About this file
The document is a Scope of Work for Fire Sprinkler Inspection Deficiencies at multiple buildings within a facility, likely located in New York. The inspection reveals numerous deficiencies across several locations including Gateway, Library, Maintenance Building, Student Center, and Technology Building. Specific required actions include supplying and/or replacing missing or damaged fire sprinkler components such as spare heads, escutcheons, cover plates, valve replacements, and pipe repairs. The deficiencies span various types of sprinklers including Tyco ext. coverage chrome, HSW chrome, 155-degree white, and G4 concealer heads, with specific quantities noted for each location.
The scope of work indicates comprehensive fire protection system maintenance, with repair and replacement needs across multiple building types. While no specific pricing, funding sources, or contract terms are explicitly detailed in the document, the comprehensive nature of the deficiencies suggests a significant infrastructure improvement project focused on ensuring code compliance and fire safety standards. The document appears to be preparatory documentation for a potential fire sprinkler repair and replacement contract, with the work centered on addressing critical system components to maintain operational safety and meet regulatory requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fire Sprinkler Deficiencies 2025.docx | DOCX document | |
| 2024 Sample Short Form Contract for BidNet.pdf | ||
| Fire sprinkler fire alarm repairs 2025RFP.docx | DOCX document | |
| 2024 Updated Insurance Schedule.pdf | ||
| Sample Terms _ Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SPRINKLER INSPECTION DEFICIENCIES
Scope of Work:
Gateway: Missing spare heads: (2) Tyco ext. coverage HSW chrome, and (2) Tyco HSW 155-deg white. (Supply) Gateway: Missing wrench and (5) escutcheons for Tyco TY5522. (Supply) Gateway: Sprinkler above bathroom ceiling by Rm 147 needs to be lowered. (Supply and Install)
Library: Missing G4 cover and sprinkler Rm G57 (high). (Supply and install) Library: (10) painted G4 covers G16B.(Supply and Replace) Library: Missing G4 cover library (high). (Supply and Replace) Library: Missing spare heads needed: (1) 165-deg ½” upright, and (1) 155-deg HSW ½”. (Supply) Library: Broken valve on pump test header (3”F x 2.5”M).(Supply and Replace)
Maintenance Bld: Sprinkler pipe with pinhole leaks. (Supply and Replace 21’ of 6” pipe) Maintenance Bld: Inline check valve on air compressor is not holding. (Supply and Replace)
Student Center: Low air on pre-action system is not working. (Supply and Replace)
Technology Bld: Painted/missing escutcheons. Ground floor inclusive bathroom, Inclusive bathroom by room 134, Room 128,150. (Supply and Replace) Technology Bld: Tape on cover plate Rm 109A. (Supply and Replace) Technology Bld: Missing spare heads: (2) G4 concealers w/wrench, (2) 155-deg HSW ½”, and (2) ¾” ext. coverage chrome pendants. (Supply)