This document is a memorandum from the City of Eugene Public Works Department requesting approval to use an alternative Construction Manager/General Contractor (CM/GC) contracting method for the Franklin Boulevard: A Partnership to Rebuild and Revive a Corridor Project, a public improvement initiative exceeding $100,000 in construction costs. The project aims to transform Franklin Boulevard from an automobile-centric arterial into a multimodal urban street prioritizing pedestrians, cyclists, and Bus Rapid Transit (BRT) users. Phase 1 includes converting two signalized intersections into multilane roundabouts, reducing the roadway from six to four lanes, reallocating space for bicycle and pedestrian facilities, adding a second dedicated BRT lane, installing fiber optic conduits, and improving sidewalk accessibility. The project has received a RAISE Grant from the U.S. Department of Transportation and utilizes multiple funding sources. The City will solicit the CM/GC contractor through a publicly advertised Request for Proposals (RFP) with advertisements in the Daily Journal of Commerce and on OregonBuys. A pre-proposal vendor conference will be held to allow interested parties to ask questions and request clarifications up to ten days before the proposal due date. The CM/GC will be selected based on objective evaluation criteria including experience, qualifications, value engineering expertise, and bonding capabilities, with potential interviews of top-ranked candidates.
The CM/GC procurement method was selected over the traditional Design-Bid-Build approach because it enables collaboration among the City, design team, and contractor during the design phase, resulting in cost savings through value engineering, accelerated project schedules, and a Guaranteed Maximum Price (GMP) to control costs. The City will negotiate Phase I pre-construction CM/GC design assistance with the top-ranked firm and execute a GMP Amendment for Phase II construction with a fixed fee based on a percentage of direct costs. The RFP requires the CM/GC to competitively solicit subcontractor bids through sealed bidding with public opening, actively engage COBID-certified suppliers, obtain at least three bids for most work portions, and adhere to prevailing wage rates and Oregon public works contract standards. The Disadvantaged Business Enterprise Program has identified the CM/GC process as an excellent opportunity to increase utilization of COBID-certified businesses. The approval was granted by Neil Obringer, Assistant Finance Director, on December 9, 2024, based on findings that the CM/GC method will not encourage favoritism or substantially diminish competition while providing substantial cost savings compared to traditional procurement methods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 1 (Technical Specifications)~5.doc | DOC document | |
| 00012331 Intent To Award.xlsx | XLSX spreadsheet | |
| ESB.RFCQ.Services.docx | DOCX document | |
| ESB.RFCQ.Attachments.docx | DOCX document | |
| 00012331 Preliminary Results.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Eugene • 180 W 8th Avenue, Suite 200 • Eugene, OR 97401 • 541-682-5291 • www.eugene-or.gov
Memorandum
Date: December 9, 2024
To: Neil Obringer, Assistant Finance Director
From: Rachael Love, Civil Engineer 2
Subject: Approval to utilize CM/GC solicitation method for Franklin Boulevard: A Partnership to Rebuild and Revive a Corridor Project
Background:
The Public Works Department has been tasked with managing the design and construction of the Franklin Boulevard transformation project, which constitutes a public improvement project.
City of Eugene public contracting rule (Rule) requires contracts for public improvement projects with an estimated value over $100,000 be awarded through an Invitation to Bid to establish a qualified low bidder. This process facilitates a Design-Bid-Build approach to the public improvement construction in which the design is performed prior to and separate from solicitation of the construction contract (this is the typical method used). However, Rule permits the use of alternative contracting methods (137-049-0620), which allows the City to consider cost in addition to qualitative factors, when such a method is deemed in the best interest of the City and community by either reducing costs or expediting the project completion.
Attached are the Findings to support use of an alternative contracting method for the Franklin Boulevard: A Partnership to Rebuild and Revive a Corridor project. For this project, Public Works Engineering seeks to utilize the Construction Manager/General Contractor (CM/GC) contracting method, which allows the designer, City, and contractor to work collaboratively, thereby expediting the construction, limiting costs and achieving a higher quality outcome.
Process:
Rule requires that the Contract Review Board (City Council) or its delegated purchasing agent approve use of an alternative contracting method. The Purchasing Agent has been delegated the authority to approve these requests. This allows the delegated Purchasing Agent to approve use of an alternative contracting method, but because of the scope, budget, and public knowledge of this project, Public Works Engineering is engaging Finance in this process and seeking approval for use of the alternative contracting method.
If these draft findings are approved, Public Works Engineering will post a public notice and, if requested, allow comment on the use of an alternative contracting method prior to final adoption of findings.
RL
RL
KM
KM
JW
https://cityofeugene.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAz6XwdvybsDUGZtecS8MCd95K5jNcRmxR https://cityofeugene.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAz6XwdvybsDUGZtecS8MCd95K5jNcRmxR https://cityofeugene.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAz6XwdvybsDUGZtecS8MCd95K5jNcRmxR
REQUEST FOR USE OF
CM/GC PROCUREMENT PROCESS
FOR PUBLIC IMPROVEMENT
Findings of Fact Prepared by Rachael Love, Civil Engineer 2/Project Manager (Public Works Engineering)
ORS 279C.335 (1) requires, with certain exceptions, that all public improvement contracts be based on competitive bidding and, under ORS 279C.375, awarded to the lowest responsible bidder. The construction cost for the Franklin Boulevard: A Partnership to Rebuild and Revive a Corridor Project will exceed $100,000, which would ordinarily require an Invitation to Bid procurement process. However, ORS279C.335(2), (City Rule 137-049-0620) permits the use of alternative contracting methods, which allows the City to consider cost in addition to qualitative factors, when such a method is deemed in the best interest of the City and community by either reducing costs or expediting the project completion.
Rule requires that the Contract Review Board (City Council) or its delegated purchasing agent approve use of an alternative contracting method.
Therefore, pursuant to the City’s Administrative Order No. 44-23-01-F, section 137-049-0620, approval is requested to proceed with a Construction Manager/General Contractor (CM/GC) procurement process for the Franklin Boulevard: A Partnership to Rebuild and Revive a Corridor Project through a qualifications-based, competitive selection process subject to the following conditions:
Evaluation criteria to be applied in selecting the CM/GC firm are stated clearly in the solicitation document. Under the proposed CM/GC procurement process, the contractor would be selected utilizing a publicly advertised Request for Proposals (RFP). Criteria used to identify the CM/GC firm that best meets the public contracting needs may include but are not limited to cost, quality, experience relevant to the improvement to be constructed, and time required to commence and complete the improvement.
The Disadvantaged Business Enterprise Program has identified the use of the CM/GC process for the Franklin Blvd Project as an excellent opportunity to potentially increase the City of Eugene’s utilization of COBID-certified businesses by requiring the General Contractor to outline their approach to engaging COBID-certified businesses as they build their project team.
Public Works Engineering of the City of Eugene finds as follows:
Project Background. The purpose of the overall project is to transform a deteriorating state highway into an urban complete street, changing Franklin Boulevard from an automobile centric arterial to a multimodal urban street that prioritizes individuals walking, cycling, and riding Bus Rapid Transit (BRT).
Franklin Boulevard: (1) is designated as a principal arterial street that connects downtown Eugene to the University of Oregon and Springfield, (2) provides access to multiple businesses and other land uses, and is along the EmX route, (3) has a deficient bicycle and pedestrian network when considering anticipated changes to adjacent and planned land uses, and (4) has current design and operating conditions that are incompatible with adopted land use development plans.
The project corridor is the central spine of Lane Transit District (LTD) Emx BRT System. EmX vehicles support over 4,000 boardings per weekday on the Project corridor, which is the highest ridership within the region’s transit network. Bottlenecks occur where EmX buses are forced to share one bidirectional bus lane, negatively impacting transit service and limiting LTD’s ability to increase service frequencies. The Project will result in one dedicated BRT lane in each direction and will incorporate design treatments optimizing for passenger and vehicle safety and BRT vehicle speed and travel time reliability to allow for improved service frequencies once constructed.
Franklin Blvd Project Description. A RAISE Grant (USDOT) was awarded to the City of Eugene to redesign Franklin Boulevard as a complete street. Phase 1 of the project will include the conversion of two signalized intersections to multilane roundabouts, the reduction of the roadway from six to four lanes, the reallocation of space for bicycle and pedestrian facilities and improved safety at traffic lane crossings, the addition of a second bus rapid transit lane, and conduits to accommodate future fiber optic cable.
The project will bring sidewalks up to accessibility compliance, provide more and better connections to activities, and add new sensory elements to help people with visual impairments. These safety investments will vastly improve access for aging populations and people with physical and mental disabilities, allowing improved walking, biking, and rolling access for all.
Input from both the design team and the construction team during the project will be paramount to delivering a complete street transformation that is completed on schedule, addresses changes to project scope required by available grant funding and meets the expectations of the public. To facilitate attaining these goals, it will be advantageous to have the general contractor on board near the beginning of the project to assist the design team.
The City project team believes this would be best accomplished with a CM/GC form of procurement for this construction project. The team believes that the CM/GC procurement process will allow the City to better meet the budget and scheduling requirements of this project without encouraging favoritism in the awarding of this contract or substantially dimi-nishing competition.
1. Project Requirements. This relatively complex project is comprised of constructing two new multi-lane roundabouts and includes sub-projects for wastewater replacement and EWEB water main design, and will be utilizing multiple funding sources in addition to the federal grant funding.
In the interest of meeting budget expectations, collaboration with the City, the Design Team, and the Owner’s Representative will be crucial to ensure the project team maximizes cost efficiencies throughout the design process, while helping to ensure the final product meets expectations.
The CM/GC provides immediate and on-going input to the design team resulting in accelerated design and construction schedules, improved management of the construction budget, and potentially lower costs.
2. The CM/GC Approach. A typical design/bid/build project has six phases: (1) program-ming; (2) schematic design; (3) design development; (4) construction documents (5) bidding; and (6) construction. Under the proposed method, the CM/GC will be selected prior to completion of phase 2, schematic design, and provide ongoing feedback to the design team on the constructability and cost of their proposed design strategies. Under the design/bid/build approach, the contractor is not selected until the conclusion of phase 5, bidding, potentially adding months to the project schedule as the feedback provided comes after design and construction documents are complete.
3. The CM/GC establishes several variables critical to the project remaining within budget and assuring a fast-track project completion. These include: (i) a Guaranteed Maximum Price (GMP) to complete the project; (ii) committing to a schedule and establishing the sequence of work based on critical path method (CPM) analysis; (iii) commitment by the CM/GC to implement the final project design within the GMP; and (iv) full coordination by the CM/GC of the project design and construction team. This approach ensures that the subcontractor bids can be solicited in a timely manner that should result in best pricing. In the traditional design/bid/build process, the final budget and schedule cannot be established with certainty until after bidding.
4. The CM/GC approach allows value engineering to take place when it is most effective– during design rather than after bidding. Value engineering is a means to determine the best project design that meets the needs and priorities of the owner within the established budget. Value engineering is done most effectively by a team consisting of the owner, architect, consultants, and contractors such as exists with the CM/GC approach. When the contractor participates in evaluating design decisions, the design team receives immediate feedback on issues of constructability, cost, quality, and scheduling of the project. The CM/GC can then commit to implementation of the project design within the prescribed schedule and budget. In the traditional design/bid/build process, value engineering with the contractor does not occur until after bidding, if at all.
5. The CM/GC approach is likely to reduce the number of construction change orders.
Having the CM/GC involved during the design process leads to a better understanding by the contractor of the owner’s needs and the architect’s design intent. The design team can also benefit from more effective value engineering when the contractor is involved during the design process. The CM/GC also assumes responsibility for implementation of the project design on time and within budget. Frequent and diligent progress reviews by the CM/GC throughout the design phase results in fewer design corrections and change orders during construction, which reduces budget risks.
6. The CM/GC selection process will encourage competition. To ensure full public disclosure of all information, the City’s Request for Proposals (RFP) solicitation package will include project goals and objectives, a detailed project description, contract terms and conditions, selection process, evaluation criteria, role of evaluation committee, provisions for comments, and complaint process and remedies available. The Purchasing Office proposes to select a CM/GC using objective criteria under the following competitive process:
A. Advertisements, pursuant to ORS 279C.360 (1), will be placed in the Daily Journal of
Commerce and posted on OregonBuys.
B. A pre-proposal vendor conference will be held, open to all interested parties. During the pre-proposal conference - and up to ten (10) days before the proposal due date -interested parties will be able to ask questions, request clarifications, and suggest changes in the solicitation documents if such parties believe that the terms and conditions of the solicitation are unclear, inconsistent with industry standards, or unfair and unnecessarily restrictive of competition.
C. Sealed proposals will be submitted by the date and time specified in the RFP.
D. An evaluation process will determine whether a proposal meets the minimum require-ments of the RFP, and to what extent, as set forth in the RFP. These requirements include, but are not limited to, the contractor’s experience and qualifications, experience with value engineering, and the ability to meet bonding requirements specified in the RFP.
E. The evaluation committee will use clear, objective criteria to evaluate and score the candidates. The evaluation committee may interview the top rated, qualified candidate(s). The City will then proceed to negotiate and enter into a contract with the top ranked firm and authorize the Phase I portion of the contract for pre-construction CM/GC design assistance. Once an acceptable GMP can be agreed upon, the City will execute a GMP Amendment for the Phase II portion of the work, construction, which will include a fixed fee based on a percentage of direct costs.
7. The RFP document sets forth clearly the contractual requirements of the CM/GC for soliciting, receiving, and awarding sub-bids. These include, but are not limited to:
A. Advertisements will be placed in the Daily Journal of Commerce and on OregonBuys.
B. Proactive contractor engagement with COBID-certified suppliers eligible to complete sub-contracted portions of the work.
C. Competition will be strongly encouraged with attempts to obtain at least three (3) bids for most portions of the work.
D. Sealed bids will be required and opened publicly at the time specified in the bid advertisements.
E. The CM/GC may self-perform the work of the “General Conditions” and other minor
“pick-up” work but is prohibited from performing portions of the trade work without bidding against other qualified sub-bidders.
F. Adherence to prevailing wage rates and all other standard conditions of Oregon public works contracts.
8. This request complies with the criteria outlined in 279C.335 (2):
A. It is unlikely the exemption will encourage favoritism in the awarding of public improve-ment contracts or substantially diminish competition for public improvement contracts.
The process used will not involve favoritism nor diminish competition. The selection process for the CM/GC will be done in a competitive, qualifications-based manner.
Evaluation committee members will evaluate proposals based on clear, objective criteria outlined in the RFP. Public notices will be published, and notices sent to firms that have expressed interest. Market conditions indicate there are sufficient entities with CM/GC experience to have a competitive RFP process. Further, the project will be competitively bid at the subcontractor level.
B. The awarding of public improvement contracts under the exemption will result in sub-stantial cost savings to the contracting agency. The CM/GC process will result in sub-stantial cost savings to the City of Eugene by requiring the City, the designer, and the contractor to work together as a team to maximize design and cost efficiencies. The proposed CM/GC method has the element of a guaranteed maximum price (GMP) ensuring that project funding requirements will be met. The CM/GC process maximizes value engineering by promoting collaboration between the owner, the designer, and contractor during design, sub-bidding, and construction. Utilizing the traditional design/bid/ build process would be more costly and require significantly more time to complete the project.
Based on the Findings of Fact presented to me, I approve utilization of the alternative contracting method proposed.
Neil Obringer, Assistant Finance Director Date
12/09/2024 https://cityofeugene.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAz6XwdvybsDUGZtecS8MCd95K5jNcRmxR
| 2024-12-09T15:27:21-0800 | |
| Agreement certified by Adobe Acrobat Sign |