This document contains the bid specifications for the annual fire device confidence testing on the Bellevue College main campus. The work must be performed from August 19th to August 30th, 2024 and will involve testing the fire alarm and sprinkler systems in accordance with NFPA 72 and NFPA 25 standards. The contractor must hold the appropriate licenses and certifications, and testing shall be scheduled during the college's class break. Bidders will be provided with documentation on the location and number of devices to be tested, and any discrepancies should be noted in the report. Bellevue College's standard terms and conditions apply.
The related state and local contract opportunity is for the annual fire device testing on the Bellevue College main campus, covering the jurisdictions of King County, Bellevue City, Snohomish County, Pierce County, Kingston CDP, and Snohomish City in the state of Washington. Bidders must comply with the technical specifications outlined in the bid document, and the contract will be awarded to the successful bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Palouse Ridge AOO.pdf | ||
| ITB_07_1124.pdf | ||
| ITB_07_1124Amendment 1 .pdf | ||
| ITB_07_1124Fire Alarm Device Bid Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SPECIFICATIONS
Location:
Requirement:
Bellevue College Main Campus
3000 Landerholm Cir. SE
Bellevue, WA 98007
All work must be performed Monday, August 19th, 2024 – August 30th, 2024. Audible Testing is preferred to occur after Noon on
Fridays.
TECHNICAL SPECIFICATIONS
Required:
1. Fire alarm systems shall be tested in accordance with NFPA 72.
a. Buildings with two fire panels will have a separate report for each. The word “ALL” will not be used in place of # of units tested. There will be a specific # of units tested.
b. Duct smoke detectors will have their cover removed and tested with smoke to make sure the HVAC unit stops. The annunciator for the duct detector will be used to reset the duct detector.
c. The fire panel will be reset after each alarm point is tested. This will test the alarm paging system for each alarm.
2. Sprinkler systems shall be tested in accordance with NFPA 25.
a. Upon completion of water flow testing, a report from the alarm center, indicating all water flow alarms were received, will become part of the fire alarm report.
3. Additionally, all confidence testing shall comply with the local authority having jurisdiction.
One copy of the test form shall be filed with the AHJ and one copy given to Bellevue College, Office of Public Safety.
4. Each bidder (or designated subcontractor) shall be licensed by the State of Washington
Department of Labor and Industries and, if required, the state Fire Marshall’s Office (Director of
Fire Protection).
5. Individual technicians shall hold the appropriate license or certification for testing fire systems (NICET, Low Voltage).
6. Testing shall be scheduled for during the College class break between August 19th and August
30th, 2024.
7. Documentation will be available regarding the location and number of devices to be tested. If any errors in number or additional devices are found, they are to be noted on the report.
8. Bellevue College standard terms and conditions apply, and copies are available upon request.
9. Use the attached tables (Fire Alarm Data Sheet) as a guide in preparing your bid.