES, (ATTACH WITH 2-1/2” BOLT AND 1/2″

NUT).

SPACE OUT PIPE SUPPORTS ACCORDING TO SPECIFICATIONS. THIS SHOULD BE

DONE BEFORE ANY PIPE IS SUPPORTED. ATTACH HORIZONTAL BRACING TO LEGS

OF PIPE SUPPORTS, (APPROXIMATELY 3/4” OF THE WAY UP THE HEIGHT OF THE

SUPPORT), WITH 3” BOLTS AND 1/2″ NUT.

INSERT INSULATION PROTECTION SHIELD BETWEEN THE BOTTOM HALF OF THE

HANGER AND INSULATED PIPE.

ADJUST HEIGHT OF HANGER SO HANGER IS SUPPORTING PIPING. CHECK THAT

WEIGHT OF PIPE IS DISTRIBUTED EVENLY THROUGHOUT THE SYSTEM.

PROVIDE 4 GUY WIRES

TO PREVENT

MOVEMENT IN ANY

DIRECTION

USE ANCHOR BOLTS

TO SECURE GUY WIRES

TO THE ROOF

NOTE:

TENSION CABLE ONLY ENOUGH

TO REMOVE SAG.

HEAVY WIRE ROPE

THIMBLE

U-BOLT CLIP

7x19 GALVANIZED

AIRCRAFT CABLE

CHAIN

SHACKLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

DETAILS

DM HL

MI-200

CHILLER SCHEDULE

TAG LOCATION AREA SERVED TYPE

COOLING

CAPACITY (TONS)

NPLV (KW/TON)

TOTAL

PRESSURE

DROP (FT W.C.)

ENERGY

EFFICIENCY

RATIO (BTU/W*H)

INTEGRATED

PART LOAD

VALUE (BTU/W*H)

EVAPORATOR ELECTRICAL

OPERATING

WEIGHT (LBS)

NOTES

FLOW (GPM)

EWT (°F) LWT (°F) WPD (FT WC) FOULING FACTOR MCA MOCP POWER (KW) VOLTAGE (V) PHASE FREQUENCY (HZ) SPEED CONTROL

DESIGN MIN

CH-1 ROOF BUILDING 1 AIR-COOLED 180 17 14.7 9.68 17.61 310 229.8 56 41 11.5 0.0001 374 400 228.6 460 3 60 6-STAGE 10,450 1

CH-2 ROOF BUILDING 1 AIR-COOLED 180 17 14.7 9.68 17.61 310 229.8 56 41 11.5 0.0001 374 400 228.6 460 3 60 6-STAGE 10,450 1

NOTES:

1. BASIS OF DESIGN IS YORK AIR-COOLED SCROLL-HERMETIC CHILLER MODEL YLAA0200HE46XFBBCTX, OR EQUAL.

PUMP SCHEDULE

TAG LOCATION SERVICE SUCTION SIZE

DISCHARGE

SIZE

FLUID

GPM NPSHR HEAD (FT)

SHUT-OFF

HEAD (FT)

IMPELLER

SIZE (IN)

PUMP RPM

MOTOR

MANUFACTURER AND MODEL NUMBER NOTES

TYPE TEMPERATURE BHP MOTOR HP VOLT PH Hz

1-P-1 & 2 MECH ROOM PRIMARY LOOP 4 3 GLYCOL 41 310 6 110 N/A 11 1760 11.71 20 208 3 6 TACO SFI3011D-1760-20 1, 2, 3, 4

1-P-4 & 5 MECH ROOM SECONDARY LOOP 4 3 GLYCOL 41 310 8 150 N/A 13 1760 17.47000 25 208 3 6 TACO SFI3013-1760-25 1, 2, 3, 4

NOTES:

1. PUMP BASIS OF DESIGN IS TACO, OR EQUAL

2. END SUCTION WITH DIFFUSOR

3. FURNISH AND INSTALL BY MECHANICAL CONTRACTOR

4. PROVIDE NEW VFDs TO WORK WITH NEW PUMPS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

EQUIPMENT SCHEDULES

DM HL

MI-300

TANK

(175 TONS)

