This memorandum summarizes the recommendations for preventative maintenance treatments for Pavement Management System Project Number 2 (NP-FOOT PMS(2)) located on Foothills Parkway (East) Section 8A in Cocke County, Tennessee. The project consists of asphalt concrete pavement resurfacing, chip sealing, crack sealing and filling, asphalt patching, and pavement markings. The recommended treatments include placing 1 inch of asphalt concrete surface course, tack coat, Type 1C chip seal on the mainline, and Type 1C chip seal with 1 inch of asphalt concrete in parking areas. The memorandum also recommends crack sealing cracks 0.25 inches or wider prior to treatment and addressing any fatigue cracking, settlement or potholes via patching. Appendix A provides a location map and Appendix B provides the 2016 pavement condition data.
The related federal contract opportunity is for sealed bids from small business concerns only for Great Smoky Mountains National Park Project NP-FOOT PMS(2) located in Cocke County, Tennessee. The solicitation number is 693C73-21-B-000013. The project consists of the pavement preservation treatments and other work recommended in the memorandum. The project will be split into multiple schedules with the total cost expected between $1,000,000 to $5,000,000. Bids are due on or around May 6, 2021 as specified in SF1442 Block 13a. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of the Bid Opening - NP-FOOT PMS(2).pdf | ||
| Plans - FOOT_PMS(2).pdf | ||
| NP-FOOT-PMS(2)_BIP_STR 5460-197P_Redacted.pdf | ||
| FP14_Eng.pdf | ||
| Categorical Exclusion Form (NEPA) - FOOT PMS(2).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - FOOT PMS(2).pdf | ||
| VETS-4212.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
SUBJECT: Project NP-FOOT PMS(2) – Pavement Recommendations
TO MESSAGE/COMMENT FROM/DATE
K. Roman Project Manager
A. Feleke Highway Design Manager
This memorandum serves to support 95% PS&E development for Project NP- FOOT PMS(2) located in the Great Smokey Mountains National Park in Cocke County, Tennessee. This memorandum summarizes our findings from field investigation and provides recommendations for preventive maintenance treatments to extend the service life of the pavement on the subject road section.
BACKGROUND
Project NP-FOOT PMS(2) consists of pavement preservation of Foothills Parkway (East) Section 8A located in Cocke County. The project begins at MP 0.0 west of the interchange with I-40 and ends at MP 5.67 near the intersection with Tennessee State Route 32 (Cosby Highway). Section 8A is a 5.67-mile, 2-lane (10-foot lanes), asphalt concrete pavement (ACP) with several scenic pull-offs and parking areas.
Section 8A was last rehabilitated in 2011 using Full Depth Reclamation as part of a National Park Service (NPS) in-house project. A Location Map is included in Appendix A.
PAVEMENT CONDITION ASSESSMENT
The Eastern Federal Lands Highway Division (EFLHD), Road Inventory Program (RIP), last collected pavement condition data along Section 8A in 2016 as part of Cycle 6 (C6) with the Data Collection Vehicle (DCV) for the Parkway. Based on the findings from the Highway Pavement Management Application (HPMA) ran by the Pavements team, the predicted pavement conditions for 2018-2022, indicate Pavement Condition Rating (PCR) of 95. PCR ratings ranging from 95 to 100 indicate Excellent pavement conditions which allow for pavement preservation treatments. Appendix B includes the C6 RIP Road Condition Summary Report for the Foothills Parkway (East) Sections 8A.
The Pavements team conducted a condition survey (i.e., visual inspection) along Section 8A during the scoping the project in October 2019. Section 8A was observed to have predominantly low surface distresses on the pavement wearing course including low severity longitudinal, transverse and block cracking.
EFLHD personnel from the Construction Branch visited the site in April 2020 to measure the cracks and refine the estimate for the crack sealing quantities. Based on the existing pavement surface conditions observed, Foothills Parkway (East) Sections 8A is in fair to good condition exhibiting low to medium severity longitudinal, transverse and block cracking. Transverse cracking was observed at 20 to 80-foot intervals for the entire project length.
