First-Article-Waiver-Worksheet.pdf
PDF 601 KB Posted
- Attached to
- Mount, Gun; NSN: 1005-01-267-8103
- Solicitation number
- W56HZV-23-R-0174
About this file
This document is a First Article Waiver Worksheet template that provides a sample format for contractors to request a waiver of first article testing requirements for a federal contract. The worksheet covers the current acquisition details, the type of waiver request (partial or full), and the justification for the waiver, which may include details on recent successful first article testing, continuous production, or testing on a higher assembly. The contractor must provide supporting documentation and certify that the information is true and correct. This template would typically be submitted as an attachment to the solicitation in Section J.
The related federal contract opportunity is a solicitation for a Firm Fixed Price contract to provide Mount, Gun Assemblies with a national stock number of 1005-01-267-8103. The solicitation is a Small Business Set-Aside issued by the Department of the Army Materiel Command TACOM Life Cycle Management Command. The contract has a one-year buying option and requires first article testing unless waived. The solicitation provides details on the technical data package, export control requirements, packaging, and instructions for submitting proposals and questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV23R0174_Solicitation AMD 0007.pdf | ||
| W56HZV23R0174_Solicitation AMD 0006.pdf | ||
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV-23-R-0174_Conformed Copy.pdf | ||
| W56HZV-23-R-0174 Conformed Copy.pdf | ||
| W56HZV23R0174_Solicitation AMD 0005.pdf | ||
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV23R0174_Solicitation AMD 0004.pdf | ||
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV23R0174_Solicitation AMD 0003.pdf | ||
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV23R0174_Solicitation AMD 0002.pdf | ||
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| QA_W56HZV23R0174.xlsx | XLSX spreadsheet | |
| W56HZV23R0174_Solicitation AMD 0001.pdf | ||
| W56HZV23R0174.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version - September 2015
This information/supporting documentation is part of your request.
It must be submitted on company letterhead and signed by an agent of the company.
Contact the Contracting Officer if you have any questions about the acquisition offer/quote requirements.
FIRST ARTICLE - WAIVER WORKSHEET
Request for Information and Supporting Documentation
This is a Sample of a Contractor's Request for First Article Waiver Worksheet. If waivers will be considered by the Government, this form or memorandum similar to this should be an attachment in Section J of the solicitation.
Contracting Officer's Name
1. CURRENT ACQUISITION INFORMATION:
NOUN
PART #
CONTRACTOR NAME
NSN
TOP DRAWING #
SOLICITATION/CONTRACT #
CONTRACTOR CAGE
REVISION LEVEL
2. TYPE OF REQUEST:
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or solicitation.
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Successful completion of a First Article Test on a recent contract for the same item(s).
Complete the following & attach supporting documentation*.
If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request
DATE OF FIRST ARTICLE TEST APPROVALCONTRACT # ISSUING GOVERNMENT AGENCY
Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
A)
Successful completion of a First Article Test on a similar item on a recent contract and the item has been tested per the same requirements as those referenced in the solicitation and/or contract.
Complete the following for the similar item & attach supporting documentation*:
Briefly describe the major differences between the similar item and the item being procured.
NSN
CONTRACT #
DATE OF FIRST ARTICLE TEST APPROVAL
Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
B)
NOMENCLATURE
PART NUMBER
If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request
Material has been in continuous production. Complete and attach supporting documentation*:
Remarks (if needed)
LENGTH OF PRODUCTION RUN
C)
APPROVAL DATE OF LAST SUCCESSFUL FIRST ARTICLE TEST
Provide a full explanation justifying why duplicate testing is unnecessary:
Recent and successful performance of a first article test on the next higher assembly. A waiver may be requested in order to eliminate duplication of testing on the lower assembly.
Complete the following for the next higher assembly and attach supporting documentation*:
D)
NSN
CONTRACT #
DATE OF FIRST ARTICLE TEST APPROVAL
NOMENCLATURE
PART NUMBER
Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
If NO, please explain:
Other: A waiver or partial waiver of the FAT is being requested based on the following:
Please be specific and attach supporting documentation* as appropriate:E)
4. OTHER PERTINENT INFORMATION
There are or have been quality issues (history) for this or similar items to include Product Quality Deficiency Reports (PQDRs), Corrective Action Request, and/or show-cause letters. Please briefly discuss below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
Please describe below.
B)
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to manufacture of this item. Please describe below. C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct.
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
PRINTED NAME
COMPANY NAME
PHONE NUMBER
TITLE
COMPANY ADDRESS
Signature
*See the solicitation/contract for information on submitting supporting documentation as well as additional requirements regarding First Article Test Waiver requests.
This information/supporting documentation is part of your request.
It must be submitted on company letterhead and signed by an agent of the company.
Contact the Contracting Officer if you have any questions about the acquisition offer/quote requirements.
FIRST ARTICLE - WAIVER WORKSHEET
Request for Information and Supporting Documentation This is a Sample of a Contractor's Request for First Article Waiver Worksheet. If waivers will be considered by the Government, this form or memorandum similar to this should be an attachment in Section J of the solicitation.
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply) Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
Page of A) Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
B) C) D) Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of Page of E)
4. OTHER PERTINENT INFORMATION
A) B) C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation as well as additional requirements regarding First Article Test Waiver requests.
8.2.1.4029.1.523496.503679
| TextField7: Kerri E. Ginter |
| TextField7: Mount, Gun Assembly |
| TextField7: 9380068 |
| TextField7: 1005-01-267-8103 |
| TextField7: 9380068 |
| TextField7: W56HZV-23-R-0174 |
| TextField7: E |
| : |
| DateTimeField1: |
| TextField8: |
| DropDownList1: |
| CurrentPage: 1.00000000 |
| CurrentPage: 2.00000000 |
| CurrentPage: 3.00000000 |
| PageCount: 3.00000000 |
| PageCount: 3.00000000 |
| PageCount: 3.00000000 |
| ResetButton1: |
| TextField9: |
| DateTimeField2: |
| TextField10: |
| NumericField1: 0 |
| SignatureField1: |
| Button1: |
| Button2: |
| ListBox1: |
| Button3: |