TT

FS

DPT

ZC

TT

FS

DPT

ZC

DPT DPT DPT

HSVFD

IT

STS

ECC

TYPICAL SECONDARY PUMP

HSMC

IT

STS

ECC

TYPICAL PRIMARY PUMP

COUPON RACK

FM

FM-1-XX

SIGNAL TO BAS

WALL MOUNTED

READ-OUT PANEL

FOR FM (TYP)

PRIME CHW FLOW

METER

FM

FM-2-XX

SIGNAL TO BAS

WALL MOUNTED

READ-OUT PANEL

FOR FM (TYP)

SECONDARY CHW

FLOW METER

6"Ø RISER4"Ø RISER

OPERATING ROOMS RISER

1-CH-I 1-CH-2

6" CHW

DECOUPLER

1-P-1

1-P-2

1-P-3

1-P-4

ACV-3

MINIMUM PUMP

FLOW BYPASS

DP SENSOR

LOCATED AT

RISER ON

LEVEL 3

DP SENSOR

LOCATED AT

RISER ON

LEVEL 2

DP SENSOR

LOCATED AT LEVEL

5 MECHANICAL

ROOM

TT

TT

AS-1

ET-1

(175 TONS)

(PRIMARY - LEAD)

(310 GPM)

(PRIMARY - LAG)

(310 GPM)

(SECONDARY - LAG)

(310 GPM)

(SECONDARY - LEAD)

(310 GPM)

S/S

CH-1

CHILLER CONTROL

PANEL

BACNET

INTERFACE

CONNECTION

TO BAS

START/STOP

CHWT D/L

CHW TEMP RESET

DEMAND LIMIT

FA FLA RS

FAULT ALARM

LOAD STATUS

RUN STATUS

S/S

CH-2

CHILLER CONTROL

PANEL

BACNET

INTERFACE

CONNECTION

TO BAS

START/STOP

CHWT D/L

CHW TEMP RESET

DEMAND LIMIT

FA FLA RS

FAULT ALARM

LOAD STATUS

RUN STATUS

NOTE:

CHILLER CONTROL POINTS INDICATED MAY BE PROVIDED THROUGH

SERIAL COMMUNICATION WITH PRIMARY DDC CONTROLLERS.

6"CHWR

6"CHWR

6"CHWS

6"CHWR

"C

H W

R

"C

H W

S

"C

H W

R

"C

H W

S

"C

H W

R

"C

H W

S

ACV-1

TT

TT

TT

ACV-2

TT

CIRCUIT SETTER CIRCUIT SETTER CIRCUIT SETTER

A. GENERAL

1. INITIAL CHILLER START SHALL BE A MANUAL START VIA INPUT FROM THE OPERATOR. AFTER INITIAL CHILLER IS ON-LINE, THE DDC SYSTEM

SHALL AUTOMATICALLY ENERGIZE OR DE-ENERGIZE CHILLERS.

2. CHILLED WATER TEMPERATURE SENSORS FOR EACH OF THE CHILLERS SHALL BE FURNISHED BY THE CHILLER MANUFACTURER AND WIRED TO

THE CHILLER CONTROL PANELS BY THE ATC CONTRACTOR.

3. THE CHILLER MANUFACTURER SHALL PROVIDE DIFFERENTIAL PRESSURE SENSORS (DP) FOR CHILLED WATER PUMPS. THE ATC CONTRACTOR SHALL WIRE (DP) SENSORS TO THE CHILLER CONTROL PANELS FOR REQUIRED FLOW CONFIRMATION.

4. PROVIDE COMMUNICATION WITH EACH PRIMARY PUMP MOTOR CONTROLLER TO INDICATE STATUS VIA CURRENT TRANSDUCERS. CONNECT TO

CHILLER CONTROL PANELS TO PROVIDE FAILURE ALARMS.

5. PROVIDE AUTOMATIC CONTROL VALVES TO ISOLATE EACH CHILLER AS SHOWN.

6. PROVIDE VENTURI TYPE WATER FLOW SENSOR/TRANSMITTERS FOR EACH CHILLER AND CONNECT TO CHILLER CONTROL PANELS TO PROVIDE

FAILURE ALARMS.

7. PROVIDE TEMPERATURE SENSORS FOR EACH CHILLER, FOR CHWS/CHWR ON PRIMARY LOOP, FOR CHWS/CHWR ON SECONDARY LOOP.

8. THE DDC SYSTEM SHALL BE TIED INTO EACH CHILLER AND PUMP FOR KW MONITORING AND RUN TIME MEASUREMENT.

9. THE CHILLED WATER SYSTEM IS DESIGNED TO OPERATE CONTINUOUSLY ALL YEAR ROUND.

10. CIRCUIT SETTERS SHALL BE SET TO MAXIMUM FLOW ALLOWED FOR EACH RISER BY TESTING AND BALANCING CONTRACTOR

B. CHILLER CONTROL

1. CHILLER OPERATION

1.1. CHILLERS SHALL BE AUTOMATICALLY STARTED AND STOPPED (SEQUENTIALLY) BY THE BAS. PRIMARY PUMPS ARE CAPABLE OF SERVING ANY CHILLER. CHILLER ISOLATION VALVES SHALL OPEN FULLY BEFORE PUMPS ARE STARTED. CONTROL OF INTERNAL CHILLER OPERATION SHALL BE THROUGH THE CONTROL PANEL PROVIDED BY THE CHILLER MANUFACTURER. AFTER STOPPING, A CHILLER SHALL NOT BE RESTARTED FOR 15 MINUTES(ADJ), AND, AFTER STARTING, SHALL RUN FOR AT LEAST 15 MINUTES(ADJ) BEFORE STOPPING. CHILLERS SHALL BE LIMITED TO TWO STARTS PER HOUR AND A MAXIMUM OF TEN STARTS IN ANY 24 HOUR PERIOD. SUPPLY WATER TEMPERATURE

FOR EACH CHILLER SHALL BE INITIALLY SET FOR 41°F.

1.2. UPON ACTIVATION OF THE LEAD CHILLER START SEQUENCE, THE DDC SYSTEM SHALL FIRST OPEN THE CHILLER WATER ISOLATION VALVES (ACV-1 OR ACV-2). ONCE THE VALVE POSITION IS VERIFIED BY ZC, THE LEAD PRIMARY LOOP PUMPS SHALL START. CHILLED WATER FLOW TO EACH OPERATING CHILLER SHALL BE MONITORED AND ALARMED VIA THE WATER FLOW TRANSMITTER. AFTER A 30 SECOND TIME DELAY (ADJUSTABLE FROM 0 TO 300 SECONDS TO PROVE FLOW), THE LEAD CHILLER SHALL BE ALLOWED TO START.

1.3. ONLY ONE PRIMARY PUMP AND ONE CHILLER SHALL OPERATE AT A TIME. IF EITHER CHILLER FAILS, IT SHALL BE LOCKED OUT. THE CHILLER'S ISOLATION VALVES SHALL CLOSE AND AN ALARM SHALL BE GENERATED. THE LAG CHILLER SHALL BE STARTED. THE BAS SHALL

NOT ATTEMPT TO START THE FAILED CHILLER UNTIL THE LOCKOUT IS MANUALLY RESET.