PAVEMENT RECOMMENDATIONS
Table 1 summarizes the pavement treatment for Section 8A mainline and parking areas recommended based on the C6 RIP data, HPMA predictions and the observed existing pavement conditions. The recommendations included in this Memo reference the FP-14 Specifications, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
M. Guercio Pavement Engineer
Through:
M. Elias Pavement Team Leader
09/24/2020
Page 2 of 3 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to
Table 1. Pavement Design Recommendation for Foothills Parkway (East) Sections 8A – Mainline and parking areas
Layer
Minimum Thickness
(in) Comments
AC Surface Course 1.0
Asphalt Concrete Pavement (ACP) – Marshall Method, as per Section 402, 4.75 mm Nominal Maximum Size Aggregate (NMSA), PG 64-22 (TN DOT 411 TL), Type I-
A Modified roughness
Asphalt Tack Coat --- AC Tack Coat as per Section 412 of the FP-14 Specifications
Chip Seal --- Chip Seal Type 1C as per Section 407 of the FP-14 Specifications
Table 2. Pavement Design Recommendation for Foothills Parkway (East) Sections 8A – Parking areas and pull-off areas
Layer
Minimum Thickness
(in) Comments
AC Surface Course 1.0
ACP – Marshall Method, as per Section 402, 4.75 mm Nominal Maximum Size Aggregate (NMSA), PG 64-22 (TN DOT 411 TL), Type IV roughness
Asphalt Tack Coat --- AC Tack Coat as per Section 412 of the FP-14 Specifications
We are also recommending the following treatments:
• Perform ACP Patch Type 2 as necessary, for areas exhibiting fatigue cracking, settlement, and/or potholes. Such areas should be identified by the Contractor (CO). Patching should be performed in accordance with Section 418.
• Perform Crack Cleaning and Sealing for cracks ½-inch or wider at least a week prior to placing the preservation treatment. Crack sealing should be performed in accordance with Section 414.
Application of Crack Sealing:
It is recommended to have as much time as possible, typically 6 to 12 months or one season per industry practice, between the crack sealing operation and a hot surface treatment application. That time will allow for the crack sealant to set into
Page 3 of 3 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to the cracks and cure under vehicular traffic. This will also prevent too much sealant under the surface treatment resulting in better performance.
Since the subject project will receive surface treatments soon after the crack sealing application, it is recommended to use a recessed configuration, as per the standard details provided in previous projects, by applying the sealant so that it sets below the surface. This reduces the risk of the sealant melting and potentially bubbling back through the subsequent hot surface treatment applications.
APPENDICES
Appendix A: Project Location Map Appendix B: RIP Road Condition Summary Report for Cycle 6 cc: Highway Design BC, TS BC w/ attachments
APPENDIX A
Project Location Map
APPENDIX A – Project Information Project NP‐FOOT PMS (2)
LOCATION MAP
No Scale
Project Site Route 0008A Foothills Parkway Section 8A
Cocke County, Tennessee
APPENDIX B
RIP Road Condition Summary Report for Cycle 6
Cycle 6 - Road Inventory Program Road Condition Summary Report for
Data Collection Vehicle (DCV) Rated Roads
Great Smoky Mountains National Park
Notes:
• This condition summary report contains only the roads rated with the Data Collection Vehicle (DCV).
• Condition on roads that were manually rated and parking areas are shown in separate reports.
• Route-level scores shown on this page may not represent scores at smaller intervals (due to rollup calculations).
• Additional details on individual road ratings at 0.10-mile and 1-mile intervals can be found in Section 5 of the Cycle 6 RIP Report.
• Refer to the RIP Report Appendix for an explanation of the rating system and rating methods.
POOR (0 - 60)
FAIR (61 - 84)
GOOD (85 - 94)
Condition (Rating / Index) Legend
EXCELLENT (95 - 100)
NR = NOT RATED
Route No. FMSS No.
Functional
Class Surf.
Type
Paved Length (Miles)Route Name R u tt in g I n d ex
P a tc h
P o th o le
I n d ex
Lo n g it u d in a l C ra ck in g
In d ex
St ru ct u ra l C ra ck
I n d ex
Su rf a ce
C o n d it io n
R a ti n g
SC
R
R o u g h n es s C o n d it ex
R
C I)
P a v em en t C o n d it
R a ti n g
P C
R
A ll ig a to r C ra ck
I n d ex
Tr a n sv er se
C ra ck in g ex
Route-Level Condition for Roads Rated with the Data Collection Vehicle (DCV)
GRSM-0008A 57695 FOOTHILLS PARKWAY SECTION 8A 1 AS 5.67 100 95 99 100 99 95 100 10097
GRSM-0008G 231708 FOOTHILLS PARKWAY SECTION 8G 1 AS 10.11 100 83 88 100 88 83 100 9990
GRSM-0008H 57694 FOOTHILLS PARKWAY SECTION 8H 1 AS 6.90 100 95 95 100 95 97 100 9997
GRSM-0010N 55726 NEWFOUND GAP ROAD NORTH 1 AS 14.98 100 97 97 100 97 99 100 10098
GRSM-0010S 55724 NEWFOUND GAP ROAD SOUTH 1 AS 16.98 100 98 98 100 98 100 100 10099
GRSM-0011N 103222 GATLINBURG SPUR ROAD (NORTHBOUND) 7 AS 4.09 100 100 100 100 100 100 100 100100
GRSM-0011S 57673 GATLINBURG SPUR ROAD (SOUTHBOUND) 7 AS 4.32 100 99 100 100 100 100 99 10099
GRSM-0012AZ 57674 NB GATLINBURG BYPASS RAMP TO GATLINBURG SPUR ROAD (NORTHBOUND) 1 AS 0.23 NR 94 94 100 94 100 100 10094
GRSM-0012BZ 57674 NB GATLINBURG BYPASS RAMP TO GATLINBURG SPUR ROAD (SOUTHBOUND) 1 AS 0.09 NR 98 100 100 100 99 100 9898
GRSM-0012CZ 57674 SB NEWFOUND GAP ROAD RAMP TO NB GATLINBURG BYPASS 1 AS 0.09 NR 83 93 100 93 83 100 9683
GRSM-0012DZ 57674 NB NEWFOUND GAP ROAD AT GATLINBURG BYPASS 1 AS 0.40 NR 97 99 100 99 97 100 9897
GRSM-0012EZ 57674 SB GATLINBURG BYPASS RAMP TO NEWFOUND GAP ROAD 1 AS 0.04 NR 97 100 100 100 97 100 10097
GRSM-0012FZ 57674 RAMP TO NB NEWFOUND GAP ROAD AT GATLINBURG BYPASS 1 AS 0.04 NR 90 90 100 90 94 100 9790
GRSM-0012Z 57674 GATLINBURG BYPASS ROAD 1 AS 3.75 100 98 99 100 99 98 100 10099
GRSM-0013AZ 57675 FIGHTING CREEK GAP ROAD 1 AS 4.97 100 42 42 100 42 51 100 9965
GRSM-0013BZ 57675 FIGHTING CREEK GAP ROAD SPUR FROM NEWFOUND GAP ROAD 1 AS 0.05 NR 4 4 100 4 49 100 994
GRSM-0014 57676 LITTLE RIVER GORGE ROAD 1 AS 12.62 100 75 75 100 75 81 100 10085
GRSM-0015 57677 LAUREL CREEK ROAD 1 AS 7.79 100 99 99 100 99 100 100 10099
GRSM-0016 57678 TOWNSEND ENTRANCE ROAD 1 AS 0.74 100 91 91 100 91 98 100 9995
Data Collection Date: 06/2016 maria.guercio Highlight
| FOOT PMS (2) Pavement Design MEMO_revised.pdf |
| FOOT PMS (2) Pavement Design MEMO.pdf |
| Appendix A - Location Map.pdf |
| DRAFT_DSR_A - Location Map PMS(1) |
| DRAFT_DSR_A - Location Map PMS(2) |
| DRAFT_DSR_A - Location Map PMS(3) |
| FOOT PMS (1) , FOOT PMS (3) Pavement Design MEMO.pdf |
| Appendix A - Location Map.pdf |
| DRAFT_DSR_A - Location Map PMS(1) |
| DRAFT_DSR_A - Location Map PMS(2) |
| DRAFT_DSR_A - Location Map PMS(3) |
| 2020-09-24T14:37:02-0400 | |
| MARIA CHIARA GUERCIO |
| 2020-09-24T14:39:02-0400 | |
| MOHAMMED B ELIAS |
File details come from the government source that posted it. Updated .