FMS State wide AST Replacement SOW rev 2.pdf
PDF 3 MB Posted
- Attached to
- RFQ FMO24270 Waste Oil AST Replacements
- Solicitation number
- BD-24-1069-MILDV-10000-104508
- Issued by
- Middlesex County, Massachusetts
About this file
This document is a Scope of Work (SOW) for a state and local contract opportunity to replace aboveground storage tanks (AST) for waste oil at multiple Field Maintenance Shop (FMS) locations in Massachusetts for the Massachusetts National Guard.
The SOW details the work required to decommission and dispose of the existing tanks, select piping, and oily solids, and install new 396-gallon Myers Medium Duty ASTs at the FMS facilities in Worcester, Reading, and Framingham. The work includes procuring and installing the new ASTs, funnels, and pumping stations, as well as all electrical work and permitting. The estimated project cost is $55,000, and the work is to be completed within normal business hours Monday through Friday. The contract opportunity is identified as RFQ FMO24270 Waste Oil AST Replacements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DB Middlesex.txt | TXT text file | |
| Non-Collusion (1)~1.pdf | ||
| DB Worcester County.txt | TXT text file | |
| ComplianceStateTaxLaws~40.pdf | ||
| Bidder's Instructions AST Replacement Field Maintenance Shops.pdf | ||
| Authorized Signatory~68.pdf | ||
| Cert_CorpVote~4.pdf | ||
| FMO24270 FORM FOR GENERAL BID.pdf | ||
| MA weekly certified payroll report form-fs~28.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Acceptance Form Under $25,000
Project_________________________________________ Project Number:__________
Location:_______________________________________ Facility Number:__________
Problem // Issue Description
Scope of Work:
POC Name/Email/Phone:_______________________________________
Initial Qualifications: ________________________________________
Estimated Project Cost: ______________
Environmental State Quartermaster (If State-Share) CFMO Approved
Approve Approve Approve
Hold Hold Hold
*Share with Chief Procurement officer for Review.
ASSOCIATED FINDINGS :
SUMMARY:
Waste oil gauge is not in working condition
DETAILS:
The waste oil tank onsite has a gauge to read the vacuum pressure of the interstitial space of the double walled bowser. The gauge is cloudy making it hard to read and the tank is not holding the correct pressure.
REQUIREMENTS:
Hazardous waste tank systems must meet secondary containment requirements.
REGULATORY CITATION:
310 CMR 30.694(1)
EPAS CODE: ST.115.12.MA
CLASS: Class I
PREVIOUS FINDING: NO PREVIOUS REGULATORY ACTION: NO
ROOT CAUSE:4.5.3
JUSTIFICATION:
Statewide issues with the waste oil bowsers have been identified and they are all beyond their life expectancy. The FMO office has been made aware of the failing parts on the bowsers.
Implement and/or maintain procedures for investigating nonconformance and taking corrective and preventive action.
ENVIRONMENTAL THREAT: POSSIBLE
IMPACT ON READINESS: UNLIKELY
REOCCURING ISSUE: Recurring finding in this state REGULATORY ACTION: Action likely in the event of regulatory inspection
RATING: Medium
SITE: WORCESTER SKLYINE DRIVE PROTOCOL: Storage Tank OpenICAP STATUS:FMS SPACE WORCESTER
SKYLINE DRIVE
BLDG NAME:
RESPONSIBLE PARTY: FMO ICAP STATUS DATE: 09/13/2022
Elizabeth WilderCREATED BY:
250NG-025966-00000L0001ID:
OWNERSHIP: DOD Owned
LAST EDITED BY: Elizabeth Wilder
REFERENCE: MA-0513 DATE ASSESSED: 05/25/2022
FOR OFFICIAL USE ONLYMA-0513 Page 4 of 7
FOR OFFICIAL USE ONLY
FINDING DETAIL
04 April 2024
MA - ARMY NATIONAL GUARD
NOTES:
PREVIOUS FINDING INFO:
COMPLIANCE CORRECTIVE ACTION:
ROOT CAUSE CORRECTIVE ACTION:
FOR OFFICIAL USE ONLYMA-0513 Page 5 of 7
FOR OFFICIAL USE ONLY
FINDING DETAIL
SQG hazardous waste storage tanks do not meet operational requirements.
DETAILS:
The secondary containment does not indicate the proper negative pressure within the interstical space of both waste oil bowsers; the vacuum gauge should read approximatley 41 kPA and is currently reading at 0 kPA.
Site personnel state that they are manually checking the dipstick between the two tank walls and ensuring there is not a leak.
REQUIREMENTS:
SQGs must comply with certain storage tank requirements.
REGULATORY CITATION:
40 CFR 262.16(b)(3)(ii) through 262.16(b)(3)(iv) and 262.16(b)(6)(ii)
EPAS CODE: ST.100.01.US
CLASS: Class I
PREVIOUS FINDING: YES PREVIOUS REGULATORY ACTION: NO
ROOT CAUSE:4.4.1
JUSTIFICATION:
FMO needs to provide the financial resources to fix the interstitial space.
Provide resources essential for environmental management.
ENVIRONMENTAL THREAT: POSSIBLE
IMPACT ON READINESS: UNLIKELY
REOCCURING ISSUE: Recurring finding in this state REGULATORY ACTION: Action likely in the event of regulatory inspection
RATING: Medium
SITE: MTA CAMP CURTIS GUILD PROTOCOL: Storage Tank OpenICAP STATUS:FIELD MAINTENANCE SHOP
READING
BLDG NAME:
RESPONSIBLE PARTY: ICAP STATUS DATE: 09/13/2021
Elizabeth WilderCREATED BY:
250NG-025C50-00000L0009ID:
OWNERSHIP: State Owned
LAST EDITED BY: Elizabeth Wilder
REFERENCE: MA-0504 DATE ASSESSED: 07/22/2021
FOR OFFICIAL USE ONLYMA-0504 Page 24 of 54
FOR OFFICIAL USE ONLY
FINDING DETAIL
STATUS NAME DATE NOTES
Open Wilder, Elizabeth 09/19/2022 6/1/2022 it was noted that the guage still had not been fixed since the last site visit. Shop personnel still have to check the interstitial space manually on the tank.
PREVIOUS FINDING INFO:
COMPLIANCE CORRECTIVE ACTION:
ROOT CAUSE CORRECTIVE ACTION:
FOR OFFICIAL USE ONLYMA-0504 Page 25 of 54
FOR OFFICIAL USE ONLY
FINDING DETAIL
Untitled
Waste oil gauge is not in working condition
DETAILS:
The waste oil tank onsite has a gauge to read the vacuum pressure of the interstitial space of the double walled bowser. The gauge is cloudy making it hard to read and the tank is not holding the correct pressure.
REQUIREMENTS:
Hazardous waste tank systems must meet secondary containment requirements.
REGULATORY CITATION:
310 CMR 30.694(1)
EPAS CODE: ST.115.12.MA
CLASS: Class I
PREVIOUS FINDING: NO PREVIOUS REGULATORY ACTION: NO
ROOT CAUSE:4.5.3
JUSTIFICATION:
Statewide issues with the waste oil bowsers have been identified and they are all beyond their life expectancy. The FMO office has been made aware of the failing parts on the bowsers.
Implement and/or maintain procedures for investigating nonconformance and taking corrective and preventive action.
ENVIRONMENTAL THREAT: POSSIBLE
IMPACT ON READINESS: UNLIKELY
REOCCURING ISSUE: Recurring finding in this state REGULATORY ACTION: Action likely in the event of regulatory inspection
RATING: Medium
SITE: WORCESTER SKLYINE DRIVE PROTOCOL: Storage Tank OpenICAP STATUS:FMS SPACE WORCESTER
SKYLINE DRIVE
BLDG NAME:
RESPONSIBLE PARTY: FMO ICAP STATUS DATE: 09/13/2022
Elizabeth WilderCREATED BY:
250NG-025966-00000L0001ID:
OWNERSHIP: DOD Owned
LAST EDITED BY: Elizabeth Wilder
REFERENCE: MA-0513 DATE ASSESSED: 05/25/2022
FOR OFFICIAL USE ONLYMA-0513 Page 4 of 7
FOR OFFICIAL USE ONLY
FINDING DETAIL
COMPLIANCE CORRECTIVE ACTION:
ROOT CAUSE CORRECTIVE ACTION:
FOR OFFICIAL USE ONLYMA-0513 Page 5 of 7
MA (3 findings)
WORCESTER SKLYINE DRIVE (250NG-025966-00000L0001)
MA-0494 [05/07/2021] (I)
MA-0513 [05/25/2022] (I)
MA-0514 [05/25/2022] (I)
SQG hazardous waste storage tanks do not meet operational requirements.
DETAILS:
The secondary containment does not indicate the proper negative pressure within the interstical space of both waste oil bowsers; the vacuum gauge should read approximatley 41 kPA and is currently reading at 0 kPA.
Site personnel state that they are manually checking the dipstick between the two tank walls and ensuring there is not a leak.
REQUIREMENTS:
SQGs must comply with certain storage tank requirements.
REGULATORY CITATION:
40 CFR 262.16(b)(3)(ii) through 262.16(b)(3)(iv) and 262.16(b)(6)(ii)
EPAS CODE: ST.100.01.US
CLASS: Class I
PREVIOUS FINDING: YES PREVIOUS REGULATORY ACTION: NO
ROOT CAUSE:4.4.1
JUSTIFICATION:
FMO needs to provide the financial resources to fix the interstitial space.
Provide resources essential for environmental management.
ENVIRONMENTAL THREAT: POSSIBLE
IMPACT ON READINESS: UNLIKELY
REOCCURING ISSUE: Recurring finding in this state REGULATORY ACTION: Action likely in the event of regulatory inspection
RATING: Medium
SITE: MTA CAMP CURTIS GUILD PROTOCOL: Storage Tank OpenICAP STATUS:FIELD MAINTENANCE SHOP
READING
BLDG NAME:
RESPONSIBLE PARTY: ICAP STATUS DATE: 09/13/2021
Elizabeth WilderCREATED BY:
250NG-025C50-00000L0009ID:
OWNERSHIP: State Owned
LAST EDITED BY: Elizabeth Wilder
REFERENCE: MA-0504 DATE ASSESSED: 07/22/2021
FOR OFFICIAL USE ONLYMA-0504 Page 24 of 54
STATUS NAME DATE NOTES
Open Wilder, Elizabeth 09/19/2022 6/1/2022 it was noted that the guage still had not been fixed since the last site visit. Shop personnel still have to check the interstitial space manually on the tank.
COMPLIANCE CORRECTIVE ACTION:
ROOT CAUSE CORRECTIVE ACTION:
FOR OFFICIAL USE ONLYMA-0504 Page 25 of 54
| Project: Waste Oil AST Replacement |
| Project Number: FMO24270 |
| Location: FMS Worcester, Reading, Framingham, Westfield |
| Facility Number: |
| Problem Issue Description: Aboveground storage tanks (AST) across multiple Field Maintenance Shops (FMS) are they are all beyond their life expectancy. Brockton and CSMS locations was completed in 2022. |
| Scope of Work: Worcester FMS: Request for Work of installing a single new 396 gallon waste oil AST (above storage tank) and replace pump station if needed to the FMS facility. The contractor shall decommission and dispose of existing tank, select piping, and oily solids IAW 310 CMR 30.00. Contractor shall install a new AST and components as needed that is matching to existing Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one Myers Medium Duty 396 gl/2,000 L. AST. Replacement shall include funnel and pumping station. The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook ups and permitting if needed. Customer will pump down tank prior to AST removal. Remaining residual will be the awarded contractor's responsibility to remove. |
Reading FMS: Request for Work of installing two new 396 gallon waste oil AST (above storage tank) and replace pump stations if needed to the FMS facility. The contractor shall decommission and dispose of existing tank, select piping, and oily solids IAW 310 CMR 30.00. Contractor shall install a new AST and components as needed that is matching to existing Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one Myers Medium Duty 396 gl/2,000 L. AST. Replacement shall include funnel and pumping station. The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook ups and permitting if needed. Customer will pump down tank prior to AST removal. Remaining residual will be the awarded contractor's responsibility to remove.
Framingham FMS: Request for Work of installing a single new 396 gallon waste oil AST (above storage tank) and replace pump station if needed to the FMS facility. The contractor shall decommission and dispose of existing tank, select piping, and oily solids IAW 310 CMR 30.00. Contractor shall install a new AST and components as needed that is matching to existing Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one Myers Medium Duty 396 gl/2,000 L AST. Replacement shall include funnel and pumping station. The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook ups and permitting if needed. Customer will pump down tank prior to AST removal. Remaining residual will be the awarded contractor's responsibility to remove.
All Work at each location shall be completed within normal business hours, Monday through Friday 0800-1600. Awarded Contractor shall proved a schedule for each location. Schedule will be in PDF format.
| POC NameEmailPhone: David Stanley (Worcester/Framingham), Bill Jacques(Reading), Bill Gould (Westfield) |
| Initial Qualifications: Certified to to procure and Install Myers Waste Oil Tanks |
| Estimated Project Cost: $55,000 |