2. CHILLER LEAD/LAG CONFIGURATION

2.1. THE CHILLER SHALL OPERATE WITH 6 STAGES OF OPERATION ACCORDING TO CHILLER MANUFACTURER INTERNAL CONTROL.

2.2. THE DDC SHALL ROTATE THE LEAD/LAG CHILLER SELECTION ON EACH RESTART TO EQUALIZE RUN TIME.

2.3. COORDINATE PART LOAD AMPS CORRESPONDING WITH CHILLER PART LOAD % OF FULL LOAD TONS WITH CHILLER MFGR'S DATA.

3. CHILLER ACTIVATION / DEACTIVATION SEQUENCES:

3.1. ACTIVATE THE CHILLER.

3.2. SLOWLY OPEN THE LEAD CHILLER ISOLATION VALVE BEFORE STARTING THE LEAD PRIMARY PUMP.

3.3. AFTER CHILLED WATER FLOW TO THE LEAD CHILLER IS VERIFIED VIA THE DP SENSORS, THE LEAD CHILLER SHALL BE ACTIVATED.

3.4. DEACTIVATE THE CHILLER.

3.5. AFTER A 3 MINUTE DELAY. THE PRIMARY PUMP SHALL BE STOPPED. AFTER THE PUMP STOPS, SLOWLY CLOSE THE CHILLER ISOLATION

VALVE

C. PRIMARY AND SECONDARY PUMP CONTROL

1. SAFETIES AND ALARMS

1.1. IF PUMP FAILS TO OPERATE AFTER BEING COMMANDED ON, AN ALARM SHALL BE INDICATED AT THE BAS, THE LEAD PUMP SHALL SHUT

DOWN, AND THE LAG PUMP SHALL BE STARTED.

1.2. THE BAS SHALL MONITOR THE POSITIONS OF THE HOA AND NORMAL-TEST-BYPASS SWITCHES ON THE VFD.

1.3. THE BAS SHALL MONITOR THROUGH BACNET INTERFACE THE OPERATION OF THE CHILLERS.

1.4. THE BAS SHALL DISPLAY ALL CHILLER ALARM PANEL ALARMS AND OPERATING PARAMETERS THROUGH THE DDC SYSTEM TO THE BAS

FRONT END.

1.5. THE BAS SHALL ROTATE THE LEAD/LAG PUMP TO EQUALIZE RUN TIME.

2. OPERATION

2.1. PRIMARY PUMP SHALL RUN ANYTIME THE CHILLER IS COMMANDED TO RUN AND RUN AT CONSTANT VOLUME TO MEET THE DP SENSOR SETPOINT OF THE CHILLER. SETPOINT SHALL BE SET DURING TESTING, ADJUSTING AND BALANCING. THE VFD SHALL BE USED FOR TAB

ONLY, AND SHALL BE LOCKED WHEN TAB IS COMPLETED.

2.2. SECONDARY PUMP SHALL RUN UPON COOLING COMMAND FROM ANY EQUIPMENT AND RUN AT VARIABLE SPEED TO MEET THE DP SENSOR SETPOINT AT THE CHILLED WATER RISER. SETPOINT SHALL BE SET AND VERIFIED DURING TESTING, ADJUSTING AND BALANCING.

2.3. WHEN CHILLER SYSTEM IS FIRST STARTED, SECONDARY PUMP SHALL BE STARTED AT LOW SPEED AND SHALL OPERATE BY ITSELF FOR 0.5 HOUR (ADJ). THE PRESSURE DIFFERENTIAL (DP'S) SENSORS PROVIDED ON EACH RISER SHALL BE POLLED. THE DP WITH THE LOWEST READING AS CONFIRMED BY THE TAB CONTRACTOR SHALL BE USED TO CONTROL THE PUMP(S). DP SENSORS ARE USED TO CONTROL THE PUMP VARIABLE FREQUENCY DRIVE (VFD'S) AND INCREASE PUMP SPEED AS REQUIRED TO MAINTAIN DP SENSORS SETPOINT.

2.4. DESIGN DP SETPOINTS ARE SPECIFIED BELOW: (TO BE VERIFIED DURING TESTING, ADJUSTING, AND BALANCING)

OPERATING ROOM: 12.0 PSI

4"Ø RISER: 18.0 PSI

6"Ø RISER : 8.5 PSI

2.5. IF DIFFERENTIAL PRESSURE AT ANY SENSOR IS ZERO FOR 30 MINUTES (ADJ) OR HAS BEEN DETERMINED TO BE UNRELIABLE BY THE EMCS, IT SHALL BE REMOVED FROM THE MONITORING SEQUENCE AND AN ALARM SHALL BE ISSUED AT THE BAS. THIS ALARM SHALL BE RESET

AUTOMATICALLY WHEN THE SENSOR RETURNS TO AN OPERABLE STATE.

2.6. SHOULD THE MINIMUM FLOW ALLOWED FOR THE PUMP BE REACHED, ACV-3 SHALL OPEN UP TO MAINTAIN MINIMUM REQUIRED FLOW FOR THE PUMP.THE MINIMUM SPEED OF THE PUMPS SHALL BE SET BY THE MINIMUM PUMP FLOW AS REQUIRED BY THE PUMP MANUFACTURER (+ 10% SAFETY), OR THE MINIMUM VFD SPEED AS RECOMMENDED BY THE VFD MANUFACTURER, WHICHEVER IS GREATER.

2.7. THE CHILLER SHALL OPERATE WITH 6 STAGES OF OPERATION ACCORDING TO CHILLER MANUFACTURER INTERNAL CONTROL.

2.8. CHILLED WATER SUPPLY TEMPERATURE SETPOINT RESET

THE CHW SUPPLY TEMPERATURE SET POINT FOR THE OPERATING CHILLERS SHALL BE RESET AS FOLLOWS:

OA DRY BULB CHW TEMPERATURE SETPONT

55°F (ADJ) 42°F (ADJ)

65°F (ADJ) 41°F (ADJ)

90°F (ADJ) 40°F (ADJ)

SET POINT SHALL BE LIMITED TO 1°F (ADJ) PER HOUR.

2.9. CHILLED WATER DIFFERENTIAL PRESSURE SETPOINT RESET

THE CHW DIFFERENTIAL PRESSURE SET POINT SHALL BE RESET BASED ON AIR HANDLING UNIT (AHU) CHW CONTROL VALVE POSITIONS TO MINIMIZE PUMP ENERGY AND TO ENSURE THE WARMEST POSSIBLE RETURN WATER. BAS SHALL RESET THE CHW DIFFERENTIAL PRESSURE

SET POINT AS FOLLOWS:

NUMBER OF CHW VALVES 100% OPEN 1 OR LESS (ADJ) 6 OR MORE (ADJ)

CHW DP SET POINT REDUCE 5 PSI (ADJ) 2 PSI (ADJ)

2.10. CHILLER TONNAGE CALCULATION THE INDIVIDUAL CHILLED OPERATING OUTPUT (CHILLER TONS) SHALL BE CALCULATED AND INDICATED AT

THE BAS USING CHILLED WATER FLOW RATE AND TEMPERATURES AS FOLLOWS:

CHILLER TONS = ((CHWR - CHWS)) X FLOW RATE (GPM)) / 12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction Documents

C U se rs

\P e te r\

D o cu m e n ts \C h ill e rR e p la ce m e n t_

R jw e e k s L E

Y

R .r v t

/5

/2

:4

:3

P M

CONTROLS

DM HL

MI-400

SWITCH LEGEND

S a

ABBREVIATIONS

RMS

TSP

KW

WIRING DEVICE LEGEND

GFI

J

PB

MOTOR & CONTROLS LEGEND

HT

SM

60AS

50AF

C

CP

VFD

ATS

G

30AS

60AF

60AS

CB

100AF

90AT

POWER DISTRIBUTION

G

T

LIGHTING FIXTURE LEGEND

LIGHTNING PROTECTION LEGEND

BOLTED BONDING CONNECTION

AT

G

ONE LINE SYMBOLS LEGEND

XXAS

XXAF

XXAF

XXAT

K

HOA

N E L

R21A

EXISTING EQUIPMENT LEGEND

BRANCH CIRCUIT & FEEDER LEGEND

FEEDER HOMERUN. REFER TO LEGEND OF FEEDER SIZES FOR CONDUCTOR

AND RACEWAY REQUIREMENTS DESIGNATED INSIDE TAG. H42B-1

INDICATES PANEL AND CIRCUIT NUMBER DESIGNATION FROM WHICH

HOME RUN SHALL ORIGINATE, 100A-3P INDICATES 100 AMPERE, 3 POLE

CIRCUIT BREAKER.

R22A-1,3,5

100A-3P H42B-1

E

AIR TERMINAL-FLAT ROOF MOUNT DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7/01/2021Revisions: Date:

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

Air-Cooled Chiller Replacement 36C24120C0045

Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104

100% Construction

Documents

TRAILER.

AND PUMPS ON 40 FEET FLAT

TEMPORARY 100 TON CHILLER

TEM

TEMPORARILY REMOVED

EXISTING FENCE SHALL BE

TRAILER.

AND PUMPS ON 40 FEET FLAT

TEMPORARY 100 TON CHILLER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7/01/2021Revisions: Date:

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .