This is a Fixed Price Research & Development Subcontract between the California Institute of Technology's Jet Propulsion Laboratory (JPL) and an unnamed Subcontractor for Mechanical Engineering Support & Assistance (MESA). The subcontract covers mechanical systems engineering tasks spanning project formulation through flight system development, including requirements definition, concept development, trade studies, hardware design, modeling, simulation, analysis, fabrication, inspection, assembly, integration, test, and technical documentation support.
Key technical disciplines include core mechanical engineering (systems engineering, mechanical hardware design, structural analysis), thermal and fluids engineering, materials and process engineering, cable/harness engineering, and specialty mechanical engineering such as optical systems and mechatronics. The subcontract will be executed through individual Subcontract Work Orders (SWOs), with the Subcontractor required to perform work at JPL, their own facility, or other defined locations. The total ceiling price is to be determined (TBD), and JPL may exercise options to extend the subcontract for up to two additional years based on the Subcontractor's performance and continued need.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontract No. TBD
FIXED PRICE RESEARCH & DEVELOPMENT
SUBCONTRACT
STANDARD SUBCONTRACT
BETWEEN
CALIFORNIA INSTITUTE OF TECHNOLOGY
JET PROPULSION LABORATORY
4800 OAK GROVE DRIVE
PASADENA, CALIFORNIA 91109-8099
(hereinafter known as “JPL;”
a corporation existing under the laws of the State of California)
AND
TBD
TBD
(hereinafter known as the “Subcontractor;”
a corporation existing under the laws of the State of TBD)
THIS SUBCONTRACT IS FOR
Mechanical Engineering Support & Assistance (MESA)
AND IS A
SUBCONTRACT UNDER JPL's NASA PRIME CONTRACT
CONTENTS/SCHEDULE
ARTICLES
ARTICLE 1. STATEMENT OF WORK AND DELIVERY/MILESTONE
SCHEDULE
ARTICLE 2. PAYMENT PROVISIONS
ARTICLE 3. SPECIAL PROVISIONS ……………………………………………..21
ARTICLE 4. ALTERATION PROVISIONS ……………………………………….29
ARTICLE 5. OPTION PROVISIONS ………………………………………………30
SIGNATURE PAGE
SUBCONTRACT PROVISIONS AND FORMS SET
The following document set are incorporated into and made a material part of this Subcontract, and can be found at JPL Acquisition’s external website:
https://acquisition.jpl.nasa.gov/terms-conditions/ under “Terms and Conditions”
GENERAL PROVISIONS (GPs) SET FOR FIXED PRICE RESEARCH AND DEVELOPMENT
SUBCONTRACTS, dated 12/24.
ADDITIONAL GENERAL PROVISIONS (AGPs) SET, dated 07/19. Note: Only the AGPs listed below are incorporated into this Subcontract:
• Audit-Negotiation – Access to Computers
• Ceiling Priced: Limitation of JPL’s Obligation
• Designation of New Technology Representative and Patent Representative
• Emergency Medical Services and Evacuation
• Filing of Patent Applications - Classified Subject Matter
• Flight Systems or Subsystems – Overtime
• Integration of Environment, Safety, and Health into the Subcontractor’s Management
System
• Patent Rights - Ownership by the Contractor
• Patent Rights - Retention by the Contractor (Short Form)
• Personal Identity Verification of Contractor Personnel
• Preventing Personal Conflicts of Interest
• Safety and Health Measures and Mishap Reporting
• Security Requirements
• Security Requirements for Unclassified Information Technology Resources
Note: Other Additional General Provisions may apply to this Subcontract and will be incorporated in the Subcontract Work Order(s).”
SUBCONTRACT FORMS SET, dated 01/23.
https://acquisition.jpl.nasa.gov/terms-conditions/
ARTICLE 1. STATEMENT OF WORK AND DELIVERY/MILESTONE SCHEDULE
1.0 The Subcontractor shall provide the labor, materials, equipment, and facilities necessary to perform mechanical systems engineering tasks in support of Quality
Critical Item (QCI), as defined in Exhibit 1: Subcontract Work Order (SWO) Procedure, and non-QCI technology development, system engineering, hardware development, and integration and test activities. Tasks, based on detailed specifications in individual
SWOs, will span project formulation through flight system development and will include requirements definition, concept development, trade study execution, hardware design, modeling, simulation, analysis, review support, mechanical fabrication, inspection, assembly, integration and test, and technical documentation support. Task execution will be performed at JPL, the Subcontractor’s facility, or other defined locations. Technical disciplines include:
Core Mechanical
1.1 Systems Engineering: system requirements development, concept development, interface definition, requirements tracking and documentation, technical documentation development, verification & validation (V&V) support, test definition and execution, integration and test support, and test data analysis and documentation.
1.2 Mechanical Engineering:
1.2.1 Mechanical hardware design, analysis, fabrication, integration and testing of metallic and composite structures, deployment mechanisms, mechanical devices, and mechanical ground support equipment.
1.2.2 Structural Analysis: finite element modeling; stress, loads, and dynamics analysis;
structural test development and planning, structural test execution and support.
1.3 Thermal, Fluids, and Cryogenic Engineering:
1.3.1 Thermal hardware design and development
1.3.2 Thermal analysis, aerodynamic and aero-thermodynamic analysis, computational fluid dynamics analysis, thermal test development and planning, thermal test execution and support.
1.4 Materials and Process Engineering: material and process review, analysis, test, and technical documentation support.
1.5 Cable/Harness Engineering: harness design, fabrication and test support.
Specialty Mechanical
1.6 Optical and Opto-Mechanical Systems
1.6.1 Optical system design, analysis, ray trace, and prescription development.
1.6.2 Design, analysis, fabrication, assembly, and test of optical bench structures, optical components, filter wheels, and focus mechanisms.
