First_Article_260.pdf
PDF 114 KB Posted
- Attached to
- F-16 Mounting Bracket NSN: 5340016435571LE
- Solicitation number
- FA820326Q0009
About this file
This is an Air Force First Article Requirements form (AFMC IMT 260) dated 25 February 2026 for NSN 5340016435571LE under PR/MIPR Number 98747/201309312-101. The contractor must deliver one unit first article as part of the production quantity within 180 calendar days from contract date. The first article will serve as a manufacturing standard and must be manufactured at the facilities designated for production under the contract, with required certification provided.
The first article is subject to government testing to ensure conformance with all drawings, specifications, and engineering data requirements. The contractor must submit a DD Form 1423 test report within 365 calendar days of contract date and notify the government 15 calendar days prior to shipment. The first article must be delivered to 809 MXSS/MXDEB at Hill Air Force Base, UT 84056-5713, with government approval or disapproval notice due within 120 days of receipt. The estimated cost of government testing and inspection is $2,500. Long lead time items are required. Upon approval, the first article will be forwarded to supply and considered part of the contract quantity. Disapproved first articles will be retained by 809 MXSS/MXDEB pending disposition instructions. First article approval may be waived for offerors with prior production of the same or similar article for the Air Force within the past 36 months and who have demonstrated satisfactory service performance, subject to cognizant engineering organization approval. Stanger, David W of 417 SCMS/GU E A is responsible for both approving and conducting testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Packaging.pdf | ||
| EDL_Redacted.pdf | ||
| CDRL_A001.pdf | ||
| MQR.pdf | ||
| Solicitation_FA820326Q0009.pdf | ||
| Packaging_158.pdf | ||
| Transportation_1653.pdf | ||
| IUID.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
25 FEB 2026(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
98747 / 201309312-101
4. NSN
5340016435571LE
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are conformance with all drawings, specifications, and engineering data requirements.
B. The detailed technical requirements for First Article approval tests are contained in the specifications included in this contract.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
809 MXSS/MXDEB along with the part.
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.
A001 calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 4Generated by PRPS using Jasper Reports on 30 Apr 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 15 calendar days prior to shipment.
(3) Delivered to government at
"First Article, Do Not Post"
FB2029 809 MXSS/MXDEB
Bldg 849 Attn: Non Accountable Bay
Hill Air Force Base, UT 84056-5713
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 120 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$2,500.0000
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to supply.
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.
X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.
b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 4Generated by PRPS using Jasper Reports on 30 Apr 2026
12. REMARKS
Stanger, David WNAME: 26 FEB 2026DATE:
A. Item 1 of section F, FIRST ARTICLE DELIVERY, is an engineering estimate and is not contractually binding. First article delivery schedule is defined in the approved and signed contract document.
B. The critical nature of this part requires a First Article from a contractor who has never produced the item or has not produced the item for an extended period of time. The Government reserves the right to assure all materials and process certifications are correct and to test the item to any and/or all drawings, specifications, and other contract requirements. A vendor will normally be allowed only one attempt to receive full or conditional approval. Failure to receive approval of First Article inspection may, at the discretion of the Government, result in termination of the contract.
C. First Article waiver approvals as well as similar item determination are solely the responsibility of the Cognizant Engineering Organization. Similar item is defined as an item that has been previously manufactured to the same drawing but is the opposite hand and/or has a different dash number.
D. The Cognizant Engineering Organization shall determine First Article testing requirements based on component criticality and complexity, regardless of Purchase Request value.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Stanger, David W
417 SCMS/GU E A
801-586-7780
586-7780
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Stanger, David W
417 SCMS/GU E A
801-586-7780
586-7780
AFMC IMT 260, 20230316, V-5,
Version 4Generated by PRPS using Jasper Reports on 30 Apr 2026
File details come from the government source that posted it. Updated .