Fisher McCall 12th Ave 36807 FY25 308 Response.pdf
PDF 207 KB Posted
- Solicitation number
- DS 761 270000000005 3
- Issued by
- Saginaw County, Michigan
About this file
This is a Davis-Bacon wage determination issued by the U.S. Department of Labor Wage and Hour Division for the Fisher-McCall 12th Avenue Well Plugging and Facility Decommissioning Project in Ottawa County, Michigan. The project involves plugging, abandoning, and restoring land at orphan well and facility locations, including site clearing, workover rig setup, wellbore cleaning and logging, cementing operations to seal zones and protect freshwater aquifers, tank and vessel decommissioning, and removal of associated infrastructure such as flowlines, electrical lines, and structures. The wage determination is valid from May 28, 2026, through November 28, 2026, and applies exclusively to this heavy construction project managed by the Michigan Department of Environment, Great Lakes & Energy, Geologic Resources Management Division under Contract Number DS250000000019.
The wage determination establishes Davis-Bacon prevailing wage rates for 18 distinct job classifications, with hourly rates ranging from $20.00 to $55.00 and fringe benefits ranging from $12.00 to $69.00. Notable rates include Crane Operator at $55.00 hourly with $30.00 fringe benefits, Welder at $41.00 hourly with $40.00 fringe benefits, and Tool Pusher at $31.00 hourly with $69.00 fringe benefits. This wage determination is project-specific and cannot be applied to other contracts or projects. All contractors and subcontractors performing work on this project must comply with these established wage rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DS 270000000005 SCHEDULE B - PRICING MATRIX Fisher-McCall 12th Ave.xlsx | XLSX spreadsheet | |
| Columbus Oil Pre-Bid Meeting.docx | DOCX document | |
| DS 270000000005 Fisher McCall 12th Ave Well Plugging and Facility Decommissioning Project.docx | DOCX document | |
| DS 27-0004 Q & A Columbus Oil and Gas.docx | DOCX document | |
| Revised DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document | |
| Pre-bid Meeting Notes Fisher McCall 12th Ave 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Labor Wage and Hour Division Washington, DC 20010
Response to SF-308 Request for Davis-Bacon Project Wage Determination
Project Wage Decision Number: 2026MI-36807308052826-Ottawa
State: Michigan
County: Ottawa
Construction Type: Heavy
Agency: Department of Environment Great Lakes & Energy – Geologic Resources Mgmt. Div.
Contract Number: DS250000000019
Project Name: Fisher-McCall 12th Avenue Well Plugging and Facility Decommissioning Project
Description of Work (as clarified): Plugging, abandoning and restoring the land at orphan well/facility locations. The work includes clearing the site of brush and trees, setting up the workover rig, tanks, flares, pumps, and specialized equipment. The wellbore will need to be cleaned out and electronically logged. Cementing will start at the bottom and work upward, making sure to seal all appropriate zones and formations as well as protecting the freshwater aquifer. Any abandoned tanks or vessels will need to be pumped out, steam clean, and prepared for scrap. All associated flowlines, electric lines, drums, buildings, secondary containments, fencing and debris will be removed and the site graded for final mulching and seeding.
Date of Decision: 05/28/2026 Expires: 11/28/2026
Modification Number: N/A
Classification Hourly Rate Fringe Benefits Rig Operator $23.00 $30.00 Tool Pusher $31.00 $69.00 Floor Hand $20.00 $30.00 Derrickman $22.00 $30.00 Roustabout Laborer $20.00 $30.00
Power Swivel Operator $23.00 $69.00 Wireline Operator $29.00 $30.00 Wireline Rigger $23.00 $30.00 Cementer $39.00 $46.00 Pump Truck Operator $24.00 $30.00 Bulk Truck Operator $24.00 $30.00 Water Truck Operator $26.00 $12.00 Mud Truck Operator $26.00 $12.00 Vacuum Truck Operator $26.00 $12.00 Heavy Equipment Operator $35.00 $30.00 Crane Operator $55.00 $30.00 Electrician $35.00 $23.00 Welder $41.00 $40.00
This wage determination is specifically for the project listed above. It cannot be used for any other purpose including contracts and or project.
If you have any questions and or additional comments, please do not hesitate to contact me at macleod.meghan@dol.gov.
Approved by:
Meghan MacLeod Acting Branch Chief Branch of Construction Wage Determinations U.S. Department of Labor 402-660-0775 | macleod.meghan@dol.gov mailto:macleod.meghan@dol.gov mailto:macleod.meghan@dol.gov
File details come from the government source that posted it. Updated .