FIO_AC Repair_B101_Drawings.pdf
PDF 23 MB Posted
- Solicitation number
- W912HV-24-Z-0007
About this file
This document provides details on a federal contract opportunity for air conditioning (AC) repair services at Building 101 located at Camp Zama in Japan. The solicitation number is W912HV-24-Z-0007 and is being issued by the Department of the Army Corps of Engineers Engineering District Japan. The pre-solicitation opportunity is for FY24 AC repair services for server rooms at Building 101 at Camp Zama. Interested parties should monitor the Federal Business Opportunities website for additional details and the full solicitation release. The accompanying file provides technical drawings of Building 101 to inform potential offerors on the scope of the AC repair work. The opportunity appears to be a small business set-aside for local contractors serving the U.S. military installation in Japan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FIO_AC Repair_B101_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
FY24 AC REPAIR FOR SERVER ROOMS B101
CAMP ZAMA, JAPAN
GENERAL NOTESSCOPE OF WORK
ABBREVIATIONS
LOCATION MAP
TARGET DESIGNATIONS
ARCHITECTURAL
1. PARTIALLY REMOVE THE EXISTING RAISED FLOOR ACCESS PANEL, INCLUDING ASSOCIATED FRAMES AND
SUPPORTS AS SHOWN IN THE DRAWING.
2. REMOVE DAMAGED 300x600mm FISSURED ACOUSTIC GYPSUM WALL TILE.
3. REINSTALL RAISED FLOOR ACCESS PANEL WITH ITS FRAMES AND SUPPORTS.
4. PROVIDE NEW 300x600mm FISSURED ACOUSTIC GYPSUM WALL TILE.
MECHANICAL
1. REPLACEMENT AND UPGRADE OF THE EXISTING LIEBERT COMPUTER ROOM AIR CONDITION (CRAC) SYSTEM
IN BUILDING 101 WHICH INCLUDES A TOTAL OF FIVE (5) AC UNITS, ALL REFRIGERANT PIPING, WATER PIPING, DRAIN AND SUPPORTS SHALL BE REPLACED WITH NEW. ONE OF THE FIVE UNITS FROM ROOM 106 HAS BEEN
REMOVED.
2. PROVIDE TEMPORARY CRAC UNITS INCLUDING ALL UTILITIES FOR TEMPORARY CRAC WITH NO DISRUPTION
TO THE SERVER ROOMS OPERATION.
ELECTRICAL
1. REMOVE THE EXISTING POWER FEEDER, WIRING, AND CONDUIT INCLUDING ASSOCIATED DEVICES OF THE
EXISTING COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS AND CRAC AIR-COOLED CONDENSING UNITS.
2. PROVIDE POWER FEEDER, WIRING, AND CONDUIT INCLUDING ASSOCIATED DEVICES OF THE NEW
COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS AND CRAC AIR-COOLED CONDENSING UNITS.
3. PROVIDE TEMPORARY POWER FEEDER, WIRING, AND CONDUIT INCLUDING ASSOCIATED DEVICES OF THE
TEMPORARY COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT AND CRAC AIR-COOLED CONDENSING UNIT.
NTS
1/10,000
1. DAMAGED SURFACE CAUSED BY REMOVAL OR INSTALLATION WORK SHALL BE RESTORED TO MATCH
EXISTING AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. IF NOT INDICATED OTHERWISE, ALL EXISTING OBJECTS, ACCESSORIES AND / OR FIXTURES ON EXISTING SURFACES SCHEDULED FOR MODIFICATION SHALL BE REMOVED AND ADJUSTED PRIOR TO SUCH WORK AND
REINSTALLED AFTER WORK COMPLETION.
3. THE CONTRACTOR SHALL BRING THE ATTENTION OF THE CONTRACTING OFFICER ANY DISCREPANCIES BETWEEN THE DRAWINGS AND PROVISION OF SHOP DRAWINGS TO RESOLVE CONFLICTS ON THE SITE PRIOR TO THE COMMENCEMENT OF WORK. PROVISION OF SHOP DRAWINGS TO RESOLVE CONFLICTS SHALL BE
PROVIDED BY THE CONTRACTOR.
4. INDICATED DAMAGED TO EXISTING STRUCTURE AND UTILITIES SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL DIMENSION AND EXISTING
CONDITIONS PRIOR TO ACTUAL CONSTRUCTION WORK.
6. NEW CRAC UNITS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
7. PERFORM LEAK TEST FOR REFRIGERANT AND DRAIN PIPING. TEST, ADJUST AND MEASURE NEW CRAC UNITS
TO MEET MANUFACTURER'S CRITERIA AND CONTRACT REQUIREMENTS.
8. REFRIGERANT GAS WILL BE REMOVED BY THE GOVERNMENT. COORDINATE NECESSARY DOCUMENTATIONS
TO DPW.
SEE HAZARDOUS MATERIAL DRAWING HD101, ARCHITECTURAL DRAWING A-001, MECHANICAL DRAWING
M-001, AND ELECTRICAL DRAWING E-001.
DRAWING SCALE
DETAIL INDICATOR GRID LOCATION
DRAWING TITLE NUMBER
SHEET ON WHICH DETAIL
INDICATOR IS FOUND
A
P-001 A1 SCALE
DRAWING TITLE
PLAN NORTH
TRUE NORTH
CONCURRENCE
A1
X-XXX
XX
X-XXX X-XXX
XX
NUMBER INDICATES
SECTION
SHEET NUMBER
WHERE TAKEN
NUMBER
INDICATES
DETAIL
INDICATES
ELEVATION
SHEET NUMBER
WHERE TAKEN
SHEET NUMBER
WHERE TAKENSECTION
TITLE ELEVATION
DETAIL
DATE:
DATE:
SOUBUDAI
SECONDARY
SCHOOL
GATE-7
GATE-4
CITY BOUNDARY
(SAGAMIHARA CITY)
ZAMA CITIZEN
GYMNASIUM
FOR SOUBUDAIMAE STATION
(ZAMA CITY)
CITY BOUNDARY
(SAGAMIHARA CITY)
FOR SOUBUDAISHITA
STATION
GYOUKOU
ROAD
SERVER ROOMS
CONSTRUCTION AREA
GATE-1
GATE-1
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
NORTH
TI
TL
E, S
C O
PE
O
F W
O R
K, G
EN
ER
AL
N
O
TE
S, T
AR
G
ET
D
ES
IG
N
AT
IO
N
S, A
BB
R
EV
IA
TI
O
N S, A N
D L
O C
AT
IO
N M
AP
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
V.
AD
O N
A
AS
S
H O
W N
C1 NTS
HAUL ROUTE PLAN
CONSTRUCTION
STAGING AREA
NTS
SERVER ROOMS
CONSTRUCTION AREA
BUILDING 101
LEGEND:
CONSTRUCTION
STAGING AREA
LINE OF ROUTE
SERVER ROOMS
CONSTRUCTION
AREA
E2 NTS
LOCATION MAP
FOR IN
FORMATIO
N O
NLY
G-002
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
INDEX OF DRAWINGS
SHEET
NO DWG CODE SHEET
ID SHEET TITLE
1 G-001
G-002
TITLE, SCOPE OF WORK, GENERAL NOTES, TARGET DESIGNATIONS,
ABBREVIATIONS, HAUL ROUTE PLAN AND LOCATION MAP
INDEX OF DRAWINGS
OF
ARCHITECTURAL
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF 49
AD101
A-101
A-102
A-301
SHEET
NO DWG CODE SHEET
ID SHEET TITLE
A-001
SHEET
NO DWG CODE SHEET
ID SHEET TITLE
MECHANICAL
GENERAL
BLDG. 101 SERVER ROOMS REFLECTED CEILING PLAN
INTERIOR ELEVATION AND SECTION
ARCHITECTURAL DETAIL
ARCHITECTURAL SCOPE OF WORK, ABBREVIATIONS, LEGEND,
NOTES AND INTERIOR FINISH SCHEDULE
M-001
MD102
MECHANICAL SCOPE OF WORK, GENERAL NOTES, LEGENDS,
SYMBOLS, & ABBREVIATIONS
MECHANICAL EQUIPMENT SCHEDULE
M-101
M-102
BLDG. 101 SERVER ROOMS MODIFIED PLAN
M-301
BLDG. 101 SERVER ROOM AIR DISTRIBUTION MODIFIED PLAN
M-302
MECHANICAL MISCELLANEOUS DETAILS
M-601
M-602 BLDG. 101 CRAC UNIT REFRIGERANT PIPING
BLDG. 101 CRAC SYSTEM CONTROL DIAGRAM
ELECTRICAL
ELECTRICAL SCOPE OF WORK, GENERAL NOTES AND LEGENDE-001
ED101 CRAC FEEDER SYSTEM PLAN (B101) - REMOVAL
E-101 CRAC FEEDER SYSTEM PLAN (B101) - MODIFIED
E-601 FEEDER SINGLE LINE DIAGRAM
HAZARDOUS MATERIAL
HD101 HAZARDOUS MATERIAL REMOVAL PLAN
G-003 BLDG. 101 SERVER ROOMS CONSTRUCTION PHASING PLAN - 1OF 49
G-004OF 49
OF 49
OF 49
BLDG. 101 SERVER ROOMS REMOVAL PLAN
BLDG. 101 SERVER ROOMS MODIFIED PLAN
A-501
BLDG. 101 SERVER ROOMS CONSTRUCTION PHASING PLAN - 2
MD101 BLDG. 101 SERVER ROOMS REMOVAL PLAN
BLDG. 101 SERVER ROOM AIR DISTRIBUTION REMOVAL PLAN
TM101
TM102
TM103
TM501
TM601
TEMPORARY BLDG. 101 SERVER ROOM N104 PHASING PLAN -
REMOVAL
TEMPORARY BLDG. 101 SERVER ROOM N104 PHASING PLAN -
MODIFIED
TEMPORARY BLDG. 101 SERVER ROOM N105 PHASING PLAN -
MODIFIED
TEMPORARY MECHANICAL DETAILS
TEMPORARY MECHANICAL EQUIPMENT SCHEDULE
OF39 49
E-602 PANELBOARD SCHEDULE
G-005
G-006
BLDG. 101 SERVER ROOM PHASE PLAN - 1 & 2
BLDG. 101 SERVER ROOM PHASE PLAN - 3 & 4
OF41 49
TE101
TE102
TE103
TE104
TE105
TE106
TE107
TE108
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 1-A
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 1-B
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 2-A
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 2-B
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 3-A
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 3-B
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 4-A
TEMPORARY CRAC FEEDER SYSTEM PLAN (B101) - PHASE 4-B
IN
D
EX
O
F D
R
AW
IN
G
S
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
V.
AD
O N
A
1/
TM104
OF42 49
OF43 49
OF44 49
M-501
BLDG. 101 SERVER ROOM ELEVATION AND SECTION - 1
BLDG. 101 SERVER ROOM ELEVATION AND SECTION - 2
M-603
OF45 49
TE001 TEMPORARY ELECTRICAL SCOPE OF WORK, GENERAL NOTES AND
LEGEND
TM602 TEMPORARY CRAC UNIT REFRIGERANT PIPING
OF46 49
OF47 49
OF48 49
OF49 49
TEMPORARY BLDG. 101 UPS ROOM PHASING PLAN - REMOVALTM105
TEMPORARY BLDG. 101 UPS ROOM PHASING PLAN - MODIFIEDTM106
TEMPORARY BLDG. 101 SERVER ROOM N106 PHASING PLAN -
REMOVALTM107
TEMPORARY BLDG. 101 SERVER ROOM N106 PHASING PLAN -
MODIFIEDTM108
TEMPORARY BLDG. 101 SERVER ROOM N105 PHASING PLAN -
REMOVAL
FOR IN
FORMATIO
EXST XFMR
STATION
N105UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
P
P
P
SL
O
PE
SL
O
PE
WT
C
D
UP
E
CORRIDOR
N109 N107
UPS RM
HACS CHILLERS
N104
N105
N106
H2 SCALE: NTS
B101 KEY PLAN
GRAPHIC SCALE
SERVER
ROOMS
10m510 1 : 100
D3 SCALE 1:100
BLDG. 101 SERVER ROOMS CONSTRUCTION PHASING PLAN
G-003
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
BL
D
G . 1
S
ER
VE
R R
O O
M S
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PL
AN
CONSTRUCTION PHASING PLAN REQUIREMENTS
GENERAL :
1. THE CONTRACTOR MUST WORK ONLY DURING THE HOURS AND DAYS EXCLUDING HOLIDAYS AS SPECIFIED UNDER SPECIFICATION 01 11 00.00 10, GENERAL CONTRACT REQUIREMENTS. THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICE IN ADVANCE AND SECURE THE APPROVAL FROM THE GOVERNMENT IF
WORK NEEDS TO BE PERFORMED OUTSIDE THE NORMAL WORKING HOURS.
2. THE OPERATION OF THE SERVER ROOMS IN BUILDING 101 MUST NOT BE DISRUPTED DURING CONSTRUCTION. THE CONTRACTOR MUST NOTIFY AND SUBMIT FOR APPROVAL OF THE GOVERNMENT A REQUEST FOR POWER OUTAGE FOR THE CONNECTION AND INSTALLATION OF THE NEW CRAC SYSTEM IN THE SERVER ROOMS. AS A MINIMUM, THE INFORMATION TO BE SUBMITTED MUST INCLUDE THE DURATION OF THE POWER OUTAGE, INTENDED DATE AND TIME TO START, AND COMPLETION OF THE WORK.
3. THE CONTRACTOR MUST PROTECT WITH COVER ALL AFFECTED FURNITURE, STORED MATERIALS OR EQUIPMENT FROM DIRT AND DAMAGE PRIOR TO START OF WORK. ANY FLOORING TILES REMOVED BY THE WORK MUST BE RETURNED OR COVERED BEFORE THE END OF DAY FOR FALL PREVENTION OR ACCIDENT.
THE CONTRACTOR MUST CLEAN THE AFFECTED AREA AND REMOVE PROTECTIVE COVERING OR RETURN FURNITURE OR EQUIPMENT TO IT'S ORIGINAL LOCATION. PICTURES MUST BE TAKEN AS RECORD INDICATING
THE CONDITION BEFORE AND AFTER THE DAILY COMPLETION OF WORK IN THE AREA.
CONSTRUCTION STAGING GENERAL NOTES:
1. INSTALLATION OF THE TEMPORARY CRAC SYSTEM FOR THE
SERVER ROOM WHICH INCLUDES THE OUTDOOR UNIT AND
INDOOR UNIT MUST BE DONE IN PHASE 1 TO AVOID
DISRUPTION OF THE SERVER ROOM'S OPERATION.
2. AFTER PHASE 1, INDOOR UNIT SHALL BE RELOCATED TO
EACH OF THE DESIGNATED AREA PER PHASE WITHOUT
DISRUPTING THE SERVER ROOM'S OPERATION. THE SAME
INDOOR UNIT SHALL BE USED ON ALL CONSTRUCTION
PHASE FOR THIS PROJECT.
LEGEND:
PHASE 1: CONSTRUCTION
PHASE 2: CONSTRUCTION
PHASE 3: CONSTRUCTION
PHASE 4: CONSTRUCTION
PHASE 1: INSTALLATION OF TEMPORARY CRAC SYSTEM AND CONSTRUCTION OF SERVER ROOM NO. N104
1. INSTALL THE TEMPORARY OUTDOOR UNIT IN THE EQUIPMENT YARD IN BETWEEN ACCU-1 & ACCU-5.
UTILIZE TEMPORARY OUTDOOR UNIT PAD SUPPORT WITH RUBBER. INSTALL REFRIGERANT PIPING IN THE EXTERIOR WITH TEMPORARY PIPE SUPPORTS. UTILIZE THE EXISTING WALL PENETRATION TO ENTER THE
SERVER ROOMS.
2. TEMPORARILY RELOCATE ALL AFFECTED EXISTING FURNITURE INSIDE SERVER ROOM NO.N104 TO SERVER
ROOM NO.N106 AND ROOM NO.N106-A.
3. INSTALL THE TEMPORARY INDOOR UNIT INSIDE SERVER ROOM NO. N104 AS INDICATED IN SHEET TM-101.
REMOVE FLOOR TILES AS INDICATED IN AD101 AND INSTALL ALL ASSOCIATED REFRIGERANT PIPING, DRAIN PIPING, POWER SUPPLY, CONTROLS, WIRING AND ALL DEVICES OR UTILITIES REQUIRED FOR THE
OPERATION OF THE TEMPORARY CRAC SYSTEM.
4. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE
TEMPORARY CRAC SYSTEM.
5. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE TEMPORARY CRAC
SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N104.
6. CRAC # 4 (AC-4/ACCU-4) AND TEMPORARY CRAC # 6 MUST BE KEPT OPERATING BEFORE SHUTTING DOWN CRAC # 1 (AC-1/ACCU-1). DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 1 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, WATER SUPPLY PIPING, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL
CONDUITS, CONTROLS AND WIRING.
7. INSTALL NEW CRAC # 1 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, WATER SUPPLY PIPING, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
8. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE THE NEW CRAC # 1 SYSTEM. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE NEW CRAC # 1 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N104.
A/C-2
1/
E.
D
O M
IN
G
O
A/C-5
A/C-4
A/C-3 A/C-1
ACCU-4
ACCU-1
ACCU-5
ACCU-3
K.
BE
LA
R
M A
K.
BE
LA
R
M A
ACCU-2
CONDENSER
UNITS
EQUIPMENT
YARD
FOR IN
FORMATIO
G-004
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
BL
D
G . 1
S
ER
VE
R R
O O
M S
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G
PL
AN
CONSTRUCTION PHASING PLAN REQUIREMENTS
CONTINUATION..
PHASE 1: INSTALLATION OF TEMPORARY CRAC SYSTEM AND CONSTRUCTION OF SERVER ROOM NO. N104
9. NEW CRAC # 1 SYSTEM AND TEMPORARY CRAC # 6 MUST BE KEPT OPERATING BEFORE SHUTTING DOWN CRAC # 4. DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 4 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
10. REPAINT ALL AREAS AFFECTED BY THE INSTALLATION OF TEMPORARY CRAC # 6 AND REMOVAL OF CRAC # 1
AND CRAC # 4.
11. INSTALL NEW CRAC # 4 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
12. INSTALL ALL REMOVED ALUMINUM FLOOR PANELS AND CARPET TILES. DAMAGED CARPET TILES DURING
THE CONSTRUCTION PROCESS SHALL BE REPLACED.
13. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE THE NEW CRAC # 4 SYSTEM. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE NEW CRAC # 4 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO.N104.
14. MOVE BACK ALL THE EXISTING FURNITURE TO ITS ORIGINAL PLANNED POSITION.
11. BY THE END OF THIS PHASE, NEW CRAC # 1 AND CRAC # 4 SYSTEM MUST BE IN FULL OPERATING CONDITION
BEFORE MOVING TO THE NEXT PHASE.
PHASE 2: CONSTRUCTION OF SERVER ROOM NO. N105
1. RELOCATE THE TEMPORARY CRAC # 6 INDOOR UNIT TO THE SERVER ROOM NO. N105. REFER TO G-005 FOR THE TEMPORARY RELOCATION OF FURNITURE AND EXISTING MATERIALS. REMOVE THE REFRIGERANT PIPING AS INDICATED IN TM-103 AND TAP A NEW REFRIGERANT LINE FROM SERVER ROOM NO. N104 TO SERVER ROOM NO. N105, UTILIZING THE EXISTING WALL PENETRATIONS UNDER THE RAISED FLOOR.
2. INSTALL THE TEMPORARY INDOOR UNIT INSIDE SERVER ROOM NO. N105 AS INDICATED IN SHEET TM-104.
REMOVE FLOOR TILES AS INDICATED IN AD101 AND INSTALL ALL ASSOCIATED REFRIGERANT PIPING, DRAIN PIPING, POWER SUPPLY, CONTROLS, WIRING AND ALL DEVICES OR UTILITIES REQUIRED FOR THE
OPERATION OF THE TEMPORARY CRAC SYSTEM.
3. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE
TEMPORARY CRAC SYSTEM.
4. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE TEMPORARY CRAC
SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N105.
5. TEMPORARY CRAC # 6 SYSTEM MUST BE KEPT IN OPERATION BEFORE SHUTTING DOWN CRAC # 3 (AC-3/ACCU-3). DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 3 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
6. REPAINT ALL AREAS AFFECTED BY THE INSTALLATION OF TEMPORARY CRAC # 6 AND REMOVAL OF
CRAC # 3.
7. INSTALL NEW CRAC # 3 CRAC SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
8. INSTALL ALL REMOVED ALUMINUM FLOOR PANELS AND CARPET TILES. DAMAGED CARPET TILES DURING
THE CONSTRUCTION SHALL BE REPLACED.
9. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE THE NEW CRAC # 3 SYSTEM. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE NEW CRAC # 3 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N105.
10. MOVE BACK ALL THE EXISTING FURNITURE TO ORIGINAL PLANNED POSITION.
11. BY THE END OF THIS PHASE, CRAC # 3 SYSTEM MUST BE IN FULL OPERATING CONDITION BEFORE MOVING
TO THE NEXT PHASE.
PHASE 3: CONSTRUCTION OF UPS ROOM
1. RELOCATE THE TEMPORARY CRAC # 6 INDOOR UNIT TO THE UPS ROOM. REFER TO G-005 FOR THE PROPOSED HAULING ROUTE, TEMPORARY RELOCATION OF FURNITURE AND EXISTING MATERIALS. REMOVE THE REFRIGERANT PIPING AS INDICATED IN TM-105 AND TAP A NEW REFRIGERANT PIPING FROM SERVER
ROOM NO. N106 TO THE UPS ROOM. UTILIZE EXISTING WALL PENETRATIONS IF AVAILABLE.
2. INSTALL THE TEMPORARY INDOOR UNIT INSIDE THE UPS ROOM AS INDICATED IN SHEET TM-106. INSTALL ALL ASSOCIATED REFRIGERANT PIPING, DRAIN PIPING, POWER SUPPLY, CONTROLS, WIRING AND ALL DEVICES
OR UTILITIES REQUIRED FOR THE OPERATION OF THE TEMPORARY CRAC SYSTEM.
3. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE
TEMPORARY CRAC SYSTEM.
4. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE TEMPORARY CRAC
SYSTEM TO PROVIDE COOLING FOR UPS ROOM.
5. TEMPORARY CRAC # 6 SYSTEM MUST BE KEPT OPERATING BEFORE SHUTTING DOWN CRAC # 5 (AC-5/ACCU-5). DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 5 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
6. INSTALL NEW CRAC # 5 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, WATER SUPPLY PIPING, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
7. REPAIR ALL DAMAGED AREA THAT SHALL BE AFFECTED BY THE INSTALLATION OF TEMPORARY CRAC # 6
AND REMOVAL OF CRAC # 5.
8. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE THE NEW CRAC # 5 SYSTEM. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE NEW CRAC # 5 SYSTEM TO PROVIDE COOLING FOR UPS ROOM.
9. BY THE END OF THIS PHASE, CRAC # 5 SYSTEM MUST BE IN FULL OPERATING CONDITION BEFORE MOVING
TO THE NEXT PHASE.
PHASE 4: CONSTRUCTION OF SERVER ROOM NO. N106 AND REMOVAL OF THE TEMPORARY CRAC SYSTEM
1. REMOVE THE TEMPORARY CRAC # 6 SYSTEM INCLUDING THE TEMPORARY AIR CONDITIONING UNIT IN THE UPS ROOM, AIR-COOLED CONDENSING UNIT IN THE EQUIPMENT YARD AND ALL ASSOCIATED REFRIGERANT PIPING WITH INSULATION, CONDENSATE PIPING, ELECTRICAL CONDUITS, WIRING AND CONTROLS.
2. REMOVE ALL THE EXISTING TILED CARPET FOR THE INSTALLATION OF TEMPORARY CRAC # 6 AND CRAC # 2
3. INSTALL NEW CRAC # 2 (AC-2/ACCU-2) AIR-COOLED CONDENSING UNIT IN THE EQUIPMENT YARD AND AIR CONDITIONING UNIT IN SERVER ROOM NO. N106 INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES. UTILIZE THE EXISTING WALL PENETRATION AS INDICATED IN TM-108.
4. REPAINT ALL DAMAGED AREAS THAT SHALL BE AFFECTED BY THE INSTALLATION AND REMOVAL OF THE
TEMPORARY CRAC # 6.
5. INSTALL ALL REMOVED CARPET TILES AND ALL DAMAGED CARPET TILES DURING THE CONSTRUCTION
SHALL BE REPLACED.
6. PERFORM CHECKLIST AND OPERATIONAL TEST BY THE MANUFACTURER PRIOR TO THE OPERATION OF THE THE NEW CRAC # 2 SYSTEM. ONCE THE UNIT OPERATIONAL TEST HAS BEEN CONFIRMED AND APPROVED, START THE NEW CRAC # 2 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N106.
7. RESTORE ALL AREAS AFFECTED BY THE CONSTRUCTION TO THE ORIGINAL CONDITION AT NO COST TO THE
GOVERNMENT.
1/
E.
D
O M
IN
G
O
K.
BE
LA
R
M A
K.
BE
LA
R
M A
FOR IN
FORMATIO
N105UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
P
P
P
SL
O
PE
SL
O
PE
WT
C
D
UP
E
CORRIDOR
N109 N107
UPS RM
HACS CHILLERS
N104
N105
N106 N106-A
EXST XFMR
STATION
N105UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
P
P
P
SL
O
PE
SL
O
PE
WT
C
D
UP
E
CORRIDOR
N109 N107
UPS RM
HACS CHILLERS
N104
N105
N106 N106-A
G-005
H1 SCALE NTS
B101 KEY PLAN
GRAPHIC SCALE
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
SERVER
ROOMS
B4 SCALE 1:100
PHASE PLAN - 1
LEGEND:
AREA OF ACCESS
FLOOR REMOVAL
B1 SCALE 1:100
PHASE PLAN - 2
WT6CAB1
SHELVES
SHELVES
WT6
SHELVES
SHELVES
TEMPORARILY
RELOCATED
EXST FURNITURE
ORIGINAL
POSITION OF
EXST FURNITURE
TEMPORARILY
RELOCATED
EXST FURNITURE
ORIGINAL
POSITION OF
EXST FURNITURE
WT1 WT2
ORIGINAL POSITION
OF EXST FURNITURE
CAB1
WT2WT1
WT3 WT4
WT5
TEMPORARY A/C-6
(SEE MECH DWG)
LINE OF ROUTE
TEMPORARY A/C-6
NEXT PHASE LOCATION
(SEE MECH DWG)
10m510 1 : 100
N106-B
N106-B
AREA OF ACCESS
FLOOR REINSTALL
TA/C-6
TA/C-6
WT
EXST
A/C
A/C
SR
WORKING TABLE
EXISTING
AIR-CONDITIONING UNIT
NEW
AIR-CONDITIONING UNIT
SERVER RACK
TA/C-6
TA/C-6
TA/C-6
TA/C-6
EXST A/C-1
EXST
A/C-4
EXST
A/C-3
EXST
A/C-5
A/C-1
A/C-4
EXST
A/C-3
EXST
A/C-5
SCHEDULE OF B101 SERVER ROOMS
FURNITURE RELOCATION
LOCATION FURNITURE QTY REMARKS
N104
WT1 1
TEMPORARILY
RELOCATE TO N106
WT2 1
WT3 1
WT4 1
WT5 1
WT6 1
CAB 1 1
TEMPORARILY
RELOCATE TO N106-B
CAB 2 1
N106-A SHELVES 1 1
TEMPORARILY
RELOCATE WITHIN THE ROOM
N106-B SHELVES 2 1
TEMPORARILY
RELOCATE WITHIN THE ROOM
C
AB
C
AB
WT3
WT5
WT4
CAB
SHELVES
CABINET
SHELVES
TEMPORARILY
RELOCATED
EXST FURNITURE
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
2. SERVER ROOM N104 EXISTING FURNITURE OBSTRUCTING THE REMOVAL OF ACCESS FLOOR TO BE
TEMPORARILY RELOCATED TO ROOM N106 AND N106-B. (SEE SCHEDULE OF FURNITURE)
2. RETURN THE RELOCATED FURNITURE TO ITS ORIGINAL PLANNED POSITION ONCE ALL THE EXISTING
RAISED FLOOR ACCESS PANEL HAS BEEN REINSTALLED.
BL
D
G . 1
S
ER
VE
R R
O O
M S
PH
AS
E
PL
AN
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
V.
AD
O N
A
1/
CONDENSER
UNITS
EQUIPMENT
YARD
CONDENSER
UNITS
EQUIPMENT
YARD
FOR IN
FORMATIO
N105UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
P
P
P
SL
O
PE
SL
O
PE
WT
C
D
UP
E
CORRIDOR
N109 N107
UPS RM
HACS CHILLERS
N104
N105
N106
EXST XFMR
STATION
N105UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
P
P
P
SL
O
PE
SL
O
PE
WT
C
D
UP
E
CORRIDOR
N109 N107
UPS RM
HACS CHILLERS
N104
N105
N106
G-006
H1 SCALE NTS
B101 KEY PLAN
GRAPHIC SCALE
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
SERVER
ROOMS
B4 SCALE 1:100
PHASE PLAN - 3
B1 SCALE 1:100
PHASE PLAN - 4
WT6
SHELVES
SHELVES
C
AB
IN
ET
SHELVES
WT3
TEMPORARILY RELOCATED
EXST FURNITURE
CABINET
WT1 WT2
WT5
WT4
ORIGINAL POSITION
OF EXST FURNITURE
10m510 1 : 100
N106-B
N106-B
LEGEND:
AREA OF ACCESS
FLOOR REMOVAL
TEMPORARY A/C-6
(SEE MECH DWG)
AREA OF ACCESS
FLOOR REINSTALL
TA/C-6
WT
EXST
A/C
A/C
SR
WORKING TABLE
EXISTING
AIR-CONDITIONING UNIT
NEW
AIR-CONDITIONING UNIT
SERVER RACK
WT6
WT3
WT1 WT2
WT5
WT4
A/C-1
A/C-4
A/C-3
EXST
A/C-5
TA/C-6
A/C-1
A/C-4
A/C-3
A/C-5
SHELVES
A/C-2
CAB
SHELVES
CABINET
SHELVES
BL
D
G . 1
S
ER
VE
R R
O O
M S
PH
AS
E
PL
AN
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
2. SERVER ROOM N104 EXISTING FURNITURE OBSTRUCTING THE REMOVAL OF ACCESS FLOOR TO BE
TEMPORARILY RELOCATED TO ROOM N106 AND N106-B. (SEE SCHEDULE OF FURNITURE)
2. RETURN THE RELOCATED FURNITURE TO ITS ORIGINAL PLANNED POSITION ONCE ALL THE EXISTING
RAISED FLOOR ACCESS PANEL HAS BEEN REINSTALLED.
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
AD
O N
A
CONDENSER
UNITS
EQUIPMENT
YARD
CONDENSER
UNITS
EQUIPMENT
YARD
FOR IN
FORMATIO
HD101
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
G . C
O
KI
N O
S
V.
G
O M
EZ
G
. C O
KI
N
O S
HAZARDOUS MATERIAL REMOVAL NOTES:
1. THE IDENTITIES, AND LOCATIONS OF HAZARDOUS MATERIALS SHOWN ARE AS DESCRIBED IN THE HAZARDOUS MATERIALS REPORT ENTITLED “HAZARDOUS MATERIALS INSPECTION REPORT, AC REPAIR FOR SERVER ROMS B101, CAMP ZAMA. JAPAN, " BY ENVIRONMENTAL SCIENCE CORPORATION, JUNE 2023. FIELD-VERIFY THE PRESENCE AND QUANTITY OF HAZARDOUS MATERIALS;
IMMEDIATELY REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER.
2. IF HIDDEN OR OTHER SUSPECT POTENTIALLY HAZARDOUS MATERIAL, WHICH HAS NOT BEEN PREVIOUSLY CHARACTERIZED, IS ENCOUNTERED DURING DEMOLITION OR RENOVATIONS, THE SUSPECT MATERIAL MUST BE ASSUMED HAZARDOUS UNTIL PROVEN OTHERWISE BY A QUALIFIED INSPECTOR. DO NOT DISTURB THE MATERIAL AND IMMEDIATELY REPORT TO THE CONTRACTING OFFICER AND OBTAIN CONCURRENCE TO IDENTIFY, SAMPLE, ANALYZE, AND EVALUATE SUCH MATERIAL IN ACCORDANCE WITH PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL NOT SAMPLE AND TEST MATERIALS THAT WERE PREVIOUSLY ANALYZED. SHOULD THE CONTRACTOR BELIEVE ADDITIONAL TESTING IS NECESSARY, FIRST NOTIFY THE CONTRACTING OFFICER AND SUBMIT WRITTEN
JUSTIFICATION , DETAILING WHY ADDITIONAL TESTING IS NECESSARY.
3. DEMOLITION MUST INCLUDE ENVIRONMENTAL ABATEMENT OF HAZARDOUS MATERIALS. INSPECT, IDENTIFY, REMOVE AND DISPOSE OF ALL HAZARDOUS MATERIALS IN ACCORDANCE WITH PROJECT SPECIFICATIONS, OSHA, JEGS, AND PERTINENT GOJ REGULATIONS. WHERE SUCH PROVISIONS DIFFER, THE MORE STRINGENT MUST APPLY.
4. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF THE ACM ABATEMENT PLAN PRIOR TO START OF HAZMAT REMOVAL IN ACCORDANCE WITH SPECIFICATION SECTION 02 82 00.
5. VERIFY TEMPORARY STORAGE AREA FOR ALL HAZARDOUS MATERIALS FOR DISPOSAL WITH THE CONTRACTING OFFICER.
6. SECURE THE WORK AREA, PROTECT ADJOINING AREAS PRIOR TO DISTURBING ANY MATERIAL FOR THE ABATEMENT ACTIVITY. MAINTAIN CRITICAL BARRIERS, ISOLATION, AND WARNING SIGNS AS NECESSARY DURING ALL ABATEMENT OPERATIONS, UNTIL FINAL CLEARANCE HAS BEEN APPROVED FOR EACH WORK AREA. PROTECT ALL SURROUNDING AREAS, INCLUDING SOIL, FROM HAZARDOUS
MATERIALS THROUGHOUT ABATEMENT AND DEMOLITION ACTIVITIES.
7. CONTRACTOR SHALL ASSUME ALL PAINTS AND COATINGS CONTAIN LEAD AT DETECTABLE LEVELS. ENSURE WORKER PROTECTION IN ACCORDANCE WITH SPECIFICATION SECTION 02 83 00, JEGS, EM 385-1-1, AND OSHA LEAD IN CONSTRUCTION STANDARDS. PAINTS, COATINGS, AND OTHER LEAD ITEMS CONTAINING LEAD CONCENTRATIONS EXCEEDING JEGS AND/OR GOJ WASTE MANAGEMENT AND PUBLIC CLEANSING LAW HAZARDOUS WASTE REGULATORY LIMITS AS DETERMINED BY TCLP ANALYSIS, ARE TO BE HANDLED AND DISPOSED OF AS SPECIALLY CONTROLLED INDUSTRIAL WASTE IN
ACCORDANCE WITH GOJ AND LOCAL PREFECTURE REGULATIONS.
8. IF REQUIRED REMOVE AND RECYCLE OR DISPOSE OF MOUNTED EQUIPMENT BATTERIES (NI-CAD, LITHIUM-ION, MAGNESIUM-ION, ETC) IN ACCORDANCE WITH JEGS AND PERTINENT GOJ REGULATIONS.
9. COORDINATE ALL HAZMAT REMOVAL WORK WITH OTHER DISCIPLINE DEMOLITION DRAWINGS. MATERIALS NOT DISTURBED BY DEMOLITION SHOULD BE PROTECTED IN PLACE.
1 2
B1 NOT TO SCALE
HAZARDOUS MATERIAL REMOVAL PLAN
ITEM ACM DESCRIPTION
104, 105, 106
10CM, BLUE-GREEN VINYL COVE BASE W/ GRAY MASTIC
LOCATIONS
30 x 30CM, BEIGE VINYL FLOOR TILE W/ BLACK AND
BROWN MASTIC ON METAL PANEL1
2 106, STORAGE 1, STORAGE 2
1 2
1 2
H
AZ
AR
D
O U
S M
AT
ER
IA
L
R
EM
O
VA
L
PL
AN
LEGEND
ASBESTOS CONTAINING MATERIAL (ACM)
3 UPS ROOMPIPE TSI, WHITE BACKING OVER SILVER BACKING WITH
WHITE FIBROUS MATERIAL, ELBOW (LIGHT GREEN)
4 UPS ROOMFLANGE GASKET, OFF-WHITE FIBROUS MATERIAL
FOR IN
FORMATIO
A-001
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
BUILDING 101 SERVER ROOMS INTERIOR FINISH SCHEDULE
ROOM NAME FLOOR CEILING CORNICE
EDGE
HEIGHT OF
CEILING REMARKS
N104 TILED CARPET, T=6mm ALUM FRAME RAISED FLOOR, H=330mm METAL PERFORATED PANEL - CH=3070mm
N105 TILED CARPET, T=6mm ALUM FRAME RAISED FLOOR, H=330mm ACOUSTIC BOARD - CH=3070mm
N106 TILED CARPET, T=6mm ALUM FRAME RAISED FLOOR, H=330mm METAL PERFORATED PANEL - CH=3070mm
N106-A TILED CARPET, T=6mm ALUM FRAME RAISED FLOOR, H=330mm METAL PERFORATED PANEL - CH=3050mm
N106-B TILED CARPET, T=6mm ALUM FRAME RAISED FLOOR, H=330mm METAL PERFORATED PANEL - CH=3050mm
CORRIDOR CEMENT MORTAR GYPSUM BOARD - CH=2710mm
UPS RM CONCRETE EXPOSED CONCRETE - CH=3525mm
BASEBOARD
FINISHING HEIGHT
WALL
VINYL 100mm
VINYL 100mm
VINYL 100mm
VINYL 100mm
VINYL 100mm
PAINT 100mm
CONC, PAINT FIN, H=1168mm + ACST BOARD, H=1902mm
CONC, PAINT FIN, H=1168mm + ACST BOARD, H=1902mm
CONC, PAINT FIN, H=1168mm + ACST BOARD, H=1902mm
CONCRETE, PAINT FIN
CONCRETE, PAINT FIN
CONCRETE, PAINT FIN
EXPOSED CONCRETE
1. ALL INSTALLATIONS AND NEW WORK FOR THIS PROJECT MUST
BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR MUST VISIT THE PROJECT SITE INDICATED
IN THE CONTRACT DRAWINGS AND VERIFY EXISTING SITE
CONDITIONS. ALL DIMENSIONS AND QUANTITIES RELATED TO
THE PROJECT MUST BE VERIFIED PRIOR TO THE
COMMENCEMENT OF WORK.
3. DAMAGED CAUSED BY REMOVAL OPERATIONS OR
CONSTRUCTION ACTIVITY IN ALL AREAS OF THE PROJECT SITE
MUST BE REPAIRED/RESTORED TO THE APPROXIMATE
ORIGINAL CONDITIONS OR BETTER AND SATISFACTORY TO
THE CONTRACTING OFFICER AT NO COST TO THE
GOVERNMENT.
5. ALL INCIDENTAL UTILITIES AFFECTED BY THIS WORK SHALL BE
REMOVED AND REINSTALLED IN PLACE UNLESS OTHERWISE
NOTED ON PLANS.
6. CONTRACTOR MUST COORDINATE WORK WITH OTHER
DISCIPLINES AND SCHEDULE OF WORK COINCIDENTAL WITH
ARCHITECTURAL WORK.
7. ALL INDICATED SIZE AND DIMENSIONS ARE IN MILLIMETER
UNLESS NOTED OTHERWISE.
8. THE CONTRACTOR UPON COMPLETION OF ALL WORK IN THIS
PROJECT MUST LEAVE THE AREA CLEAN AND READY TO USE
TO THE SATISFACTION OF THE CONTRACTING OFFICE.
9. ALL EXISTING FURNITURE AND FIXTURES ARE TO REMAIN,
UNLESS STATED OTHERWISE.
10. ALL EXISTING EQUIPMENT, CABINETS, FIXTURES TO REMAIN
AND SHALL BE PROTECTED DURING CONSTRUCTION.
11. STORE AND PROTECT EXISTING RAISED FLOOR PANELS,
FRAMES AND SUPPORTS FOR REINSTALLATION.
ARCHITECTURAL ABBREVIATIONS AND LEGENDARCHITECTURAL NOTES
ABBREVIATIONS: LEGEND:
ARCHITECTURAL SCOPE OF WORKS
REMOVAL WORK:
NEW WORK:
A/C AIR-CONDITIONING
ACST ACOUSTIC
ARCH ARCHITECTURAL
ALUM ALUMINUM
BD BOARD
C CHAIR
CH CEILING HEIGHT
CLG CEILING
CORR CORRIDOR
CONC CONCRETE
CZ CAMP ZAMA
D DRAWER
DWG, DWGS DRAWING/S
E EQUIPMENT
ELEC ELECTRICAL
EP ELECTRICAL PANEL
EXST EXISTING
FIN FINISH
FL FLOOR, FLOOR LINE
GL GRADE LINE
H, HT HEIGHT
LN LINE
MATL MATERIAL
MECH MECHANICAL
mm MILLIMETER
N NORTH
RM ROOM
SR SERVER RACKS
T THICKNESS
TEMP TEMPORARILY
TYP TYPICAL
WT WORKING TABLE
W/ WITH
X
X
REMOVAL WORK
MODIFIED WORK
EXISTING ACCESS PANEL
MECHANICAL OPENING
KEYNOTE FOR REMOVAL WORK
KEYNOTE FOR NEW WORK
LIGHTING
SUPPLY DUCT AIR
SUPPLY DUCT
AIR GRILLES
ACOUSTIC BOARD CEILING
PERFORATED METAL CEILING
GYPSUM BOARD CEILING
TILED CARPET, RAISED FLOOR
ROOM NAME
EXST WALL PENETRATION
XXX
AR
C
H
IT
EC
TU
R
AL
S C
O
PE
O F
W O
R K, AB
BR
EV
IA
TI
O
N S, L
EG
EN
D
, N O
TE
S
AN
D
IN
TE
R
IO
R F
IN
IS
H S
C H
ED
U
LE
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
A
D O
N A
PARTIALLY REMOVE THE EXISTING RAISED FLOOR ACCESS
PANEL, INCLUDING ASSOCIATED FRAMES AND SUPPORTS
AS SHOWN IN THE DRAWING.
REMOVE DAMAGED 300x600mm FISSURED ACOUSTIC
GYPSUM WALL TILE
REINSTALL RAISED FLOOR ACCESS PANEL WITH ITS FRAMES AND
SUPPORTS.
PROVIDE NEW 300x600mm FISSURED ACOUSTIC GYPSUM WALL TILE
FOR IN
FORMATIO
STATION
27260
5360 5495 5480 5485 5440
14110
7470 6640
UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN
SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
SHELVES
SHELVES
P
P
P
SL
O
PE
SL
O
PE
WT5
WT4
WT6
WT
WT1 WT2
C
WT3
D
UP
C
AB
E
N106-A
N106-B
N106
CORRIDOR
N109 N107 N104
N105
UPS RM
HACS CHILLERS
CAB2
TEMP REMOVE
FLOOR AIR GRILLE
(SEE MECH DWG)
TEMP REMOVE
FLOOR AIR GRILLE
(SEE MECH DWG)
TEMP REMOVE
FLOOR AIR GRILLE
(SEE MECH DWG)
EXST
A/C-4
EXST A/C-1
EX
ST
A/ C
-3
EX
ST
A /C
-5
TEMP REMOVE
FLOOR AIR GRILLE
(SEE MECH DWG)
TEMP REMOVE
FLOOR AIR GRILLE
(SEE MECH DWG)
AD101
H1 SCALE NTS
B101 KEY PLAN
GRAPHIC SCALE
6m1.50 1 : 60
3.0 4.5
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
SERVER
ROOMS
A2 SCALE 1:60
BLDG. 101 SERVER ROOMS REMOVAL PLAN
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
2. STORE AND PROTECT EXISTING RAISED FLOOR PANELS,
FRAMES AND SUPPORTS FOR REINSTALLATION.
BL
D
G . 1
S
ER
VE
R R
O O
M S
R
EM
O
VA
L
PL
AN
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
A
D O
N A
CONDENSER UNITS
EQUIPMENT YARD
FOR IN
FORMATIO
STATION
27260
5360 5495 5480 5485 5440
14110
7470 6640
UP
SR
SR
E
SR SR
SR
SR
EP
UP
UP
UP
DN
SLOPE
EXST UPS UNIT
EP
EP EP
SR
SR SR
SRSR
SR
SHELVES
SHELVES
P
P
P
SL
O
PE
SL
O
PE
WT5
WT4
WT6
WT
WT1 WT2
C
WT3
D
UP
C
AB
E
N106-A
N106-B
N106
CORRIDOR
N109 N107 N104
N105
UPS RM
HACS CHILLERS
CAB2
REINSTALL
FLOOR AIR GRILLE
(SEE MECH DWG)
REINSTALL
FLOOR AIR GRILLE
(SEE MECH DWG)
REINSTALL
FLOOR AIR GRILLE
(SEE MECH DWG)
A/ C
-5
A/C-4
A/C-1
A/ C
-3
A/C-2
REINSTALL
FLOOR AIR GRILLE
(SEE MECH DWG)
REINSTALL
FLOOR AIR GRILLE
(SEE MECH DWG)
A-101
H1 SCALE NTS
B101 KEY PLAN
GRAPHIC SCALE
6m1.50 1 : 60
3.0 4.5
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
SERVER
ROOMS
A2 SCALE 1:60
BLDG. 101 SERVER ROOMS MODIFIED PLAN
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
BL
D
G . 1
S
ER
VE
R R
O O
M S
M O
D
IF
IE
D
P
LA
N
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
A
D O
N A
B2 A-301
C4 A-301
C5
A-301
CONDENSER
UNITS
EQUIPMENT
YARD
FOR IN
FORMATIO
27260
5360 5495 5480 5485 5440
14110
7470 6640
UP
CH = 2710 CH = 2415
CH = 3070
CH = 3050
CH = 3050
CH = 3525
N106-A
N106-B
N106
CORRIDOR
N109 N107 N104
N105
UPS RM
CH = 3070
A-102
A2 SCALE 1:60
BLDG. 101 SERVER ROOMS REFLECTED CEILING PLAN
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
H1 SCALE NTS
B101 KEY PLAN
SERVER
ROOMS
NOTES:
1. REFER TO A-001 FOR THE LEGEND AND ABBREVIATIONS.
GRAPHIC SCALE
6m1.50 1 : 60
3.0 4.5
BL
D
G . 1
S
ER
VE
R R
O O
M S
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
A
D O
N A
FOR IN
FORMATIO
1ST FL
CLG LN
2ND FL
RAISED FL
EP
EP
N106-A N106
1ST FL
CLG LN
2ND FL
RAISED FL
N106-A N106-BN104
1ST FL
CLG LN
2ND FL
RAISED FL
EP
CLG LN
RAISED FL
N105
A-301
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
B2 SCALE 1:60
SECTION
C6
A-101 C4 SCALE 1:60
SECTION
B4 A-101
EXST CONCRETE
WALL PAINT FIN
EXST PERFORATED
METAL PANEL CEILING
EXST
ACOUSTIC
BD WALL FIN
EXST ACOUSTIC
BOARD WALL FINISH
EXST PERFORATED
METAL PANEL CEILING
EXST CONCRETE
WALL W/ PAINT FIN
EXST TILE CARPET
ON ALUM FRAME
RAISED FLOOR
EXST TILE CARPET
ON ALUM FRAME
RAISED FLOOR
H=100mm, VINYL BASEBOARD
H=100mm, VINYL
BASEBOARD
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
GRAPHIC SCALE
6m1.50 1 : 60
3.0 4.5
IN
TE
R
IO
R E
LE
VA
TI
O
N A
N D
S
EC
TI
O
N
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/
V.
A
D O
N A
C5 SCALE 1:60
N105 INTERIOR ELEVATIONE4
A-101
A-501 D2
EXST
ACOUSTIC
BD WALL FIN
H=100mm, VINYL BASEBOARD
EXST ACOUSTIC
BD CLG
FOR IN
FORMATIO
A-501
GRAPHIC SCALE
1 : 5
0.5m
1m0.50.10 1 : 10
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
OC
TO
BE
R
A5 SCALE 1:10
ALUM FRAME RAISED FLOOR
TYPICAL DETAIL
T=6mm
TILED CARPET
PEDESTAL BASE
ASSEMBLY
SUB-FLOOR
CARPET FRAME
ALUM FLOOR
PANEL
M-501 C5
B2 SCALE 1:5
LEG SUPPORT DETAIL
STEEL
BASE PLATE
PLATED STEEL
LOCKING NUT
FASTENER
ALUM FLOOR PANEL
CARPET FRAME
T=6mm
TILED CARPET
H=100mm
VINYL BASEBOARD
EXST CONCRETE
WALL
NOTES:
1. REFER TO A-001 FOR THE SCOPE OF WORKS, LEGEND AND ABBREVIATIONS.
TYPICAL PEDESTAL
AR
C
H
IT
EC
TU
R
AL
D
ET
AI
L
IC
H
IR
O
S U
ZU
KI
S.
M
O R
EN
O
1/ 5, /1
V.
A
D O
N A
G3 SCALE 1:10
WALL SECTION AT N105
TOP OF
CONCRETE WALL
RAISED FL
1ST FL
EXST 300X600mm
FISSURED ACOUSTIC
GYPSUM WALL TILE
EXST CONCRETE
WALL W/ PAINT
FINISH
D2 SCALE 1:10
WALL DETAIL AT N105
EXST WOOD
TRIM
EXST 300X600mm
FISSURED ACOUSTIC
GYPSUM WALL TILE
EXST CONCRETE
WALL W/ PAINT
FINISH
EXST WALL
OPENING
A-501 B2
EXST WALL
CABLE RACEWAY
PLASTIC MOLD
(SEE ELEC NOTE E-001)
EXST WALL
CABLE RACEWAY
PLASTIC MOLD
(SEE ELEC DWG FOR
DETAIL)
G3 A-501
EXST WOOD
TRIM
EXST 50mm THK
LGS FURRINGS
EXST
CONCRETE NAIL
FOR IN
FORMATIO
M-001
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
K.
BE
LA
R
M A
K.
BE
LA
R
M A
E.
D
O M
IN
G
O
OC
TO
BE
R
T/C
THERMOSTAT/CONTROLLER (ELECTRONIC AND DIGITAL
DISPLAY)
T
THERMOSTAT/CONTROLLER (PROGRAMMABLE ELECTRONIC
AND DIGITAL DISPLAY)
NEW EQUIPMENT ITEM
AIR FLOW THROUGH
EXHAUST FANEF
APPROXIMATEAPPROX
DIRECT DIGITAL CONTROLDDC
VARIABLE FREQUENCY DRIVEVFD
M
T
FM
FS
VD
HUMIDITY SENSOR
THERMOMETER
PRESSURE GAGE
FLOW METER
FLOW SWITCH
DAMPER MOTOR
VOLUME DAMPER
TEMPERATURE SENSOR
H
EXISTING EQUIPMENT ITEM
1. THE CONTRACTOR MUST CONDUCT ON-SITE SURVEY OF THE EXISTING SITE CONDITIONS PRIOR TO
COMMENCEMENT OF WORK.
2. DEVIATION FROM THE DRAWINGS NECESSITATED BY FIELD CONDITIONS MUST BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER AND APPROVED BY HIM PRIOR TO THE EXECUTION OF WORK.
3. MECHANICAL EQUIPMENT MUST BE THE STANDARD PRODUCTS OF THE MANUFACTURER.
4. THE CONTRACTOR MUST VERIFY EXISTING UTILITIES UNDER THE RAISED FLOORING THAT WILL BE AFFECTED DURING THE ACTUAL CONSTRUCTION WORK. DAMAGE TO EXISTING UTILITIES MUST BE
REPAIRED BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.
5. MOUNTING AND ANCHORING OF OF MECHANICAL EQUIPMENT MUST BE DONE BY THE ACTUAL
DIMENSIONS OF THE SELECTED EQUIPMENT.
6. FABRICATED HANGERS, SUPPORTS AND SLEEVE MUST BE HOT-DIPPED GALVANIZED UNLESS OTHERWISE
INDICATED OR SPECIFIED.
7. UPON COMPLETION OF WORK, CLEAN WORK AREAS TO THE SATISFACTION OF THE CONTRACTING
OFFICER.
8. AIR CONDITIONING REFRIGERANT PIPING SIZES MUST BE AS PER MANUFACTURER'S RECOMMENDATION.
9. REFRIGERANT MUST BE DISPOSED BY THE CONTRACTOR OFF BASE IN ACCORDANCE WITH JEGS, AND
LOCAL REGULATORY REQUIREMENTS. REFRIGERANT TECHNICIANS MUST BE TRAINED IN PROPER
RECOVERY AND RECYCLING PROCEDURES, LEAK DETECTION, SAFETY, SHIPPING, AND DISPOSAL IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS AND PRACTICES OR JAPANESE EQUIVALENT.
10. WASTE MATERIALS AND CONSTRUCTION DEBRIS MUST BE DISPOSED OFF-BASE AND IN ACCORDANCE WITH THE LOCAL AND OTHER LAWS. THE CONTRACTOR MUST PROVIDE MANIFEST RECEIPT FROM THE
LOCAL LANDFILL DISPOSAL.
11. DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS OTHERWISE NOTED.
12. HEAVY LINES INDICATE NEW WORK. LIGHT LINES INDICATE EXISTING INSTALLATIONS.
13. ALL WORK AND MATERIALS ARE NEW UNLESS OTHERWISE INDICATED AS EXISTING.
GV
M
A
SUPPLY AIR DUCT
RETURN AIR DUCT
OUTDOOR AIR DUCT
EXPANSION JOINT
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN PIPE
GATE VALVE
SOLENOID VALVE
CHECK VALVE
PRESSURE RELIEF VALVE
2-WAY MOTORIZED SYSTEM
PRESSURE REDUCING SYSTEMR
AUTOMATIC AIR VENT
WYE STRAINER
CHS
CHR
D
SV
SAD
RAD
OAD
DCP
DISCONNECTION POINT
FUEL OIL SUPPLY
FUEL OIL RETURN
OIL PIPE VENT
O
OR
VO
NCP
NEW CONNECTION POINT
SECURITY GRILLESG
AIR CONDITIONINGA/C
DEDICATED OUTDOOR AIR SYSTEMDOAS
DRAWINGDWG
NUMBERNO.
1. REPLACEMENT AND UPGRADE OF THE EXISTING LIEBERT COMPUTER ROOM AIR CONDITION (CRAC) SYSTEM IN BUILDING 101 WHICH INCLUDES A TOTAL OF FIVE (5) AC UNITS, ALL REFRIGERANT PIPING, WATER PIPING, DRAIN AND SUPPORTS SHALL BE REPLACED WITH NEW. ONE OF THE FIVE AC UNITS FROM ROOM 106 HAS
BEEN REMOVED.
SPRINKLER PIPINGSP
EXHAUST AIREA
OUTSIDE AIR / FRESH AIROA
SUPPLY AIRSA
TYPICALTYP
RETURN AIRRA
EXISTINGEXIST
Ø25 mm SPRINKLER PIPING25 SP
M
EC
H
AN
IC
AL
S C
O
PE
O F
W O
R K, G
EN
ER
AL
N O
TE
S, LE
G
EN
D
S, S
YM
BO
LS
A
BB
R
EV
IA
TI
O N
S
AIR-COOLED CONDENSING UNITACCU
CONCRETECONC
COMPUTER ROOM A/CCRAC
DRY BULBDB
EXTERNAL STATIC PRESSUREESP
FULL LOAD AMPEREFLA
GALVANIZEDGALV
KILOWATTSKW
LITERS PER SECONDLPS
MANUFACTURERMFR
PASCALPA
REFRIGERANT LIQUIDRL
REFRIGERANT GASRG
WET BULBWB
HVAC LEGENDS AND SYMBOLSMECHANICAL SCOPE OF WORK
MECHANICAL GENERAL NOTES
ABBREVIATIONS
STEELSTL
REFRIGERANT LIQUID / GAS
WATER SUPPLY
RL/RG
CW
NOT TO SCALENTS
1/
1. PROVIDE TEMPORARY CRAC UNIT INCLUDING ALL UTILITIES FOR TEMPORARY CRAC WITH NO DISRUPTION TO
THE SERVER ROOM'S OPERATION.
TEMPORARY MECHANICAL SCOPE OF WORK
DISCONNECTION POINTDCP
NEW CONNECTION POINTNCP
AIR CONDITIONING & REFRIGERATION UNITACR
JAPAN ENVIRONMENTAL GOVERNING STANDARDSJEGS
SERVER RACKSR
POWER DISTRIBUTION UNITPDU
WORKING TABLEWT
CHAIRC
DRAWERD
ELECTRICAL PANELEP
EQUIPMENTE
PANELP
HUMIDIFIER AIR CONTROL SYSTEM (CHILLER UNIT)HACS
TRANSFORMERXFMRFOR IN
FORMATIO
ACCU
ACCU
ACCU
ACCU
AC
AC
AC
A/C-4
A/C-1
A/ C
-3
N109 N107
CORRIDOR
N105
N104
N106
CONDENSER UNITS
EQUIPMENT YARD
UP
SR
SR
E
SR SR
SR
SR
N106-A
N106-B
EP
UP
UP
UP
DN
SLOPE
EP
EP EP
SR
SR SR
SRSR
SR
SHELVES
SHELVES
SL
O
PE
SL
O
PE
WT
WT
WT
WT
WT WT
C
WT
D C
AB
IN
ET
CW
CW
C W
DD
TM101
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
K.
BE
LA
R
M A
K.
BE
LA
R
M A
E.
D
O M
IN
G
O
OC
TO
BE
R
TE
M
PO
R
AR
Y
BL
D
G . 1
S
ER
VE
R R
O O
M N
PH
AS
IN
G
PL
AN
R
EM
O
VA
L
GRAPHIC SCALE
1/
NOTES:
1. CRAC#1 DESCRIBES AC-1 / ACCU-1,
CRAC#2 DESCRIBES AC-2 / ACCU-2 AND SO ON..
5m10.50 1 : 50
LEGEND:
PHASE 1A: CONSTRUCTION
PHASE 1B: CONSTRUCTION
PHASE 1C: CONSTRUCTION
PHASE 1A: INSTALLATION OF TEMPORARY CRAC SYSTEM (CRAC # 6)
1. REMOVE ABANDONED REFRIGERANT PIPING OF CRAC # 2 INCLUDING ASSOCIATED INSULATION, PIPE
SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
2. INSTALL TEMPORARY CRAC # 6 (AC-6/ACCU-6) SYSTEM WHICH CONSISTS OF THE AIR-COOLED OUTDOOR UNIT AND REFRIGERANT PIPING WITH INSULATION. UTILIZE THE EXISTING WALL PENETRATION AS INDICATED
IN THE PLANS.
3. INSTALL TEMPORARY CRAC # 6 INDOOR UNIT INSIDE SERVER ROOM NO. N104 AS INDICATED IN THE PLANS.
CONNECT THE TEMPORARY REFRIGERANT PIPING AND TAP THE CONDENSATE DRAIN IN THE EXISTING
CONDENSATE LINE.
4. PERFORM MANUFACTURER'S CHECKLIST AND CONDUCT OPERATIONAL TEST PRIOR TO THE OPERATION OF
THE TEMPORARY CRAC SYSTEM.
5. AFTER THE COMPLETION OF THE UNIT OPERATIONAL TEST AND UPON ACCEPTANCE BY THE GOVERNMENT, START THE TEMPORARY CRAC # 6 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N104.
PHASE 1B: REMOVAL OF CRAC # 1 SYSTEM
1. CRAC # 4 (AC-4/ACCU-4) AND TEMPORARY CRAC # 6 MUST BE KEPT OPERATING BEFORE SHUTTING DOWN CRAC # 1 (AC-1/ACCU-1). DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 1 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, WATER SUPPLY PIPING, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL
CONDUITS, CONTROLS AND WIRING.
2. REMOVE THE EXISTING CONDENSATE DRAIN LINE AND RECONNECT ALL CONDENSATE DRAIN LINES FROM
THE EXISTING CRAC UNITS AS NECESSARY.
3. INSTALL NEW CRAC # 1 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, WATER SUPPLY PIPING, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
4. PERFORM MANUFACTURER'S CHECKLIST AND CONDUCT OPERATIONAL TEST PRIOR TO THE OPERATION OF THE NEW CRAC # 1 SYSTEM. AFTER THE COMPLETION OF THE UNIT OPERATIONAL TEST AND UPON ACCEPTANCE BY THE GOVERNMENT, START THE NEW CRAC # 1 SYSTEM TO PROVIDE COOLING FOR
SERVER ROOM NO. N104.
PHASE 1C: REMOVAL OF CRAC # 4 SYSTEM
1. NEW CRAC # 1 SYSTEM AND TEMPORARY CRAC # 6 MUST BE KEPT OPERATING BEFORE SHUTTING DOWN CRAC # 4. DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 4 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
2. INSTALL NEW CRAC # 4 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND DEVICES.
3. PERFORM MANUFACTURER'S CHECKLIST AND CONDUCT OPERATIONAL TEST PRIOR TO THE OPERATION OF THE NEW CRAC # 4 SYSTEM. AFTER COMPLETION OF THE UNIT OPERATIONAL TEST AND UPON ACCEPTANCE BY THE GOVERNMENT, START THE NEW CRAC # 4 SYSTEM TO PROVIDE COOLING FOR SERVER ROOM
NO.N104.
4. UPON SUBSTANTIAL COMPLETION OF THIS PHASE, NEW CRAC # 1 AND CRAC # 4 SYSTEM MUST BE IN FULL
OPERATING CONDITION BEFORE MOVING TO THE NEXT PHASE.
C3 SCALE 1:50
TEMPORARY BLDG. 101 SERVER ROOM NO. N104 CRAC SYSTEM PHASING PLAN - REMOVAL
FOR IN
FORMATIO
A/C-4
A/C-1
A/ C
-3
N109 N107
CORRIDOR
N105
N104
N106
CONDENSER UNITS
EQUIPMENT YARD
UP
SR
SR
E
SR SR
SR
SR
N106-A
N106-B
EP
UP
UP
UP
DN
SLOPE
EP
EP EP
SR
SR SR
SRSR
SR
SHELVES
SHELVES
SL
O
PE
SL
O
PE
WT
WT
WT
WT
WT WT
C
WT
D C
AB
IN
ET
ACCU
ACCU
ACCU
ACCU
AC
AC
AC
ACCU
AC
CW
CW
C W
D D D
D
D
TM102
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
K.
BE
LA
R
M A
K.
BE
LA
R
M A
E.
D
O M
IN
G
O
OC
TO
BE
R
TE
M
PO
R
AR
Y
BL
D
G . 1
S
ER
VE
R R
O O
M N
PH
AS
IN
G
PL
AN
M
O D
IF
IE
D
GRAPHIC SCALE
1/
5m10.50 1 : 50
C3 SCALE 1:50
TEMPORARY BLDG. 101 SERVER ROOM NO. N104 CRAC SYSTEM PHASING PLAN - MODIFIED
NCP
CONDENSATE
DRAIN LINE FOR
TEMPORARY
CRAC UNIT
REFRIGERANT
LINE FOR
TEMPORARY
CRAC UNIT
FOR IN
FORMATIO
A/ C
-3
N109 N107
CORRIDOR
N105
N104
N106
CONDENSER UNITS
EQUIPMENT YARD
UP
SR
SR
E
SR SR
SR
SR
N106-A
N106-B
EP
UP
UP
UP
DN
SLOPE
EP
EP EP
SR SR
SRSR
SR
SHELVES
SHELVES
SL
O
PE
SL
O
PE
WT
WT
WT
WT
WT WT
C
WT
D C
AB
IN
ET
ACCU
ACCU
AC
AC
AC
AC
ACCU
ACCU
ACCU
CW
CW
C W
DDD
TM103
US Army Corps of Engineers ®
Japan District
AR
C
H
IT
EC
T
- E N
G
IN
EE
R
TO
K
YO
, J
A
PA
N
PA
E
D
ES
IG
N
A N
D
FA
C
IL
IT
Y
M A
N A
G
EM
EN
T
A
B C D
E F G H
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, J
AP
AN
C
O R
PS
O
F
EN
G
IN
EE
R
S
AP
O A
P
8-
D
ES
C R
IP
TI
O N
D
AT
E D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
AP
PR
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
SU
BM
IT
TE
D B
Y:
D R
AW
IN
G C
O D
E:
PL
O T
SC
AL
E:
C O
N
TR
AC
T
N O
SHEET OF
SHEET
IDENTIFICATION
M
AR
K M
AR
K
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
FY
A C
R
EP
AI
R
F O
R S
ER
VE
R R
O O
M S
B1
C
AM
P
ZA
M A, J
AP
AN
IS
O
A
IS
O
A
M .O
KA
N
O
IS
O
A
/2
6/
W
2H V-
-D
-0
W
2H V-
-F
-0
K.
BE
LA
R
M A
K.
BE
LA
R
M A
E.
D
O M
IN
G
O
OC
TO
BE
R
TE
M
PO
R
AR
Y
BL
D
G . 1
S
ER
VE
R R
O O
M N
PH
AS
IN
G
PL
AN
R
EM
O
VA
L
LEGEND:
PHASE 2A: CONSTRUCTION
PHASE 2B: CONSTRUCTION
PHASE 2A: RELOCATE TEMPORARY CRAC # 6 TO SERVER ROOM NO. N105
1. RELOCATE THE TEMPORARY CRAC # 6 INDOOR UNIT TO THE SERVER ROOM NO. N105. REFER TO G-005 FOR THE TEMPORARY RELOCATION OF FURNITURE AND EXISTING MATERIALS. REMOVE THE REFRIGERANT PIPING AS INDICATED IN TM-102 AND PROVIDE NEW REFRIGERANT LINE FROM SERVER ROOM NO. N104 TO SERVER ROOM NO. N105, UTILIZING THE EXISTING WALL PENETRATIONS UNDER THE RAISED FLOOR.
2. INSTALL THE TEMPORARY INDOOR UNIT INSIDE SERVER ROOM NO. N105 AS INDICATED IN SHEET TM-102.
REMOVE FLOOR TILES AS INDICATED IN G-005 AND INSTALL ALL ASSOCIATED REFRIGERANT PIPING, DRAIN PIPING, POWER SUPPLY, CONTROLS, WIRING AND ALL DEVICES OR UTILITIES REQUIRED FOR THE
OPERATION OF THE TEMPORARY CRAC SYSTEM.
3. PERFORM MANUFACTURER'S CHECKLIST AND CONDUCT OPERATIONAL TEST PRIOR TO THE OPERATION OF
THE TEMPORARY CRAC SYSTEM.
4. AFTER COMPLETION OF THE UNIT OPERATIONAL TEST AND UPON APPROVAL BY THE GOVERNMENT, START
THE TEMPORARY CRAC SYSTEM TO PROVIDE COOLING FOR SERVER ROOM NO. N105.
PHASE 2B: CONSTRUCTION OF SERVER ROOM NO. N105
1. TEMPORARY CRAC # 6 SYSTEM MUST BE KEPT IN OPERATION BEFORE SHUTTING DOWN CRAC # 3 (AC-3/ACCU-3). DISCONNECT AND REMOVE ALL ASSOCIATED UTILITIES FOR CRAC # 3 INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONING UNIT, AIR-COOLED CONDENSING UNIT, REFRIGERANT PIPING WITH INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS AND WIRING.
2. CONNECT THE CONDENSATE DRAIN LINE FROM CRAC # 3 TO THE NEW CONDENSATE DRAIN LINE PIPING
POINT OF CONNECTION.
3. INSTALL NEW CRAC # 3 SYSTEM INCLUDING ALL ASSOCIATED REFRIGERANT PIPING, INSULATION, CONDENSATE DRAIN PIPING, PIPE SUPPORTS, ELECTRICAL CONDUITS, CONTROLS, WIRING, AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .