fn1467-18_amend_2.docx
DOCX document 30 KB Posted
- Attached to
- CONSTRUCTION PROJECTS
- Solicitation number
- FN1467-19
About this file
FN1467-19 AMENDMENT 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAGE_GRADE_RATES_CORRECTED.pdf | ||
| fn1457-18_amend_1.docx | DOCX document | |
| wage_grade_rates.pdf | ||
| UNICORACH.pdf | ||
| NCIC_FORM.pdf | ||
| FN1467-19__UNICOR_ALLENWOOD_CONSTRUCTION_PROJECTS.pdf | ||
| sf_1449_fn1467-19_ALLENWOOD_CONSTRUCTION_PROJECT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
| AMENDMENT #2 |
| 11/13/2018 |
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code)
(x)
9A. AMENDMENT OF SOLICITATION NO.
FN1467-18
X
9B. DATED (SEE ITEM 11)
02/ x
11/02/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
D. OTHER (Specify type of modification and authority)
E. IMPORTANT : Contractor is not, x is required to sign this document and return 2 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
COMMODITY: Construction Projects SEE ATTACHED
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Tiffani Balestrini, Contract Specialist
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
BY
(Signature of the person authorized to sign)
(Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR(48 CFR) 53.243
This amendment hereby answers questions a result of solicitation FN1467-18 as well as amendment #1 of the solicitation.
| Q: | The Solicitation/Contract form that is to be submitted, is that the only bid form that is necessary? And we are to fill out sections 12,17,23,24,30. |
| A: | Yes these sections are what needs to be completed as well as block 26. |
A separate pricing sheet should be provided by your firm to show a break out of pricing. This does not need to be an extensive breakdown. Just provide a general break down of costs associated with the project. (for example, labor, permits, etc) This can be done in spreadsheet form, or as a word document.
| Q: | What/Where is the ACH Form? |
| A: | The ACH form was an attachment to the solicitation document posted on November 2, 2018 It is a banking enrollment form. |
| Q: | Section B- What and Where is Section B? |
| A: | Section B is pages 2-5 of the solicitation document. It is stated as follows: |
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Q: With respect to Section 17. What are you referring to with the CODE Entries/ Is the facility code the same as the CAGE Code?
A: Block 17 only needs to reflect your firms name, address and phone number. The CODE does not need to be completed.
Q: I thought I would see a form which I would fill out with our quote for the Lot #1 UNICOR warehouse repairs. I would appreciate any help / direction from you.
A: Overall Proposal pricing shall be provided on the SF1449 form (Signature Page) A separate pricing sheet should be provided by your firm to show a break out of pricing. This does not need to be an extensive breakdown. Just provide a general break down of costs associated with the project. (for example, labor, permits, etc) This can be done in spreadsheet form, or as a word document.
Closing date for submission of offerors will be Monday November 19, 2018 at 2:00 pm EST.
Except as provided herein, all other terms and conditions remain unchanged.
File details come from the government source that posted it.