FO501995 Cost Proposal.xlsx
XLSX spreadsheet 51 KB Posted
- Solicitation number
- FO501995a
- Issued by
- Connecticut
About this file
This is a cost proposal form for the Torrey Life Sciences Greenhouse Improvements - Phase 1 project (Project Number FO501995) submitted to the State of Connecticut. The project involves greenhouse improvements and requires contractors to submit a Schedule of Values that accurately represents the distribution of project costs across specified work divisions. The form utilizes a standardized cost breakdown structure organized by division groups, including General Requirements, Existing Conditions, structural trades (Concrete, Masonry, Metals, Wood), building envelope systems (Thermal & Moisture Protection, Openings, Finishes), mechanical systems (HVAC, Plumbing), electrical systems, site work (Earthwork, Exterior Improvements, Utilities), and specialized equipment categories such as Process Integration, Material Processing and Handling Equipment, and Water and Wastewater Equipment. Contractors must indicate "N/A" for divisions not applicable to the project scope and ensure all costs associated with materials, labor, equipment, taxes, insurance, bonds, overhead, profit, supervision, and incidental expenses are included within each division's pricing.
The cost proposal requires contractors to submit a total bid amount in both numerical figures and written words, with the written amount governing in cases of discrepancy. A critical qualification requirement restricts submission of cost proposals and statements of qualification to only those contractors with documented experience in abatement work. The form explicitly prohibits modification of the cost proposal template, stating that any alterations may constitute grounds for bid disqualification. Contractors must distribute their total project costs across the applicable division groups, ensuring comprehensive pricing coverage of all work required to complete the greenhouse improvements project in full.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Values
| COST PROPOSAL | ||
| PROJECT NUMBER: | FO501995 | |
| PROJECT NAME: | Torrey Life Sciences Greenhouse Improvements - Phase 1 | |
| CONTRACTOR NAME: | ||
| SCHEDULE OF VALUES | ||
| Contractor agrees that the Schedule of Values submitted with this bid is a true representation of the distribution of the costs of this Project. Please indicate N/A for those divisions of work not applicable. Divisions that are not listed below are reserved for future use. The costs provided below shall include the complete cost for furnishing and installing of materials, labor, and equipment required to provide the complete scope of work for each specified division (includes the costs of applicable taxes, insurance, bonds, overhead, profit, small tools, travel, parking, supervision, etc.). | ||
| DIVISION | GROUP | AMOUNT |
| 0 | Procurement and Contracting Requirements | N/A |
| 1 | General Requirements | |
| 2 | Existing Conditions | |
| 3 | Concrete | |
| 4 | Masonry | |
| 5 | Metals | |
| 6 | Wood, Plastics, Composites | |
| 7 | Thermal & Moisture Protection | |
| 8 | Openings | |
| 9 | Finishes | |
| 10 | Specialties | |
| 11 | Equipment | |
| 12 | Furnishings | |
| 13 | Special Construction | |
| 14 | Conveying Equipment | |
| 21 | Fire Suppression | |
| 22 | Plumbing | |
| 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| 25 | Integrated Automation | |
| 26 | Electrical | |
| 27 | Communications | |
| 28 | Electronic Safety and Security | |
| 31 | Earthwork | |
| 32 | Exterior Improvements | |
| 33 | Utilities | |
| 34 | Transportation | |
| 35 | Waterway and Marine Construction | |
| 40 | Process Integration | |
| 41 | Material Processing and Handling Equipment | |
| 42 | Process Heating, Cooling and Drying Equipment | |
| 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| 44 | Pollution and Waste Control Equipment | |
| 45 | Industry Specific Manufacturing Equipment | |
| 46 | Water and Wastewater Equipment | |
| 48 | Electrical Power Generation |
TOTAL BID AMOUNT: $ - 0
TOTAL BID AMOUNT
(IN WORDS):
Show the Total Bid Amount in both words and figures. In case of discrepancy, the amount shown in words will govern.
&8Pricing Sheet Rev. 102020 &8Do not modify this form. Modification of this form may be consider ground for disqualification of your bid. &8Page &P of &N image1.jpeg
File details come from the government source that posted it. Updated .