About this file
This is a technical design document for the Flat Rock Road Phase 2 Pole Changeout Project prepared for the City of Covington, dated October 1, 2025. The project involves the replacement and reconfiguration of electrical distribution poles and associated infrastructure along Flat Rock Road. The scope includes 41 pole locations (numbered 1 through 41, with some subdivisions) with specifications for new pole installations, existing pole removals, conductor installations and transfers, transformer placements, and equipment reconfigurations. The document provides detailed technical specifications across 13 sheets (D1 through D13), with each sheet depicting a specific section of the project area at a scale of 1 inch equals 100 feet. Materials specified include various conductor types (336 ACSR, 4/0 ACSR, 2 ACSR, and 1/0 ACSR) in quantities ranging from 137 to 1,245 feet per pole location, along with equipment such as power switches (C1-PBS, C2-PBS variants), insulators (H1.1, E1, E9 types), cutouts, transformers, guy leads, and underground conduits (UM5).
The document includes numerous technical notes for specific pole installations, such as instructions to re-use existing transformers and cutouts, transfer existing single-phase and two-phase taps, install new anchors with specified guy lead lengths (ranging from 10 to 25 feet), and set certain poles at specified depths. The project encompasses both overhead and underground conductor work, with references to power encroachments, pavement centerlines, and Department of Transportation right-of-way considerations. No pricing information, contract terms, funding sources, or award details are included in this technical design document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Flat Rock.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE:
EXISTING SINGLE
PHASE TAP
1 45/3
NOTE:
RE-USE
TRANSFORMER
1 45/3
1 J2.1 1 C1F 1 J2.1
1 H1.1
1 C1-PBS-L1 H1.1
1 40/5
1 C3L
2 E1 1 F1
1 H1.1
1 C2-PBS-V
3 E1 2 F1-S
1 50/2 1 H1.1
NOTE:
14' NEUTRAL FROM
TOP
RE-USE CUTOUT
TRANSFER
EXISTING SINGLE
PHASE TAP
NOTE:
18' & 15' GUY LEAD
NOTE:
30' & 25' GUY LEAD
BOTH SETS
1 C8FL
1 H1.1
26°
#3
340' 4/0 ACSR
1020' 336 ACSR
340' 2 ACSR
1020' 1/0 ACSR
#3
#2
180' 4/0 ACSR
540' 336 ACSR
180' 2 ACSR
540' 1/0 ACSR
#2
1 50/2
#1
4 F1-S 6 E1
#1
4 F1-S 6 E1
#1
R -1
N -1
R -3
N -3
R -3
N -3
#3
#2
#1
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D1POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
Flat Rock rd
POLE CHANGE OUT
#4
999' 336 ACSR
333' 4/0 ACSR
1 C1-PBS-L
#4
1 45/3 1 H1.1
1 C1-PBS-L
#6
1062' 336 ACSR
354' 4/0 ACSR
#5
#5
876' 336 ACSR
292' 4/0 ACSR
1 45/3 1 H1.1
333' 2 ACSR
999' 1/0 ACSR
#4
1 C1-PBS
1 H1.1 1 45/3
1 C1F
#6
1062' 1/0 ACSR
354' 2 ACSR
1 45/3 1 H1.1
292' 2 ACSR
876' 1/0 ACSR
#5
1 C1-PBS
3 M5-6
1 C1-PBS-L
NOTE:
RE-USE CUTOUT
R -3
N -3
R -2
N -2
R -3
N -3
#6
#5
#4
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D2POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
3 M5-6
1 F1 1 F1-S 2 E11 E1
NOTE:
EXISTING SINGLE
PHASE TAP 2°
NOTE:
INSTALL NEW
ANCHOR W/ 15'
LEAD
2 J2.1
1 C2-PBS-L
1 H1.1
1 C8FL
1 E1
1 40/5 1 C8F
1 H1.1 1 E9
1 H1.1 1 45/3
NOTE:
15' GUY LEAD
1 F1-S 1 E9
1 C1-PBS-L
#7
1 H1.1 1 45/3
894' 336 ACSR
298' 4/0 ACSR
#7
1 C1F 1 H1.1 1 45/3
894' 1/0 ACSR
298' 2 ACSR
900' 336 ACSR
300' 4/0 ACSR
900' 1/0 ACSR
300' 2 ACSR
1 50/2
#9
#9 #9
#8
288' 4/0 ACSR
864' 336 ACSR
288' 2 ACSR
864' 1/0 ACSR
#8
R -2
N -2
R -3
N -3
R -2
N -2
#8-1
#9
#8
#7
1 E1 1 F1
1 E1 1 F1-S
#8-1
1 H1.1 1 30/5
#8-1
1 H1.1 1 30/5
R -2
N -2
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D3POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
1 50/2 1 J2.1
50' UM5
1 H1.1 1 F1-S
1 C8FL
2 E1
NOTE:
25' GUY LEAD IN
BISECT
E-
9'
E -2
E -1
2 J2.1
2 J2.1
1 J2.1 #13
183' 6DUP#12
191' 6DUP
#11
200' 6DUP
#10
229' 6DUP
E -1
'NOTE:
RE-USE CUTOUT
1PH POTHEAD &
LIGHT
1 F1 1 E1 1 40/5
1 C2-PBS
1 H1.1
#13
549' 1/0 ACSR
183' 2 ACSR
40' UM5
1 F1-S 2 E1
1 C2-PBS-L
1 45/3 1 H1.1
#12
573' 336 ACSR
191' 4/0 ACSR
1 F1 1 E1 1 40/5
1 C2-PBS
1 H1.1
#12
573' 1/0 ACSR
191' 2 ACSR
50' UM540' UM5
NOTE:
RE-USE CUTOUT
1PH POTHEAD
1 H1.1 1 45/3
1 C2-PBS-L
600' 336 ACSR
200' 4/0 ACSR
2 E1 1 F1-S
#11
1 H1.1
1 C2-PBS
1 40/5
600' 1/0 ACSR
200' 2 ACSR
#11
1 E1 1 F1
2 E1 1 F1-S
1 E1 1 F1
1 40/5 1 H1.1
1 C2-PBS
#10
687' 1/0 ACSR
229' 2 ACSR
1 45/3 1 H1.1
1 C2-PBS-L
#10
687' 336 ACSR
229' 4/0 ACSR 7°
12°
#13
183' 4/0 ACSR
549' 336 ACSR
R -2
N -2
R -2
N -2
R -1
N -1
R -1
N -1
R -2
N -2
#13
#12
#11
#10
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D4POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
CUTOUT
1PH POTHEAD
NOTE:
TRANSFER
EXISTING SINGLE
PHASE TAP
1 45/3 1 H1.11 45/3
1 H1.1
NOTE:
RE-USE RECLOSER
ON POLE
1 C1-PBS 1 C1-PBS-L
#15
903' 336 ACSR
301' 4/0 ACSR
1 C8FL
1 E1 1 F1-S 1 H1.1 1 45/3
1 H1.1 1 C8F
1 40/5
#15
903' 1/0 ACSR
301' 2 ACSR
NOTE:
20' GUY LEAD IN
BISECT
1 E1
1 F1-S 1 E1 1 H1.1
50' UM5
1 C2-PBS-L
NOTE:
MOVE NEUTRAL TO
8' FROM TOP
260' 2 ACSR
780' 1/0 ACSR
260' 4/0 ACSR
780' 336 ACSR
#16 #16
843' 336 ACSR
281' 4/0 ACSR
843' 1/0 ACSR
281' 2 ACSR
1 45/3
#14
#14 #14
R -2
N -2
R -3
N -3
R
- 2
N
- 2
#16
#15
#14
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D5POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
#17
1 C1-PBS
242' 2 ACSR
726' 1/0 ACSR
1 C1-PBS-L
242' 4/0 ACSR
726' 336 ACSR
#17
1 50/2 1 H1.1
1 50/3 1 H1.1
3 M5-6
NOTE:
TRANSFER BOTH
EXISTING SINGLE
PHASE TAPS
NOTE:
RE-USE CUTOUT
#18
930' 336 ACSR
310' 4/0 ACSR
1 C1-PBS-L
930' 1/0 ACSR
310' 2 ACSR
1 C1-PBS
1 45/3 1 H1.1
1 H1.1 1 40/5
#18
R -2
N -2
R -3
1 0
N -3
1 0
R -3
N -3
#18
#17
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D6POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
1 C2-PBS-V
#21-1
1 F1-S1 E1 2 E11 F1
2 E9 1 C3 1 E9
1 45/3 1 H1.1
1 45/4 1 H1.1
1 45/5
1 C1-PBS-L1 C1-PBS
1 45/3 1 H1.1
1 H1.1
#20 #20
951' 336 ACSR951' 1/0 ACSR
317' 2 ACSR 317' 4/0 ACSR
1 H1.1 1 H1.1 1 45/3
1 C1-PBS 1 C1-PBS-L
#19 #19
1 40/5
927' 336 ACSR
309' 4/0 ACSR
927' 1/0 ACSR
309' 2 ACSR
11°
1 H1.1 1 35/5
1 H1.1 1 35/5
#21-1 #21-1
894' 336 ACSR
298' 4/0 ACSR
894' 1/0 ACSR
298' 2 ACSR
#21#21 R
-3
N -3
R -2
N -2
#21
#20
#19
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D7POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
TRANSFER
EXISTING TWO
PHASE TAP
1 45/3 1 H1.1
1 J2.1 1 40/5 1 H1.1
1 J2.1
#24
495' 336 ACSR
165' 4/0 ACSR
1 C1-PBS-L
165' 2 ACSR
495' 1/0 ACSR
#24
1 C1-PBS
NOTE:
RE-USE
TRANSFORMER &
CUTOUT
50' UM550' UM5
2 E1 2 F1
1 C6 1 H1.1
6 E1 4 F1-S
1 C6L 1 H1.1
1 50/2 1 J2.1
1 50/3 1 J2.1
NOTE:
25' & 20' FANNED
GUY LEADS
1 H1.1 1 45/3
1 C2-PBS-L
1 E1 1 F1-S
#22
846' 336 ACSR
282' 4/0 ACSR
1 J2.1
1 H1.1
1 C2-PBS
1 45/3 1 E1 1 F1
#22
846' 1/0 ACSR
282' 2 ACSR
24°
#23#23
921' 336 ACSR
307' 4/0 ACSR
921' 1/0 ACSR
307' 2 ACSR
R -2
N -2
R -3
N -3
R -1
N -1
R -2
N -2
#24
#23
#22
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D8POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
1 C1-PBS-L
1 C1-PBS-L
#25.5
627' 336 ACSR
209' 4/0 ACSR
1 45/3 1 H1.1
1 C1-PBS-L
#26
621' 336 ACSR
207' 4/0 ACSR
221' 4/0 ACSR
663' 336 ACSR
1 C1-PBS-L
#25
1 H1.1 1 45/3
#27
981' 336 ACSR
327' 4/0 ACSR
#27
3 M5-6
1 C1-PBS
1 J2.1 1 H1.1
1 45/3 1 H1.1
1 40/5 1 H1.1
1 C1-PBS
#26
1245' 1/0 ACSR
415' 2 ACSR
221' 2 ACSR
663' 1/0 ACSR
1 C1-PBS
#25
1 H1.1 1 40/5
#27
981' 1/0 ACSR
327' 2 ACSR
1 45/3
NOTE:
EXISTING TWO
PHASE TAP
#25.5
N -2
R -4
N -2
R -2
N -2
R -3
N -3
#27
#26
#25
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D9POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
1 H1.1 1 45/31 H1.1
1 45/3 3 M5-6
NOTE:
INCREASE GUY
LEAD TO 22'
1 F1-S 2 E1
1 F1 1 E1
NOTE:
EXISTING SINGLE
PHASE TAP
2 J2.1
409' 2 ACSR
1227' 1/0 ACSR
409' 4/0 ACSR
1227' 336 ACSR
1 C2-PBS-L
1 50/2
#30#30
#30
1 F1-S
1 C2-PBS-L
2 E1
1 C1-PBS-L
264' 4/0 ACSR
792' 336 ACSR
#28
264' 2 ACSR
792' 1/0 ACSR
#28
1 C1-PBS
8°
16°
#29#29
780' 336 ACSR
260' 4/0 ACSR
780' 1/0 ACSR
260' 2 ACSR
#29 1 50/2
R -2
N -2
R -2
N -2
R-4
N-4
R-365'N-365'
#30
#29
#28
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D10POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
1 H1.1 1 J2.1 1 50/2
1 H1.1 1 J2.1 1 50/33 M5-6
1 C1F 1 C1-PBS-L
1 J2.1 1 H1.1
2 E1 1 F1-S
1 E1 1 F1
1 45/3 1 H1.1
1 C2-PBS
1 50/3 1 H1.1
1 C2-PBS-L
#32 #32
939' 1/0 ACSR
313' 2 ACSR
939' 336 ACSR
313' 4/0 ACSR
#31
1095' 336 ACSR
365' 4/0 ACSR
1 C1-PBS-L
365' 2 ACSR
1095' 1/0 ACSR
#31
1 C1F
#33#33
1185' 336 ACSR
395' 4/0 ACSR
1185' 1/0 ACSR
395' 2 ACSR
#33 1 45/3
R-313'N-313'
R-395'N-395'
R-260'N-260'
#33
#32
#31
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D11POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
TRANSFER
EXISTING SINGLE
PHASE TAPS
RE-USE
TRANSFORMER
#34 #34
260' 4/0 ACSR
780' 336 ACSR
260' 2 ACSR
780' 1/0 ACSR
1 40/5 1 H1.1
1 45/3 1 H1.1
2 J2.1
1 C8FL
2 J2.1 1 C8F
328' 2 ACSR
984' 1/0 ACSR
328' 4/0 ACSR
984' 336 ACSR
#35 #35
1 45/3 1 H1.11 H1.1
1 40/5
2 J2.1
1 C1-PBS 1 C1-PBS-L
2 J2.1
356' 2 ACSR
1068' 1/0 ACSR
356' 4/0 ACSR
1068' 336 ACSR
#36 #36
1 C1-PBS 1 C1-PBS-L
1 45/3 1 H1.1 2 J2.1
1 45/3 1 H1.1 2 J2.1
3 M5-6
NOTE:
SET POLE 8.5' DEEP
RE-USE
TRANSFORMER
2 E1 1 F1-S
1 E1 1 F1
1 45/4
1 C2-PBS
1 C8FL
1 45/3
1 H1.1 3 J2.1
1 H1.1 3 J2.1
NOTE:
TRANSFER
EXISTING SINGLE
PHASE TAP
RE-USE
TRANSFORMER
NOTE:
TRANSFER
EXISTING SINGLE
PHASE TAP
NOTE:
15' GUY LEAD IN
BISECT
20°
#37#37
831' 336 ACSR
277' 4/0 ACSR
831' 1/0 ACSR
277' 2 ACSR
R-328'N-328'
R-356'N-356'
R-277'N-277'
R-230' N-230' #37
#36
#35
#34
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D12POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2
2 F1 2 E1
#41
#39
648' 1/0 ACSR
216' 2 ACSR
NOTE:
25' & 22' GUY LEADS
SET POLE 7' DEEP
2 F1
2 E9
1 C7F 1 C7FL
NOTE:
JOINT USE WOOD
GTC POLE
NOTE:
25' & 22' GUY LEADS
1 J2.1
216' 6DUP
2 C7FL
4 F1-S 6 E1
1 H1.1
#38
690' 336 ACSR
230' 4/0 ACSR
2 J2.1 1 H1.1
1 C8FL
1 45/3 2 E1 1 F1-S
#38
690' 1/0 ACSR
230' 2 ACSR
2 J2.1 1 H1.1 1 40/5
1 C2-PBS
1 E1 1 F1
NOTE:
RE-USE
TRANSFORMER
NOTE:
10' GUY LEAD IN
BISECT
2 E1 1 40/4
#41
N-1
6°
45°
#40#40
411' 336 ACSR
137' 4/0 ACSR
411' 1/0 ACSR
137' 2 ACSR
#40 1 70/1
#39
648' 336 ACSR
216' 4/0 ACSR
#39 1 45/3
R-216' N-216'
R-1
N-1
#40
#39
#38
NEW POLE
EXISTING POLE
REMOVE POLE
DATE
INITIALS
REVISIONS
DESCRIPTIION
EXISTING ANCHOR
SECURITY LIGHT
NEW ANCHOR
WATER - POND/LAKE/RIVER
NEW CONDUCTOR
EXISTING CONDUCTOR
UNDERGOUND CONDUCTOR
S H
E E
T
D13POWER ENCROACHMENT
PAVEMENT CENTER LINE
D.O.T. RIGHT-OF-WAY SCALE: 1"= 100'
City of Covington
10/1/2025
Flat Rock rd PH2