1.7 Mechatronics Systems: mechatronics design and implementation including electrical and mechanical interfaces, firmware, and hardware; modeling and simulation;
autonomous or remotely controlled mechanisms; moving mechanical assemblies for manipulation, mobility and pointing, sensing and feedback devices; and electrical and mechanical ground support equipment for testing.
2.0 All work to be performed under the Subcontract shall be directed to the
Subcontractor by use of a “Subcontract Work Order” (SWO), in accordance with
Exhibit 1, entitled “Subcontract Work Order Procedure.” The Subcontractor shall be responsible for delivering fully compliant products and services, in accordance with the
Work Description specified on each SWO.
3.0 In furtherance of this effort, the Subcontractor shall:
3.1 Adhere to JPL Design Principles for MESA, Exhibit 4, for the execution of tasks under this subcontract unless specified otherwise in the individual task.
3.2 Deliver Subcontract Data Requirements List (SDRL)/Data Requirements
Document (DRD) items referenced in Exhibit 5.
3.3 Submit a Quality Assurance Plan which addresses quality policies, processes and procedures that will be used for this subcontract.
3.4 Provide JPL QA personnel access to the Subcontractor’s documentation and records of policies, guidelines and procedures used in the design, analysis, manufacturing, inspection, and test of the products for this subcontract.
3.5 Each SWO will have a tailored set of DRDs required by the Project requesting the work. A complete list of DRDs potentially applicable to the work under this subcontract is provided in Exhibit 14. Each individual SWO will select only a subset of DRDs from this Exhibit.
3.6 For the documentation required by each SWO, JPL’s approval is required if data are delivered “in place” at the Subcontractor’s facility. “In place” documentation shall be made accessible to JPL personnel for review and/or approval in a timely manner. The Subcontractor shall maintain these records for a period after the date of delivery, consistent with the terms of the Subcontract.
3.7 Notify the SCM and CTM in writing of all organizational changes, including change of ownership/name, change of key project personnel, changes in product and/or process, changes of suppliers, changes of manufacturing and facility locations.
3.8 Notify CTM and JPL QA in writing prior to JPL Mandatory Inspection Points
(MIPs): within California – 3 days, within continental US – 5 days, international
– 10 days. MIPs will be specified on each SWO as required by JPL.
3.9 Notify CTM and JPL QA in writing regarding all Material Review Board (MRB) Class 1/Major non-conformances within two (2) business days.
3.9.1 The Subcontractor shall provide notice of all other non-conformances (commonly referred to as Class 2/Minor MRBs) if requested by JPL.
Note: Class 1/Major non-conformances are those that affect the JPL interface with respect to fit, form, function, safety, reliability, or interchangeability, and other JPL-identified critical items. This includes "Use As Is", “Repair”, and “Scrap” of JPL furnished material dispositions (commonly referred to as Class 1/Major MRBs).
Note: Repair dispositions shall be approved by JPL QA and the JPL Project prior to proceeding with the repair. After completion of the repair, hardware shall be inspected and accepted by JPL QA at JPL or the Subcontractor’s site.
3.10 RESERVED
3.11 Designate one overall Program Manager (PM) who is responsible for the technical and programmatic performance of the subcontract, along with authority to acknowledge receipt of SWOs on behalf of the Subcontractor. The PM shall be knowledgeable of all
SWO tasks, keep JPL apprised of any technical, personnel, and administrative issues, and be empowered to resolve such problems on behalf of the Subcontractor. In performance of this subcontract, the PM shall:
3.11.1 Conduct weekly status meeting with the JPL Contract Technical Manager
(CTM) and JPL Subcontract Manager (SCM) for the purpose of reviewing and reporting the progress and status of cost, schedule, and technical performance associated with each SWO utilizing the Exhibit 3: Weekly
Subcontract Work Order Status Report Template for the discussion.
3.11.2 Report via the JPL web-based workflow tracking system for tracking RFP status and load proposal documents and fully executed SWOs.
3.11.3 Manage on-boarding in accordance with Exhibit 6 “Unescorted Access:
Subcontractor Badging Instructions and Requirements” and offboarding of affiliates including but not limited to the return of: Laptops, RSA Tokens, JPL Badges, Cell Phones, etc.
3.11.4 Provide on a quarterly basis an updated list of personnel working on all active SWOs.
3.11.5 Participate in technical and management meetings at JPL or
Subcontractor’s facility as required by individual SWOs, including but not limited to: Requirements Reviews, Design Reviews, Implementation
Reviews, Test Reviews, Operational Readiness Reviews, Technical
Working Groups, technical presentations, Monthly Management Reviews at the SWO level, and ad-hoc meetings.
3.11.6 Resolve any Subcontractor or sub-tier Subcontractor personnel or subcontract problems including situations which warrant investigation, disciplinary action, or termination.
3.11.7 As applicable, manage Subcontractor personnel who are assigned to perform work at a JPL Sensitive Compartmented Information Facility (SCIF). This shall include maintaining frequent communication and contact (monthly at a minimum) with such SCIF assigned Subcontractor personnel and managing such employees’ needs and transactions while working at JPL.
3.11.8 Ensure sub-tiers and new Subcontractor employees have been vetted for their skills and availability prior to proposal responses.
3.11.9 In the event former JPL employees are hired, the PM shall notify the JPL
Subcontracts Manager in the SWO proposal response when any former
JPL or Caltech employee will be assigned to tasks associated with this subcontract, regardless of when the former JPL or Caltech employee separated from JPL.
3.12 The Program Manager, Subcontractor employees, and Subcontractor sub-tiers are responsible for the following:
3.12.1 Shall not solicit and/or market Subcontractor services unless invited to do so by JPL Acquisition personnel. Interaction with JPL employees is to focus on technical aspects/solutions, and performance and cost aspects of the SWO.
3.12.2 Shall contact JPL customers within 48 hours to discuss any concerns or issues on task(s).
3.12.3 Travel to remote locations and to perform work at such locations (non-JPL sites) as designated on the SWO.
3.12.4 Subcontractor personnel who are assigned to JPL worksite, shall be assigned a work schedule consistent with the JPL calendar (i.e. work and holiday schedules).
3.12.5 Subcontractor personnel and sub-tiers shall work off-site (their own facility) and on-site at JPL at no extra travel cost to JPL.
3.13 Provide facilities as follows:
3.13.1 Satisfies the requirements in Article 1 and is within close proximity approximately one hundred and fifty miles (150) miles driving distance of
JPL.
3.13.2 Unless specified otherwise in an SWO, perform all work at a
Subcontractor-provided facility. That facility shall have secure access control and, at a minimum, provide office space for Subcontractor personnel, computer space, computer interconnection access to JPL, end-user areas, video conferencing capability, conference rooms for large face-to-face meetings and training, available guest parking, and work areas such as a small conference room or workspace for technical exchange and interface meetings with JPL.
3.13.3 Provide office space and logical access to Subcontractor’s network to any
JPL employee assigned for temporary work at the Subcontractor’s facility.
3.13.4 Provide JPL access to all applicable Subcontractor’s facilities, and critical lower-tier suppliers’ where work is being performed under this
Subcontract and individual task SWOs, allowing JPL to conduct audits, evaluations, surveys, and mandatory inspection points of JPL hardware, as necessary.
3.14 JPL Furnished IT Systems
3.14.1 The Subcontractor shall use JPL-furnished managed systems (to include
Virtual Desktops), for the performance of this subcontract. Such managed systems include any hardware, software, or interconnected system or subsystem of equipment that is used to process, manage, access, or store
NASA or JPL data, including electronic information. The usage of JPL-furnished managed systems, to include Virtual Desktops shall be used only and solely for the performance of this subcontract. The use of JPL-furnished managed systems satisfies the ‘Security Requirements for
Unclassified Information Technology Resources’ set forth as an
Additional General Provision (AGP).
3.14.2 If an exception is granted for the use of Subcontractor-furnished IT systems, Subcontractor personnel who use computers connected to the JPL network shall comply with the security requirements in the ‘Security
Requirements for Unclassified Information Technology Resources”
(AGP).
3.14.3 The Subcontractor’s computers connected to the JPL network shall be considered a “system” as defined in the current version of the ‘Security
Requirements for Unclassified Information Technology Resources’ AGP and shall comply with the requirements set forth in the provision.
3.14.4 The Subcontractor shall appoint an IT Security Representative to generate and maintain an IT Security Plan. This Plan is produced automatically by entering information about each computer into a JPL program.
3.14.4.1Representative will be responsible for complying with ‘Security
Requirements for Unclassified Information Technology
Resources’ AGP.
3.14.5 All Subcontractor personnel that have access to the JPL network will complete the mandatory JPL training on IT Security annually.
3.14.6 Identity, Credential, and Access Management
3.14.6.1 All Subcontractor personnel shall complete the NASA JPL onboarding process and receive a NASA JPL Identity and
Credential prior to initiating work.
3.14.6.2 As a part of the onboarding process, personnel will submit for a background investigation.
3.15 Provide training in accordance with the following:
3.15.1 The Subcontractor personnel may be required to attend training seminars, classes, symposiums, technical exhibits, or other related training functions necessary to maintain unique technical skills required by JPL on a SWO basis. Unique training skills are specific to JPL and may not be applicable to another organization. The Subcontractor is responsible for coordinating such training, including but not limited to transportation, lodging, tuition, etc. This training will be identified, authorized, and funded on the individual SWO.
3.15.2 Subcontractor personnel are expected to be trained and qualified for the tasks to be performed and to maintain state-of-the-art expertise. Generic
Training Skills are general job skills that personnel are expected to possess to perform work (for example Microsoft Office, Computer Aided Design and Analysis tools, etc.). The Subcontractor is responsible for providing this training. This training will not be specified on the individual SWO.
3.15.2.1The Subcontractor shall have computer systems equipped with licenses for specialized software for each discipline, including:
a. Structural Analysis:
i. MSC or Simcenter Nastran
ii. FEMAP
iii. Dynamics: MSC Adams
iv. Impact: LS Dyna
b. Mechanical Design (CAD)
i. NX (Siemens)
ii. Solidworks
c. Thermal Engineering
i. Thermal Desktop
d. CFD
i. STAR CCM+
e. Opto-mechanical analysis
i. SigFit
ii. CodeV
iii. Zemax
3.15.3 Ensure that all Subcontractor personnel and lower-tier Subcontractors comply with Subcontractors’ required training and all JPL policies and procedures, in addition to all applicable terms and conditions and flow down requirements of this subcontract prior to starting work at JPL. This also applies to any JPL-controlled facilities. The training and policies/procedures include but are not limited to the JPL provided mandatory training for Subcontractor employees who have physical or electronic access to JPL of NASA Cybersecurity & Privacy Awareness, Working with JPL: Affiliate Mandatory Training, Ethics Awareness, and
Export Control Awareness.
3.15.4 Provide all safety and health training in accordance with the
Subcontractor’s Injury and Illness Prevention Plan (IIPP), prior to the execution of the Subcontract, the applicable state and federal regulations, and in accordance with Subcontractor provided Exhibit 9, Management/Operations Plan. All safety and health training requirements shall be the responsibility of the Subcontractor. Personnel injuries/illnesses shall be documented on Subcontractor Cal-OSHA Form
300 log. Subcontractor shall report serious injuries or fatalities of personnel to Cal-OSHA as specified in CCR Title 8, Section 342, Reporting Work-Connected Injuries.
3.16 Provide Occupational Safety for Subcontractor JPL Facility support services:
3.16.1 Provide onsite safety support for all Subcontractor personnel assigned to work at JPL facilities.
3.16.1.1 Review all JPL Risk Reviews, including Facility &
Laboratory Assessment of Safety Hazards (FLASH), System Safety Survey, Instructions for Build, Assembly &
Test (IBAT), Procedures for Build, Assemble, and Test
(PBAT), prior to the start of Subcontract Work Order.
