Bidder's Instructions AST Replacement Field Maintenance Shops.pdf
PDF 132 KB Posted
- Attached to
- RFQ FMO24270 Waste Oil AST Replacements
- Solicitation number
- BD-24-1069-MILDV-10000-104508
- Issued by
- Middlesex County, Massachusetts
About this file
This document is a Request for Quotes (RFQ) from the Massachusetts Military Division, seeking a contractor to replace above-ground storage tanks (ASTs) at four Field Maintenance Shops (FMS) located in Worcester, Reading, Framingham, and Westfield, Massachusetts. The scope of work includes decommissioning and disposing of the existing tanks, selecting piping and oily solids, and installing new 396-gallon Myers brand waste oil ASTs. The replacement work must adhere to state fire regulations and include necessary electrical hookups and permitting. Mandatory site visits are scheduled for July 10-11, 2024, and bids are due by July 18, 2024, with an anticipated contract start date thereafter.
The procurement method is a Fee for Service contract, with progress payments made via Electronic Funds Transfer. Prevailing wages per Davis-Bacon requirements apply, and a payment bond may be required if the project exceeds $25,000. This opportunity is part of the Massachusetts Small Business Purchasing Program, with the intent to award to one or more certified small businesses based in the Commonwealth.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DB Middlesex.txt | TXT text file | |
| Non-Collusion (1)~1.pdf | ||
| DB Worcester County.txt | TXT text file | |
| ComplianceStateTaxLaws~40.pdf | ||
| Authorized Signatory~68.pdf | ||
| Cert_CorpVote~4.pdf | ||
| FMO24270 FORM FOR GENERAL BID.pdf | ||
| FMS State wide AST Replacement SOW rev 2.pdf | ||
| MA weekly certified payroll report form-fs~28.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maura Healey Governor
Kim Driscoll Lieutenant Governor
KARYN E. POLITO
The Commonwealth of Massachusetts
Executive Office of Public Safety & Security
Military Division 2 Randolph Road
Hanscom AFB, Massachusetts 01731-3001 Tel: (339) 202-3900 www.mass.gov/guard
Terrence M. Reidy Secretary of Public Safety & Security
Major General Gary W. Keefe The Adjutant General
20 June 2024
RFQ FMO24270 Waste Oil AST Replacements
Field Maintenance Shops, Statewide
Scope of Work
Concept: The Awarding Authority seeks a Limited User Contract to award one (1) contractor to coordinate the replacement of above ground storage tanks across multiple Field Maintenance Shops, Statewide. Locations will include FMS Worcester, FMS Reading, FMS Framingham, and FMS
Westfield. The current tanks are all beyond their life expectancy.
Applicable Procurement Law: M.G.L. c. 149, s. 44A; M.G.L. c. 30, § 39M.
Scope of Work:
Worcester FMS: Request for the installation of a single new 396-gallon waste oil AST (above ground storage tank) and replacement of pump station if needed to the FMS facility. The contractor shall decommission and dispose of the existing tank, select piping, and oily solids IAW 310 CMR 30.00.
Contractor shall install a new AST and components as needed that is matching to existing Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one Myers Medium
Duty 396 gl/2,000 L. AST. Replacement shall include a funnel and pumping station. The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook-ups and permitting if needed. Customer will pump down tank prior to AST removal. Remaining residual will be the awarded contractor's responsibility to remove.
Reading FMS: Request for the installation of two new 396-gallon waste oil AST (above ground storage tanks) and the replacement of pump stations if needed to the FMS facility. The contractor shall decommission and dispose of the existing tank, select piping, and oily solids IAW 310 CMR 30.00.
Contractor shall install a new AST and components as needed that is matching to existing Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one Myers Medium
Duty 396 gl/2,000 L. AST. Replacement shall include a funnel and pumping station. The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook-ups and permitting if needed. Customer will pump down tank prior to AST removal. Remaining residual will be the awarded contractor's responsibility to remove.
Framingham FMS: Request for the installation of a single new 396-gallon waste oil AST (above ground storage tank) and the replacement of pump station if needed to the FMS facility. The contractor shall decommission and dispose of the existing tank, select piping, and oily solids IAW 310 CMR
30.00. Contractor shall install a new AST and components as needed that is matching to existing
Meyers tank brand and shall be equal to existing footprint. Contractor shall procure and install one
Myers Medium Duty 396 gl/2,000 L AST. Replacement shall include a funnel and pumping station.
The tank shall follow State Fire Regulation for Waste Oil Tanks 527 CMR 9.06. Work is to also include all electrical hook-ups and permitting if needed. Customer will pump down tank prior to AST removal.
Remaining residual will be the awarded contractor's responsibility to remove.
Acquisition Method: Fee For Service. The Awarding Authority will discuss progress payments for the awarded project amount to be paid with Electronic Funds Transfer (EFT).
The Massachusetts Military Division is a tax-exempt entity. The awarded contractor will produce
Liability Insurance information naming the Commonwealth as additionally insured prior to work commencing. Contractors submitting a bid must include an Authorized Signatory and Non-Collusion
Form.
Wages: Prevailing wages will be required for this project. Included with the solicitation are Davis
Bacon (federal wages.) Certified payroll is required prior to progress or final payment.
Bonding: Should the project cost exceed $25,000 a payment bond in the amount of 50% of the project value will be required from the awarded contractor prior to work commencing.
Site Visit: There will be mandatory site visits prior to submission of a bid on 10 JULY 2024 & 11
JULY 2024. Please contact POCs Dave Stanley (Worcester & Framingham) at david.a.stanley65.nfg@army.mil and Bill Jacques (Reading) at william.h.jacques.nfg@army.mil to announce your intent to attend.
Bid Submission: Participating vendors shall submit a completed General Bid Form of cost for furnishing all plant, labor, materials, equipment, transportation, and qualified personnel to perform all necessary travel and services required to complete the requirement herein described.
Only electronic quotes submitted via COMMBUYS will be accepted in response to this RFQ.
Responses must be sent via the “Create Quote” functionality in COMMBUYS.
Additional statutory forms to be included are the Commonwealth Authorized Signatory and Non-
Collusion Forms.
Contractors with questions can submit them via email to the purchaser, Contract Specialist III Nick
Haddad Nicholas.Haddad@mass.gov. Responses to questions will come in the form of an addendum, posted in the CommBuys solicitation prior to the bid closing date.
It is the Bidder’s responsibility to verify receipt of questions. It is the responsibility of the prospective
Bidder and awarded Contractor to maintain an active registration in COMMBUYS and to keep current the email address of the Bidder’s contact person and prospective contract manager, if awarded a contract, and to monitor that email inbox for communications from the Purchasing Department, including requests for clarification. The Purchasing Department and the Commonwealth assume no responsibility if a prospective Bidder’s/awarded Contractor’s designated email address is not current, or if technical problems, including those with the prospective Bidder’s/awarded Contractor’s computer, network, or internet service provider (ISP) cause email communications sent to/from the prospective
Bidder/Awarded contractor and the Purchasing Department to be lost or rejected by any means including email or spam filtering.
Bid due date: Bids will be submitted electronically on www.commbuys.com no later than 18 July
2024 at 10:00AM with an award from the Awarding Authority immediately following. A lump sum bid will be evaluated using M.G.L. c. 149, s. 44A; M.G.L. c. 30, § 39M. by the Awarding Authority.
mailto:david.a.stanley65.nfg@army.mil mailto:Nicholas.Haddad@mass.gov http://www.commbuys.com/
Estimated Procurement Calendar:
Announcement of Intent to Procure June 24
Bid Release Dat e June 24
Site Visit Date July 10 & 11
Deadline for Quotes/Bid Responses July 18
Notification of Apparent Successful Bidders July 25
Estimated Contract Start Date
The awarded contractor personnel must be able to pass security screening in order to access the base for a site visit or to conduct work on this project. The project manager may request limited personal information for any contractor personnel accessing the site in order to pre-clear them with base security.
Small Business Purchasing Program
Program Background
The Massachusetts Small Business Purchasing Program (SBPP) was established pursuant to Executive
Order 523 to increase state contracting opportunities with small businesses having their principal place of business within the Commonwealth of Massachusetts. Pursuant to the SBPP, it is the intention of the issuing department to award this Small Procurement to one or more SBPP participating business(es) as described below.
https://www.mass.gov/sbpp https://www.mass.gov/executive-orders/no-523-establishing-the-massachusetts-small-business-purchasing-program https://www.mass.gov/executive-orders/no-523-establishing-the-massachusetts-small-business-purchasing-program
File details come from the government source that posted it. Updated .