This document is a Performance Work Statement (PWS) for providing fitness room janitorial services at the Kentucky Air National Guard Base. The PWS outlines the scope of work, contract requirements, and performance standards for the contractor. Key details include:

The contractor shall provide all personnel, equipment, tools, materials, and other services necessary to clean the 1,939 sq. ft. fitness room in Building 600 on a Monday, Wednesday, and Friday schedule. Services include dusting, trash removal, floor cleaning, equipment cleaning, and window washing. The contractor must meet performance thresholds of at least 90% compliance in each task area. The government will provide cleaning supplies. The contract is for a base year with optional renewal years.

The related federal contract opportunity is a Request for Quotation (RFQ) for the fitness room cleaning services, with a response due date of April 19, 2024. This will be a small business set-aside contract awarded based on best value to the government, with a focus on price reasonableness.

View the file

Other files

File Type Posted
KYANG Gym Cleaning Site Visit Q and A.docx DOCX document
EAL TEMPLATE_Fitness Room Site Survey.pdf PDF
SCA Wage Determinations 3.29.24.txt TXT text file
ACWS Solicitation - W50S8L24QA002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FITNESS ROOM JANITORIAL

PERFORMANCE WORK STATEMENT

1.0 GENERAL

1.1Scope of Work. The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to provide custodial services at the Kentucky Air National Guard, Wing Fitness Room, located on the Kentucky Air National Guard Base, KY. This contract shall cover the period set forth in the contract.
1.2Compliance with applicable Federal, State, and Local Requirements. In performing work under this contract, the Contractor shall comply with all relevant Federal, State, and Local statutes, ordinances, laws, and regulations.
1.3Buildings/Areas Covered. The following buildings/areas are covered by this contract;
1.3.1Building: 600; Room: 107; Square feet: 1,939

2.0 PERSONNEL

2.1Contract Manager. The Contractor shall provide a contract manager who shall be the point of contact during the performance of work. The name of this person and alternate(s) who can act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer and the Contracting Officer’s Representative (COR).
2.1.1The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operations of this contract.
2.1.2The Contract Manager or alternate shall be available during normal duty hours, and must be prepared to meet on the installation with Government personnel designated by the Contracting Officer and/or the COR to discuss problem areas.
2.1.3The Contract Manager or alternate must be able to read, write, speak, and understand the English language.
2.2Appearance. Contractor personnel shall present a neat appearance and be easily recognized. This must be accomplished by wearing distinctive clothing bearing the name of the company or wearing name badges, which contain the company name and employee name. An example of acceptable attire would be black pants, collar shirt tucked in to pants with a belt, and tennis shoes.

2.3 Background Check. Contract personnel must be able to pass a background check and provide security forces the employee’s name, social security number, driver’s license number and date of birth.

3.0 CLEANING TASKS

3.1Dusting. After dusting, no dust, lint, litter, or dry soil shall remain on the horizontal surfaces of fitness equipment nor on horizontal ledges (to include the top of modular walls), window sills, hand rails, etc., to a line 7’-0” above the floor level. Treadmill belts shall be dusted and cleaned with water.
3.2Trash Removal. All wastebaskets and other trash containers within the area covered shall be emptied, and returned to their initial location. Boxes, cans and papers placed near a trash receptacle and marked “TRASH” shall be removed. Any obviously soiled or torn plastic trash receptacle liners in such receptacles shall be replaced. Trash shall be disposed of in secured plastic bags. The Contractor shall pick up any trash that may fall onto the facility or grounds during the removal of such collected trash. The trash shall be deposited in the nearest outside trash collection point.
3.3Vacuum/Sweep Floors. After the floor has been vacuumed, the entire floor surface, including corners and abutments, shall be free of litter, dust, and foreign debris. Trash receptacles and easily movable items shall be removed and replaced after vacuuming.
3.4Mop Floors. All accessible solid floor areas shall be mopped. Trash receptacles and easily movable items shall be moved and replaced after mopping. After mopping, the floor shall have a uniform appearance, with no streaks, swirl marks, detergent residue, or any evidence of soil, stains, film, debris or standing water. There shall be no splash marks or mop streaks on furniture, walls, baseboard, etc., or mop strands remaining in the area. Careful attention will be given to the areas directly around the base of the equipment.
3.5Glass/Mirror Cleaning. After glass cleaning there shall be no traces of film, dirt, smudges, water, or other foreign matter.
3.6Fitness Equipment. Tasks are to include wiping down surfaces of fitness equipment with degreaser and germicide provided by the government. This includes pads, foot holds, hand grips, metal frame, etc. All equipment should be clean, free of dust particles, dirt, grease, and grime. Any piece of broken equipment will be reported to the COR immediately. Fitness equipment includes cardio machines, weight machines, free weights, mats, ropes, etc.

3.7 Exterior Windows. Exterior windows will be cleaned on the interior and exterior sides. After window cleaning there shall be no tracts of film, dirt, smudges, water or other foreign matter.

3.8Restock Supplies. Restock supplies like paper towels, spray bottles, and disinfectant wipes.
3.9.High Dusting. Cleaning air ducts, corners, and other surface taller than 7’.

4. 0 SCHEDULE OF TASKS

4.1 Period of Service and Hours of Operation. Service is to be performed every Monday, Wednesday, and Friday between 1:00 pm and 3:00 pm. Eastern Standard time in accordance with paragraph 4.3. When a holiday falls on the day of service, the service will not be required, and that service day will fall to the next business day in which service is not scheduled.