3.16.2 Provide an approved JPL Subcontractor Environmental, Safety and Health
Plan Requirements Form 2885. Approval shall be obtained by the JPL’s
Occupational Safety Program Office (OSPO) prior to commencement of the Subcontract.
3.16.2.1 Must flow down all safety and health requirements to lower-tier Subcontractors including compliance to the prime Subcontractor’s Safety and Health Plan and Form
2885 or submit their own Safety and Health Plan for JPL review.
3.16.3 Provide Personal Protective Equipment (PPE) as required. JPL will provide only if it is specific to the area or items such as chemical gloves.
Subcontractor provides all other PPE such as Fall Protection, Hearing protection, respirators, safety shoes, prescription safety glasses.
3.16.4 Report Mishaps and close calls into the JPL Mishap Information System
(JIMS): https://jmis.jpl.nasa.gov/.
3.16.4.1 Send information to your worker’s compensation provider and add any recordable injuries to the OSHA Log.
3.16.5 Ensure that all Subcontractor personnel complete any JPL required Safety
Training prior to beginning work in a JPL facility.
3.16.5.1Subcontractor will provide their company-provided general safety training that is required. Subcontractor can only take JPL-specific safety training if working onsite and required. Subcontractor will provide proof of the company-provided safety training to JPL prior to start of work.
3.17 Provide JPL access to the Subcontractor’s documentation and records of policies, guidelines and procedures used in the design, analysis, manufacturing, inspection, and test of the product for this subcontract and individual task SWOs.
4.0 Performance Schedule and Delivery Instructions
4.1 The term of this Subcontract shall commence on the date of this Subcontract and continue through TBD, or the date of completion or cancellation of the effort under any SWO then outstanding, whichever is later. However, in no event shall JPL issue any SWO after TBD nor shall the Subcontractor perform work on any SWO issued after this date.
4.2 The Subcontractor shall perform the work defined and required by the SWO’s
Statement of Work and deliver work artifacts in accordance with the delivery requirements specified in the SWO.
4.3 Respond to Request for Proposals to the JPL Subcontracts Manager (SCM) within four (4) JPL business days excluding Regular Day Off (RDO) Fridays. Depending upon the complexity of the work, JPL will provide a longer submission period from the standard four (4) JPL business days.
5.0 Shipment Destination
5.1 Alternative Fridays JPL will be closed except for time-critical project activities and for receiving special shipments (e.g., FedEx, UPS, etc.). If such shipments cannot be avoided to JPL on Friday closures, they must be scheduled in advance with JPL Receiving (8:00 AM – 3:30 PM PT) at 818-393-5544 or 818-354-7784.
There will be no JPL outgoing shipments.
5.2 Except as otherwise provided in this Subcontract, the point of inspection, acceptance and delivery of all items/supplies deliverable under this Subcontract shall be the Jet Propulsion Laboratory, 4800 Oak Grove Drive, Pasadena, https://jmis.jpl.nasa.gov/
California 91109. Any/all such supplies shall be packaged, packed, boxed, or crated in such a manner to ensure safe delivery and shall be shipped prepaid and at the Subcontractor’s expense to the point of delivery.
5.3 Packing Slip to include:
5.3.1 Associated Purchase Order (APO) number
5.3.2 Requester’s name
5.3.3 End use location
6.0 Delivery Requirements
6.1 RESERVED
6.2 Subcontract Plans and Documentation
Submit all plans and documentation in accordance with this Article 1.
6.2.1 Submit the IT Security Plan, as specified in Article 1, Paragraph
3.14.4 on or before the execution of the subcontract.
6.2.2 Management/Operation Plan, as specified in Article 1, Paragraphs
3.3 and 3.15.4 on or before subcontract execution. Plan to include but not limited to:
6.2.2.1 Provide Quality Assurance (QA) Plan to be ISO 9001
certified and/or AS 9100 at time of award. Describe how
JPL classifications of hardware and delivery of the work will be in accordance with the quality requirements for flight or non-flight Quality Critical Items (QCI).
6.2.2.2 High level description of the day-to-day operations and management of the subcontract.
6.2.2.3 Subcontractor Training Plan including all training as specified in Paragraphs 3.14.5, 3.15 and 3.16.5 of this
Article 1.
6.2.2.4 Screening and vetting process of employees and lower-tier
Subcontractors.
6.2.2.5 Invoice and reconciliation process/record keeping and reporting.
6.2.3 Environmental Health and Safety Plan as required in Article 1, Paragraphs 3.16.2 and 3.16.5 on or before subcontract execution.
6.3 Supply Chain Risk Management (SCRM) Screening
Submit parts lists and software Bill of Materials (BOM) as defined by the
JPL Provision for NFS 1852.239-74, INFORMATION TECHNOLOGY
SYSTEM SUPPLY CHAIN RISK ASSESSMENT (NASA
PROCUREMENT CLASS DEVIATION 15-03C) (SEP 2018) for any electrical, electronic, electromechanical, and electrically-active photonic devices, software, firmware, and hardware delivered to JPL.
Parts and software BOMs will be reviewed by JPL for SCRM compliance.
If additional detail is needed or questions on items occur, the JPL SCRM team, SCM, CTM, and the Subcontractor will discuss these items as necessary. If items are rejected in the SCRM screening process, corrective action may need to be taken at the sole discretion of JPL.
6.3.1 Lists of all parts included in all items to be delivered to JPL, including those intended to be used in hardware procured from lower-tier Subcontractors, excluding JPL-provided equipment, shall be submitted electronically in Microsoft Excel format to the
SCM, CTM, and scrm-help@jpl.nasa.gov. Parts lists shall also include internal parts used in hybrid, multi-chip module, and soldered assemblies.
The parts lists shall contain the following information:
a. Preliminary Design Lists: 1-3 mos. ADOS
i. Part type
ii. Product name & number
iii. Description
iv. Proposed manufacturer, including name and address
v. Flight part number (if Source Control Drawing)
vi. Procurement part number (if different from flight number)
vii. Manufacturer’s website and CAGE code
viii. Country of Origin
ix. Manufacturer Point-of-Contact, name and email
The item number should be kept unique to that part only.
Changes should be in the form of “adds” and “deletes”.
b. As-Designed Lists: Submit the complete “As-Designed” parts with updates annotated. Same information as preliminary design list.
1 mo. Post-PDR
c. Updates: Part changes annotated as implemented.
As needed
d. As-Built Lists: Same as As-Designed list. All changes from the “As Designed” lists should be annotated with reference to the latest update of the “As-Designed” list.
1 mo. Before delivery
6.3.2 Bill of Materials (BOMs) of all software included in all items to be delivered to JPL, including those intended to be used in hardware procured from lower-tier Subcontractors, excluding
JPL-provided equipment, shall be submitted electronically in
Microsoft Excel format to the SCM, CTM, and scrm-help@jpl.nasa.gov. Software BOMs shall include Open Source
Software, custom software, as well as commercially purchased software.
Software BOMs shall include the following:
a. Preliminary BOM: 1 mo. Pre-PDR
i. Product name & number
ii. Description
iii. Version
iv. Country of Primary Software Development
v. Supplier/OEM/Source POC (Point of Contact), name and email
vi. Supplier/OEM/Source’s website and CAGE code
vii. Supplier/OEM/Source origin location of software download (i.e. URL, Library name)
Changes should be in the form of “adds” and “deletes”.
b. As-Designed BOMs: Submit the complete “As-
Designed” software BOM with updates annotated.
3 mo. Pre-CDR
c. Updates: Software changes annotated as implemented.
As needed
d. Final BOMs: Same as As-Designed BOMs. All changes from the “As Designed” BOM should be annotated with reference to the latest update of the “As-Designed”
BOM. 1 mo. Before delivery
This SOW section covers submittals of all Parts Lists and Software BOMs used on the system or subsystem for SCRM screening. Flow down to lower-tier Subcontractors providing hardware and/or software shall be implemented per the JPL Prime Contract.
7.0 Additional Delivery Requirements
7.1 The Subcontractor shall provide the New Technology Representative as set forth in the Clause Article entitled “Designation of New Technology Representative and Patent Representative” with the annual and final reports of reportable items described in the Clause Article entitled “New Technology.” The Subcontractor shall send copies of transmittal letters for these reports to the Subcontracts
Manager (Note: an annual report is not due if there are no reportable items, but the final report must be submitted, regardless, along with a certification of no reportable items).
Annual Report: every 12 months commencing on Date of Subcontract. Due within 30 days after reporting period.
Final Report: within 3 months after work completion.
7.2 Contractor-Held Asset Tracking System (CHATS) Report
(https://acquisition.jpl.nasa.gov/tc)
Performed Monthly, and the report is to be provided 3 business days after month reported.
7.3 NASA Form 1018 (or equivalent), “NASA Property in the Custody of
Contractors”
First Report: From date of Subcontract thru Sept. 30th;
Subsequent Reports: Oct. 1st thru Sept. 30th.
All Reports due within 30 days after reporting period.
7.4 Annual Results of Inventories
The Subcontractor shall submit the following to JPL promptly after completing an annual physical inventory:
• A listing that identifies all discrepancies disclosed by a physical inventory;
• A signed statement that physical inventory of all or certain classes of
Government property was completed on a given date; and
• Certification that the official property records were found to be in agreement except for any discrepancies reported.
7.5 Annual Verification of Government-Owned/Subcontractor-Held Property
Performed Annually, and due 30 days after receipt of list from JPL through
Subcontract completion.
7.6 Provide a Subcontract Work Order Status Report (Microsoft Excel Spreadsheet
Format) at the SWO level that shall be delivered via E-mail to the JPL Contract file:///C:/Users/gloesch/Documents/Word%20documents/Raytheon/(https:/acquisition.jpl.nasa.gov/tc)
Technical Manager (CTM), Subcontracts Manager (SCM), on a weekly basis
(Exhibit 3).
7.6.1 The SWO Status Report shall include at a minimum: Active SWO number and Title, Start and End dates, JPL project/task number, and the green/yellow/red status of technical and schedule for each SWO.
7.6.2 Provide a monthly budget report to JPL SWO task managers. This report is to include at a minimum: Active SWO number and Title, Start and End dates, JPL project/task number, and the technical status in addition to the schedule status.
7.7 Provide on an annual basis information on your lower-tier subcontracting:
Amount expended by the prime Subcontractor (as measured as the aggregate cost of all SWOs). Include the actual workshare for the lower-tier subcontracting by total dollars and percentage of work.
7.8 RESERVED
7.9 Submit to the cognizant JPL Subcontracts Manager one (1) copy each of the
Subcontract’s Worker’s Compensation, and Commercial General Liability certificates per General Provision “Insurance and Indemnification” on or before execution of the subcontract.
8.0 JPL will:
8.1 Provide on-line access to the MESA Subcontract Work Order (SWO) Tracking
Tool. JPL users and Subcontractor will use the web-based workflow tracking system for tracking RFP status and storing SWO-related documents.
8.2 Issue SWOs in accordance with Exhibit 1, indicating the specific effort(s) to be performed and deliverables to be submitted by the Subcontractor to JPL.
8.3 As applicable, designate which SWOs will be performed in the SCIF using the following SWO numbering series:
800 = TS/SCI SWOs
8.3.1 Security Requirements AGP is applicable to the SWO number beginning with an 8. The 800 series will specify the level of security required for that Statement of Work, by using the Subcontract Security Classification
Specification (DD Form 254).
8.4 Designate a Subcontracts Manager (SCM) with authority to administer the
Subcontract in all its aspects, other than those of a technical nature. In this capacity, he/she is authorized, on behalf of JPL:
8.4.1 Transmit all subcontract modifications and Subcontract Work Orders
8.4.2 Process all subcontract correspondence.
8.4.3 Any subcontract modification transmitted to the Subcontractor by the cognizant JPL Subcontracts Manager will be presumed by the
Subcontractor to be properly executed on behalf of the Institute.
8.5 Designate a Contract Technical Manager (CTM) who will monitor technical performance of the Subcontractor for compliance with the technical requirements of this subcontract.
8.6 Designate on each SWO a Technical Representative who will:
8.6.1 Provide documentation, standards, approvals, and/or forms determined by the JPL Technical Representative to be necessary for the performance of work.
8.6.2 Maintain close coordination with the Subcontractor via
telecommunications and meetings as required.
8.6.3 Review documentation provided by the Subcontractor as required by the
SWO and provide approval and/or comments to the Subcontractor or required revisions within two (2) weeks of receipt of the data by JPL, or as required by the SWO.
8.6.4 Be responsible, with support from the CTM and SCM, for the resolution of anomalies associated with the SWO and its Deliverables.
8.7 Furnish all required JPL specific supplies, tools and equipment (except for personal protective equipment (PPE) for the performance of work when required to be performed at JPL or JPL-controlled facility.
8.8 Provide JPL specific or mandatory training required to meet special JPL standards of qualification, specific methods of performance, or otherwise accomplish the specific JPL work assignment as directed on the SWO.
8.9 Provide training to Subcontractor staff on JPL required internal systems, including but not limited to: JPL-ID, JPL Mishap Information System (JIMS), Electronic Invoicing (ELI) and the MESA Contract Tool (MCT).
8.10 JPL will acquire and supply JPL-furnished managed systems and/or Virtual
Desktop Infrastructure (VDI) for the performance of this subcontract. This is limited to all that apply: laptop or desktop computer systems, mobile devices, tablets, printers, Virtual Desktop Infrastructure (VDI). The deployment of JPL-furnished managed systems and/VDI will be provided as part of the on-boarding process, upon subcontract award.
8.11 Provide affiliate badges as per Exhibit 6 “Unescorted Access: Subcontractor
Badging Instructions and Requirements”.
8.12 Provide annual performance reviews, including but not limited to:
8.12.1 JPL Internal Survey from Technical Managers regarding performance.
8.12.2 Performance Indicators including but not limited to completing tasks on time and within budget, quality of deliverables in addition to overall program management.
8.13 Reserve the right to audit the Subcontractor’s Quality Management System and practices to ensure they meet all contractual requirements.
8.14 Support Safety Surveys and ESD Surveys, as applicable, at Subcontractor’s facilities and at critical lower-tier Subcontractors.
8.15 Attend and participate, as applicable, in Subcontractor and lower-tier
Subcontractor technical discussions and reviews, including, but not limited to:
Design Reviews, Manufacturing Readiness Reviews, Test Readiness Reviews and
Pre-Ship Reviews.
8.16. Serve as a member of the Subcontractors’ MRB, along with the JPL Project, and approve all Material Review Board Class 1/Major non-conformances.
8.17 Review the Subcontractor’s Product Inspection, Assembly and Test Flow Chart and insert the JPL QA Mandatory Inspection Points (JMIPs) as specified on the individual SWO.
8.18 Review the Subcontractor’s critical lower-tier suppliers’ Product Inspection, Assembly and Test Flow Chart and insert the JPL QA Mandatory Inspection
Points (JMIPs) as specified on the individual SWO.
8.19 Perform in-process and final JMIPs required by the Product Inspection, Assembly and Test Flow Charts as specified on the individual SWO.
8.20 Witness all acceptance and environmental tests, as JPL deems necessary.
8.21 JPL QA and the project task manager will approve repair dispositions prior to proceeding with the repair. After completion of the repair, JPL QA will inspect and provide acceptance.
9.0 Exhibits
The following exhibits are hereby incorporated into and made a material part of this
Subcontract:
9.1 Exhibit 1: Subcontract Work Order Procedure dated 4/16/2025 Total Pages 5
9.2 Exhibit 2: Electronic Labor Invoicing (ELI) Template, dated 3/24/2025
Excel Total Tabs 3
9.3 Exhibit 3: Weekly Subcontract Work Order Status Report Template, dated 2/25
Excel Total Tabs 3
9.4 Exhibit 4: JPL Design Principles for Mechanical Design of Flight
Hardware, dated April 30, 2025 Total Pages 25
9.5 Exhibit 5: Subcontract Data Requirements List (SDRL) and Data Requirements
Description (DRD) dated June 25, 2025 Total Pages 18
9.6 Exhibit 6: Unescorted Access: Subcontractor Badging Instructions and
Requirements JPL Form 7394-Sub, dated 4/22 Total Pages 4
9.7 Exhibit 7: Cyber Review Template for Security Requirements for Unclassified
Information Technology Resources Rev. 41 dated 2/27/2025 Total Pages 11
9.8 Exhibit 8: Subcontractor Environmental, Safety and Health Plan, dated TBD, Total Pages TBD
9.9 Exhibit 9: Management/Operations Plan (Subcontractor Provided), dated TBD, Total Pages TBD
9.10 Exhibit 10: Organizational Conflict of Interest Avoidance Plan (Subcontractor
Provided) dated TBD, Total Pages TBD
9.11 Exhibit 11: DD Form 254 Contract Security Classification Specification
(Subcontractor Provided) dated TBD, Total Pages TBD
9.12 RESERVED
9.13 Exhibit 13 FP: Limitation of JPL’s Obligation Provisions dated April 17, 2025
Total Pages 3
9.14 Exhibit 14: MESA List of Applicable DRDs dated July 14, 2025 Total Pages 310
ARTICLE 2 PAYMENT PROVISIONS
1.0 Ceiling Price: $TBD
1.1 The total ceiling price of this Subcontract is the sum of the individual Subcontract
Work Order (SWO) prices not to exceed the ceiling price above. Issuance of this
Subcontract assumes no minimum guarantee of SWOs or minimum total
Subcontract price. The fixed price and schedule of delivery is pre-negotiated.
