This submittal register outlines the technical specifications for a structural steel project to upgrade fuel wharves in Japan. The project involves coating steel waterfront structures, piles, sheet piling, and mooring bollards using a zero VOC splash zone coating system. The specifications require surface preparation to SSPC SP 6/NACE No.3 commercial blast standard and application of a primer, urethane elastomer intermediate coat at 2.5mm dry film thickness, and topcoat. Coating materials and contractors must meet certification requirements. The contractor must implement quality control procedures, conduct environmental monitoring, and submit daily inspection reports and coating qualification test results for review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 35 PAGES
FY21 DLA DESC1904 Modernize Fueling Wharves to T-1 Tanker Capable
01 11 00.00 10 SD-01 Preconstruction Submittals
1.11Initial Site Conditions Photos
1.7 GKey Personnel Qualifications
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5 GCrane Operators/Riggers
1.7.2.3 GNaval Architecture Analysis
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on O nly
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 35 PAGES
01 35 26 1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.16 GMagnetic Survey Report
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
SD-06 Test Reports
3.1.1Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
1.5.8 GSpecial Inspector of Record
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.1Interim Final Report
3.1.3 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 35 PAGES
01 50 00 3.3.2 GTemporary Utility Connections
Plan
01 57 19 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.9 GEnvironmental Protection Plan
1.9.12.1 GDirt and Dust Control Plan
3.2.1 GStormwater Pollution Prevention
Plan
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.2.1.1Inspection Reports
3.7.2Nonhazardous Solid Waste
Diversion Report
SD-07 Certificates
1.7.1 GAsbestos Certification
1.7.2 GLead Certification
3.11 GWritten Assessment Of Friable
Asbestos Disturbance
SD-11 Closeout Submittals
3.8.3.4 GDisposal Documentation for
Hazardous and Regulated Waste
GSolid Waste Management Report
3.8.3.1 GHazardous Waste/Debris
Management
1.11Environmental Records Binder
01 74 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 35 PAGES
01 74 19 1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 35 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 61 13 SD-03 Product Data
1.2 GWork Plan
3.9 GClosure Report
SD-06 Test Reports
3.3Confirmation Sampling and
Analysis
3.5.1 GSampling of Stored Material
3.5.2 GSampling Liquid
3.7.2Compaction
02 82 13.00 10 SD-01 Preconstruction Submittals
1.7.1 GAsbestos Hazard Abatement Plan
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 35 PAGES
02 82 13.00 10 1.4 GDetailed Drawings
SD-03 Product Data
3.8.3.1 GAsbestos Waste Shipment
Records
1.1Weight Bills and Delivery Tickets
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.8 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program
1.8.1Licenses, Permits and
Notifications
3.8.3.3 GAsbestos Management Plan
SD-06 Test Reports
3.6Exposure Assessment and Air
Monitoring
1.7.3Local Exhaust System
SD-07 Certificates
1.7.3Local Exhaust System
2.1 GEncapsulants
1.9Medical Surveillance
Requirements
SD-11 Closeout Submittals
3.8.3.2Records
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.2 GLead Work Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 35 PAGES
02 83 13.00 20 1.5.1.1 GIndustrial Hygienist/Private
Qualified Person (IH/PQP)
1.5.1.2 GTraining Certification
1.5.2.7 Glead waste management plan
1.5.2.3 GMedical Examinations
SD-07 Certificates
1.5.1.3 GTesting laboratory
3.5.1.1 GClearance Certification
3.5.2.1Hazardous waste treatment, storage, or disposal facility (TSD)
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of IH/PQP
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination
3.5.3.2Disposal Request Form
03 01 00 SD-01 Preconstruction Submittals
1.5.3 GQualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 35 PAGES
03 01 00 1.5.5 GWork Plan
1.6.1 GWork Plan
1.5.2 GQuality Control Plan
SD-03 Product Data
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-04 Samples
2.4Reinforcement And
Reinforcement Supports
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-05 Design Data
3.1.3 GFormwork And Shoring
1.5.1 GRepair Procedures
2.8 GMixture Proportioning
SD-06 Test Reports
2.8Mixture Proportioning
3.1.5Quality Control
3.2.3Quality Control
3.3.3Quality Control
2.4Reinforcement And
Reinforcement Supports
2.5Conventional Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 35 PAGES
03 01 00 2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-07 Certificates
1.5.3Qualifications
2.4Reinforcement And
Reinforcement Supports
2.5Conventional Concrete
2.6Polymers
SD-08 Manufacturer’s Instructions
2.2Equipment For Concrete
Preparation
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
2.1Formwork
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.6Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 35 PAGES
03 30 00 2.4.3.1Liquid Chemical Hardeners and
Sealers
2.6.2Mechanical Reinforcing Bar
Connectors
1.6.3.2Pumping Concrete
2.3.4 GAdmixtures
2.3.5Fiber Reinforcement
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
3.13.2.4Air Content
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 35 PAGES
03 30 00 1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Hardeners and
Sealers
2.4.4Joint Sealants
2.4.1Curing Compound
03 31 29 SD-01 Preconstruction Submittals
1.8.2.2Concrete Curing Plan
1.7.6 GConcrete Qualification Program
1.6 GConcrete Quality Control Program
1.8.2.4Concrete Placement and
Compaction
1.8.2.4Concrete Pumping
1.8.2.1Curing Concrete Elements
1.8.2.3Form Removal Schedule
1.6.2 GLaboratory Qualifications
1.6.1 GQuality Control Personnel
SD-02 Shop Drawings
1.8.1.1Formwork
1.6.1.2 GReinforcing Steel
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 35 PAGES
03 31 29 1.2 GCorrosion Inhibitors
1.8.2.8Safety Data Sheets
SD-04 Samples
1.7.7Mass Concrete Mock-up
1.8.5.8Test Section
SD-05 Design Data
1.8.5.1 GConcrete Mixture Requirements
1.8.2.9Mixture Designs
1.7.7 GMass Concrete Temperature
Control Plans
SD-06 Test Reports
1.7.7Mass Concrete Mock-up
1.8.5.4Aggregates
1.8.5.5Admixtures
3.1.1.1As-Built Report
1.8.5.6Cement
1.7.4.2Concrete Mixture Proportions
1.8.5Concrete Test Reports
1.7.4.2Durability Modeling
1.7.6.1Fresh Concrete Properties
1.7.6.2Hardened Concrete Properties
1.8.5.3Silica Fume
1.8.5.2Supplementary Cementing
Materials
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 35 PAGES
03 31 29 1.8.3.1Cementitious Material Mill
Certificates
1.6.1.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
1.8.2.6Coatings
SD-11 Closeout Submittals
1.8.3.1Aggregate Moisture Content
1.8.3.1Aggregate Sampling
3.1.1.1As-Built Report
1.8.5Concrete Test Reports
1.8.4.3Quality Control Charts
1.8.4.1Daily Inspection Reports
1.8.4.4Quality Team Meetings
1.8.4.2Sampling Logs
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 35 PAGES
05 05 23.16 3.2Weld Inspection Log
SD-07 Certificates
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
SD-06 Test Reports
3.6.1.2Weld Inspection Reports
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
2.3Bolts, Nuts, And Washers
SD-07 Certificates
1.3Structural Steel
Contractor/Subcontractor
Qualifications
3.4Welding Procedure Specifications
(WPS)
2.2Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on O nly j2ee9gsg Underline j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 35 PAGES
05 12 00 2.3Bolts, Nuts, And Washers
2.5Galvanizing
2.4.1Welding Electrodes And Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technicians
1.4.3.1Welding Procedures and
Qualifications
05 50 13 SD-02 Shop Drawings
2.5Gratings
2.7 GAngles and Plates
2.4 GMetal Railings
2.3Ladders
SD-03 Product Data
2.5 GGratings
2.1.5 GHot-Rolled Carbon Steel Bars
2.3Ladders
2.4.3Protective Coating
2.4.1 GSteel Railings And Handrails
2.4.2 GStainless Steel Railings and
Handrails
SD-07 Certificates
2.1 GCertified Mill
1.3.2 GWelders Qualifications
1.3.1 GWelding Procedures
1.4Fabricator Certification For
Ladder Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on O nly
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 35 PAGES
09 90 00 SD-02 Shop Drawings
3.7Piping Identification
SD-08 Manufacturer’s Instructions
3.5.2Mixing
SD-10 Operation and Maintenance
Data
1.3.1.1Coatings
09 97 13.26 SD-06 Test Reports
1.4.5.1Coatings Qualification Test
Reports
3.6.2.2Inspection Report Forms
3.6.2.3Daily Inspection Reports
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.2.2Implement Corrective Action
1.4.3Coating Work Plan
1.4.6.4Coating Materials
1.4.6.1Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.2Qualifications of Testing
Laboratory for Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on O nly
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 35 PAGES
09 97 13.26 1.4.6.3Qualifications of Coating
Contractors/Subcontractors or
Shop
SD-08 Manufacturer’s Instructions
1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.6.2.4 GInspection Logbook
09 97 13.27 SD-06 Test Reports
1.4.4.1Coatings Qualification Test
Reports
1.4.4.2Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.7.2.2Inspection Report Forms
3.7.2.3Daily Inspection Reports
1.4.4.3Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.5.1Qualifications of Certified
Industrial Hygienist (CIH)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on O nly
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 35 PAGES
09 97 13.27 1.4.5.5Qualifications Of Individuals
Performing Abrasive Blasting
1.4.5.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.5.3Qualifications of Coating
Inspection Company
1.4.5.4Qualifications of QC Specialist
Coating Inspector
1.4.5.6Qualifications of Testing
Laboratory for Coatings
1.4.5.7Qualifications of Testing
Laboratory for Abrasive
1.4.5.8Qualifications of Coating
Contractors
1.4.5.9Coating Materials
1.4.5.10Coating System Component
Compatibility
1.4.5.11Non-metallic Abrasive
1.4.5.12Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.5.6Disposal of Used Abrasive
3.7.2.4 GInspection Logbook
21 13 13.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 35 PAGES
21 13 13.00 10 1.4.4Shop Drawings
3.7As-Built Drawings
SD-03 Product Data
1.4.2Fire Protection Related
Submittals
2.2Materials and Equipment
1.6Spare Parts
3.6Preliminary Tests
3.7Final Acceptance Test
3.8Onsite Training
1.4.2Fire Protection Specialist
1.4.3Suppression System Installer
SD-05 Design Data
1.4.4Sway Bracing
SD-06 Test Reports
3.6Preliminary Test Report
3.7Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.8Operating and Maintenance
Manuals
26 05 48.00 10 SD-02 Shop Drawings
1.3Equipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 35 PAGES
26 05 48.00 10 SD-03 Product Data
1.3Equipment Requirements
1.2.4Contractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 11 16.00 33 SD-02 Shop Drawings
2.3Cubicle Type Unit Substation
2.7Distribution
2.5Cubicle type unit switching station
2.6Switchgear
SD-03 Product Data
2.4 GTransformers
3.8.3.6 GTransformers
2.6.1.1 GDisconnecting Switches (DS)
2.6.1.2 GLoad Break Switches (LBS)
2.7.4.1 GCircuit breaker
2.7.4.2 GCircuit Breaker with GFCI
2.7.5.1 GInstruments
2.7.5.2 GInstrument Control Switches
2.7.5.3Buzzer
2.7.5.4Test Terminal
2.7.5.6 GLightning Arrester
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 35 PAGES
26 11 16.00 33 SD-06 Test Reports
3.8.2Acceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.5.1Data Package 5
26 20 00 SD-02 Shop Drawings
2.10 GPanelboards
2.11 GTransformers
SD-03 Product Data
2.9 GReceptacles
2.10.3 GCircuit breakers
2.8 GSwitches
2.11 GTransformers
2.13 GMotor controllers
2.14 GManual motor starters
2.21 GSurge protective devices
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.5Grounding system test
3.5.3Transformer tests
3.5.4Ground-fault receptacle test
26 42 13.00 20 SD-02 Shop Drawings
1.5Cathodic Protection Plan
2.4At-Grade Test Stations
SD-03 Product Data
2.1Anodes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 35 PAGES
26 42 13.00 20 2.4At-Grade Test Stations
2.5Cable and wire
SD-07 Certificates
1.4Qualifications of Corrosion
Engineer
SD-10 Operation and Maintenance
Data
3.7Cathodic Protection Systems
SD-11 Closeout Submittals
3.5.2.1Native Potential Testing
3.6One Year Warranty Period
Testing
3.7Final System Test Report
26 56 00 SD-01 Preconstruction Submittals
1.5.2Photometric Plan
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
1.5.1.2 GPoles
2.5 GBrackets and Supports
SD-03 Product Data
2.2 GLED, Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.2 GLighting Contactor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 35 PAGES
26 56 00 2.3.1 GPhotocell
2.4.1Concrete Poles
SD-06 Test Reports
3.2Operating Test
31 00 00 SD-01 Preconstruction Submittals
3.4 GShoring
1.4.2 GDewatering Work Plan
SD-06 Test Reports
3.14Testing
2.1Borrow Site Testing
31 41 16 SD-02 Shop Drawings
2.1 GMetal Sheet Piling
SD-03 Product Data
3.2.2.2Driving
3.2.1 GPile Driving Equipment
3.2.5 GPulling and Redriving
SD-06 Test Reports
2.3.1Materials Tests
SD-11 Closeout Submittals
3.4Pile Driving Record
31 62 16.16 SD-02 Shop Drawings
2.1.3.1 GPile splices
3.2.3 GPile placement
SD-03 Product Data
3.1 GPile driving equipment
3.2.2 GPile driving records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 35 PAGES
31 62 16.16 3.3 GPile tests
SD-04 Samples
3.3.1 GTest piles
SD-05 Design Data
3.3.2Wave equation analysis
SD-06 Test Reports
3.3.1 GPile driving analyzer
3.3.2Dynamic testing of piles
SD-11 Closeout Submittals
3.2.2Pile driving records
32 05 33 SD-03 Product Data
2.1 GFertilizer
2.3Mulches Topdressing
2.3.1Organic Mulch Materials
SD-07 Certificates
3.3.1Maintenance Inspection Report
SD-10 Operation and Maintenance
Data
1.6Maintenance
32 11 20 SD-03 Product Data
1.4Plant, Equipment, and Tools
SD-06 Test Reports
2.2.1 GInitial Tests
3.10.1 GIn-Place Tests
32 11 23 SD-03 Product Data
1.4Plant, Equipment, and Tools
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 35 PAGES
32 11 23 SD-06 Test Reports
2.3.1 GInitial Tests
3.11.1 GIn-Place Tests
32 12 13 SD-06 Test Reports
3.7 GSampling and Testing
32 12 16 SD-03 Product Data
2.4 GMix Design
3.11 GQuality Control
3.12 GMaterial Acceptance
SD-06 Test Reports
2.2 GAggregates
3.11.3.2QC Monitoring
32 31 13 SD-02 Shop Drawings
2.1 GFence Assembly
3.2.2.1 GLocation of Gate, Corner, End, and Pull Posts
Part 3 GErection/Installation Drawings
SD-03 Product Data
2.1 GFence Assembly
2.3.1 GZinc Coating
2.1 GPVC Coating
2.2.1 GFabric
2.2.6 GStretcher Bars
2.2.4 GBarbed Wire
2.2.10 GWire Ties
2.3.2 GConcrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 35 PAGES
32 31 13 SD-07 Certificates
1.3.1Certificates of Compliance
SD-08 Manufacturer’s Instructions
2.1Fence Assembly
2.1Hardware Assembly
2.1Accessories
SD-11 Closeout Submittals
3.3Recycled Material Content
32 92 19 SD-03 Product Data
2.5.1Wood Cellulose Fiber Mulch
2.4Fertilizer
SD-06 Test Reports
2.2.3Topsoil Composition Tests
SD-07 Certificates
2.1Seed
32 92 23 SD-03 Product Data
2.4Fertilizer
SD-06 Test Reports
2.2.3Topsoil composition tests
SD-07 Certificates
2.1sods
33 08 55 SD-01 Preconstruction Submittals
1.3.2 GExisting System Cleanliness
Confirmation Plan
1.3.3 GSystem Start-Up Plan
1.3.1 GPerformance Testing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 35 PAGES
33 08 55 1.3.1 GFuel Provisioning Plan
SD-06 Test Reports
1.5.1Final Reports
3.7Equipment Tests
3.6.3Piping Flushing Checklist
SD-07 Certificates
1.3.6 GCertification (Ready for Start-Up
and Performance Testing)
1.6.1 GContractor Start-Up Qualifications
2.2.1Certificate of Calibration
1.7Disposal Of Waste Materials
SD-11 Closeout Submittals
1.6.2Certification of Entire System
33 11 00 SD-03 Product Data
3.2.4 GDisinfection Procedures
SD-06 Test Reports
3.3.1.4 GBacteriological Samples
3.3.1.2 GHydrostatic Sewer Test
3.3.1.3 GLeakage Test
3.3.1.1 GHydrostatic Test
33 30 00 SD-02 Shop Drawings
3.1.1 GInstallation Drawings
3.2.3 GEquipment Installation
SD-03 Product Data
2.2.1 GDuctile Iron Piping
2.3Sump Pump
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 35 PAGES
33 30 00 SD-06 Test Reports
3.3.1.1Hydrostatic Sewer Test
3.3.1.3 GTests For Pressure Lines
3.3.2 GField Testing and Adjusting
Equipment
SD-07 Certificates
3.3.4.1 GPre-Installation Inspection
Request
3.3.4.2 GPost-Installation Inspection
33 52 23.15 SD-01 Preconstruction Submittals
1.6 GWelding Procedure Specifications
(WPS)
1.6 GWelder Performance Qualification
(WPQ)
1.6 GProcedure Qualification Record
(PQR)
3.1 GWelding Operations
SD-02 Shop Drawings
1.6.2 GPOL Service Piping
SD-06 Test Reports
3.2Examinations, Inspections and
Tests
SD-07 Certificates
1.6 GQualifications
33 52 40 SD-01 Preconstruction Submittals
1.5.2 GWork Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 35 PAGES
33 52 40 1.5.3 GHydrotesting Plan
2.2.3 GQuality Assurance Plan
SD-02 Shop Drawings
2.1.2Grounding and Bonding
2.5.3 GPipe Supports
SD-03 Product Data
2.2.2Carbon Steel Piping
2.2.3Stainless Steel Piping
2.2.4 GExternal Protective Coatings For
Aboveground Piping
2.2.5Fittings
2.2.5.2Carbon Steel Fittings
2.2.6 GInsulating Flange Kits
2.2.6 GLightning Surge Arrester
2.2.7Bolts, Nuts And Washers
2.2.8Gaskets
2.2.9 GFlange Protectors
2.3.1 GBall Valves
2.3.2 GPlug (Double Block and Bleed)
Valves
2.3.3 GWafer Check Valves
2.4 GPressure Relief Valve
2.4.2 GPressure Relief Valve
2.4.3 GPressure Relief Valve
2.5.1Strainers
2.5.4Sample Connections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 35 PAGES
33 52 40 2.6 GFlexible Hose Connectors
SD-06 Test Reports
3.10.1Pneumatic Test
3.10.2Hydrostatic Test
3.10.4Performance Testing
SD-07 Certificates
1.5.1 GContractor Qualifications
1.5.4.1 GPipeline Inventory
2.2.3 GQualifications of Owner's
Inspector
3.4.7 GSurvey Final Elevations
3.11Demonstrations
SD-10 Operation and Maintenance
Data
2.2.6Insulating Flange Kits
2.2.6Lightning Surge Arrester
2.3.1Ball Valves
2.3.2Plug (Double Block and Bleed)
Valves
2.3.3Wafer Check Valves
2.4Pressure Relief Valve
2.4.2Pressure Relief Valve
2.4.3Pressure Relief Valve
2.5.1Strainers
2.5.4Sample Connections
33 52 43.90 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 35 PAGES
33 52 43.90 3.2.5 GMarine Loading Arm Drawings
3.2.5 GInstallation and Erection
Drawings
SD-03 Product Data
3.2.5 GProduct Data for Spare Parts
SD-06 Test Reports
3.2.6Field Tests and Inspection
Reports
SD-07 Certificates
3.2.5 GMarine Loading Arm Material List
SD-10 Operation and Maintenance
Data
3.2.6 GOperation and Maintenance
Manuals
33 57 55 SD-02 Shop Drawings
2.3.1 GGrounding and Bonding
SD-03 Product Data
2.4 GPressure Indicators
2.5 GPump Controls
2.5.3 GFlow Relay
2.6.1 GSliding Vane Rotary Pump
2.7.3 GLiquid Level Gauge
2.7 GSDA Mix Tank
SD-07 Certificates
1.5 GContractor Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 35 PAGES
33 57 55 SD-10 Operation and Maintenance
Data
2.5 GPump Controls
2.6.1 GSliding Vane Rotary Pump
2.5.3 GFlow Relay
2.7 GSDA Mix Tank
33 71 02 SD-02 Shop Drawings
1.6.1 GPrecast underground structures
SD-03 Product Data
2.5 GHigh voltage cable
2.7 GHigh voltage cable joints
2.6 GHigh voltage cable terminations
2.12.2.1 GPrecast concrete structures
2.12.2.4Sealing Material
3.5.2Pulling-In Irons
2.12.3 GManhole frames and covers
2.12.4 GHandhole frames and covers
2.13 GCable supports
SD-06 Test Reports
3.18.1Field Acceptance Checks and
Tests
35 20 23 SD-01 Preconstruction Submittals
3.7.1 GOperations Plan and
Performance Schedule
3.7.1 GMaterial Disposal Area
3.7.1 GPlant and Equipment Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 35 PAGES
35 20 23 3.7.2 GInterference with Navigation
3.7.9 GSubmerged or Floating Pipelines
1.3.1.1 GHydrographic Surveyor
Qualifications
1.3.1.2 GSurvey Control Plan
SD-06 Test Reports
1.3.1.3 GPost-Construction Bathymetric
Surveys
35 59 13.19 SD-03 Product Data
2.1Fender
2.3Hardware
SD-05 Design Data
2.1Dimension
2.1Fender
2.1Design
SD-08 Manufacturer’s Instructions
3.1Installation
35 74 00 SD-02 Shop Drawings
2.2 GOil spill containment boom
SD-03 Product Data
2.2 GOil spill containment boom
2.3 GBoom Guide
1.5.1 GManufacturer's warranty
1.3System Description
SD-04 Samples
2.2 GOil spill containment boom
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 35 PAGES
35 74 00 2.3 GBoom Guide
SD-07 Certificates
2.4 GMaterials
SD-08 Manufacturer’s Instructions
2.2 GOil spill containment boom
2.3 GBoom Guide
2.6oil Boom Reel
SD-10 Operation and Maintenance
Data
2.2 GOil spill containment boom
2.3 GBoom Guide
2.6Oil Boom Reel
35 75 00 SD-02 Shop Drawings
2.1Life ring cabinet
SD-03 Product Data
2.2Life ring
2.3Rope
35 76 00 SD-02 Shop Drawings
2.1.6Bollard
SD-03 Product Data
2.1.3Steel bolts
2.1.4Steel nuts
2.1.5Steel washers
2.1.8Sealants
SD-07 Certificates
2.1.3Steel bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 35 PAGES
35 76 00 2.1.4Steel nuts
2.1.5Steel washers
2.1.8Sealants
3.1.4Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0006)For Inf orm ati on
FY21 DLA DESC1904 UPGRADE FUEL WHARF 19SF0005
TSURUMI, JAPAN
SECTION 05 12 00
STRUCTURAL STEEL
08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2017) Steel Construction Manual
AISC 360 (2016) Specification for Structural Steel Buildings
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A325 (2014) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A992/A992M (2011; R 2015) Standard Specification for Structural Steel Shapes
ASTM B695 (2004; R 2016) Standard Specification for
W912HV-21-R-0002 SECTION 05 12 00 Page 1 (AM-0006)
For Inf orm ati on
Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM F3125/F3125M (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 830 MPa and 1040 MPa Minimum Tensile Strength, Metric Dimensions
ASTM F959/F959M (2017a) Standard Specification for Compressible-Washer-Type Direct Tension Indicators for Use with Structural Fasteners, Metric Series
ASTM A325 (2014) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
JAPANESE ARCHITECTURAL STANDARDS SPECIFICAITONS (JASS)
JASS 6 (2015) Structural Steelwork Specification for Building Construction
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS B 1048 (2007) Fasteners - Hot Dip Galvanized Coatings
JIS B 1180 (2014) Hexagon Head Bolts and Hexagon Head Screws
JIS B 1186 (2013) Sets of High Strength Hexagon Bolt, Hexagon Nut and Plain Washers for Friction Grip Joints
JIS B 1220 (2015) Set of Anchor Bolt for Structures
JIS G 3101 (2017) Rolled Steels for General Structure (Amendment 1)
JIS G 3136 (2012) Rolled Steel for Building Structures
JIS G 3192 (2014) Dimensions, Mass and Permissible Variations of Hot Rolled Steel Sections
JIS G 3193 (2008) Dimensions, Mass and Permissible Variations of Hot Rolled Steel Plates, Sheets, and Strips
JIS G 3444 (2016) Carbon Steel Tubes for General Structure
JIS G 3466 (2015) Carbon Steel Square and Rectangular Tubes for General Structure
JIS G 4321 (2000) Stainless Steel for Building Structure
JIS Z2305 (2013) Non-destructive Testing - Qualification and Certification of
W912HV-21-R-0002 SECTION 05 12 00 Page 2 (AM-0006)
For Inf orm ati on
Personnel
JIS H 8641 (2007) Hot Dip Galvanized Coatings
JIS Z 3021 (2016) Welding and Allied Processes - Symbolic Representation
JIS Z 3060 (2015) Method of Ultrasonic Testing for Welds of Ferritic Steel
JAPANESE SOCIETY OF STEEL CONSTRUCTION (JSS)
JSS II 09 (2015) Sets of Torshear Type High Strength Bolt, Hexagonal Nut and Plain Washer for Structural Joints
MINISTRY OF LAND, INFRASTRUCTURE, TRANSPORT AND TOURISM,
GOVERNMENT OF JAPAN (MLIT)
MLIT-SS Chapter 7 (2019) Public Building Construction Standard Specifications - Ch.7 Steel Frame Work
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR Part 1926, Subpart R Steel Erection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Erection and Erection Bracing Drawings; G
SD-02 Shop Drawings
Fabrication Drawings Including Details of Connections; G
SD-03 Product Data
Welding Electrodes and Rods
Direct Tension Indicator Washers
Non-Shrink Grout
Tension Control Bolts
SD-05 Design Data
SD-06 Test Reports
Weld Inspection Reports
W912HV-21-R-0002 SECTION 05 12 00 Page 3 (AM-0006)
For Inf orm ati on
Direct Tension Indicator Washer Inspection Reports
Bolts, Nuts, And Washers
SD-07 Certificates
MLIT Structural Steel Fabricator Quality Certification
MLIT Structural Steel Erector Quality Certification
Structural Steel Contractor/Subcontractor Qualifications
Welding Procedure Specifications (WPS)
Steel
Bolts, Nuts, And Washers
Galvanizing
Welding Electrodes And Rods
Certified Welding Inspector
NDT Technicians
Welding Procedures and Qualifications
1.3 MLIT QUALITY CERTIFICATION STRUCTURAL STEEL CONTRACTOR/SUBCONTRACTOR
QUALIFICATIONS
Work must be fabricated by MLIT Structural Steel Fabricator, Category M.
Submit MLIT Structural Steel Fabricator quality certification.
Work must be erected by MLIT Structural Steel Certified Erector. Submit MLIT Structural Steel erector quality certification.
Structural steel contractor/subcontractor must have completed at…