First Article Requirement (dated 13 Jan 2026).pdf

PDF 113 KB Posted

Attached to
Minuteman III ICBM, Cable Assembly Federal contract opportunity
Solicitation number
FA820626Q0256
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a First Article Requirements document (AFMC IMT 260) dated December 11, 2024, establishing approval requirements for NSN 6150014622642AH under PR/MIPR Number 97384/33307-40015-10. The first article consists of 1 unit of Lot/Item one and will be part of the production quantity. The article will not serve as a manufacturing standard, and long lead time items are required.

The contractor must perform testing with government testing also required, with performance conformance to all drawings and specifications. The test report is due 45 calendar days from contract date, with government written notice of approval/disapproval due within 90 days of report receipt. The first article must be delivered within 60 calendar days from contract date, with 30 days' advance notification of shipment to OO-ALC/809MXSS/MXDEB at Hill AFB, Utah. Government written notice of approval/disapproval is due within 120 days of first article package receipt. The estimated cost of government testing/inspection evaluation is $3,000. Approved first articles will be forwarded to Air Force Supply and become part of the contract quantity. Disapproved articles will be retained by OO-ALC/809MXSS/MXDEB pending contractor disposition instructions. Waiver conditions exist for offerors with prior production history of the same or similar articles to the Air Force, those currently in production under an existing Air Force contract with prior approval, or those with satisfactory in-service performance, provided no more than 36 months have elapsed since contract completion. Test reports should be forwarded to Alfredo Armendariz, 414 SCMS/GUEAB, Hill AFB, Utah, who serves as the cognizant engineering organization responsible for approval. The First Article Laboratory at OO-ALC/809MXSS/MXDEB is responsible for conducting testing.

View the file

Other files for this federal contract opportunity

Other files attached to Minuteman III ICBM, Cable Assembly, newest first.
File Type Posted
Packaging SOW (dated 13 Jan 2026).pdf PDF
CDRLs (dated 13 Jan 2026).pdf PDF
Transportation (dated 13 Jan 2026).pdf PDF
FA820626Q0256.pdf PDF
Packaging (dated 13 Jan 2026).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

11 DEC 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

97384 / 33307-40015-10

4. NSN

6150014622642AH

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM one

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

CONFORMANCE WITH ALL DRAWINGS AND SPECIFICATIONS

B. The detailed technical requirements for First Article approval tests are contained in

THE DRAWINGS AND SPECIFICATIONS

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

414 SCMS/GUEAB

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

Alfredo Armendariz

414 SCMS/GUEAB

6031 Gum Lane, Bldg. 1227

Hill AFB, Utah 84056-5826

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 13 Jan 2026

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 60 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

OO-ALC/809MXSS/MXDEB, Attn: Non-Acc

Dear John Bay, Central Recieving, B

Hill AFB, Utah 84056

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 120 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$3,000.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Air Force Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by OO-ALC/809MXSS/MXDEB pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 13 Jan 2026

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Alfredo Armendariz (alfredo.armendariz.1@us.af.mil)

414 SCMS/GUEAB

385.445.8344

385.445.8344

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

First Article Laboratory

OO-ALC/809MXSS/MXDEB

801-777-4472

777-4472

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 13 Jan 2026

File details come from the government source that posted it. Updated .