First Article_6532.pdf
PDF 92 KB Posted
- Attached to
- A10 Frame Structures Federal contract opportunity
- Solicitation number
- FA821222R0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item Description_6532.pdf | ||
| Engineering Data Requirements_Attachment A_6532.doc | DOC document | |
| Special Packaging Instruction_6532.pdf | ||
| ITEM UNIQUE IDENTIFICATION CHECKLIST_6532.pdf | ||
| Item Description_3231.pdf | ||
| Engineering Data List_6532.pdf | ||
| Engineering Data List_3231.pdf | ||
| Engineering Data Requirements_Attachment A_3231.doc | DOC document | |
| FA821222R0022_Solicitation.pdf | ||
| Packaging Requirements.pdf | ||
| Form 807_3231.pdf | ||
| CDRL_FD20202200303.pdf | ||
| Statement of Work.pdf | ||
| Special Packaging Instruction_3231.pdf | ||
| Manufacturing_Qualification_Requirements_6532.pdf | ||
| Manufacturing_Qualification_Requirements_3231.pdf | ||
| ITEM UNIQUE IDENTIFICATION CHECKLIST_3231.pdf | ||
| First Article_3231.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
10 JUN 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
98747 / 160D414020-5
4. NSN
1560010366532FJ
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM EA
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Conformance with all drawings, models, specifications, form, fit, and function.
B. The detailed technical requirements for First Article approval tests are contained in
The Government reserves the right to test item to any specification included in the contract.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
Number of days for government approval / disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
DODACC:FB2029 OO-ALC 809 MXSS/MXDEB
BLDG 849 ATTN: NON-ACCOUNTABLE BAY
HILL AFB, UT 84056-5713
MARK FOR: F/A I & TEST DO NOT POST
(2) Government written notice of approval / disapproval due 90 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 120 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
DODACC:FB2029 OO-ALC 809 MXSS/MXDEB
BLDG 849 ATTN: NON-ACCOUNTABLE BAY
HILL AFB, UT 84056-5713
MARK FOR: F/A I & TEST DO NOT POST
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$2,000.0000
Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 06 Dec 2021
10 JUN 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
USAF SUPPLY
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Meredith, Jaime MNAME: 11 JUN 2021DATE:
1. The lead engineer has performed a secondary review of this item and found that a first article test is required for purchase requests less than $25,000.
2. If the vendor has never produced this item or hasn't produced it for an extended period of time, then, in view of the critical nature of the part, a "First Article" is required.
3. Vendor may be allowed only one attempt to receive full or conditional approval. At the discretion of the Government, failure to receive approval of "First Article" inspection will result in termination of the contract or a request for resubmitted. It may result in subsequent removal of the vendor as an approved source.
4. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
5. Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
6. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 06 Dec 2021
10 JUN 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Meredith, Jaime M
416 SCMS / GUEAB
801-586-5743
586-5743
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
First Article Testing Lab
809 MXSS/MXDEB
801-586-4472
586-4472
Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 06 Dec 2021
File details come from the government source that posted it. Updated .