4.2 Areas Included for Cleaning. The following areas within each building are included:

4.2.1Building 600, Room 107, 1,939 sq. ft. (Contract does not include restrooms).
4.3Cleaning Tasks. The following are to be performed per the frequency specified below:
Cleaning Tasks
Bldg. 600; Room 107 Frequency
Removal of all trash
Daily
Low Dusting
Daily
High Dusting
Twice per month
Windows/Mirrors
Daily
Vacuum and mopping of floors
Daily
Fitness Equipment cleaning
Daily
Restocking of supplies
Daily as needed

Paper towels, spray bottles, disinfecting wipes.

Exterior Windows Washed, inside and outside
Initial within two (2) weeks after award, recurring once a month thereafter

4.4 Supplies. The COR will be responsible for the control of the Cleaning Supply Inventory (See 5.7). Contractor will be require to bring their own equipment.

5.0 INSPECTION/ACCEPTANCE

5.1Standards of Performance. The Contractor’s performance will be determined satisfactory when the tasks meet or exceed the standards described herein. Should the services provided not conform with the contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When defects in services cannot be corrected by re-performance, the Government may:
(1)Require the Contractor to take necessary action to ensure that future performance conforms to the contract requirements, and;
(2)Reduce the contract price to reflect the reduced value of the services performed.

If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may:

(1)By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service, or;
(2)Terminate the contract for default.
5.2Quality Control. The Contractor shall establish and maintain a complete Quality Control Plan to assure the requirements of the contract are provided as specified. Updated copies must be provided to the Contracting Officer as changes are incorporated. The plan shall describe the method(s) for identifying the quality of service performed before the level of performance becomes unacceptable.
5.3Quality Assurance Surveillance Plan. The Government shall appoint in writing a COR. The Government will evaluate the Contractor’s performance in accordance with local procedures and will record all surveillance observations. Customer complaints shall be the initial indicator of unsatisfactory performance. When the COR concurs with a customer complaint, the Contractor’s representative will initial the observation.
5.4Performance Evaluation Meetings. The Contract Manager may be required to meet with the COR and/or the Contracting Officer periodically to discuss the performance on this contract.
5.5Conservation of Utilities. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities, including:
5.5.1Lighting shall be used only in areas where and when work is actually being performed.
5.5.2Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the workers.
5.5.3Water faucets or valves shall be turned off when not in use.
5.6Contractor Furnished Items and Services. The Contractor shall furnish all personnel, equipment, tools, transportation, materials, supervision, and other items and services necessary to perform the custodial services described in this contract.
5.7Cleaning Supply Inventory. The Government will provide expendable supplies: cleaning chemicals, germicide, trash bags, paper towel and other cleaning supplies. Should these supplies not be available to the Contractor on any occasion, the Contractor shall be relieved of responsibility to service that item as required by definition until such time as the item is furnished.
5.8Points of Contact.MSgt Kevin Woodard email: kevin.woodard.1@us.af.mil phone: (502) 413-4120
MSgt Aaron Foote email aaron.foote@us.af.mil phone: (502) 413-4381

Performance Threshold Matrix/Checklist 123d Fitness Room Janitorial Service Contract

Deliverable
Paragraph
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Low Dusting
3.1
90% of all dust, lint, litter, or dry soil shall be removed from horizontal surfaces fitness equipment and on horizontal ledges, window sills, hand rails, etc., to a line 7’-0” above the floor level.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Trash Removal
3.2
90% of all wastebaskets, and other trash containers within the area covered shall be emptied, and returned to their initial location. Boxes, cans and papers, placed near a trash receptacle and marked “TRASH” shall be removed. Any obviously soiled or torn plastic trash receptacle liners in such receptacles shall be replaced. Trash shall be disposed of in secured plastic bags. The Contractor shall pick up any trash that may fall onto the facility or grounds during the removal of such collected trash. The trash shall be deposited in the nearest outside trash collection point.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Mop Floors
3.3
90% of all accessible solid floor areas shall be mopped. Trash receptacles and easily movable items shall be moved and replaced after mopping. After mopping, the floor shall have a uniform appearance, with no streaks, swirl marks, detergent residue, or any evidence of soil, stains, film, debris or standing water. There shall be no splash marks or mop streaks on the floor, fitness equipment, walls, baseboard, etc., or mop strands remaining in the area.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Vacuum/Sweep Floors
3.4
90% of the swept floor surface, including corners and abutments, shall be free of litter, dust, and foreign debris. Trash receptacles and easily movable items shall be removed and replaced after sweeping.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Floor Maintenance
3.5
90% of areas accessible to floor machines shall receive floor maintenance. After receiving floor maintenance floors shall have a uniform appearance, and be free of scuffmarks, heal marks, and other stains and discoloration. All floor maintenance solutions shall be removed from baseboards, fitness equipment, trash receptacles, etc. Trash receptacles and easily movable items shall be moved to allow maintenance underneath. Any items moved shall be returned to their proper position when operations have been completed. The techniques used depend upon the materials, equipment, and personnel used to do the job. The Contractor needs to apply the Floor maintenance techniques to the affected areas, as required, not necessarily to the entire floor to return the floor to the expected standard.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Glass/Mirror Cleaning
3.6
90% of glass will be clean of film, dirt, smudges, water, or other foreign matter.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection

Fitness Equipment Strength, Cardio, and free equipment

3.7
90% of equipment will be clean and free of any debris. Treadmill, elliptical machines will be have all the track and sides clean. Large mats will be sanitized.
Maximum allowable deviation from the Performance Standard is 10%
Monthly Inspection
Exterior Windows
3.8
90% of windows will be clean of film, dirt, smudges, water, or other foreign matter.
Maximum allowable deviation from the Performance Standard is 10%
Quarterly Inspection

END OF PWS