This document is an Addendum to the Invitation to Bid (ITB-24-106) for the SE 162nd Ave Extension Project issued by the North Clackamas School District. The project involves the construction of a new roadway at SE 162nd Avenue and a new driveway at Scouters Mountain Elementary School, including site work, utilities, lighting, signage, and landscaping. The addendum provides clarification on the scope of work for the street lighting, confirms the availability of native topsoil, and provides a virtual link for the bid opening. It also confirms that the appropriate General Conditions are provided as an exhibit to the solicitation documents.

The solicitation does not include an engineer's cost estimate. The contractor will be responsible for trenching, J-boxes, conduit, and other related infrastructure, while the local utility, Pacific Gas & Electric (PGE), will install the poles, lights, and make the final connections. Soil testing will be required to assess the suitability of the native topsoil for the planting areas, and strippings are not allowed in the pond areas where specialized water quality media is required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Clackamas School District SE 162nd Ave Extension Project

ITB-24-106

Addendum 1 22 February 2024

THE FOLLOWING CHANGES, ADDITIONS, AND DELETIONS TO THE SOLICITATION DOCUMENTS POSTED TO

OREGONBUYS ON 7 FEBRUARY 2024 HEREBY BECOME A PART OF THE CONTRACT DOCUMENTS.

NOTIFY ALL SUBCONTRACTORS AFFECTED BY THIS ADDENDUM 1.

Questions and Answers:

1. Who is responsible for installing the street lights? Would the contractor for the SE 162nd Ave Project be responsible for trenching, J-Box’s and conduit only?

a. Contractor is responsible for:

i. Raceways/conduit

ii. Carson boxes

iii. Concrete footings (PGE will provide at Oldcastle for contractor to pick up)

iv. Pull string

v. Calling for Inspections

b. PGE will install:

i. Poles

ii. Lights

iii. Photocells

iv. Wire

v. Connections in the Carson boxes

vi. And energizing all the lights

2. Is there an engineer’s cost estimate available?

a. No.

3. Would the native strippings be suitable for the topsoil in the planters or the pond or would we need to import topsoil?

a. Native stockpiled topsoil is acceptable for planting as long as it meets the specifications for PH and organic matter content. Soil testing will be needed to assess. Strippings are not allowed in the pond areas where water quality media is required.

4. Is there a link for the virtual Bid Opening for the ITB-24-106 (SE 162nd Ave Extension Project?

a. Video call link: https://meet.google.com/fop-pqag-quz Or dial: (US) +1 904-323-4842

PIN: 309 259 754#

https://meet.google.com/fop-pqag-quz

North Clackamas School District SE 162nd Ave Extension Project

ITB-24-106

Addendum 1 22 February 2024

5. Clarification on Duplicate General Conditions?

a. Disregard General Conditions in Project Manual / Bid Specs. Appropriate General

Conditions is Exhibit A to the solicitation documents titled NCSD – 2018 Design-Bid-Build General Conditions – 162nd Ave Extension_Exhibit A

Attachments to this Addendum:

1. PGE SRL Opt A&B Revised 01-04-2021

2. Final Job Sketch – M3335871

END OF ADDENDUM