This document is a USDA Agricultural Marketing Service (AMS) Supplement for Egg Products Distributed for Federal Food and Nutrition Assistance Programs, effective October 2026 and revised September 28, 2026. The supplement provides program certification requirements for egg products purchased by the Department of Agriculture, including Hard Boiled Eggs, Whole Eggs, All Purpose Egg Mix, and Egg Patty (product codes 100, 110, and 120). Actual purchases are described in the AMS Master Invitation for Bid – Domestic Programs (MIFB-D). Effective January 2027, USDA AMS will transition all contract compliance from the grading-based monitoring and certification approach (Option A) to audit-based acceptance services (Option B) conducted by the AMS Quality Assessment Division (QAD). Contractors must request approval of AMS QAD audit-based acceptance services prior to bidding and maintain compliance throughout contract completion. All costs associated with AMS representative services, including audits, examinations, supervision, and official documentation, are the responsibility of the contractor.

The document establishes two compliance pathways: Option A requires continuous on-site AMS Grader supervision during production and processing with pre-production plant surveys and post-award monitoring; Option B requires submission of product samples and technical proposals during the pre-bid period (allowing 10 working days for evaluation), followed by pre-bid onsite capability assessment audits covering food defense, production compliance, and record review. Under Option B, contractors deemed eligible proceed to post-award assessment audits conducted at production commencement, with frequency not less than monthly for continuous or multiple contracts, or once per contract for intermittent contractors. Technical proposals must follow specified formats (Exhibits A-D) documenting quality control programs with procedures, records, forms, and photographs demonstrating conformance to Federal Purchase Program Specifications (FPPS) requirements. Contractors must include detailed production descriptions, quality assurance methods, corrective actions, and preventative measures using the Plan-Do-Check-Act framework. Product samples must be submitted frozen (0°F or lower) or refrigerated (34°F to 40°F), except for bulk liquid whole eggs which do not require samples. Technical proposals should be submitted to designated AMS email addresses in non-PDF format (Microsoft Word), with contact information for the authorized company representative included on the cover page.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved by: Jeffrey Hendricks

Date Issued: 01/18/2024 Date Revised: 09/28/2026

APPROVED

SUPPLEMENT FOR EGG

PRODUCTS DISTRIBUTED FOR

FEDERAL FOOD AND NUTRITION

ASSISTANCE PROGRAMS

Agricultural Marketing Service (AMS) Livestock and Poultry (LP) Program

Standards and Specification Division (SSD) Room 2624 S-Bldg., Phone: (202) 692-0086

Changes from previous requirements in blue

Effective: October 2026

Overview

This document provides additional program certification requirements for the following egg products purchased by the Department of Agriculture (USDA), including the applicable Federal Purchase Program Specification (FPPS) and all Exhibits:

• Hard Boiled

• Whole Eggs

• All Purpose Egg Mix

• Egg Patty

111 Actual purchases shall be described in the AMS Master Invitation for Bid – Domestic Programs (MIFB-D) – previously Master Solicitation for Commodity Procurements – Domestic Programs (MSCP-D); and Solicitations.

120 Effective January 2027, USDA AMS will transition all contract compliance methods to AMS Quality Assessment Division (QAD) audit-based acceptance services highlighted under AMS Contract Compliance Option B. Contractors currently using AMS Contract Compliance Option A: Grading-Based Monitoring and Certification will be transitioned to an audit-based acceptance service.

For contract compliance, the Contractor shall request the use of an AMS QAD audit-based acceptance service for assessing compliance of the finished product. AMS shall seek to honor the request of the Contractor but reserves the right to make a final determination.

121 The Contractor shall ensure AMS QAD audit-based acceptance service is approved and implemented prior to bidding and maintain requirements for compliance until completion of the contract.

130 The cost of services performed by AMS representatives shall be at the expense of the Contractor. This includes, but is not limited to, audits, examinations, supervision, official documentation, and related services.

https://www.ams.usda.gov/sites/default/files/media/FPPSHardCookedEgg.pdf https://www.ams.usda.gov/sites/default/files/media/FPPSWholeEggs.pdf https://www.ams.usda.gov/sites/default/files/media/FPPSAllPurposeEggMix.pdf https://www.ams.usda.gov/sites/default/files/media/FPPSEggPattyFINAL.pdf

Date Revised: 09/28/2026

140 Questions concerning charges and the availability of AMS agents can be directed to a USDA/AMS, LP Program’s Quality Assessment Division (QAD) field office or to USDA, AMS, LP, QAD Business Operations Branch, 10809 Executive Center Drive, Suite 318, Little Rock, AR 72211-6022; phone: 501-312-2962 or email: QAD.BusinessOps@usda.gov

200 AMS Contract Compliance Option A: Grading-Based Monitoring and Certification

210 QAD Grading-Based Monitoring and Certification

211 Monitoring of production, processing and product certification shall be conducted through the direct continuous supervision of an AMS Grader in accordance with the requirements listed in the FPPS and AMS/LP/QAD Policies and Procedures for certifying USDA commodity foods.

A technical proposal is not required to be submitted when the contractor is operating under Option A. All raw materials will be subjected to the certification process prior to being utilized in manufacturer’s finished products.

220 Pre-Production Onsite Plant Survey

221 QAD shall contact the contractor to set-up a pre-production plant survey, including review of food defense and production capability, and discuss production and certification requirements.

230 Post-Award Monitoring and Certification

231 The AMS Grader shall be present at all times during production and processing of the commodity.

232 The AMS Grader may select samples for laboratory analyses or inspect the commodity at any point in transit and after delivery to point of destination.

233 The contractor or AMS Grader shall perform checkloading examinations as described in the

FPPS at the time of shipment and issue an acceptance document to accompany each shipment.

234 The AMS Grader shall be responsible for certification of compliance with the requirements of the FPPS including, but not limited to, raw material, formulation, cooking, refrigeration or freezing, packaging and packing, metal detection, labeling and marking and net weight.

300 AMS Contract Compliance Option B: Audit-Based Acceptance Service

310 Audit-Based Acceptance

311 Verification of production and processing shall be conducted through routine plant visits and audits performed by QAD according to the Contractor’s and/or Subcontractor’s approved technical proposal (see section 360 – Technical Proposal Requirements) and the applicable FPPS. All raw material shall be under applicable USDA acceptance as outlined in the FPPS.

This includes, but is not limited to, regulatory requirements of USDA FSIS, FDA and AMS regulations.

311.1 Interested Contractors shall submit sample(s) and technical proposal (outlined in Sections 350 and 360) at any time during the pre-bid period. Contractors should allow 10 working days from USDA receipt of the product sample(s) and technical proposal for notification of evaluation results. A Contractor is deemed eligible upon notification of approval of the sample(s) and technical proposal by SSD. Submission of sample(s) and technical proposal is not binding on USDA.

311.2 Once a Contractor is notified by SSD that the technical proposal meets the applicable criteria, QAD shall contact the Contractor to set up a pre-bid onsite capability assessment audit.

320 Pre-Bid Onsite Capability Assessment Audit

321 QAD shall conduct an onsite capability assessment that shall consist of reviewing:

321.1 Food Defense Requirements – QAD shall conduct a food defense audit that shall include, but is not limited to, a thorough evaluation of the contractor’s and or subcontractor’s food defense plan. Documentation shall support the contractor’s and/or subcontractor’s food defense plan and meet requirements outlined in the MIFB-D for Commodity Procurements.

321.2 Production of the commodity that complies with the applicable FPPS and approved technical documentation,

321.3 records related to purchasing, receiving, production, quality control, inventory, shipping, and,

321.4 interviews with management and production personnel.

322 Upon completion, QAD shall provide SSD either with a verbal or email notification of the audit findings. SSD shall notify the vendor of their status based on the audit findings as well as QAD and the Commodity Procurement Program (CPP). The official final audit report shall be sent to the contractor once released from QAD.

323 After bid opening, CPP shall contact QAD and SSD to determine that Contractors have met all requirements to deem the bids responsive or non-responsive.

324 For bids that are determined to be non-responsive, CPP shall notify the Contractor(s) directly.

330 Post-Award Assessment Audit

331 Contractors who receive contracts shall have their required documentation readily available for review upon request by SSD, QAD, or other AMS agents. Records may be maintained in hard copy or electronically. However, records maintained electronically shall be made available immediately upon request.

332 QAD shall conduct an onsite audit of the Contractor’s and/or Subcontractor’s facility(s) and processes when production commences for the first contract awarded. Additional audits, and their frequency, shall be conducted as determined by QAD, but not less than once per month for contractors or subcontractors with continuous or multiple contracts, or once per contract for intermittent contractors. At the discretion of QAD, more frequent audits may be conducted when audit deficiencies are detected.

340 Post-Award Actions

341 Any deviation from contractual requirements shall be immediately reported by the Contractor to the CPP Contracting Officer and SSD. The CPP Contracting Officer or SSD shall notify the Contractor regarding eligibility to continue to participate as a Contractor.

342 Contractor shall assure that the delivered product complies with the provisions of the FPPS, the applicable assessment by AMS, and the Contractor’s technical proposal approved by

SSD.

343 In the instance that any non-conformance is cited by the AMS representative, or when a complaint is received by commodity recipient agencies, the Contractor shall submit a cause and effect analysis and corrective actions to address the non-conformance or complaint.

350 Product Sample

351 Potential Contractors shall submit samples that are produced in accordance with their submitted technical proposal.

351.1 Contractors with previously approved technical proposals and product samples are not required to resubmit. Any change to previously approved documentation and product sample (ingredient/formulation) shall be resubmitted for review and approval to SSD prior to bid.

352 Contractor shall submit one 5-pound sample (or two samples if a sample unit is less than 5-pounds) along with a legible product label which illustrates the ingredient statement, Nutrition Facts, safe handling instructions, and allergen declaration (if applicable). All samples shall arrive in the frozen (0°F or lower) or refrigerated (34°F to 40°F) state, as outlined in the

FPPS.

352.1 For bulk liquid whole eggs (100047), a product sample is not required.

360 Technical Proposal Requirements

361 The Contractor shall submit a Technical Proposal that meets the following requirements:

361.1 Include a detailed description of the egg products offered and each of the production steps that are taken to meet or exceed the minimum product requirements set forth in the FPPS.

(Plan/Do)

361.2 Describe all the quality assurance methods used to verify conformance to all requirements.

This shall include the monitoring and measurements taken during the process to verify conformance with each requirement. All measurement results shall be recorded and made available to AMS. (Check)

361.3 Identify all corrective actions to be taken if deviations from contractual and specification requirements occur during production, and all preventative actions to be taken to preclude a reoccurrence. (Act)

361.4 The technical proposal shall follow the format as shown in Exhibit A-D and should be brief and concise.

361.5 The technical proposal shall be preceded by the following, as required by the template:

361.5.1 Table of Contents listing the major areas as they appear in the technical proposal; and

361.5.2 List of attachments, forms provided with the technical proposal, if appropriate with the applicable document name and reference number.

362 SSD shall review technical documentation to determine if the proposal is adequate and shall notify the Contractor of the status of submission and eligibility to bid.

363 Instructions for Submission of Technical Proposal

363.1 The following procedures establish the acceptable minimum requirements for the format and content of the technical proposal:

363.1.1 The Government has provided a format which is to be used in preparing the technical documentation (see Exhibit A-D). The contractor shall submit the technical proposal as an email file attachment to AMS (TechnicalApprovals@usda.gov, Anjeanette.Johnson@usda.gov, Jeffrey.Hendricks@usda.gov and Jed.Warnock@usda.gov).

363.1.2 The technical proposal shall be saved in a non-portable document file format (not PDF; e.g., Microsoft Word). The technical proposal shall be submitted in its entirety. If the file size is too large to send in a single email, it may be divided and sent in multiple emails (i.e., Part 1, Part 2, Part 3, etc.). The collection of attachments and appendices shall be submitted as a separate document as well.

363.1.3 The technical proposal shall be submitted by an authorized agent of the company.

363.1.4 While it is not the desire of the Government to penalize an offeror for non-compliance with formatting instructions, technical evaluators may have difficulty evaluating the technical proposal to the fullest extent possible if the proposal is not presented in the proper format.

Technical evaluators shall not be required to search other subsections or sections of the offeror’s technical proposal for information requested in the evaluation.

364 Technical Proposal Revisions

364.1 Changes to a Contractor’s technical proposal may be submitted at any time or at the request of

SSD. All technical proposal revisions shall meet the following criteria:

364.2 Any changes to technical documentation made by the Contractor after its initial submittal mailto:TechnicalApprovals@usda.gov mailto:Anjeanette.Johnson@usda.gov mailto:Jeffrey.Hendricks@usda.gov mailto:Jed.Warnock@usda.gov shall be accomplished by submitting an entire technical proposal. A cover letter shall be submitted with the changes identified and an explanation of the need for the change. The Contractor shall include the revision date and the appropriate page number(s).

364.3 Changes to original technical proposal shall be highlighted and deletions in strikeout

EXHIBIT A

Technical Proposal Format for Hard Cooked Eggs

Cover Page:

Company Name Company Address Contact Person, including title, phone number, including emergency contact information, e-mail address (must be authorized to represent the company).

Technical Proposal for: Hard Cooked Eggs

Table of Contents (all pages and attachments shall be numbered and identified – all attachments shall be identified and referenced in the Technical Proposal).

The technical proposal should document a quality control program that includes procedures, records, forms, pictures, etc., which demonstrates conformance with the following checklist of requirements for all Sections and Subsections therein:

100 ITEM DESCRIPTION

200 APPLICABLE DOCUMENTS

300 CHECKLIST OF REQUIREMENTS

400 PROCESSING

500 MICROBIAL

600 HANDLING INSTRUCTIONS

700 PACKAGING AND PACKING

800 FINAL EXAMINATION OF PACKAGED AND PACKED COMMODITY

900 PALLETIZED UNIT LOADS

1000 SHIPMENT AND DELIVERY

1100 DESTINATION EXAMINATION

1200 PRODUCT ASSUARNCE AND COMPLAINT RESOLUTION

Attachments or Appendixes - Please attach all referenced documents with the applicable document name and reference number.

EXHIBIT B

Technical Proposal Format for Whole Eggs

Company Address Contact Person, including title, phone number, including emergency contact information, e-mail address (must be authorized to represent the company).

Technical Proposal for: Whole Eggs

Table of Contents (all pages and attachments shall be numbered and identified – all attachments shall be identified and referenced in the Technical Proposal).

The technical proposal should document a quality control program that includes procedures, records, forms, pictures, etc., which demonstrates conformance with the following checklist of requirements for all Sections and Subsections therein:

100 ITEM DESCRIPTION

200 APPLICABLE DOCUMENTS

300 CHECKLIST OF REQUIREMENTS

400 PROCESSING

500 PACKAGING AND PACKING

600 MICROBIOLOGICAL REQUIREMENTS – SAMPLING AND LABORATORY ANALYSIS

700 LABELING

800 FINAL EXAMINATION OF PACKAGED AND PACKED COMMODITY

900 PALLETIZED UNIT LOADS

1000 SHIPMENT AND DELIVERY

EXHIBIT C

Technical Proposal Format for All Purpose Egg Mix

Company Address Contact Person, including title, phone number, including emergency contact information, e-mail address (must be authorized to represent the company).

Technical Proposal for: All Purpose Egg Mix

Table of Contents (all pages and attachments shall be numbered and identified – all attachments shall be identified and referenced in the Technical Proposal).

The technical proposal should document a quality control program that includes procedures, records, forms, pictures, etc., which demonstrates conformance with the following checklist of requirements for all Sections and Subsections therein:

100 ITEM DESCRIPTION

200 APPLICABLE DOCUMENTS

300 CHECKLIST OF REQUIREMENTS

400 PROCESSING

500 PACKAGING AND PACKING

600 LABELING

700 FINAL EXAMINATION OF PACKAGED AND PACKED COMMODITY

800 UNITIZATION

900 SHIPMENT AND DELIVERY

1000 DESTINATION EXAMINATION

1100 PRODUCT ASSUARNCE AND COMPLAINT RESOLUTION

EXHIBIT D

Technical Proposal Format for Frozen, Fully cooked, Scrambled, Round Egg Patty

Cover Page:

Company Name Company Address Contact Person, including title, phone number, including emergency contact information, e-mail address (must be authorized to represent the company).

Technical Proposal for: Frozen, Fully cooked, Scrambled, Round Egg Patty

Table of Contents (all pages and attachments shall be numbered and identified – all attachments shall be identified and referenced in the Technical Proposal).

The technical proposal should document a quality control program that includes procedures, records, forms, pictures, etc., which demonstrates conformance with the following checklist of requirements for all Sections and Subsections therein:

100 ITEM DESCRIPTION

200 APPLICABLE DOCUMENTS

300 CHECKLIST OF REQUIREMENTS

400 PROCESSING

500 MICROBIAL

600 HEATING INSTRUCTIONS

700 PACKAGING AND PACKING

800 FINAL EXAMINATION OF PACKAGED AND PACKED COMMODITY

900 PALLETIZED UNIT LOADS

1000 SHIPMENT AND DELIVERY