1.2 Each SWO will be separately issued and negotiated in advance for work contemplated in accordance with specific SWO requirements and fixed rates included in Paragraph 3.2 below.
1.3 North American Industry Classification System (NAICS) code applicable to this
Subcontract: 541715
1.4 Profit Rate (FP SWOs):
1.4.1 For fixed price SWOs, the profit rate shall be TBD%.
1.5 Progress payments will be allowed according to the terms set forth in the
Additional General Provision entitled “Progress Payments – Small Business.”
1.6 Fixed Price - Incrementally Funded
1.6.1 For SWOs funded incrementally, the SWO shall be subject to the
Incremental Liability Schedule as stated in Exhibit 12 FP: Limitation of
JPL’s Obligation Provisions
2.0 Billing Instructions:
Detailed billing instructions, including sample invoices, can be found at the following link: Acquisition and Supplier Resources
The Subcontract provides for authorization of work by Subcontract Work Orders
(SWOs), a breakdown of billings by SWO number is required. The cost control is by JPL project/task, therefore cost detail by project/task must be furnished with invoices.
2.1 The Subcontractor shall electronically submit all invoices to JPL through a template in JPL’s Electronic Invoicing System (ELI), Exhibit 2. The file must be uploaded into the JPL system on Monday, every two weeks; except at JPL’s fiscal year end, when an accrual file must be uploaded with an estimate for the last week of the fiscal year by 12:00 pm on the last Wednesday of the JPL fiscal year. Detailed costs for all invoices submitted through ELI must be based upon authorized JPL project/task numbers and the corresponding SWO number.
https://acquisitions.jpl.nasa.gov/invoice-services/
2.2 Upon importing the invoice file into ELI application; the program will validate the entries. The subcontracting company will know what transactions are accepted and rejected. For rejected transactions, the subcontracting company must resolve them with SCM and the CTM. Exhibit 2 details the rejection codes.
If the rejected transactions cannot be resolved by the scheduled due date for submission, the subcontracting company will cancel and export the file. The subcontracting company will remove the rejected lines from the file and import only the accepted lines. Certified paper invoices must be revised accordingly at
SWO level and at Subcontract level to reduce the rejected transactions that have not been resolved. Discrepancies that are found between the electronic and the certified paper versions may cause the return of the invoice and may delay the payment.
2.3 Once the rejected transactions are resolved, the subcontracting company will resubmit them in a separate file from the current billing. The resubmitted file will only contain the rejected transactions that have been corrected. Invoice number must be different to avoid duplicate invoice number. Invoice total from hard copy should be matched with the file submission total at summary level (Subcontract level) and detail level (SWO level) with cost and profit/fee breakdown.
2.4 Original certified PDF invoice shall also be submitted to the JPL Supplier
Payment Analyst instead of a paper invoice and two (2) copies shall also be submitted to the JPL Supplier Payment Analyst that specifies cost and profit/fee for each SWO. This invoice shall reflect major cost elements as separate line item as follows: Direct Labor (Manufacturing Labor, Engineering Labor, etc…), Direct Material, Other Direct Costs (Travel, Subcontract costs), Overhead on
Direct Labor (if more than one overhead for different labor type, it needs to show the detail on the invoice), and General & Administrative Expense (G&A). This invoice must be submitted at the same time of submitting the costs through ELI application.
2.5 Each invoice shall include separate columns for current and cumulative costs at both the subcontract and the SWO summary level.
2.6 A file that contains raw and burdened cost for each fiscal year will be provided to
JPL Supplier Payment one month after the fiscal year end close. This information will be used to verify the invoices for indirect rate adjustments.
2.7 A copy of the approved billing indirect rate applicable to this subcontract from the subcontracting company’s cognizant auditor must be submitted with the invoice. If the recommended or approved rates are changed, the subcontracting company must provide notice the updated billing rate to JPL Supplier Payment
Analyst. Upon submission, the invoice will be reviewed for adequacy.
3.0 Submission of Proposals
3.1 For basic SWOs exceeding $250,000 and SWO modifications, regardless of value, causing the overall SWO value to exceed the first $250,000 shall include additional back-up data (e.g.: Subcontractor billing rates, direct labor rates, any special G&A or Overhead for pass-through, FPRA, etc.) if utilizing lower-tier
Subcontractors. Additional back-up data shall be provided from the lower-tier directly to the JPL Subcontracts Manager.
3.2 All cost proposals staffed by the Subcontractor shall include the following table at the time of proposal submission and prior to SWO execution. The rates included in the following table are established for JPL fiscal years 2026 through 2030 for use in determining the proposed price of each SWO. Except as otherwise authorized herein, these amounts are chargeable by the Subcontractor to JPL under this Subcontract as based on the negotiated value of the base cost to which the amounts are applied, as written in each SWO.
Example:
Labor Category Proposed Direct Labor
Rates
3.3 For both domestic and foreign travel, the Subcontractor shall provide a travel proposal for SCM and CTM review and approval prior to travel.
3.4 Subcontracted costs (lower-tier) shall be billed to JPL at net cost to the
Subcontractor and shall not include any profit/fee. For all burden costs associated with the purchasing and handling of the lower-tier, the Subcontractor shall apply to the net cost a G&A rate of XX% for the entirety of the subcontract.
4.0 Tax Reporting and Withholding
In accordance with the “Notice of Potential Tax Withholding” contained in this
Subcontract’s “Subcontract Forms Set,” the Subcontractor shall comply with any applicable Federal and State Income Tax reporting and withholding regulations; certain kinds of payments are subject to United States Federal or California State income tax reporting and withholding.
