About this file
This document is a construction drawing for a Portland General Electric (PGE) project located in Gresham, Oregon. The project involves installing an underground electrical circuit, 13 aluminum poles, and LED lights to be connected at 240V. The customer is responsible for providing trenching, backfilling, conduit, elbows, junction boxes, vaults, and pads. PGE will determine the size and number of conduits required and will provide a standby crew to open all energized PGE vaults, junction boxes, and equipment/facilities. The project is located at 10811 SE 172nd Ave in Happy Valley, within the Clackamas School District.
The document outlines detailed construction requirements, including specifications for duct, clearances, transformer pad installations, and ground rod installations. It also includes a vicinity map and a notice regarding the required right-of-way permit from the local jurisdiction. This project appears to be part of a larger state and local contract opportunity for the extension of SE 162nd Avenue and related infrastructure improvements in the area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PGE CONSTRUCTION DRAWING
This document accurately represents FIELD Construction.
Foreman: Date:
AS-BUILT VERIFICATION & NESC VIOLATIONS CORRECTED
DATE: SCALE: ACCOUNT: AWO: JOB NO:
TITLE:
CIRCUIT:
LOCATION:
DESCRIPTION:
COUNTY:
DESIGN BY:
SECTION (S):
DRAWN BY:
WORK WITH: SHEET:
SIZE:
PHONE:
© PORTLAND GENERAL ELECTRIC CO. - ALL RIGHTS RESERVED
(503)
OF
GRESHAM
LINE CREW CENTER
1705 NE BURNSIDE ST
GRESHAM, OR 97030
672-5417RICO SOLIS LUIS BLANCO
D1331BCLACKAMAS
Install UG circuit, 13 Aluminum poles and LED lights, connect at 240V
10811 SE 172nd Ave, HAPPY VALLEY
PLEASANT VALLEY-SUN 17X22
N Clack School Dist/Clack Co Service Dist. # 5/Scouters Mt Elem CUP-01/Job 11-23
M333587110000091061070001NTS10/06/2023
CONST. PROJECT MGR: PHONE:
Date:General Foreman:
(Signature only required for field construction changes.)
CONSTRUCTION NOTES: SLCST
1. CUSTOMER TO PROVIDE ALL TRENCHING, BACKFILLING, CONDUIT, ELBOWS, JUNCTION
BOXES, VAULTS AND PADS. JOINT USE TRENCH WITH GAS, TRENCH TO BE 48 INCHES DEEP
AND 30 INCHES WIDE, MEASURED FROM FINAL GRADE. ALL PGE CONDUCTORS TO BE
INSTALLED IN GRAY, SCHEDULE 40, ELECTRICAL GRADE, PVC CONDUIT WITH NYLON PULL
STRINGS (MIN. 500 LBS. TEST). PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS
REQUIRED. MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE
BETWEEN GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH & SMALLER TO BE 36 INCH
RADIUS. RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS
OF 151 FEET OR LONGER, OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES IN
BENDS. PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS THE
MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES. ALL BENDS MUST BE
FACTORY MADE. REFER TO LETTER OF RESPONSIBILITY FOR FURTHER DETAILS.
2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS, JUNCTION
BOXES, AND EQUIPMENT/FACILITIES, INCLUDING CONNECTION OR INSTALLATION OF
CONDUITS AND PULL STRINGS. CALL SERVICE COORDINATION AT 503-323-6700 TO SCHEDULE
A PGE STANDBY CREW.
3. ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE FLUSH TO CURB /
SIDEWALK.
4. CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND FROM
PROPERTY LINE TO PROPERTY LINE. CROSSINGS TO BE 48 INCHES DEEP, MEASURED FROM
FINAL GRADE.
5. DIRECTIONAL BORING REQUIREMENTS: BLACK HDPE (HIGH DENSITY POLYETHYLENE) DUCT
OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION (CERTA-LOK OR LIKE MECHANICAL
CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT. HDPE SHALL MEET THE
REQUIREMENTS OF PGE SPECIFICATION L22501 (AVAILABLE ON REQUEST FROM PGE
PROJECT MANAGER). FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE
EQUALLY SPACE EXTRUDED RED STRIPES (WHICH IS A SPECIFICATION REQUIREMENT).
MANDREL TEST OF HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR
PRESENT.
6. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE FINAL GRADE.
CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL AND TO EXTEND 1 INCH
ABOVE THE PAD.
7. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET (MIN) FROM ANY COMBUSTIBLE
BUILDING, WALL OR OVERHANG AND 4 FEET (MIN) FROM ANY FIRE HYDRANT. PGE
TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. ALWAYS MAINTAIN 10
FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
8. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED TO
VEHICLES. REFER TO ELECTRICAL SERVICE REQUIREMENTS (ESR) SECTION 5.6.8.
9. AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT (P.U.E.) TO BE 8 FEET (MIN), 10 FEET
(PREFERRED).
10. CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER
TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE
WILL BE EXCAVATOR, PGE, TELCO, CATV, AND GAS.
11. CUSTOMER TRENCH AND ELBOW CONFIGURATIONS, ALL CONDUIT, VAULT AND PAD
INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING. WHEN YOU ARE
READY FOR PGE TO INSPECT (AFTER INSTALLATION IS COMPLETE) CALL 503-736-5450 OR
503-463-4348 (SALEM AREA). ALLOW UP TO 2 WORKING DAY FOR INSPECTION TO OCCUR.
12. REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC
REQUIREMENTS.
13. DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT. NON-STANDARD UNDER-
GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER.
VICINITY MAP
RIGHT-OF-WAY PERMIT NOTICE:
A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY
WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED
CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL
AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT.
THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS
BEFORE WORK IS TO BEGIN. A COPY OF THE PERMIT MUST BE ON SITE.
YOUR PROJECT REQUIRES A PRECONSTRUCTION MEETING. CONTACT YOUR SERVICE & DESIGN
PROJECT MANAGER 7 TO 10 WORKING DAYS PRIOR TO EXCAVATION TO COORDINATE THE
PRE-CON. PGE'S FIELD CONSTRUCTION COORDINATOR (FCC) WILL PROVIDE YOUR TRENCH
AND CONDUIT INSPECTIONS.
PRE-CONSTRUCTION MEETING / TRENCH AND CONDUIT INSPECTION
ANY DEVIATION FROM THIS DESIGN MUST
BE APPROVED BY PGE PROJECT MANAGER
Know what's below.
Call before youdig.
CALL 811 BEFORE YOU DIGATTENTION:
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
BY THE OREGON UTILITY NOTIFICATION CENTER.
THOSE RULES ARE SET FORTH IN OAR 952-001-0001
THROUGH 952-001-0100. YOU MAY OBTAIN COPIES OF
THE RULES BY CALLING THE OREGON UTILITY
NOTIFICATION CENTER ADMINISTRATION @ (503-232-1987)
TO REQUEST UTILITY LOCATES CALL THE OREGON
UTILITY NOTIFICATION CENTER, 811 AT LEAST
2 BUSINESS DAYS PRIOR TO EXCAVATION.
CONTACT SERVICE COORDINATOR
FOR TRENCH AND CONDUIT INSPECTION PRIOR
TO BACKFILL. PGE WILL NOT INSTALL WIRE
UNTIL TRENCH IS 100% BACKFILLED.
SERVICE COORDINATOR
503-323-6700 OR 800-542-8818
THINK
SAFETY
FIRST!
PGE FACILITIES NOT DRAWN TO SCALE
THIS DRAWING IS A GRAPHICAL REPRESENTATION OF PORTLAND GENERAL
ELECTRIC FACILITIES IN THE FIELD. THIS MAP ILLUSTRATES ELECTRICAL
CONNECTIVITY, TYPES AND NUMBERS OF CONDUCTORS AND PLACEMENT OF
EQUIPMENT WITHIN THE DISTRIBUTION SYSTEM. IT IS RECOMMENDED THAT
THE USER NOT RELY ON THIS DIAGRAM FOR GEOGRAPHICAL LOCATIONS
JUNCTION BOX INSTALLATIONS
FOR STREET LIGHTING
CONTACT PGE FOR APPROVED MANUFACTURERS
8' GROUND ROD
INSTALLED BY
CUSTOMER
1" PVC SCH 40 ELECTRICAL GRADE
TO OPTIONAL ST LT POLE
2" OR 3" PVC SCH 40
ELECTRICAL GRADE
(DETERMINED BY PGE)
SCH 40 GREY PVC FACTORY BENDS
(STEEL OR PGE APPROVED FIBERGLASS
FOR RUNS OVER 150', OR 180 DEGREES
OR MORE IN BENDS)
*36'' RADIUS 90 BEND
3"
2"54
1"
STREET SIDE
TOP VIEW
1" CONDUIT TO
STREET LIGHT POLE
2" OR 3"
CONDUIT
2" OR 3"
CONDUIT
GROUND
ROD
INSTALL GROUND ROD AND
CONDUIT ON THE SOURCE SIDE
13''x24''x18'' DEEP OR 17"x30"x18" DEEP
PGE APPROVED
JUNCTION BOX
DETERMINED BY PGE
FINAL GRADE IF SOFT SURFACE
FINAL GRADE IF HARD SURFACE (FLUSH)
JUNCTION BOXES CANNOT BE COVERED BY LANDSCAPE MATERIALS.
IF PGE LOCATES A HIDDEN JUNCTION BOX WITHIN 6 MONTHS OF
PGE TAKING OWNERSHIP, PGE WILL BILL THE DEVELOPER FOR THE
COST TO LOCATE AND MAKE ANY ADDITIONAL REPAIRS TO BRING THE
JUNCTION BOX TO GRADE.
INSTALL 30A FUSES IN SECONDARY PEDESTALS OR SECONDARY
VAULTS (WHICHEVER IS ST LT POINT OF ATTACHMENT) FOR EACH
STREET LIGHT PER T&D CONSTRUCTION STANDARD LC11550
NEW PGE FACILITIES TO BE INSTALLED
(UNLESS OTHERWISE SPECIFIED)
LIGHTING LEGEND
REMOVE FACILITIES INSTALL FACILITIES
INSTALL ADDITIONAL FACILITIES/MODIFY FACILITIES
INSTALL 1-#10 CU-TX ST LT CIRCUIT IN 1" SCH40 PVC CONDUIT
PROVIDED & INSTALLED BY CUSTOMER
INSTALL 1-1/0 AL-TX ST LT CIRCUIT IN 2" SCH40 PVC CONDUIT
PROVIDED & INSTALLED BY CUSTOMER
CUSTOMER INSTALLED 1324 STREETLIGHT JUNCTION BOX
PGE TO PROVIDE GROUND ROD, CUSTOMER TO INSTALL
CUSTOMER INSTALLED 1730 SECONDARY VAULT
PGE TO PROVIDE GROUND ROD, CUSTOMER TO INSTALL
INSTALL 88W LED LEOTEK GREEN COBRA GRAY LIGHT
ON NEW SLO 30' ALUMINUM DAVIT POLE
USE NEW 6' MAST ARM
ON 5CL-LB-PGE CONCRETE BASE
SET 2' FP-FC
CONNECT 240VOPT A
UTILITY VAULT 20R-LB-4-PGE (870 lb)
PRECAST CONCRETE FOOTING
1.
Notes:
Tamped 3/4-inch minus crushed rock backfill is required around all poles and footings regardless of soil CONDITION to maintain proper pole alignment.
3. Maximum working moment for this footing is 4,255 lb-ft.
4. WHEN INSTALLING ALUMINIUM POLES, ONE 8'-5/8" GALVANIZED
GROUND ROD WITH #6 SOLID CU WIRE MUST BE INSTALLED
AT LEAST 2" BELOW FINAL GRADE IN UNDISTURBED SOIL.
PER NESC 21 5C
Anchor Bolt Size and Spacing as Required Customer to Supply (4 Places in Top)
2.
Bolt Circle = 11" Dia.
3-1/2" Bolt Projection 1"-8NC x 36" NC Galv Steel
20" DIA
11"
3-1/2"
48"
See Note 1
Crushed Rock
2-3/8" Dia conduit chase
(4 places)
Finish Grade
See Note 2
3/4"-Minus
FIELD SIDE
FINAL GRADE
STREET SIDE
18" COILED AT TOP OF
FOOTING FOR PGE
(NOTE#4)
CONCRETE
FOOTING
GROUND
CLAMP
8' GALVANIZED
5/8" GROUND ROD
#6 AWG BSD CU
GROUND
CONDUCTOR
1" SCHED 40
CONDUIT
W/36" SWEEP
STREET SIDE
FIELD SIDE
STREET LIGHT FOOTING
GROUND ROD LOCATION
TOP
VIEW
NOTES: (PGE TO PROVIDE GROUND ROD &
COPPER WIRE, CUSTOMER TO INSTALL)
1. THE GROUND ROD & #6 AWG BSD CU MUST BE
INSTALLED DURING STREET LIGHT FOOTING
INSTALLATION.
2. THE GROUND ROD MUST BE INSTALLED IN
UNDISTRURBED SOIL AT LEAST 2" BELOW
FINAL GRADE, PER NESC 215C APPROVED BY PGE.
3. CUSTOMER TO COIL 3" OF COPPER WIRE
AROUND TOP OF GROUND ROD. PGE WILL MAKE
FINAL CONNECTIONS.
4. BONDING IS ACCOMPLISHED BY CONNECTING
THE NEUTRAL CONDUCTOR (GREEN CONDUCTOR)
TO THE GROUNDING CONDUCTOR NEAR THE
POLE GROUNDING TAB.
MIN
6"
4"
GROUND ROD INSTALLATION
FOR METAL STREET LIGHT POLES
OPT. A
NOTE:
PGE TO PROVIDE CONCRETE BASES & GROUND RODS FOR
CUSTOMER TO INSTALL AT THE SAME TIME AS THE CONDUIT.
INSTALL 40W LED AURORA PENDAND LIGHT
ON NEW SLO 23' ALUMINUM DECORATIVE BLACK POLE
USE NEW 4' MAST ARM
ON 20R-LB-PGE CONCRETE BASE
SET 2' FP-FC
CONNECT 240VOPT A
LAMP POLE FOOTING
No. 5CL-LB (750 lb)
5'-0"
See Note 1
Crushed Rock
1'-2" 1'-2"
See Note 2 11"
3/4"-Minus
3-1/2"
Finish Grade
3. WHEN INSTALLING ALUMINIUM POLES, ONE 8'-5/8" GALVANIZED
GROUND ROD WITH #6 SOLID CU WIRE MUST BE INSTALLED
AT LEAST 2" BELOW FINAL GRADE IN UNDISTURBED SOIL.
PER NESC 21 5C
1. Tamped 3/4-inch minus crushed rock backfill is REQUIRED around all poles and footings regardless OF SOIL CONDITION to maintain proper pole alignment.
Anchor Bolt Size and Spacing as Required Customer to Supply (4 Places in Top)
2.
Bolt Circle = 11" Dia.
3-1/2" Bolt Projection 1"-8NC x 36" NC Galv Steel
Notes:
E10376 Snapshot
E10376 PolyLine
E10376 Image
E10376 Rectangle
E10376 Text Box
JOB SITE
E10376 Text Box 23'-Unknown None
E10376 Rectangle
E10376 Rectangle
E10376 Text Box 23'-Unknown None
E10376 Snapshot
E10376 Rectangle
E10376 Snapshot
E10376 Text Box 23'-Unknown None
E10376 Rectangle
E10376 Text Box 23'-Unknown None
E10376 Snapshot
E10376 Text Box 23'-Unknown None
E10376 Text Box 23'-Unknown None
E10376 Text Box
VT-756
E10376 Text Box
VT-755
E10376 Text Box 30'-Unknown None
E10376 Text Box
VT-754
E10376 Text Box
VT-753
E10376 Text Box 30'-Unknown None
E10376 Text Box
VT-752
E10376 Text Box 30'-Unknown None
E10376 Text Box
VT-751
E10376 Text Box 30'-Unknown None
E10376 Text Box
VT-750
E10376 Text Box 30'-Unknown None
E10376 Text Box
VT-757
E10376 Rectangle
E10376 Text Box
VT-758
E10376 Rectangle
E10376 Text Box
VT-759
E10376 Rectangle
E10376 Text Box
VT-760
E10376 Rectangle
E10376 Rectangle
E10376 Text Box 23'-Unknown None
E10376 Snapshot
E10376 Text Box
VT-749
E10376 Text Box 30'-Unknown None
E10376 Text Box 165'
E10376 PolyLine
E10376 Rectangle
E10376 Text Box
POWER SOURCE
E10376 Text Box 155'
E10376 Text Box 60'
E10376 Text Box 110'
E10376 Text Box 120'
E10376 Text Box 115'
E10376 Text Box 150'
E10376 Text Box 115'
E10376 Text Box 100'
E10376 Text Box 35'
E10376 Text Box 220'
E10376 Text Box 150'
E10376 Text Box 120'
E10376 Snapshot
E10376 Snapshot
E10376 Text Box
INSTALL 6 WAY BUS
E10376 Arrow
E10376 Arrow
E10376 Rectangle
E10376 Text Box CUSTOMER TO CALL PGE SERVICE DESK AT 503-323-6700 TO SCHEDULE A STANDBY CREW WHILE PLUMBING INTO PD-16
E10376 Arrow
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .