View the file

Other files

File Type Posted
PWS.pdf PDF
DID_80809B.pdf PDF
Transportation_FMS.pdf PDF
DID_81534A.pdf PDF
Solicitation FA812121R0007.pdf PDF
Repair_Data_List.pdf PDF
DID_80727A.pdf PDF
Repair_Qualification_Requirements.pdf PDF
DID_80503.pdf PDF
FMS_DID_80727A.pdf PDF
FMS_DID_80915.pdf PDF
FMS_CDRL_81535.pdf PDF
Packaging_USAF.pdf PDF
DID_80441C.pdf PDF
FMS_CDRL_80727A.pdf PDF
FMS_DID_81535.pdf PDF
Packaging_FMS.pdf PDF
Transportation_USAF.pdf PDF
DID_80229D.pdf PDF
USAF_CDRL.pdf PDF
DID_81838.pdf PDF
DID_81995.pdf PDF
DID_81535A.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit A

C. Category

D. System/Item.

F100-PW-100/220/220E/ Seal, Air, Aircraft G E. Contract/PR NO.

FD2030-20-33729

F. Contractor

1. Data Item No.

A010

2. Title of Data Item:

Status Report for Contractor Receipt/Shipment of FMS R/R

3. Subtitle:

4. Authority (Data Acquisition Document No.)

DI-MISC-80915

5. Contract Reference

PWS

6. Requiring Office

AFLCMC/LPSIB

7. DD 250 Req N/A

1. Dist Statement Required N/A

10. Frequency Monthly

12. Date of First Submission See Block 16

14. Distribution

8. APP Code N/A

11. As of Date See Block 16

13. Date of Subsequent Submission See Block 16

a. Addressee b. Copies

D r a f t

Final

Reg Repro

16. REMARKS

BLOCK 4: DID IS TAILORED AS FOLLOWS:

Notate that the CDRL is for the basic year and ALL option periods

THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE

STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR. THE

REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH

AND FORWARDED BY E-MAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY

OF THE FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE

MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL

CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED. THE LAST

REPORT WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE

REQUIRED.

CONTRACTOR’S FORMAT IS ACCEPTABLE.

NOTE: THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, ITEM PART

NUMBER, NATIONAL STOCK NUMBER, SERIAL NUMBER, NOMENCLATURE, DATE

RECEIVED, DOCUMENT NUMBER, DATE INPUT INTO WORK, EXHIBIT LINE ITEM

NUMBER, FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET.

REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART

NUMBER SEQUENCE. SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND T.O.

REFERENCE.

CALL FOR E-MAIL ADDRESS: 405-736-4398 (LPSIB).

AFLCMC/LPSIB 1

DCMA/ACO 1

15. TOTAL 2 1 1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

F. Contract/PR NO.

3. Title of Data Item:

5. Contract Reference

PWS

6. Requiring Office

AFLCMC/LPSIB

7. DD 250 Req N/A

2. Dist Statement Required N/A

10. Frequency Monthly

12. Date of First Submission

11. As of Date See Block 16

13. Date of Subsequent Submission See Block 16

a. Addressee b. Copies

D r a f t

Final

Reg Repro

16. REMARKS

BLOCK 4: DID IS TAILORED AS FOLLOWS:

Notate that the CDRL is for the basic year and ALL option periods

THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE

STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR. THE

REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH

AND FORWARDED BY E-MAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY

OF THE FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE

MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL

CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED. THE LAST

REPORT WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE

REQUIRED.

CONTRACTOR’S FORMAT IS ACCEPTABLE.

NOTE: THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, ITEM PART

NUMBER, NATIONAL STOCK NUMBER, SERIAL NUMBER, NOMENCLATURE, DATE

RECEIVED, DOCUMENT NUMBER, DATE INPUT INTO WORK, EXHIBIT LINE ITEM

NUMBER, FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET.

REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART

NUMBER SEQUENCE. SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND T.O.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 1 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

G. Contract/PR NO.

FD2030-20-30361

4. Title of Data Item:

5. Contract Reference

PWS

6. Requiring Office

AFLCMC/LPSIB

7. DD 250 Req N/A

3. Dist Statement Required N/A

10. Frequency Monthly

12. Date of First Submission

11. As of Date See Block 16

13. Date of Subsequent Submission See Block 16

a. Addressee b. Copies

D r a f t

Final

Reg Repro

16. REMARKS

BLOCK 4: DID IS TAILORED AS FOLLOWS:

Notate that the CDRL is for the basic year and ALL option periods

THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE

STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR. THE

REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH

AND FORWARDED BY E-MAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY

OF THE FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE

MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL

CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED. THE LAST

REPORT WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE

REQUIRED.

CONTRACTOR’S FORMAT IS ACCEPTABLE.

