FKEC_Bid_26-06_ADDENDUM_1_SHAPE_FILES.zip
ZIP file 694 KB Posted
- Solicitation number
- FKEC BID #26-06
- Issued by
- Florida
About this file
This file is an addendum containing shape files related to a competitive bid solicitation issued by Florida Keys Electric Cooperative (FKEC) for comprehensive inspections of its underground distribution system in compliance with Florida Public Service Commission Rules 25-6.034 and 25-6.0341, the National Electrical Safety Code, and OSHA standards. The scope encompasses inspections of 31 pad-mounted switchgear units, 809-890 pad-mounted transformers, 80 pad-mounted junction cabinets, 2 Medium Voltage Interrupt cabinets, 5 fused elbow vaults, 4 primary metering cabinets, and associated underground components including terminations, elbows, bushings, grounding systems, and protective devices. Written questions were due March 23, 2026 at 2:00 p.m., with proposals due March 31, 2026 at 2:00 p.m. via email to procurement@fkec.com or through DemandStar e-Bidding. Contract award is anticipated by November 1, 2026, with project completion also targeted for November 1, 2026.
FKEC will evaluate proposals based on firm and staff qualifications (40 percent weight), relevant past performance (20 percent), and cost proposal (40 percent), with award not necessarily going to the lowest bidder. The specific budget or award value is not disclosed in the procurement documents. Contractors must maintain comprehensive insurance coverage including professional liability, commercial general liability with $2,000,000 per occurrence limits, workers' compensation with $500,000 limits, and commercial automobile liability with $2,000,000 limits. Work is restricted on FKEC blackout days (Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving, Christmas Eve, and Christmas Day), during specified holiday weeks, and the Florida Lobster Sport Season (July 26-August 1, 2026). Compensation will be structured as a fixed "not to exceed" amount with FKEC retaining the right to withhold ten percent of projected costs if the contractor exceeds the scheduled completion date. No set-asides or disadvantaged enterprise restrictions are identified in the procurement documents, and no incumbent vendors or current contractors are listed.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .