Columbus Oil Pre-Bid Meeting.docx
DOCX document 23 KB Posted
- Solicitation number
- DS 761 270000000005 3
- Issued by
- Saginaw County, Michigan
About this file
This document is a pre-bid meeting sign-in sheet and meeting minutes for the Columbus Oil Orphan Well Plugging Project in Cass County, Michigan, conducted by GRMD (Great Lakes/Mid-Michigan Resource Development) staff on November 4, 2026. The project involves the plugging of 22 orphan wells and removal of associated electrical infrastructure at each well location using turn-key pricing methodology. The pre-bid meeting was attended by representatives from nine contractor companies and included site observations where vendors evaluated well locations, access conditions, and landing area suitability. Key topics covered during the meeting included cement specifications for bottom hole plugs, fluid containment requirements prohibiting earthen pits in favor of containerized tanks, and flowline stub-up procedures requiring blind flanging at master gate valves. Contractors were instructed to submit detailed project timelines as a factor in best-value vendor selection, complete Schedule B Pricing Matrices with unit pricing, and provide per-well and total pricing for all 22 wells.
The project requires Davis-Bacon Prevailing Wage compliance from all contractors, with weekly pay certifications mandatory before invoice processing. Eligibility to submit bids is restricted to vendors holding pre-qualified contracts with EGLE (Michigan Department of Environment, Great Lakes, and Energy), with nine pre-qualified vendors listed including Excel Site Rentals, Antrim Cementers, McConnell & Scully, Mid-State Oil Tools, Taplin Group, Plants and Goodwin, Lease Management, NuPointe Energy, and Team Services. The meeting clarified that hydrogen sulfide levels in these wells are very low to non-detect, and addressed technical questions regarding cement alternatives and infrastructure handling to ensure contractor understanding of project requirements prior to bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DS 270000000005 SCHEDULE B - PRICING MATRIX Fisher-McCall 12th Ave.xlsx | XLSX spreadsheet | |
| Fisher McCall 12th Ave 36807 FY25 308 Response.pdf | ||
| DS 270000000005 Fisher McCall 12th Ave Well Plugging and Facility Decommissioning Project.docx | DOCX document | |
| DS 27-0004 Q & A Columbus Oil and Gas.docx | DOCX document | |
| Revised DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document | |
| Pre-bid Meeting Notes Fisher McCall 12th Ave 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMBUS OIL ORPHAN WELL PLUGGING PROJECT – (CASS COUNTY)
PRE-BID MEETING CONTRACTOR SIGN IN SHEET
November 04, 2026 (Started at Noon)
| NAME |
| COMPANY |
| PHONE |
| Jordan Birgy |
| EXCEL(Taplin Sub.) |
| 231-384-2460 |
| Mike Fritz |
| Plants & Goodwin |
| 989-630-7885 |
| Steve Minella |
| Taplin |
| 269-903-5725 |
| Chuck Pardue |
| Mid-State Oil Tools |
| 989-329-8721 |
| Mike Machuta |
| Mid-State Oil Tools |
| 989-330-3106 |
| Shannon Hein |
| Mid-State Oil Tools |
| 989-630-7078 |
| Danny Manusko |
| TEAM Services |
| 231-340-6366 |
| Clay Cochran |
| M&A Resources |
| 601-323-3766 |
| Dennis Wiles |
| NuPointe Energy |
| 260-330-0289 |
| Kevin Smith |
| McConnell & Scully |
| 517-795-6539 |
| Tim Howard |
| Antrim Cementers |
| 989-370-3193 |
| Ron Swan |
| TSP |
| 248-467-4920 |
QUESTIONS GENERATED DURING PRE-BID MEETING
1. Can Class A or Type 1L cement be used instead of 50/50 Poz on the bottom hole plug.
Answer: Type 1L or Class A cement can be permitted for use on a bottom hole plug on a case-by-case basis. These wells have very low to non-detect levels of hydrogen sulfide.
2. Are earthen pits permitted during well plugging? Answer: Earthen pits are not permitted during well plugging activities. All fluids including well plugging fluids will be containerized in tanks (half round tanks, etc.).
3. Do all flowline stub-ups have to be removed at the well locations? Answer: The flowline network in this field is complex and is tied into common flowlines related to another active operator. As such, flow-line stub-ups will be blind flanged back at the closest master gate valve to where the line stubs up from the ground, and will also allow adequate room for installing the cellar at each well location. The blind flange must be securely bolted and be adequate to handle operating pressure from the field.
GRMD Staff Present: Keith Kidder (ran meeting), Jim Armbruster, and Tola Jolayemi.
Keith – opened meeting at 12:00 pm Noon, and covered:
1. Stated that this pre-bid was for the Columbus Oil Well Plugging Project that includes the plugging of 22 orphan wells and removal of associated electrical infrastructure at each well location using Turn-key Pricing.
2. Went over important dates when questions were to be submitted to the State, when answers to questions would be posted, and when bids were due to the State for this project. I encouraged all contractors to thoroughly review the RFP for important details related to this project. I instructed them to review the well plugging instructions as well as the Schedule B Pricing Matrix.
3. I instructed to the contractor group that this project would be “Turn-key Pricing” and to review the scope of work, collect all necessary information in the field, to provide a competitive bid on a per well price and also a total price for plugging 22 total wells. I also instructed them to fill out completely the Schedule B Pricing Matrix so that unit pricing is known in the event a change or amendment is needed in the future.
4. I informed the contractor group that this project will utilize Davis-Bacon Prevailing Wage (DBPW) requirements and that all contractors are to follow all requirements and regulations related to DBPW.
5. I strongly encouraged contractors to make sure that pay certifications are completed weekly, accurately, and correctly. I also noted that invoicing cannot be processed until Pay Certification is verified.
6. I instructed contractors to provide a project timeline and that it should be very detailed and clearly describe proposed work activities, rig availability, and personnel availability. It is a factor in determining ‘best value’ when selecting a winning vendor.
Vendors were able to observe site conditions, well locations, evaluate access to the landing area and. Vendors were off location by 1:45pm, Keith K. and GRMD staff left the Pre-Bid Meeting at 2:00 pm.
Note: only those vendors who hold a pre-qualified contract with EGLE will be eligible to submit pricing for this project.
Prequalified Vendors:
| Excel Site Rentals | Contract# 210000000635 | |
| Antrim Cementers | Contract# 210000000636 | |
| McConnell & Scully | Contract# 210000000640 | |
| Mid-State Oil Tools | Contract# 210000000641 | |
| Taplin Group | Contract# 210000000642 | |
| Plants and Goodwin | Contract# 270000000090 | |
| Lease Management | Contract# 270000000091 | |
| NePointe Energy | Contract# 270000000092 | |
| Team Services | Contract# 270000000093 | |
| M&A Energy Services | Contract# 270000000094 |
File details come from the government source that posted it. Updated .