This document outlines the scope of work for lead remediation services at the Pittsburgh Police Firing Range, a project solicited by the City of Pittsburgh Office of Management and Budget on behalf of the Department of Public Works. The project involves comprehensive environmental remediation of the 50-yard firing range located off Washington Boulevard near the Zone 5 Police station. Key deliverables include excavating an estimated 231 cubic yards of soil from the backstop berm to a depth of 0.5 to 3.0 feet, screening 80–90% or more of lead bullets and bullet fragments larger than 1/4"–3/8" from impacted materials, and complete range restoration including reinstallation of a two-course railroad-tie retaining wall. The contractor must recycle recovered lead through a licensed facility and provide the city with lead transport documentation and a certificate of recycling. The bid response deadline is February 27, 2023, at 2:00 pm, with project execution scheduled between April 1 and April 30, 2023. A potential 90-day contract extension is available if necessary. Site walkthroughs can be arranged by contacting the Pittsburgh Bureau of Police Firearms Training staff.

The contractor will receive a minimum of 50% of the recovered lead's recycled value as compensation. The procurement emphasizes participation from disadvantaged business enterprises, including Minority-Owned Business Enterprises (18% goal), Women-Owned Business Enterprises (7% goal), and Veteran-Owned Small Businesses (5% goal). Bidders must submit a vendor questionnaire, Statement of Affiliations, Vendor Contact Sheet, Vendor Registration Form, and W-9 Form. The project requires specialized expertise in environmental remediation, lead reclamation, and shooting range restoration, including site preparation, health and safety planning, waste management, and precise soil excavation and screening techniques. No specific budget ceiling is stated in the solicitation materials.

View the file

Other files

File Type Posted
Pittsburgh_Bureau_of_Police_Firing_Range_Lead_Remediation.pdf PDF
firing-range_2.JPG JPG image
firing-range_3-aerial.png PNG image
firing-range_1.JPG JPG image
firing-range-lead-maintenance-tasks_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRING RANGE LEAD MAINTENANCE TASKS

I. MOBILIZATION, SITE SET-UP, AND PLAN PREPARATION

• Mobilize personnel and equipment to project site

• Prepare work plan

• Prepare health & safety plan

• Prepare waste management plan

• Complete site walk-through with customer representative to confirm excavation processing areas

• Establish temporary access, site access control, and traffic control; place appropriate signage

• Set up processing area and equipment

• Obtain approvals and permits as necessary (City can provide city fee waiver forms.)

• Locate utilities

• Vegetation removal if applicable

• Protect or remove railroad-tie retaining walls if applicable

II. EXCAVATION, SCREENING, AND RECYCLING

• Excavate estimated depth of 0.5-3.0 feet of soil from the backstop berm or deeper if the concentration of bullets appears economically feasible to recover at deeper depths

• Screen 80%-90% or more (weight percent) of the lead bullets & bullet fragments greater than 1/4"-3/8" from the lead-impacted range materials

• Contain and securely store recovered lead for shipment

• Ship recovered lead to a licensed lead recycler

• Provide customer with lead transport documentation, certificate of recycling, and a minimum of 50% of the value of the recycled lead

III. RANGE RESTORATION

• Return screened soil to original berm

• Replace oversized materials to range at a mutually agreed-upon location as necessary

• Re-install processed soils on the main berm and backstops, reshape to mirror original slope.

• Supplement soil for backstop berm as needed

• Purchase and install two-course railroad-tie retaining wall along the bottom of the backstop berm on the main berm.

• Decontaminate equipment before demobilization