Engineering Data Requirements_Attachment A_3231.doc
DOC document 42 KB Posted
- Attached to
- A10 Frame Structures Federal contract opportunity
- Solicitation number
- FA821222R0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item Description_6532.pdf | ||
| Engineering Data Requirements_Attachment A_6532.doc | DOC document | |
| Special Packaging Instruction_6532.pdf | ||
| ITEM UNIQUE IDENTIFICATION CHECKLIST_6532.pdf | ||
| Item Description_3231.pdf | ||
| Engineering Data List_6532.pdf | ||
| Engineering Data List_3231.pdf | ||
| First Article_6532.pdf | ||
| FA821222R0022_Solicitation.pdf | ||
| Packaging Requirements.pdf | ||
| Form 807_3231.pdf | ||
| CDRL_FD20202200303.pdf | ||
| Statement of Work.pdf | ||
| Special Packaging Instruction_3231.pdf | ||
| Manufacturing_Qualification_Requirements_6532.pdf | ||
| Manufacturing_Qualification_Requirements_3231.pdf | ||
| ITEM UNIQUE IDENTIFICATION CHECKLIST_3231.pdf | ||
| First Article_3231.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV:
ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
XXXXXXXXXXXXXXXX
2. PART NUMBER:
3. NATIONAL STOCK NUMBER:
1234-12-123-1234FG
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC, WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
| REV: |
| ENGINEERING DATA REQUIREMENTS |
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
FRAME ASSEMBLY – INR DUCT PNL FRAMEWORK STA 158.245 TO STA 171.500 (A-10)
2. PART NUMBER:
160D414020-3
3. NATIONAL STOCK NUMBER:
1560-01-036-3231FJ
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. CONTRACTOR IS RESPONSIBLE TO COMPLETELY RESEARCH THESE MANUALS, SPECIFICATIONS, AND STANDARDS AND FULLY UNDERSTAND THE REQUIREMENTS NECESSARY FOR MANUFACTURE OF COMPONENT PARTS AND ASSEMBLIES. ALL DEVIATIONS, MINOR AND MAJOR, FROM THE ENGINEERING DRAWING PACKAGE SHALL BE SUBMITTED TO 416th SCMS/GUMBA (A-10 STRUCTURES ENGINEERING).
6. WHEN MILITARY DOCUMENTS LISTED IN THE ENGINEERING DRAWING ARE CANCELLED THEY SHALL BE REPLACED BY THE INDUSTRY EQUIVALENT DOCUMENT SPECIFIED ON THE MILITARY DOCUMENT'S CANCELLATION NOTICE. THIS APPLIES TO THE ORIGINAL AIRCRAFT MANUFACTURER'S SPECIFICATIONS THAT ARE CITED IN THE DRAWING, AS WELL. THE CHARACTERISTICS OF TYPE, GRADE, CLASS, ETC. SPECIFIED IN THE CANCELLED MILITARY DOCUMENT SHALL BE MAINTAINED OR EXCEED THOSE CHARACTERISTICS WHEN APPLYING THE INDUSTRY EQUIVALENT DOCUMENT(S). WHEN THERE IS NO LISTED REPLACEMENT THE CONTRACTOR SHALL REQUEST AND RECOMMEND A SUBSTITUTE DOCUMENT FROM 416th SCMS/GUMBA (A-10 STRUCTURES ENGINEERING) THROUGH THE GOVERNMENT CONTRACTING OFFICIAL.
7. USE OF NORTHROP GRUMMAN SPECIFICATION Z-R701 IN CONJUNCTION WITH MIL-STD-130 IS MANDATORY TO ENSURE THE PROPER MARKING OF THE PARTS. (Z-R701 HAS UNLIMITED DATA RIGHTS IN JEDMICS)
8. "IUID" (ITEM UNIQUE IDENTIFIER) IS REQUIRED IAW MIL-STD-130. SPECIFIC INSTRUCTIONS FOR MARKING METHODS, LOCATION, CONTENT AND FORMAT SHALL BE SPECIFIED BY THE CONTRACTOR AND SUBMITTED TO THE GOVERNMENT FOR APPROVAL PRIOR TO CONTRACT DELIVERY. THE CONTRACTOR MUST DEMONSTRATE THE MARKING DOES NOT ADVERSELY AFFECT ITEM INTEGRITY OR PERFORMANCE AND WILL REMAIN READABLE AND ATTACHED THROUGHOUT THE USEABLE LIFE OF THE ITEM. IUID IS NOT REQUIRED FOR ITEMS WHOS INDIVIDUAL COST PER UNIT IS LESS THAN $5,000.
9. MASTER TOOL160D414020-001 MAC WILL BE PROVIDED TO CONTRACTOR FOR THE PURPOSE OF PRODUCING PRODUCTION TOOLING. WHERE APPLICABLE, MANUFACTURED COMPONENTS MUST BE COORDINATED WITH CONTROL MEDIA (I.E. MASTER TOOLING, MYLARS, LOFT MASTERS ETC., AS LISTED IN EDL). LOCATE ALL HOLES ON PRODUCTION TOOLING USING THE MASTER TOOL. IF THERE IS AMBIGUITY COMMON TO HOLE LOCATIONS AND DRAWINGS, THE MASTER TOOL TAKES PRECEDENCE. IF ANY AMBIGUITY, AS DETERMINED BY THE CONTRACTOR, MAY AFFECT FORM, FIT, AND FUNCTION OF THE ASSET, CONTACT APPROPRIATE CONTRACTING PERSONNEL FOR DISPOSITION. CONTRACTOR SHALL RETURN MASTER TOOL WHEN FIRST ARTICLE IS APPROVED.
10. ALL TOOLING BUILT BY CONTRACOR IS CONSIDERED GOVERNMENT PROPERTY AND SHALL BE RETURNED TO THE GOVERNMENT AT THE COMPLETION OF THE CONTRACT.
PREPARED BY:
RICHARD TILTON
OFFICE SYMBOL:
GBMAF
DATE:
20080411
PREPARED BY:
Jason Grosklags
OFFICE SYMBOL:
416 SCMS/GUEAB
DATE:
20211109
HILL AFB FORM 462 Page 1 of 1
File details come from the government source that posted it. Updated .