Florida_Trench_Safety_Act.pdf

PDF 156 KB Posted

Attached to
7th St N, 50th Ave N and Vicinity Storm Drainage Improvements Part 1 (Project No. 19045-110)
Solicitation number
IFB- 25 - 289
Issued by
Pinellas County, Florida

About this file

This document is a Florida Trench Safety Act Certification and Disclosure Statement for the 7th St N, 50th Ave N and Vicinity Storm Drainage Improvements Part 1 project, with the project number 19045-110. The document outlines the bidder's acknowledgment and compliance requirements for trench safety standards as specified by Florida State Statute §553.60 - 553.64 and OSHA excavation safety standards. The project involves storm drainage improvements, and the contractor must adhere to specific trench safety standards during construction, including compliance with applicable safety regulations, special shoring requirements, and consideration of geotechnical information.

The bidder is required to identify and cost out specific trench safety measures, with the understanding that these compliance costs are to be included in the proposal pricing. The document emphasizes that no additional adjustments will be made by the City for variations in trench linear footage or shoring square footage, except as specified in the contract documents. The bidder must complete the certification by providing details on trench safety measures, their unit of measure, quantity, unit cost, and extended cost, and sign the document to confirm understanding and commitment to comply with the Florida Trench Safety Act.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7th St N, 50th Ave N and Vicinity Storm Drainage Improvements Part 1 Project No. 19045-110

Florida Trench Safety Act Certification and Disclosure Statement

The Bidder acknowledges the requirements of the Florida Trench Safety Act, pursuant to Florida State Statute §553.60 - 553.64, and that Occupational Safety and Health Administration’s excavation safety standards 29 C.F.R. §1926.650, Subpart P, is incorporated as the state standard.

The Bidder further acknowledges:

1. The trench safety standards will be in effect during the period of construction of the project;

2. The Contractor performing the trench excavation will comply with the applicable trench safety standards;

3. The Contractor performing the trench excavation will adhere to any special shoring requirements, if any, of the state or other political subdivisions which may be applicable to the project;

4. The Contractor shall consider any geotechnical information available from the City, its own sources, or otherwise in the Contractor’s design of the trench safety system which it will employ on the Project;

5. The cost of compliance with trench safety standards are identified below;

6. The method(s) of compliance must be identified by the Bidder;

7. The Bidder’s cost to comply with the Trench Safety Act is included in its proposal pricing. No adjustment shall be made by the City for any differences in the number of linear feet of trench to be excavated or square feet of shoring used, except as may otherwise be provided in the Contract Documents.

Unit of Trench Safety Measure Measure Unit Unit Extended

(Description) (LF, SF) (QTY) Cost Cost

A. _________________________________ ___________ ___________ _____________ ______________

B. _________________________________ ___________ ___________ _____________ ______________

C. _________________________________ ___________ ___________ _____________ ______________

D. _________________________________ ___________ ___________ _____________ ______________

Total ________________

I hereby certify that I have read, understand, and will comply with the Florida Trench Safety Act. This acknowledgment is signed on the date stated below by an authorized signing officer with legal powers to commit the Contractor to a binding agreement.

Authorized Signature Company Name

Print Name and Title Date

(1)

TA1:
TA11:
TA12:
TA13:
TA14:
TA2:
TA21:
TA22:
TA23:
TA24:
TA3:
TA31:
TA32:
TA33:
TA34:
TA4:
TA41:
TA42:
TA43:
TA44:
TATotal:
TACompanyName:
TADate:
TAPrint Name and Title:

File details come from the government source that posted it. Updated .