5.0 SWO Closeout
5.1 The Subcontractor shall provide to JPL on an annual basis for each expired SWO:
5.1.1 A Government Property Inventory (including residual materials) related to the SWO and/or a properly executed Property Closeout Certificate, form
JPL 0948;
5.1.2 Release of Claims JPL form 1047-NC for each expired SWO;
5.1.3 A final invoice identifying specifically:
5.1.3.1 The total cumulative allowable direct costs broken out by cost elements;
5.1.3.2 The total cumulative allowable indirect costs;
5.1.3.3 Total profit/fee;
5.1.3.4 The previously paid amount and the total balance due; and including a Certification as follows:
"I hereby certify that the above SWO final invoice is correct and just, that payment therefore has not been received, and that the bill is presented with the knowledge that the amount paid hereunder will become the basis of a claim against the United States Government."
Authorized Signature:
(Typed name of official and title)
Telephone number: ________________
5.2 After receipt of the above items, the Institute's Subcontract Audit and Compliance
Group shall perform, and the Subcontractor shall allow to be performed a closeout audit requiring access to all applicable records of the Subcontractor when deemed necessary by JPL.
ARTICLE 3. SPECIAL PROVISIONS
1.0 Confirmation of Protection of Third Party Technical Limited Rights Data
Restricted Rights Data and Caltech/JPL Proprietary Data
(a) JPL anticipates providing the Subcontractor with third-party Limited Rights or
Restricted Rights data. In addition, JPL may provide the Subcontractor with JPL/Caltech
Proprietary data. The Subcontractor shall protect this data in accordance with the markings on the data with at least the same degree of care which the Subcontractor applies to its own proprietary data, but with no less than a reasonable degree of care under the circumstances. This data shall only be used for the purposes of this Subcontract and shall be destroyed or returned upon completion of the performance of this
Subcontract.
(b) The Subcontractor shall insert this clause or a clause substantially similar in lower-tier subcontracts where the Subcontractor anticipates providing third-party Limited Rights data or Restricted Rights data or JPL/Caltech Proprietary data received from JPL to such lower-tier Subcontractors.
2.0 Deviations to Requirements Approval
This Subcontract contains firm requirements that are considered vital to the mission.
Although JPL will give consideration to any requirement deviation(s) proposed by the
Subcontractor, JPL shall in no event be required to approve a deviation that will affect substantive mission requirements. JPL’s decision to relax a requirement or approve a deviation in one case shall not imply an obligation to do so in another case. JPL shall also not be required to relax requirements or approve deviations on the basis of technical difficulty or commercial impracticability. The determination as to whether the substantive mission requirements would be affected by a deviation shall be at JPL’s sole and unilateral discretion.
3.0 RESERVED
4.0 Key Personnel and Facilities
The personnel or facilities, if any, specified below are considered essential to the work being performed hereunder. Prior to removing, replacing, or diverting any of the specified individuals or facilities, the Subcontractor shall notify JPL reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this Subcontract. No diversion shall be made by the Subcontractor without the written consent of JPL, provided that JPL ratify in writing the change. Such ratification shall constitute the consent of JPL required by this clause. The specified personnel below may, with the consent of the Subcontracting parties, be amended from time to time during the course of the Subcontract to either add or delete personnel and/or facilities, as appropriate.
The following Subcontractor personnel shall be considered Key Personnel under this
Subcontract: TBD
5.0 Prohibition On Certain Technology, Telecommunications and Video Surveillance
Services or Equipment
Pursuant to FAR 52.204-25 and Section 889(a)(1)(A) & (B) of the John S. McCain
National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232), as well as FAR 52.204–23 and National Defense Authorization Act for Fiscal Year 2018 (Public
Law 115-91), your organization shall not provide nor cause JPL to use any telecommunications or surveillance equipment, system, or service (or a component thereof) from any prohibited entity, including but not limited to: Kaspersky Labs, Huawei Technologies Company, ZTE corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Dahua Technology Company (or any subsidiary or affiliate of such entities), or an entity owned, controlled by, or connected to
The People’s Republic of China, as determined by the Secretary of Defense. Your organization shall insert the substance of FAR 52.204-25 and FAR 52.204–23 in all lower-tier subcontracts and other contractual instruments, including lower-tier subcontracts and for the acquisition of commercial products or commercial services.
6.0 RESERVED
7.0 Security Requirements For Registering Subcontractor’s Information
Technology Devices
(a) The Subcontractor shall register their devices with JPL according to whichever of the following two (2) circumstances applies:
(1) Subcontractor has a persistent presence on JPL's unclassified, non-public, internal network (intranet). Persistent presence means access to JPL's intranet is obtained through a direct wired or wireless connection, as opposed to being provided via JPL’s Remote Access service (https://ras.jpl.nasa.gov).
Subcontractor shall take the following action: All affected Subcontractor assets must be identified in the IT Security Database (ITSDB)
(https://itsdb.jpl.nasa.gov/itsdb/) and included in an authorized JPL security plan.
OR
(2) Subcontractor does not have a persistent presence on JPL's intranet, if so:
(i) Subcontract shall take the following actions:
• All devices operating for more than one business day within JPL’s internal address space must be registered and approved in the institutional cybersecurity asset repository and operate with a JPL-provided x.509
Device Certificate.
• Connecting to JPL VPN meets this definition.
• Registrations must include primary and alternate media access control (MAC) addresses, hostname, operating system (OS), subcontract number, and contact information for system user/admin/owner.
• Registered and approved devices must be reachable by institutional cybersecurity tools/services when connected to the
JPL Network.
• All users on the JPL Network are subject to “Acceptable Use of
JPL Computer and Network Resources” (DocID 79016)
• Security patches must be applied within 15 calendar days of release operating systems and applications, including VPN software.
• Antivirus and anti-malware software must be installed and configured on eligible devices.
• Configure to automatically update current definitions.
• Conduct frequent scans (ideally 72-hours, but at a minimum monthly).
• Users must not alter security configurations or device certificates issued by JPL.
• Enable and use encryption for both data at rest and data in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .