This file is an Excel-based cost proposal attachment (Attachment A-15) for a Jet Propulsion Laboratory (JPL) Mechanical Engineering Support and Assistance (MESA) Request for Proposal (RFP), specifically a Cost Plus Fixed Fee solicitation with multiple tabs detailing labor rates, indirect rates, fee calculations, and cost breakdowns. The solicitation is a 100% small business set-aside targeting mechanical systems engineering services for non-flight and flight technology development, system engineering, hardware development, and integration and test activities, with NAICS code 541715.

The attachment contains detailed pricing information across four tabs: Labor Rates (Tab 1), which includes sample labor categories like Test Engineer III with escalation rates; Indirect Rates (Tab 2), showing proposed rates for fringe benefits, labor overhead, and G&A; SWO Fee Calculation (Tab 3), demonstrating cost calculation methodologies; and RWO Cost Breakdown (Tab 4), with subsections for travel, material, subcontract, and other direct costs. The solicitation indicates JPL intends to award to multiple small business subcontractors, with tasks issued via Subcontract Work Orders (SWO), and the total contract will be executed through cost-type and fixed-price mechanisms.

View the file

Other files

File Type Posted
Addendum 5 - MESA RFP.pdf PDF
A-22 SB Joint Venture Certificate.docx DOCX document
Addendum 4 - MESA RFP.pdf PDF
Addendum 3 - MESA RFP.pdf PDF
Addendum 2 RFP MESA.pdf PDF
Addendum 1 RFP MESA.pdf PDF
JPL Acknowledgement Form 2384-A1.docx DOCX document
Notice of SB JPL Form 4022-A6.docx DOCX document
Acct Sys JPL Form 7370 A-20.doc DOC document
Past Perform JPL Form 0358-A14.docx DOCX document
4.23 Exhibit 13 FP LimitationJPLObligation.pdf PDF
4.23 Exhibit 7 Cyber Review Template Rev.41.xlsx XLSX spreadsheet
CPFF MESA Std Subcontract Final.pdf PDF
4.23 Exhibit 6 Unescorted Access Form 7394-B12.pdf PDF
4.23 Exhibit 12 CR Stds of Conduct Form 4412-B11 (1).pdf PDF
4.23 Exhibit 3 Weekly Status Report Template.xlsx XLSX spreadsheet
RFP-CZ-2664-06012025 FINAL.pdf PDF
4.23 Exhibit 4 JPL Design Principles.pdf PDF
CPFF Article 2 Payment Provisions - Rate Table.xlsx XLSX spreadsheet
4.23 Exhibit 5 MESA SDRL.pdf PDF
FP Article 2 Payment Provisions - Rate Table.xlsx XLSX spreadsheet
4.23 Exhibit 2 ELI Template.xls XLS spreadsheet
4.23 Exhibit 1 SWO Procedure MESA.pdf PDF
4.23 Exhibit 14 MESA List of Applicable DRDs.pdf PDF
Attachment A-15 FP CEB.xlsx XLSX spreadsheet
Fixed Price MESA Std Subcontract Final.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - Labor Rates & Esc

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 1
Mechanical Engineering Support & Assistance
Proposed Direct Labor Rates & Annual Escalation for SWO Fee Calculation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 1 and paragraph 3.1.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Labor Categories
#Labor
CategoryCode or
Number (if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance
Level or "None"Hourly Direct Labor Rate
FY'26FY'27FY'28FY'29 OptionFY'30 Option
1$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00
Proposed Annual Labor Escalation
FY'27FY'28FY'29 OptionFY'30 Option
0.00%0.00%0.00%0.00%
SAMPLE
#TitleCode or
Number (if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance
Level or "None"Hourly Direct Labor Rate
FY'26FY'27FY'28FY'29 OptionFY'30 Option
1Test Engineer IIITE3Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsNone$50.00$51.55$52.84$54.29$55.86
2Test Engineer IIITE3SCHolds Security Clearance. Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsTop Secret$54.00$55.67$57.06$58.63$60.33
Sample Annual Labor Escalation*
FY'27FY'28FY'29 OptionFY'30 Option
3.10%2.50%2.75%2.90%

* The percentages shown are in no way indicative of amounts expected by JPL.

&"Times New Roman,Regular"&11Page &P of &N

Tab 2 - Indirect Rates & Fee

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 2
Mechanical Engineering Support & Assistance
Indirect Rates & Fixed Fee for Fee Calculation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 2 and paragraph 3.6.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Indirect Rates - For use in SWO fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'26FY'27FY'28FY'29 OptionFY'30 Option
1
2
3
4
5
6
7
8
9
Fixed FeeFY'26FY'27FY'28FY'29 OptionFY'30 Option
Fee Percentage for use in SWO fixed fee calculation0.0%0.0%0.0%0.0%0.0%
INDIRECT RATE SAMPLE - Rates shown are in no way indicative of proposed rates expected by JPL.
Indirect Rates - For use in SWO fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'26FY'27FY'28FY'29 OptionFY'30 Option
1Fringe BenefitsDirect labor54.2%55.0%53.7%55.2%55.7%
2Labor OverheadDirect labor + fringe benefits34.7%35.2%35.0%35.2%35.5%
3Material OverheadRaw material cost7.5%7.7%7.2%6.9%7.1%
4Subcontract OverheadSubcontract cost3.0%2.7%3.1%2.9%3.2%
5IT ServicesLabor hours$ 0.25$ 0.24$ 0.29$ 0.27$ 0.23
6General & AdministrativeSubtotal direct cost43.7%41.0%42.2%44.0%42.7%
* The percentages shown are in no way indicative of amounts expected by JPL.

&"Times New Roman,Regular"Page &P of &N

Tab 3 - SWO Fee Calculation

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 3
Mechanical Engineering Support & Assistance
SWO Fee Calculation
Sample for Information Purposes Only
Note -
Tab 3 is for information purposes. Reference RFP Volume III Cost Instructions Section 2.1 Tab 3 for required acknowledgement of compliance.
Cost ElementSWO Cost
at Current RatesSWO Cost for Fee Calculation
at Negotiated RatesTotal Negotiated SWO
Hours/CurrentHours/Neg IndirectCost Est @Hours/Current
LaborBaseRateTotalBaseRateCurrent RatesBaseRateTotal
Data System Architect10$ 70.00$ 70010$ 70.00$ 70010$ 70.00$ 700
Data Management & Archive10$ 45.00$ 45010$ 45.00$ 45010$ 45.00$ 450
Technical Writing and Editing10$ 40.00$ 40010$ 40.00$ 40010$ 40.00$ 400
Mission & Flight System Plan10$ 65.00$ 65010$ 65.00$ 65010$ 65.00$ 650
Mission Operations10$ 55.00$ 55010$ 55.00$ 55010$ 55.00$ 550
Total Labor50$ 2,75050$ 2,75050$ 2,750

Overhead/Fringe $ 2,750 92.0% $ 2,530 $ 2,750 87.0% $ 2,393 92.0% $ 2,530

Material$ 5,000$ 5,000$ 5,000
Material Overhead$ 5,0004.3%$ 215$ 5,0004.0%$ 2004.3%$ 215
Subcontract$ 2,000$ 2,000$ 2,000
Subtotal Cost / G&A Base$ 12,495$ 12,343$ 12,495
G&A$ 12,49539.0%$ 4,873$ 12,34335.0%$ 4,32039.0%$ 4,873
Total Cost$ 17,368$ 16,663$ 17,368
FCCM - Labor$ 2,7500.68%$ 19$ 2,7500.68%$ 190.68%$ 19
FCCM - Material$ 5,0000.07%$ 4$ 5,0000.07%$ 40.07%$ 4
FCCM - G&A$ 12,4950.42%$ 52$ 12,3430.42%$ 520.42%$ 52
Total Cost + FCCM$ 17,443$ 16,738Cost at Current Rates$ 17,443
Fixed FeeN/A4.0%$ 667Fee per Negotiated Rates$ 667
Total Price**N/AN/A$ 18,110
Notes -
1 The SWO cost base for fee calculation is developed using the negotiated indirect rates. The negotiated fee percentage is applied to the total cost (excluding FCCM) resulting from the application of the negotiated indirect rates, to calculate the fee amount.

2 The current direct labor rates are assumed to fall within the negotiated direct labor rate ranges.

3 The Total Price includes the total cost based on current rates plus the fee amount that results from applying the negotiated fee percentage to the total cost (excluding FCCM) as based on the negotiated indirect rates. Note that all direct labor & FCCM cost within the fee calculation cost base reflect current rates.

&"Times New Roman,Regular"Page &P of &N

Tab 4 - RWO Cost Breakdown

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 4
Mechanical Engineering Support & Assistance
RWO Cost Element Breakdown
enter company name
Notes -
1. Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 4.
2. The rates used below shall be consistent with the FY'26 labor rate ranges proposed within Tab 1 and the FY'26 indirect rates proposed within Tab 2.
3. Insert or delete rows as needed.
Cost ElementRWO 1RWO 2RWO 3Total
Hours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmount
Direct Labor
Category 10$0.00$00$0.00$00$0.00$00$0.00$0
Category 20$0.00$00$0.00$00$0.00$00$0.00$0
Category 30$0.00$00$0.00$00$0.00$00$0.00$0
Category 40$0.00$00$0.00$00$0.00$00$0.00$0
Category 50$0.00$00$0.00$00$0.00$00$0.00$0
Category 60$0.00$00$0.00$00$0.00$00$0.00$0
Category 70$0.00$00$0.00$00$0.00$00$0.00$0
Total Direct Labor0$00$00$00$0
Overhead$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Fringe Benefits$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Material$0$0$0$0
Subcontract$0$0$0$0
Travel$0$0$0$0
Other Direct Cost$0$0$0$0
Subtotal Cost$0$0$0$0
G&A$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Cost$0$0$0$0
COM - Labor$0$0$0$0
COM - Non-labor$0$0$0$0
COM - G&A$0$0$0$0
Total COM$0$0$0$0

Total Cost + COM $0 $0 $0 $0

Fee$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Price$0$0$0$0

&"Times New Roman,Regular"Page &P of &N

Tab 4-1 Travel

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 4-1
Mechanical Engineering Support & Assistance
RWO Travel Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.2.
2Insert or delete rows as needed.
RWO 1
TripDateOriginDestinationNumber of -AirfareMileage @ $0.xx/mileLodgingM&IERental CarOther (define)Other (define)Total $

/Trip

#TravelersNightsRental CarsUnit $Total $# MilesTotal $Unit $Total $Unit $Total $Unit $Total $Unit $Total $Unit $Total $
1$0.00
2$0.00
3$0.00
Grand Total$0.00
TripPurpose of Travel
#
1
2
3
RWO 2
TripDateOriginDestinationNumber of -AirfareMileage @ $0.xx/mileLodgingM&IERental CarOther (define)Other (define)Total $

/Trip

#TravelersNightsRental CarsUnit $Total $# MilesTotal $Unit $Total $Unit $Total $Unit $Total $Unit $Total $Unit $Total $
1$0.00
2$0.00
3$0.00
Grand Total$0.00
TripPurpose of Travel
#
1
2
3
RWO 3
TripDateOriginDestinationNumber of -AirfareMileage @ $0.xx/mileLodgingM&IERental CarOther (define)Other (define)Total $

/Trip

#TravelersNightsRental CarsUnit $Total $# MilesTotal $Unit $Total $Unit $Total $Unit $Total $Unit $Total $Unit $Total $
1$0.00
2$0.00
3$0.00
Grand Total$0.00
TripPurpose of Travel
#
1
2
3

&"Times New Roman,Regular"Page &P of &N

Tab 4-2 Material

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 4-2
Mechanical Engineering Support & Assistance
RWO Material Cost Detail
enter company name
Notes:
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.3.
2"Raw Mat'l Mark-up" shall include only those mark-up amounts unique to raw material cost, e.g. material handling, freight-in, scrap, etc.
3Basis of Estimate "Source Document" includes (but is not limited to); Purchase Order (current or historical), catalog price, engineering estimate.
4Basis of Estimate "Reference" shall cite the specific Source Document, e.g. P.O. # and date, catalog publication & date, engineering estimate back-up, etc.
5Insert or delete rows as needed
RWO 1
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0
RWO 2
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0
RWO 3
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0

&"Times New Roman,Regular"Page &P of &N

Tab 4-3 Subcontracts

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 4-3
Mechanical Engineering Support & Assistance
RWO Subcontract Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.4.
2Insert or delete rows as needed.
Row
#Subcontractor
NameSubcontract
DescriptionBasis of
EstimateProposed Amount
NameDivision/LocationDescriptionTypeRWO 1RWO 2RWO 3Total
1$0$0$0$0
2$0$0$0$0
3$0$0$0$0
4$0$0$0$0
5$0$0$0$0
6$0$0$0$0
7$0$0$0$0
Total$0$0$0$0

&"Times New Roman,Regular"Page &P of &N

Tab 4-4 Other Direct Cost

JPL RFP CZ-2664-06012025 COST PLUS FIXED FEEAttachment A-15, Tab 4-4
Mechanical Engineering Support & Assistance
RWO Other Direct Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.5.
2Insert or delete rows as needed.
#ODC ItemDescriptionBasis of Estimate
1
2
3
4
5
6
7
8
9
10
11
12
RWO 1RWO 2RWO 3
#ODC ItemQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
1$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00TotalTotal$0.00

&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .