DOFE Prj L202 Prop Form.doc
DOC document 42 KB Posted
- Solicitation number
- FMATOC-10-R-0003
About this file
L202 Proposal Form word file
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOFE Prj L202 Prop Form.doc | DOC document | |
| Wage Rates for DOFE L202.pdf | ||
| DOFE Prj L202 Access Road.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF PROPOSED TASK ORDER PROPOSAL
FMATOC-10-R-0003
Date: September 8, 2010
OFFERED: ( ) ESB (X) SB Set-asid1
( ) HUBZone ( ) SVDB ( ) 8(a)
( ) UNRESTRICTED (X) KSARNG
MATOC Contractors-Small Business PROJECT TITLE AND NO: DOFE Prj L202, Access Road Reparations, Forbes Field, Topeka, KS PROJECT DESCRIPTION: Project is comprised of the demolition and removal of the existing deteriorated and heaving asphalt roadway, curb, and guttering which services the AASF hangars, mulitpole vehicle storage bull pens, and a Aviation Unit OPS Facility. The project includes the construction of a new road surface in its place. The new road will be having compacted sub-base, 6 inches of pavement per CFMO Best Practices for pavement and Roadways. The project also includes site grading and drainage necessary to insure positive drainage away from each structure in all directions, and associated new storm sewer lines, inlets, and accessory design elements. This project will be phase in a manner to provide continuous access to all of the owner facilities.
All work shall be in strict accordance with the
(X) Plans/drawings and Specifications dated 9-2-10 (One set of drawings and specs for project) Posted on www.fbo.gov website.
MAGNITUDE OF PROJECT: (X) $500,000.00 to $1,000,000.00.
PROPOSAL DUE DATE: All offers are due by Friday, 24 September 2010, NLT 2:00 p.m, CST. Email proposals will be accepted (linda.j.criss@us.army.mil) Facsimile proposals will be accepted ( 785 274-1642) or mail to: USPFO for Kansas, ATTN: P&C, Linda Criss, 2737 S. Kansas Ave, Topeka, KS 66611 PERFORMANCE PERIOD: 90 days, after receipt of Notice to Proceed
SITE VISIT: A pre-bid conference and site visit will be conducted on 14 September, 2010, Building 636 Conference Room, at 1:00 p.m., Forbes Field Flight Facility, Toepka KS. Information provided at this site visit as well as answers to questions shall not change/qualify the terms and conditions of the solicitation and specifications. Terms remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR Clause 52.228-15 Performance and Payment Bonds – Construction, contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
LIQUIDATED DAMAGES: (X) (YES) reference FAR Clause 52.211-12 Liquidate Damages - Construction. If yes, the following amounts will be applicable to this TASK ORDER ($250.00, one time charge, $75.00 daily charge).
CONSTRUCTION: FAR Clause 52.246-21 Warranty of Construction is applicable to this task order.
WAGE DETERMINATION: Currently, General Decision Number KS100005 09/03/2010 Modification No 8, dated 09/03/2010 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.
AWARD OF TASK ORDER: Offer required acceptance period is 60 days.
[ ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.
PROJECT SAFETY: In accordance with FAR Clause 52.236-13 Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. Click here to view this manual. U.S. Army Corps of Engineers Safety and Health Requirements Manual http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm QUESTIONS AND ANSWERS: All questions and answers must be in writing. Email all questions to (linda.j.criss@us.army.mil). Do not contact engineers or A&E as this will only delay receipt of answers. Questions must be received NLT 3 workdays prior to closing. Answers will be provided with questions, on a non-attribution basis to all eligible MATOC contractors.
PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause ( X) IS NOT APPLICABLE TO THIS TASK ORDER.
The following provision(s) is/are applicable to this task order:
( ) The government intends on awarding to a single offeror.
(X)The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 30 days after initial award. Performance period upon award of options will not be extended.
BASIS FOR AWARD: NOTE: Only with (X) apply:
( ) PRICE;
( ) PRICE and PAST PERFORMANCE @ equal weight (see notes);
(X) LPTA See notes/instructions ( ) OTHER, See notes instructions ( ) Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.
( ) PAST PERFORMANCE: For the purposes of this solicitation no specific past performance information is required of the MATOC contractor as part of the proposal. The Government will evaluate the quality , timeliness, and management of the offeror's past performance considering currency, relevancy, sources, context, and trends on recent (within the last three (3) years projects performed under the existing or predecessor MATOC contracts, other open market projects performed in support of locations serviced by National Guard Contracting Offices. Also, evaluations available through the Construction Contractor Assessment System (CCASS) may be used.
Linda J. Criss
Linda J. Criss
Contracting Officer
MATOC PROPOSAL FORM
PROJECT NO. DOFE Project No. L202, Access Road Reparations, Forbes Field, Topeka, KS PROJECT DESCRIPTION: Placement of lights along access road to Field Site #1 and further on the 35th MVSC. Upgrade the road from dirt and gravel to hardball. Addition of electrical panels to Field Site #1. Addition of secure communication systems.
Item
Number
Description
Quantity Unit
Amount
Project No. L202, Access Road Reparations, Forbes Field, Topeka, KS
1 JOB
Lump Sum Alternate No. 1: Remove and Replace all Curb & Gutter Within project limits.
Lump Sum $_______________ Alternate No.2: Phase III Construction as Indicated on Plans.
Lump Sum $_______________
Alternate No.3: Delete all Asphalt pavements from Project and replace with Concrete Pavement. Lump Sum $________________
ACKNOWLEDGEMENT OF AMENDMENTS
The Offeror acknowledges receipt of amendments to this Task Order
Amendment No.
Date
Amendment No.
Date
SIGNATURE:
COMPANY NAME
Name and title of person authorized to sign
Offer Date
Note the following provision(s) is/are applicable to this task order:
Note: Offerors are reminded that unlike the bid process, the request for quotation process is not public. No information will be released until an award decision is made. All contractors submitting an offer will be notified, via email of the award results
Note: The Government intends to evaluate proposals and award the delivery order without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. The Government reserves the right to reject any or all proposals at any time prior to award; negotiate with any or all offerors; award a contract to other than the offeror submitting the highest technically rated; and award contracts to offerors submitting a proposal determined by the Government to be the most advantageous (best value) to the Government in accordance with the factors stated above.
File details come from the government source that posted it. Updated .