NOTE: THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, ITEM PART

NUMBER, NATIONAL STOCK NUMBER, SERIAL NUMBER, NOMENCLATURE, DATE

RECEIVED, DOCUMENT NUMBER, DATE INPUT INTO WORK, EXHIBIT LINE ITEM

NUMBER, FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET.

REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART

NUMBER SEQUENCE. SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND T.O.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 1 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

H. Contract/PR NO.

5. Title of Data Item:

5. Contract Reference

PWS

6. Requiring Office

AFLCMC/LPSIB

7. DD 250 Req N/A

4. Dist Statement Required N/A

10. Frequency Monthly

12. Date of First Submission

11. As of Date See Block 16

13. Date of Subsequent Submission See Block 16

a. Addressee b. Copies

D r a f t

Final

Reg Repro

16. REMARKS

BLOCK 4: DID IS TAILORED AS FOLLOWS:

Notate that the CDRL is for the basic year and ALL option periods

THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE

STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR. THE

REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH

AND FORWARDED BY E-MAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY

OF THE FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE

MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL

CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED. THE LAST

REPORT WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE

REQUIRED.

CONTRACTOR’S FORMAT IS ACCEPTABLE.

NOTE: THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, ITEM PART

NUMBER, NATIONAL STOCK NUMBER, SERIAL NUMBER, NOMENCLATURE, DATE

RECEIVED, DOCUMENT NUMBER, DATE INPUT INTO WORK, EXHIBIT LINE ITEM

NUMBER, FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET.

REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART

NUMBER SEQUENCE. SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND T.O.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 1 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

I. Contract/PR NO.

6. Title of Data Item:

5. Contract Reference

PWS

6. Requiring Office

AFLCMC/LPSIB

7. DD 250 Req N/A

5. Dist Statement Required N/A

10. Frequency Monthly

12. Date of First Submission

11. As of Date See Block 16

13. Date of Subsequent Submission See Block 16

a. Addressee b. Copies

D r a f t

Final

Reg Repro

16. REMARKS

BLOCK 4: DID IS TAILORED AS FOLLOWS:

Notate that the CDRL is for the basic year and ALL option periods

THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE

STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR. THE

REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH

AND FORWARDED BY E-MAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY

OF THE FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE

MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL

CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED. THE LAST

REPORT WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE

REQUIRED.

CONTRACTOR’S FORMAT IS ACCEPTABLE.

NOTE: THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, ITEM PART

NUMBER, NATIONAL STOCK NUMBER, SERIAL NUMBER, NOMENCLATURE, DATE

RECEIVED, DOCUMENT NUMBER, DATE INPUT INTO WORK, EXHIBIT LINE ITEM

NUMBER, FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET.

REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART

NUMBER SEQUENCE. SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND T.O.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST
CONTRACT DATA REQUIREMENTS LIST
CONTRACT DATA REQUIREMENTS LIST
CONTRACT DATA REQUIREMENTS LIST
CONTRACT DATA REQUIREMENTS LIST
CONTRACT DATA REQUIREMENTS LIST:
Form Approved CMB No 07040188:
A Contract Line Item No:
B Exhibit A:
C Category:
D SystemItem F100PW100220220E Seal Air Aircraft G:
E ContractPR NO FD20302033729:
F Contractor:
1 Data Item No A010:
3 Subtitle:
4 Authority Data Acquisition Document No DIMISC80915:
5 Contract Reference PWS:
6 Requiring Office AFLCMCLPSIB:
8 APP Code NA:
1 Dist Statement Required NA:
10 Frequency Monthly:
12 Date of First Submission See Block 16:
14 Distribution:
11 As of Date See Block 16:
13 Date of Subsequent Submission See Block 16:
b Copies:
Final:
a Addressee16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
Reg16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
D r a fAFLCMCLPSIB:
Repro1:
D r a fDCMAACO:
1DCMAACO:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_2:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_2:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_2:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_3:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_3:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_4:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_3:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_4:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_5:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_6:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_4:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_5:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_7:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_8:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_5:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_6:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_9:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_10:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_6:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_7:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_11:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_12:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_7:
D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_8:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_13:
116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_14:
DCMAACO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS Notate that the CDRL is for the basic year and ALL option periods THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN RECEIVED FOR REPAIR THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL OR FAXED NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPAIRED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED CONTRACTORS FORMAT IS ACCEPTABLE NOTE THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY ITEM PART NUMBER NATIONAL STOCK NUMBER SERIAL NUMBER NOMENCLATURE DATE RECEIVED DOCUMENT NUMBER DATE INPUT INTO WORK EXHIBIT LINE ITEM NUMBER FORECAST COMPLETION DATE AND SHIP DATE OF SERVICEABLE ASSET REPORT IS TO BE FURNISHED IN EITHER NATIONAL STOCK NUMBER OR PART NUMBER SEQUENCE SCRAPPED ITEMS REQUIRE REASON FOR SCRAP AND TO REFERENCE CALL FOR EMAIL ADDRESS 4057364398 LPSIB_8:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .